Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL

Similar documents
Our projects Shell Prelude FLNG

Floating LNG facilities

FLNG Opportunities for WA A Contractor s Perspective. Sam ALLEN Managing Director, Technip in Australia Perth, 12 March 2015

Offshore Energy Solutions. Technologies and products

Offshore Construction Management Services. Capability & Experience

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

BROWSE BASIN NORTH-WEST AUSTRALIA

Engineering Procurement Construction Installation. Company Profile.

Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012

Local Contribution to the Aasta Hansteen development

CAPETANO OIL LIMITED (+233) (+233)

Floating Production, Storage and Offloading (FPSO) Facilities

Corporate Profile CALM. Our Activities

Engineering and Procurement We are designing and purchasing everything we can firmly identify

Robust Solutions for New Frontiers Chow Yew Yuen

Reliance Industries Limited. Notice Inviting Expression of Interest

Subsea Positioning In deep water

Title of Presentation

WHITE ROSE OILFIELD DEVELOPMENT APPLICATION

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

2 THE PROPOSED WHITE ROSE OILFIELD DEVELOPMENT 2.1 PROJECT DESCRIPTION

Flexible Pipe Technip

Subsea Structural Engineering Services. Capability & Experience

SUBSEA SYSTEM ARCHITECTURE FOR CORAL SOUTH FLNG

Dry trees for cost effective solution with the Wellhead Barge: WHB

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates

QUARTERLY UPDATE. Summary

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

Next Generation FPSO: The Engineering & Construction Contractor Solution

Floating Systems. Capability & Experience

Contents. 1. Brief presentation of Eni. 2. General field information. 3. Challenges pre project sanctioning. 4. Development solution

Global Energy Group s multi-client contract showcases UK-based engineering talent to achieve first oil for Catcher

Evolution of Deepwater Subsea / Offshore Market

Technip Floating Production: A Comprehensive Portfolio

4 DEVELOPMENT AND PRODUCTION SCENARIOS

A marginal field (re-)development using several alternative methodologies 1

Offshore Pipelines. Capability & Experience

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

ENGINEERING SOLUTIONS AND CAPABILITIES. Capacity enhancement for deep water operations THE CHALLENGE THE SOLUTION

WHITE ROSE DEVELOPMENT PROJECT. Canada-Newfoundland and Labrador Benefits Report. For the Period April 1 June 30, 2004

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning September 2017 Dubai, United Arab Emirates

Bay du Nord Framework Agreement

A WORLD-LEADING SEABED-TO-SURFACE PARTNER

PRELUDE FLNG A STORY OF INNOVATION

Commercial. Committee. Technical Planning. Committee. Development and Construction. Operations

Statement of Experience. Ocean driven. OFFSHORE VESSELS ONSHORE LOGISTICS ROPES & MOORINGS COMMERCIAL DIVING

The Commercial Shipbuilding / Offshore Industry / Professional Society Perspective

Status på Dvalin-prosjektet. Roy Padget, Topside Host Manager

2 SBM Offshore Corporate Profile

FSRU READY FOR THE FUTURE?

Click to edit Master title style

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

Personalized Service, Industry Expertise. Franklin Howard

For personal use only

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow

Opportunities and Challenges in Deepwater West Africa Projects

Offshore Wind Risks - Issues and Mitigations

Experienced project management Total flexibility of the workforce Modern drydocking facilities

NO. ONGC/EOA/KG-DWN-98/2 Cluster 2/ONSHORE/EOI/2016/ Date: EXPRESSION OF INTEREST (EOI)

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

Learn more at

OTC FPSO INTEGRITY: JIP on FPSO Fatigue Loads Stephen Bultema (Bultema Marine), Henk van den Boom (MARIN), Max Krekel (Bluewater)

The World Floating Production Report

MOBILISATION SUPPORT. Joint Competency Statement

Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept

We Deliver We Care.

COMPREHENSIVE SOLUTIONS

Specially Sponsored by

Oil&Gas Subsea Production

Offshore Efficiency Innovation Execution. Oil & Gas

A niche service provider to the offshore oil and gas industry. Swiber Holdings Limited Corporate Presentation

Offshore Australasia Oil & Gas Market Report to 2017

Special Sponsorship. Supporting Organizers

Catcher field partners. Contents. 50% (operator)

Husky Energy East Coast Update

FPSO Engineering. From Concept to Commissioning. Iv-Oil & Gas

Umbilicals and Subsea Power Cables Excellence in Connecting Subsea EWEA

Marine Risers. Capability & Experience

INDONESIA DEEPWATER INVESTMENT

Send your directly to

Arctic and Cold Climate. Capability & Experience

Swiber Holdings Limited 1Q FY08 Results Briefing

WATER INTAKE RISERS FOR PRELUDE FLNG

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

Manager of Company Announcements ASX Limited Level 6, 20 Bridge Street SYDNEY NSW By E-Lodgement

Gulfstar One FPS. Nathan Davidson. February 26, 2015

Managing Offshore Field Development & Marine Asset

Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers

QUARTERLY UPDATE. Summary

FLNG: A case study in innovation

The use of an integrated contract model (iepci) for Subsea developments

2011 Capital Markets Day

Offshore Drilling Rigs

Learn more at

Unique range of activities OFFSHORE ONSHORE. A world leader in project management, engineering and construction for the energy industry

DNB s oil and offshore conference. Idar Eikrem, CFO

Apache Subsea Projects NORTH SEA REGION. Richard Stark Paul Williams

Transcription:

Prelude FLNG Project DOT conference presentation Jaap de Vries, Prelude FLNG Project Director FINAL Copyright of Royal Dutch Shell plc 1

Prelude FLNG: the largest offshore floating facility ever The Prelude FLNG facility will be 488m long, 74m wide and will weigh more than 600,000 tonnes with its cargo tanks full It is being built at the SHI shipyard in South Korea, one of the few places in the world with a dry dock big enough to construct a facility of this size Once constructed, the facility will be towed to location where commissioning will begin Once operational, the Prelude FLNG facility will produce 3.6 million tonnes per annum (mtpa) of LNG, 1.3 mtpa of condensate and 0.4 mtpa of LPG 2

Prelude FLNG Subsea scope 4 x 12 ID Flexible Risers 4 x 4 anchor chains + wire lines Single Riser Base Manifold w/ Fail Close Valves 4 x 12 CRA Clad Flowlines (~3kms) 1 x Steel Tube Umbilical Single Drill Centre 2 x 6-Slot Manifolds 7 x Producer Wells 3

Prelude FLNG onshore support and logistics Prelude FLNG 826 kms Darwin support Operations Workshop Aviation Base : Broome and then forward helicopter base on Dampier Peninsula 460kms Land Base : Broome Drilling Supply Base Perth Corporate Headquarters Broome Drilling Supply Base (existing use) Darwin Operations Maintenance Workshop (longer distance outweighed by Darwin advantages) Marine Port : Broome for exploration and later development drilling Perth Corporate HQ Darwin port for all domestic and int l consignments (other than drilling), laydown areas for subsea flowlines/umbilical Other : Communications via satellite (avoids need for onshore communications tower) Prelude FLNG Project 1 weekly supply vessel and November 2 standby 2012 tugs (24 hr coverage) 4

Prelude FLNG main contractors FLNG facility Turret Mooring System (subcontracted by TSC) Offshore installation Drilling Subsea hardware 5 5

Prelude FLNG October 2012 status Subsea and wells AUSTRALIA Offshore installation Technip Oceania Drilling rig Noble Clyde Boudreaux Well heads first steel cut September 2011 Drilling rig mobilized to Australia September 2012 NORWAY Subsea Control Manifold SINGAPORE Xmas tree Turret mooring system first steel cut May 2012 FLNG substructure first steel cut October 2012 FLNG detailed design and engineering FRANCE, MALAYSIA AND INDIA Technip Samsung Consortium Turret Mooring System construction DUBAI SBM Subcontracted to DryDocks World FLNG substructure and topsides construction KOREA Samsung heavy industries shipyard FLNG boilers construction JAPAN Marine steam boilers Kawasaki Heavy Industries 6

Prelude FLNG main delivery locations Londo n Rijswij k Geoj e Paris Monac o Dubai Kuala Lumpur Prelud e Housto n Perth 7

Prelude FLNG on track for delivery! Dubai Turret Mooring System Dubai Turret Mooring System Geoje Substructure (July) Brazil Noble Clyde Boudreaux leaving to Cape Town (Sept) steelcut Onshore geotechnical investigation NCB Riser arriving in qualification Australia Brazil testing Noble Clyde Boudreaux on route to Cape Town Geoje substructure steelcut Perth steelcut celebrations Wellheads shipped Boilers under construction (Kawasaki) SHI subcontracting audits 8

Prelude FLNG - pretty big. Imagine the scale The Prelude FLNG facility will be the largest offshore floating facility in the world, containing more than 260,000 tonnes of steel five times more than used to build the Sydney Harbour Bridge. Its decks will measure 488 metres by 74 metres, longer than four football fields laid end to end. 10

Prelude FLNG pretty big... 11

Prelude FLNG - layout Accommodation Steam generation AGRU stripping MEG regeneration Flare Liquefaction Utilities Booster compression NGL extraction & fractionation End flash, boil off and fuel gas Loading arms AGRU absorption & mercury Removal Inlet facilities Product storage within the hull Turret and mooring 12

Construction - Samsung Heavy Industries yard Dry Dock # 3 courtesy Samsung HI 13

Prelude FLNG high-level development schedule Identify Assess Select Define Execute Operate FLNG Pre-FEED (Basic Design Packages) Shipyards Tendering FID Front End Engineering Detailed Engineering & Construction Upstream & Onshore Operation Concept Select Front End Engineering Approvals Env referral ESHIA Env Approval Detailed Engineering & Construction Safety Assessment EIS submission Production Licence EIS public comment Prod Lic granted FDP submissions Stakeholder Engagement NOPSA design approval Confidential NOPSA ops approval Key Stakeholders 14

15

Prelude FLNG Project A world first! Strong business case for FLNG, with clear benefits for Prelude Rapid Engineering Development Discovered in 2007, FEED completion and FID in 2011 Approvals all on track Environmental approval granted Nov 2010 Final Field Development Plan submitted and Production Licence application made in Dec 2010 Combining the best of Shell s worldwide knowledge in one project organisation Challenges Novelty on contracting SDA now as an operator Multi-location Delivery Scaling up in all aspects An exciting project, on track as Shell s first FLNG application! 16