Electrical testing safety Part 1: Preparing for absence of voltage testing

Similar documents
Electrical Measurement Safety. Sponsored By:

Key factors to maintaining arc flash safety

2015 NFPA 70E. SESHA 2015 ARIZONA MINI CONFERENCE December 10, 2015 Intel Corporation

+/- (3 PERCENT +2) AC VOLTAGE, +/- (2 PERCENT +2) DC VOLTAGE, +/- (5 PERCENT +3) RESISTANCE. User Manual, Test Lead Wrap, TP2 Test Probes

Fluke 170 Series True-rms Digital Multimeters

Clamp Meter ABCs. Application Note. The transformer action

NFPA-70E. Electrical Safety in the Workplace. Standard for Edition

Paul Dobrowsky Innovative Technology Services

374/375/376 Clamp Meter

Fluke T5 Electrical Testers. Fluke T and T5-600 Voltage, Continuity and Current Testers

Installation Tester and DMM Kits

374/375/376 Clamp Meter

Measure voltage without test leads. Product Highlights

Education & Training

The table below lists the symbols used on the Clamp and/or in this manual. Important Information. See manual.

Insulation Testing. Distributor Training Program

Fluke Digital Multimeters Solutions for every need

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

Arc Flash Analysis Training

Fluke 370 FC Series True-rms Wireless AC/DC Clamp Meters

Digital Voltage Detector 0-999kV Operating Instructions VD1000PTM

PRODUCTIVELY SAFER LOCK-OUT TAG-OUT PROCEDURE

Clamp Meter ABC s APPLICATION NOTE. The transformer action. Choosing your clamp meter

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More

1587/1577 Insulation Multimeters

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

80i-110s. AC/DC Current Probe Instructions. Introduction

MS8268 HANDHELD DIGITAL MULTIMETER OPERATOR S INSTRUCTION MANUAL

1507/1503. Insulation Testers. Technical Data. Features and benefits:

Meters and Test Equipment

Analog Voltage Detector 1-450kV Operating Instructions VDAO450TM. Patent No. 6,275,022

Fluke 1587 FC/1577 Insulation Multimeters

374 FC/375 FC/376 FC Clamp Meter

Analog Voltage Detector 0-40kV Operating Instructions VDA040CTM

PHASE ROTATION METER. Operating and Instruction Manual. a n d A C C E S S O R I E S

AT Advanced Wire Tracer. Users Manual

Electrical Multimeter

Instruction Manual for Digital Grounding Resistance Meter

So advanced, we had to create a new category

VIP ESI. Electrical Service Industry Voltage and Impedance Indicator. Instruction Manual & Specification

netzerotools.com 374/375/376 Users Manual Clamp Meter

DM-46 Instruction Manual

Measuring Reflected Voltage Spikes in VFD Motor Applications

80i-110s AC/DC CURRENT PROBE

Light Pole Safety Testing Mark Voigtsberger VP of Operations Power Quality Testing

323/324/325 Clamp Meter

312, 316, 318. Clamp Meter. Users Manual

The future of installation testing is here. The Fluke 1650 Series Multifunction Testers

A DUMMIES GUIDE TO GROUND FAULT PROTECTION

Electrical Safety Policy Health and Safety FCX-HS03 Release 07/2018 Version 1

USER'S MANUAL ACDC-100 TRMS ACDC-100. Versatile AC/DC Clamp-on Multimeter Series

374/375/376 Clamp Meter

Safety Warnings Features Specifications Instrument Layout Operation Preparation AC Current Measurement How to Use Peak Hold Function How to Use The

Arc Flash Mitigation An Overview. Gus Nasrallah, P.E. Electroswitch May 30, 2013

INSTRUCTION MANUAL UTL260

Arc Flash Analysis and Documentation SOP

Digital Clamp Meter Model: &

First Draft Language

Electrical Arc Hazards

DIGITAL MULTIMETER CONTENTS DIGITAL MULTIMETER CONTENTS

STANDARDIZING ARC FLASH PPE LABELS

374/375/376 Clamp Meter. Users Manual

INSTRUCTION MANUAL. March 11, 2003, Revision 3

12B/18 MultiMeter Instruction Sheet

79/26 Series III Multimeter

Making sense of electrical signals

Insulation resistance testing. A complete solution for every application

Fluke 1660 Series Multifunction Installation Testers

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

DIGITAL DUAL DISPLAY AC/DC CLAMP METER MODEL-860A OPERATION MANUAL

Measuring variable-speed motor drive output voltage with a Fluke ScopeMeter 190 Series

PEN TYPE DIGITAL MULTIMETER OPERATION MANUAL T8211D

MM V 10A ENGLISH. INSTRUCTION MANUAL Auto-Ranging DATA HOLD AUDIBLE CONTINUITY MIN / MAX TEMPERATURE DIODE TEST CAPACITANCE

LOCKOUT / TAGOUT PROGRAM

5790A Automated AC Measurement Standard

Installation Manual DOC R1 Date: 05/27/99. Plug-in Meter Installation Manual

Safety Warnings Features Specifications Instrument Layout Operation Preparation AC Current Measurement How to Use Peak Hold Function How to Use The

User s Manual Current Probe. IM E 1st Edition. Yokogawa Electric Corporation

Electrical Severity Measurement Tool Revision 4

Fluke 1740 Series. Three-Phase Power Quality Loggers Memobox. Assess power quality and conduct long-term studies with ease

99 Washington Street Melrose, MA Fax TestEquipmentDepot.com # # AAC Clamp Meter. Instruction Manual

MM700. True RMS ENGLISH. INSTRUCTION MANUAL Auto-Ranging. Measurement Technology

Upgrading Your Electrical Distribution System To Resistance Grounding

Fluke MDA-510 and MDA-550 Motor Drive Analyzer

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

Application Note (Revision NEW) Original Instructions. EMI Control in Electronic Governing Systems

DIGITAL MULTIMETER INSTRUCTION MANUAL

Common Covered Task 408OP Inspect Cathodic Protection Rectifier

374/375/376. Calibration Manual. Clamp Meter

USER'S MANUAL DMR-6700

NOTE: Fully read and understand this manual before using this Digital Multimeter.

returned to your distributor for attention. 14. Do not operate the function switch while the instrument is connected to a circuit.

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

30XR-A Professional Digital Multimeter Users Manual

Contact Voltage Detection

Webinar: An Effective Arc Flash Safety Program

Fluke 570 Series Infrared Thermometers:

MM700. INSTRUCTION MANUAL Auto-Ranging Digital Multimeter True RMS

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

Transcription:

APPLICATION NOTE Electrical testing safety Part 1: Preparing for absence of voltage testing James R. White, Training Director, Shermco Industries, Inc. OSHA and the NFPA 70E Standard for Electrical Safety in the Workplace both direct workers to deenergize all energized parts to which an employee may be exposed, unless energized conditions are required for troubleshooting. Placing electrical equipment or systems in an electrically-safe work condition might seem simple, but there are several factors to consider. Proper planning and preparation will make any type of testing simpler and safer. Perform a risk assessment. A risk assessment is required by NFPA 70E Section 110.1(G) Electrical Safety Program, 130.3 Working While Exposed to Electrical Hazards, 130.4(A) Shock Risk Assessment and 130.5 Arc Flash Risk Assessment. NFPA 70E does not use the phrase hazard/risk analysis anymore. The definition of risk assessment in Article 100 incorporates determining the hazards. Having to stop work to fetch other tools or test instruments interrupts focus and can contribute to an accident. Traffic in the area can pose a substantial hazard. This includes foot traffic, as well as forklifts and other type of vehicles. Barriers, barricades, signs and possibly an attendant may be needed to prevent intrusion into the work zone. Complete an Energized Electrical Work Permit (EEWP). This is required by NFPA 70E Section 130.2(B) Energized Electrical Work Permit. The EEWP incorporates the risk assessments needed, details the required PPE, as well as the precautions needed to protect the work zone. It also contains an authorization to perform energized work, which is critical to worker safety. Management must approve all energized work prior to the task, as they are responsible if an incident should occur. NFPA 70E has expanded the exemptions for the use of an EEWP in Section 130.1(B)(3), but those exemptions only relieve the worker of having the EEWP signed off by management. All other requirements of Article 130 still apply. Figure 1. Use a non-contact voltage tester for your first test. - Informative Annex J contains an example EEWP. Since it is located in the annex it can be modified as needed to suit a specific task or job condition. Before taking a single measurement, first determine: Is this troubleshooting or testing for the absence of voltage? What test instruments are required to verify the energized or de-energized state? Is a safety backup required? Has he/she been trained in the proper methods of release, how to contact emergency assistance or CPR/use of an AED? Where is the location of the nearest AED? Where will the safe work zone be established? Will it be at the limited approach boundary or the arc flash boundary? What Personal Protective Equipment (PPE) will be required? - What is the voltage of the circuit? - What is the arc flash boundary? - How much incident energy is possible at your working distance? Top THREE Tools to use for electrical safety testing 1. Low-voltage proximity or non-contact voltage testers 2. Electrical testers (previously solenoid) 3. Digital multimeter

detectors only test phase-to-ground. Note that this does not apply to medium and high-voltage systems, as proximity voltage detectors are the preferred method of testing. At Shermco Industries, we issue each of our technicians a proximity tester like the one shown in Figure 1 to keep in their top pocket or somewhere it can be easily seen. During disaster recovery projects, especially where there has been widescale flooding, these proximity voltage detectors provide a critical early warning of energized conductors or circuit parts that may be hidden or presumed deenergized. We believe they have prevented many shock incidents by using them in this manner. If the proximity voltage detector lights up, there is definitely a voltage somewhere; it just may not be where it s expected. Keep in mind that proximity voltage detectors may give a false negative indication (that is, not light up) if: Figure 2. For your second test, pick a digital, not solenoid, electrical tester. What method is being used to determine the arc-rated clothing and PPE required? Has an incident energy analysis been performed, with labels on the equipment or is the Table Method being used? Is the lockout/tagout complete? Is the test instrument functioning properly? Most importantly, can this task be performed safely? Line (7), Part II of the sample EEWP in Informative Annex J states Do you agree the above-described work can be done safely? Honestly, if you have the heebee-jeebees about performing a task while the equipment is energized it just needs to be shut down. If testing for the absence of voltage, that is, to verify there is no voltage present before beginning work, consider using a noncontact proximity tester (Figure 1), an electrical tester (Figure 2), or a multimeter (Figure 3). Tools to use A) Low-voltage proximity or non-contact voltage testers Proximity voltage detectors are good for an initial test, but should always be followed up with a direct-contact meter. NFPA 70E requires that the conductors or circuit parts be tested phase-tophase and phase-to-ground. Proximity voltage The insulated test point touches grounded metal. The cable being tested is partially buried. The user is isolated from ground. It is used inside a metal enclosure. Proximity testers also won t detect the presence of voltage through the shield on shielded cable. To better understand why proximity testers have these limitations, read the Fluke application note on the subject, Understanding capacitive voltage sensors. The key word is proximity. Proximity varies not just by distance, but also by the strength of the expanding and contracting magnetic field around an energized conductor. Distance has to account for everything between the tester and the electrical source, including the air, insulation, breaker material, twist locks, and so forth. The real issue is that proximity testers may indicate voltage, or they may not, depending on specific circumstances. For absence of voltage testing, a different, completely reliable test method is required. B) Electrical testers (previously solenoid) Back in the day, solenoid testers were the weapon of choice, mostly because everything else was so expensive. There are some issues with using these. If the voltage drops below about 70 to 90 volts, depending on the specific tester used, the tester doesn t indicate voltage is present. I ve been nailed more than once because of this. 2 Fluke Corporation Harmonics Standards: What are they and how can you use them?

Once I was testing a motor controller that had a blown fuse. That phase was being back-fed through a control power transformer (CPT) and should have shown voltage. Due to the impedance of the CPT and the tester, I received no indication. I screamed like a chicken when I made contact. Even solenoid units with indicator lights stop lighting up at about 30 volts or so. This won t send a person into fibrillation, but it could cause them to back into something that could. Solenoid testers wear out and the voltage scale becomes scarred up. If you can t read the voltage indicator and the solenoid is so weak that it barely vibrates, it s not reliable to use. Fluke strongly recommends using the newer generation of fused, electronic testers. They still vibrate and light up, but they re much more accurate, they measure down to 10 volts and they re fused for transient protection and are CAT-rated. C) Digital multimeter Multimeters are the best standard test instrument for making accurate contact measurements to determine if a circuit is energized. Care is needed when using multimeters. Turning the multimeter function dial to the wrong function (amps instead of volts, for example) is one of the most common mistakes people make when using a multimeter. Also, older models that are not auto-ranging could be put into a range that is too high, making the voltage appear much smaller than it really is. Someone in a hurry, stressed or not careful could get in trouble. Using newer meters resolves this issue, as well as bringing new features and protections in. Figure 3. A DMM with a low-impedance option is the smartest pick for a live-dead-live test. The Fluke model 117 for example, has a low input-impedance function for voltage testing that can be a great safety feature when determining if a ghost voltage is casued by a backfeed or is induced. The Fluke 117 also has a built-in noncontact voltage test function, for people who want to start with a proximity test and then move to a contact test, with the same instrument. Any direct-contact meter can be dangerous if connected to a circuit voltage that is higher than it is rated for. In my travels around the country, several facilities have had fatalities due to an electrical worker troubleshooting a 2.3 kv or 4.16 kv motor starter control circuit. The CPT is often mounted on the side of the drawout unit and the terminals cannot be seen clearly, Figure 4. The technician is trying to test the 480 V circuit and comes into contact with the medium-voltage circuit instead. Bad things happen when this occurs. Figure 4. Note CPT Mounted on Side of 4.16 kv Starter. The 480 V Terminals Cannot Be Clearly Identified 3 Fluke Corporation Harmonics Standards: What are they and how can you use them?

OSHA states that test equipment, and their accessories, shall be rated for the circuits they ll be connected to. NFPA 70E (2) Rating. Test instruments, equipment, and their accessories shall be rated for circuits and equipment where they are utilized. Personal Protective Equipment Does it sound strange to require PPE for a deenergized test? Until electrical circuits or parts are tested and found absent of voltage, they must be considered energized. Before working for Shermco, I was the Electrical Field Services Manager and Compliance Manager for SUNOHIO. Early one morning, I took a crew out to test a power transformer that was having problems at an industrial customer s facility. Upon arrival, I asked for a one-line to write the LOTO procedure. The drawing I was given was so old it was yellowed. I was assured by both the plant manager and the electrical supervisor that the one-line was fine and no changes had ever been made to the 4.16 kv system. My crew proceeded to lock and tag the system and, since it was a double-ended substation, it was fairly easy to isolate the problem transformer. The terminal chamber cover was removed and, being completely certain the circuit was deenergized, I was about to untape the connections in preparation for testing. At the last moment, I decided to follow good safety practice and test the circuit, even though I knew it was dead. The proximity voltage detector lit up and I almost fainted. Another lesson learned. An alternate circuit had been installed at some time in the past and no one working there was aware (or remembered) it. Take my word for it, it s not dead until it is proven dead. Don t make my mistake. There was nothing funny about this incident. other, unshielded conductors that are still energized. The expanding/contracting magnetic field around the energized cables can induce a voltage into the deenergized cable. Be certain to have a tight, clean connection at the point of grounding otherwise the grounds could blow off under short circuit conditions. Verifying the operation of the voltage tester Before beginning the absence of voltage test, inspect the test instrument to ensure it is working properly. 1. Inspect the test instrument: Are there any obvious defects in the case or meter element? Does the selector switch turn smoothly without binding? Do the functions change properly when the selector switch is operated? Does the test instrument have the correct CAT rating for the part of the electrical system it is being used on? Does the display function properly? Are the digits broken or do they fade in and out? This could indicate a low battery, damaged dosplay or loose connections to the display. 2. Inspect the test leads: Are there any signs of damage, such as cuts or breaks in the insulation, melted or discoloration of the insulation, or crushing of the test lead. Crushing could indicate internal damage that may not be obvious externally. Are the probe ends straight and undamaged. Burnt or bent probe ends could prevent the test instrument from indicating properly. Lockout/Tagout Electrical workers are required by OSHA to place equipment in an electrically-safe work condition (although they don t use those words) in 1910.333(b) and the NFPA 70E in Article 120, which involves Lockout, Tagout, test operating, testing at the point of contact, and grounding, if necessary. Grounding may or may not be practical on low-voltage systems, but should be done whenever possible. Capacitors, UPS systems and long cable runs can maintain a stored charge. The application of temporary protective grounds eliminates this hazard by discharging the stored energy. There may also be induced voltages if the conductors are from a long cable tray containing 1000 V CAT III and 600 V CAT IV meters designed to withstand 8000 V transients Use meters with these markings: 1000 V CAT III or 600 V CAT IV Figure 5. Fluke meters designed to older standards do not show category rating on front of instrument Do not use meters without proper CAT markings on 480 V circuits 4 Fluke Corporation Harmonics Standards: What are they and how can you use them?

Are the probe ends tight? Loose ends could interfere with measurements. Test for continuity by setting the test instrument to the OHM function (Ω) and touch the leads together. Any reading above 0.3 ohms indicates an issue. If the test leads are fused, verify the fuse is still good. Be certain the test instrument is on the voltage function before proceeding. 3. Wearing proper PPE, measure a voltage similar to the voltage of the equipment about to be tested. NFPA 70E Section 120.1(5) states Before and after each test, determine that the test instrument is operating satisfactorily through verification on a known voltage source. Note that a known voltage source is required to verify the test instrument. This could be any known voltage source, but should be the same voltage magnitude and type (AC or DC) as is being tested. Never wrap test leads around a test instrument. It may be convenient, but it places undue stress on the 900 elbow connector. Some test leads have been found to have separated inside the elbow, but can indicate voltage when verifying function. To ensure the test leads are not internally damaged, wriggle the test leads when performing the initial verification. Safely pull the leads while testing on a known voltage source. Any interruption indicates a possible internal break. Test leads can be easily damaged during use (or improper storage), so best safety practice is to replace them annually. They are expendable and low cost. 4. Test the circuit that is supposed to be de-energized and verify the absence of voltage. 5. Once absence of voltage testing is complete, re-verify the meter is still functioning properly by going to the same known voltage source and making another measurement. This is known as live-dead-live testing and is mandated by OSHA when voltages are above 600 volts. It is also required by the NFPA 70E in Section 110.4(A)(5), Operation Verification, as well as Section 120.1(5), Verification of an Electrically Safe Work Condition. Test instruments lead a tough life and when your life depends on them, live-dead-live is the only way to go, for voltages of any level. Fluke. Keeping your world up and running. Fluke Corporation PO Box 9090, Everett, WA 98206 U.S.A. Fluke Europe B.V. PO Box 1186, 5602 BD Eindhoven, The Netherlands For more information call: In the U.S.A. (800) 443-5853 or Fax (425) 446-5116 In Europe/M-East/Africa +31 (0) 40 2675 200 or Fax +31 (0) 40 2675 222 In Canada (800)-36-FLUKE or Fax (905) 890-6866 From other countries +1 (425) 446-5500 or Fax +1 (425) 446-5116 Web access: http://www.fluke.com 2008-2009, 2014-2015 Fluke Corporation. Specifications subject to change without notice. Printed in U.S.A. 9/2015 3392477e-en Modification of this document is not permitted without written permission from Fluke Corporation. 5 Fluke Corporation Harmonics Standards: What are they and how can you use them?