IIRSA INDICATIVE TERRITORIAL PLANNING METHODOLOGY REVISION OF THE IIRSA PROJECT PORTFOLIO GTE ANDEAN HUB

Similar documents
MILAN DECLARATION Joining Forces for Investment in the Future of Europe

Draft executive summaries to target groups on industrial energy efficiency and material substitution in carbonintensive

Research and Innovation Strategy for the Smart Specialisation of Catalonia. Brussels March 20th, 2014

BSSSC Annual Conference Resolution 2016

2010/3 Science and technology for development. The Economic and Social Council,

Chapter 11 Cooperation, Promotion and Enhancement of Trade Relations

Torsti Loikkanen, Principal Scientist, Research Coordinator VTT Innovation Studies

MEXICO 2030 BEFORE THE FOURTH INDUSTRIAL REVOLUTION: PROPOSALS FOR PRODUCTIVITY, GROWTH AND SOCIAL INCLUSION. Executive Summary

Please send your responses by to: This consultation closes on Friday, 8 April 2016.

Economic and Social Council

APEC Chile 2019 Chile s Priorities

Burgundy : Towards a RIS3

CHAPTER TWENTY COOPERATION. The objective of this Chapter is to facilitate the establishment of close cooperation aimed, inter alia, at:

High Level Seminar on the Creative Economy and Copyright as Pathways to Sustainable Development. UN-ESCAP/ WIPO, Bangkok December 6, 2017

Latin-American non-state actor dialogue on Article 6 of the Paris Agreement

demonstrator approach real market conditions would be useful to provide a unified partner search instrument for the CIP programme

RIO Country Report 2015: Lithuania

MARITIME CLUSTERS SUPPORTING RESEARCH & INNOVATION TO ENHANCE BLUE ECONOMY ENTREPRENEURSHIP TRIPLE HELIX MATRIX

Innovation-Based Economic Development Strategy for Holyoke and the Pioneer Valley

Agenda Item 4: Transport Strategy: Vision and Objectives

8365/18 CF/nj 1 DG G 3 C

The 21 st APEC Small and Medium Enterprises Ministerial Meeting Joint Ministerial Statement. Nanjing, China September 5, 2014

THE BLUEMED INITIATIVE AND ITS STRATEGIC RESEARCH AGENDA

SME support under Horizon 2020 Diana GROZAV Horizon 2020 SME NCP Center of International Projects

Committee on Development and Intellectual Property (CDIP)

Highways, ring road, expressways of tomorrow in the Greater Paris

Inclusively Creative

Working together to deliver on Europe 2020

Economic Clusters Efficiency Mathematical Evaluation

Horizon Work Programme Leadership in enabling and industrial technologies - Introduction

Presentation of the results. Niels Gøtke, Chair of the expert group and Effie Amanatidou, Rapporteur

ClusterNanoRoad

Elements in decision making / planning 4 Decision makers. QUESTIONS - stage A. A3.1. Who might be influenced - whose problem is it?

REPORT D Proposal for a cluster governance model in the Adriatic Ionian macroregion. (Activity 3.4)

The Role Of Public Policy In Innovation Processes Brussels - May 4 th, 2011

Post : RIS 3 and evaluation

TRANSFORMATION INTO A KNOWLEDGE-BASED ECONOMY: THE MALAYSIAN EXPERIENCE

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session

Analysing Megatrends to Better shape the future of Tourism

Data users and data producers interaction: the Web-COSI project experience

The 26 th APEC Economic Leaders Meeting

10246/10 EV/ek 1 DG C II

DRAFT. "The potential opportunities and challenges for SMEs in the context of the European Trade Policy:

Document on the. Joint Initiative for Research and Innovation

Horizon 2020 Towards a Common Strategic Framework for EU Research and Innovation Funding

THE METHODOLOGY: STATUS AND OBJECTIVES THE PILOT PROJECT B

No. prev. doc.: 9108/10 RECH 148 SOC 296 Subject: Social Dimension of the European Research Area - Adoption of Council conclusions

The ICT industry as driver for competition, investment, growth and jobs if we make the right choices

United Nations Environment Programme 12 February 2019* Guidance note: Leadership Dialogues at fourth session of the UN Environment Assembly

A New Platform for escience and data research into the European Ecosystem.

Smart specialisation interactions between the regional and the national

S3P AGRI-FOOD Updates and next steps. Thematic Partnership TRACEABILITY AND BIG DATA Andalusia

Towards a new place-based approach & a smartly specialised, innovative Danube Region

TERMS OF REFERENCE. Preparation of a Policymakers Handbook on E-Commerce and Digital Trade for LDCs, small states and Sub-Saharan Africa

Draft Plan of Action Chair's Text Status 3 May 2008

Italia Africa Business Week

OECD-ASEAN Business Statement

DRAFT TEXT on. Version 2 of 9 September 13:00 hrs

A Science & Innovation Audit for the West Midlands

National Innovation System of Mongolia

In-Country Shared Value Creation The Case of Ghana

Policy Partnership on Science, Technology and Innovation Strategic Plan ( ) (Endorsed)

Challenges for the New Cohesion Policy nd joint EU Cohesion Policy Conference


COMMISSION STAFF WORKING DOCUMENT STRATEGY FOR EUROPEAN TECHNOLOGY PLATFORMS: ETP 2020

Participatory backcasting: A tool for involving stakeholders in long term local development planning

Colombia s Social Innovation Policy 1 July 15 th -2014

CAPACITIES. 7FRDP Specific Programme ECTRI INPUT. 14 June REPORT ECTRI number

THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT BELARUS

Innovations in fuel cells and related hydrogen technology in Norway

Basque Country s experience in the S3P Partnerships ERRIN S3 Working Group

ORBIT/SPECTRUM ALLOCATION PROCEDURES REGISTRATION MECHANISM

Importance of SMEs in Greening the Economy in Georgia

Position Paper of Iberian universities. The mid-term review of Horizon 2020 and the design of FP9

Conclusions concerning various issues related to the development of the European Research Area

LSIF Convenor s Summary Report to CTI

(EC) ), 11(8) 347/ /2009, (EC)

Senate Bill (SB) 488 definition of comparative energy usage

Report OIE Animal Welfare Global Forum Supporting implementation of OIE Standards Paris, France, March 2018

I hope the Korean experience can give some implication for India s SME policy.

Technology Platforms: champions to leverage knowledge for growth

Distinguished Co-facilitators, Ambassadors, delegates and representatives from capitals,

Member State Programme Objec ve Focus Priori es Method Funding Source

- The experience and relevance of EU SMEs support in Asia-

ASEAN: A Growth Centre in the Global Economy

Ricardo Labó Vice Minister for Mining, Republic of Peru. Peruvian mining strategies

OECD-INADEM Workshop on

Seoul Initiative on the 4 th Industrial Revolution

Emerging Transportation Technology Strategic Plan for the St. Louis Region Project Summary June 28, 2017

Initial draft of the technology framework. Contents. Informal document by the Chair

Government Role for Technology Transfer

CORPORATIVE PRESENTATION

Mr. Alain Schoenenberger

Ex-Ante Evaluation (for Japanese ODA Loan)

The Sustainable Tourism Programme of the 10-Year Framework of Programmes on Sustainable Consumption and Production

Climate Change Innovation and Technology Framework 2017

the Companies and Intellectual Property Commission of South Africa (CIPC)

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS

CBD Request to WIPO on the Interrelation of Access to Genetic Resources and Disclosure Requirements

DANUBE INNOVATION PARTNERSHIP

Transcription:

IIRSA INDICATIVE TERRITORIAL PLANNING METHODOLOGY REVISION OF THE IIRSA PROJECT PORTFOLIO GTE ANDEAN HUB Santa Cruz, 22 August, 2007

Objetives of the IIRSA Project Portfolio To allow the countries (which form each Integration and Development Hub in IIRSA EID) to widen the common understanding on the contribution of the projects of the Initiative to the sustainable development in the territories of the Hubs

Indicative Territorial Planning Methodology (General Vision)

Elements of the Methodology of Indicative Territorial Planning Integration and Development Hubs Strategic Vision of Long Term Strategic Aspects applied to the EID Business Vision Groups of Projects Evaluation of Groups of Projects

Stages: Elements of the Methodology of Indicative Territorial Planning 1. Groups of Projects 2. Establishment of the Factors of Analysis 3. Preparation and consolidation of the information on the Groups of Projects 4. Evaluation of the Groups of Projects 5. Project Portfolio ordered and based on Consensus and ordered

Basic Concepts (1) The grouping of investment projects is based on the possibility of exploiting the positive externalities of a group of investments, which may result in greater benefits than the sum of each of the effects of the individual projects that form the grouping Group of Projects: interdependent group of projects, in an specific geo-economic space that has sinergy effects on the sustainable development Vertical Synergy: when the grouping takes place in accordance with input output relations, in a functional systemic chain. Ex: road-waterway-port

Basic Concepts (2) Horizontal Synergy: when it refers to the usage of common resources Ex: river locks hydroelectric power station Anchor Project: project that justifies the formation of a grouping around it and becomes feasible the synergy. Existing Anchor-Project: a project that may be already implemented. Strategic Function of the Group: efects and benefits of the implementation of the group of projects for the integration and regional development.

Revision Process of the IIRSA Project Portfolio

Stages of the Revision Process 1 st Stage: Implementation To assess progress regarding the performance of the projects of the corresponding EID and also assess how their implementation produces an impact on the integration process. 2 nd Stage: Planning To deepen the joint evaluation among the countries in each EID regarding the impact of the groups of projects and the individual projects on the sustainable development of the areas of influence of the hub, taking into consideration the progress achieved in the territory since 2004, the current development plans in each country and the common integration and development objective in South America.

Implementation - Activities Revision of the projects of the hub that are included in the Implementation Agenda Based on Consensus 2005-2010 (AIC, in Spanish) in order to identify progress and drawbacks in relation to the implementation of the projects of the Agenda and also to the Strategic Management System (SIGE, in Spanish), as well as to identify additional actions aimed at boosting the projects. Revision of other projects under execution in the IIRSA Portfolio with the purpose of identifying progress of the performance of the works, financing sources and other elements that may have an impact on the implementation of the project portfolio of the Initiative.

Planning Activities Revision of the Groups of Projects Revision of the Groups of Projects in order to ratify and redefine the groupings of projects in each hub, whether due: to the inclusion of new groups in the EID and/or new projects in the already existing groups to the exclusion or redefinition of groups and/or projects Revision of the strategic function of the group To widen and improve the content of the strategic function of each group in order to reflect better the economic, social and environmental effects of the set of projects. Revision of the Anchor Project

Planning Activities Analysis of the Groups of Projects Analysis of the Groups of Projects using the two dimensions of analysis of the indicative territorial planning methodology: sustainable development and feasibility of the Groups of Projects (see Annex II Structure of Factors of Analysis). Identification of programs and/or governmental actions complementary to the infrastructure projects of each group to widen the economic, social, environmental and institutional sustainability in the territory of the Group of Projects. Identification of projects of the Integration Sectoral Processes (PSI, in Spanish) that have a huge impact on the integration in the corresponding EID (border crossings, etc.).

Planning Activities Analysis of the Groups of Projects (2) To examine the inclusion or exclusion of projects in the AIC to be consolidated at the end of the GTEs round (it is at this point when there will be a complete vision of the set of proposals from all hubs); it must be submitted for consideration to the Executive Steering Committee (CDE, in Spanish) of IIRSA. Identification of the Groups of Projects to which new planning methodologies may be applied: logistics, productive integration and environmental evaluation. The results of the application of new methodologies in the Groups of Projects that are available will be an additional element to support the analysis process

Organization of the Works The dynamic of the works allows the generation of a special environment for the technical debate, which is vital to create among the experts of the countries a common vision regarding the definition of the integration projects and their effects on the sustainable development of the territory of the EID. Work group: The revision process will be developed in multinational work groups and will be organized as follows: 1 CCT coordinator to chair the works. 1 CCT facilitator to provide content. 2 Participants per country for the analysis and decision making process. 1 Secretary to write the report simultaneously

Organization of the Work Groups The activities will carry out under the supervision of the main round table, made up by the rest of the members from the national delegations, technicians from the CCT and other international organizations: observers, consultants and National Coordinators from other countries who do not belong to the hub being discussed but who may want to participate as observers. During the debates, the participants of the work group will always be able to consult the rest of the national delegates or any other observer, and the latter will be able to take part in the debate under the moderation of the coordinator of the work table.

Dynamics of the debate 1 st Stage: Implementation Each country will present a summary of the status of the projects of the AIC and of other projects of the portfolio that may be included in each Group of Projects of the EID. Also, each country will provide comments on the SIGE. In the case of binational or multinational projects, the countries involved will be invited to provide their contributions individually.

Dynamics of the debate 2 nd Stage: Planning(1) The first part of the work, in this stage, will be to revise all the groupings as a whole to further analyze all the groupings individually. The Structure of Factors Analysis, the forms for the Evaluation of the Groups of Projects and the support forms on Integration Sectoral Processes will be used.

Dynamics of the debate 2 nd Stage: Planning(2) In this stage, which is devoted to the revision of the portfolio, it will not be necessary to compare groups individually. Nevertheless, the questions of the forms will be very useful to guide debates among the countries. Additionally, if new groups of projects were formed, it will be applied the Methodology of Indicative Territorial Planning.

Recommendations The quality of the results of the process of evaluation of the group of projects depends on three essential conditions: 1. The participation of experts who are deeply concerned with and committed to the projects under the Integration and Development Hub and are knowledgeable about their economic, social and environmental aspects. 2. Participants that have information on technical, economic and political aspects associated with the feasibility of investment projects. 3. Availability of information on the territory of the group of projects and the technical characteristics.

Indicative Territorial Planning Methodology Factors Analysis Structure

Factors Analysis Structure Contribution to the sustainable development through physical integration Feasibility Economic Dimension Social Dimension Environmental Dimension Elements of feasibility Financing Political convergence Increase of trade flows Generation of employment and rent Natural resources conservation Institutional and regulatory framework Attraction of private investments in productive units Improvement of population quality of life Environmental quality Current and future demand consistence Increase of competitiveness Possibilities of mitigation of environmental risks Execution and operation conditions

PROJECT GROUPS EVALUATION HUB: CONTRIBUTION TO SUSTAINABLE DEVELOPMENT THROUGH PHYSICAL INTEGRATION 1. Economic dimension 1.1. Increase of trade flows Questions What is the impact of the group of projects over the ability to remove restrictions to the commerce? Comments To consider the magnitude of the markets and the productive systems linked by the group of projects. To take into account the particularly aspects of the sectoral processes that conform the identified groups. To considerate local, intraregional and extra regional trade flows. To indicate if there are groups of projects in competition or complementary to existent demands in the Hub territory. What is the impact of the group on the integration of new areas to the regional trade flow? What is the impact of the group of projects on local development and the reduction of regional disparities based on the increase of trade flows? To consider isolated spaces in the territory of the group of projects.

PROJECT GROUPS EVALUATION HUB CONTRIBUTION TO SUSTAINABLE DEVELOPMENT THROUGH PHYSICAL INTEGRATION 1. Economic dimension 1.2. Attraction of private investments in productive units Questions What is the impact of the group of projects over the increase of the capacity to attract private investments in productive units (agribusiness, industry and services) for its area of influence? Comments The local productive system could be an enterprise, groups of enterprises, productive chains and clusters. What is the capacity of the group of projects to stimulate the development of local productive systems in its area of influence? The mentioned favorable conditions are related to the increase of the productive chains competitiveness, market access and input access. What is the impact on favorable conditions to the formation of integrated productive chains in two or more countries in the space of the Hub?

HUB PROJECT GROUPS EVALUATION CONTRIBUTION TO SUSTAINABLE DEVELOPMENT THROUGH PHYSICAL INTEGRATION 1. Economic dimension 1.3. Increase of competitiveness Questions What is the impact of the group of projects over the increase of competitiveness of goods and services produced in the existing productive units in its area of influence? Comments The increase of the competitiveness is a consequence of the reduction of transport, energy or telecommunication costs, time reduction and the improvement of the quality of services. Also consider the effects presented in the territory outside the group of projects, for example electric power systems, gas pipes and telecommunications (fiber optic) or through already implemented or currently operative projects. Taking into account the dominant production pattern in the area of influence of the group of projects, what is the expected effect on the basic requirements to increment valueadded to the local production? To consider the infrastructure requirements, taking into account the value added of goods and services produced services in the area of influence of the groups of projects.

HUB PROJECT GROUPS EVALUATION CONTRIBUTION TO SUSTAINABLE DEVELOPMENT THROUGH PHYSICAL INTEGRATION 2. Social dimension 2.1. Generation of employment and rent Questions What is the impact of the group of projects on the generation of employment and rent in the area of influence? Comments To consider the generation of employment and rent, specially in current or future productive units served by new infrastructure, even in micro and small enterprises.

HUB PROJECT GROUPS EVALUATION CONTRIBUTION TO SUSTAINABLE DEVELOPMENT THROUGH PHYSICAL INTEGRATION 2. Social dimension 2.2. Improvement of population quality of life Questions What is the impact of the group of projects and correlated economic activities with respect to social inclusion and human development considering lower income levels? Comments To compare, among the groups, the geographical distribution of the population and the social indicators in their areas of influence. What is the impact of the group of projects over the population in its area of influence considering education, health services, access to information and mobility? To consider also the effect of the group of projects implementation on taxes that derive from the productive activities promoted by new infrastructure that would be applied in social development initiatives.

HUB PROJECT GROUPS EVALUATION CONTRIBUTION TO SUSTAINABLE DEVELOPMENT THROUGH PHYSICAL INTEGRATION 3. Environmental dimension 3.1. Natural resources conservation Questions What is the expected impact of the group of projects over the conservation or the most rational use of natural resources in its area of influence, taking into account the characteristics of the eco-system? Comments To verify if the projects of the groups are the most appropriate to the ecosystem characteristics in their area of influence. The groups of projects that present the grater negative impact have the lesser degree with respect to natural resources conservation.

HUB PROJECT GROUPS EVALUATION CONTRIBUTION TO SUSTAINABLE DEVELOPMENT THROUGH PHYSICAL INTEGRATION 3. Environmental dimension 3.2. Environmental quality Questions What is the capacity of the group of projects to improve (or maintain) environmental quality (less pollution) with respect to hydric resources, soil and air? Comments The groups of projects that present potential risks to environmental quality reduction (pollution and other negative effects) have the lesser degree in this evaluation.

HUB 1. Elements of feasibility PROJECT GROUPS EVALUATION FEASIBILITY 1.1. Institucional and regulatory framework Questions Taking into account the involved sectors, what is the level of risk that faces the implementation of the group of projects in relation to the current regulatory framework in the country (es) where the projects are located? Comments It is recommended to analyze each project and estimate the medium condition of the group. Considering the hypothesis of a negative condition of great magnitude provoke by the anchor-project or by one of the main projects of the group, it is necessary to take that as a determinant in the group evaluation.

HUB 1. Elements of feasibility PROJECT GROUPS EVALUATION FEASIBILITY 1.2. Current and future demand consistence Questions What are the conditions that guarantee the existence of a current or future demand, that justifies the group of projects? Comments Is the level of risk favorable in terms of credibility of future demand projections for the project group?

HUB 1. Elements of feasibility PROJECT GROUPS EVALUATION FEASIBILITY 1.3. Possibilities of mitigation of environmental risks Questions What is the possibility to mitigate environmental impacts at a reasonable cost of the predictable impacts of the group of projects? Comments It is recommended to consider also the indirect impacts with respect to biological diversity, vegetation, hydric resources, pressure on indigenous land or traditional population, protected areas or weak eco-systems. What is the possibility of approval by environmental authorities in the country (es)? It is recommended to analyze each project and estimate the medium condition of the group. Considering the hypothesis of a negative condition of great magnitude provoke by the anchor-project or by one of the main projects of the group, it is necessary to take that as a determinant in the group evaluation.

HUB 1. Elements of feasibility PROJECT GROUPS EVALUATION FEASIBILITY 1.4. Execution and operation conditions Questions Is the level of risk compatible to the technology, equipment, construction processes and general requirements associated to the implementation and operation of the group of projects? Comments

HUB 2. Financing PROJECT GROUPS EVALUATION FEASIBILITY Questions Is the group of projects capable to attract private investments, based on the expected profitability? Comments To analyze each project and estimate the medium condition of the group, in a proportional way to the estimated value of the projects. Is there investment capacity at the public sector level to support the projects of the group? Is the group of projects capable to attract public-private partnerships? To take into account the estimated values of the project to be implemented in the short and medium term and the annual investment capacity of the countries involved in the group. Is there a favorable possibility to obtain financing to implement the projects of the group? To verify the existence of a proper regulatory framework.

HUB 3. Political convergence PROJECT GROUPS EVALUATION FEASIBILITY Questions Is there convergence among the countries considering the implementation of the group of projects of transnational characteristics? Is there convergence between the group of projects and public policies and investment national and/or subnational priorities? Comments Analyze each project and estimate the medium condition of the group. Considering the hypothesis of a negative condition of great magnitude provoke by the anchorproject or by one of the main projects of the group, it is necessary to take that as a determinant in the group evaluation. Is the context favorable to overcome eventual difficulties to implement the groups considering political, social or environmental pressures, even to sustain these priorities during the process of implementation of the projects? Retorna Próximo

IIRSA INDICATIVE TERRITORIAL PLANNING METHODOLOGY REVISION OF THE IIRSA PROJECT PORTFOLIO GTE ANDEAN HUB Santa Cruz, 22 August, 2007