Instruction Manual: Ariane V (ESC-A cryogenic upper stage)

Similar documents
Instruction Manual: Ariane V (ES storable propellant upper stage)

Contents. Build the Spitfire: Step-By-step

Instruction Manual: Ariane V (Hermes Space Shuttle)

The Lansdowne One Car Garage Assembly Instruction by Laser Dollhouse Designs

Build the Spitfire: Step-By-step. Pack 3 Stages 21-30

USS Enterprise Instructions

Discover how to draw a picture that looks distorted on the page, but normal in a cylindrical mirror.

Bob's Card Models and [Resources]

11a (4 ea) This model designed and copyright 2011 by Mike Hungerford. Web:

The Papernator 2003 created and designed by Clive Davis, NAR #80412

Assembly Instructions for Shuttle Crawler Transporter (Part 1)

The Hearse Carriage Assembly Instructions Page 1.

Hubble Space Telescope Expert Model Interior Directions Downloads, patterns, and other information at:

Bobs Card Models

USS ENTERPRISE BRIDGE

The Ballistic Blaster Rocket Kit should contain the following items. If anything is missing, call Customer Service at

Little Briana Cottage Dollhouse assembly instructions

Harmony Remote Repair

Bob's Card Models

Hubble Space Telescope Paper Model Directions Downloads, patterns, and other information at:

BOBS CARD MODELS. De Haviland Dash-8 water-bomber (1:72)

Please contact us at BLMAmodels.com for any spare part requests.

Scratch Build a Water Tower

Trebuchet Construction Instructions

Fryer's Trebuchet Paper Kits

Hubble Space Telescope Expert Model Exterior Directions Downloads, patterns, and other information at:

Figure 2 (left) Continental bobbin with single head. Figure 3 (right) East midlands bobbin with double head

CRAFTS. London Double Decker Bus Craft

Craftman One Car Garage Assembly Instruction by Laser Dollhouse Designs

Build the Spitfire: Step-By-step. Pack 7 Stages 61-71

4" Round Fieldstone Tower

Bob's Card Model

Wayside Cottage Assembly Instructions By Laser Dollhouse Designs

Enterprise 1701D STNG

Removing and Replacing the Y-truck

Assembly Instructions for Busted Bricks Marble Machine #1

Thoroughbred: Assembly Instructions

Solar Probe Plus Approx 1:40 scale

3Insert the second rod no. 4

BOBS CARD MODELS. Canadair CL-215 (1:72)

29mm Priority Cinco. Glue all along seam. Tape

Swift assembly guide

INSTALLATION MANUAL FORTRESS SERIES

The Castle House Assembly Instructions By Laser Dollhouse Designs

Bob's Card Models and [Resources]

Play Scale Doll Accessories Products hfd008a, hfd008b, hfd008c, and hfd008d Designed by Ann Lenore Vanture

Tools: Scissors, hand held single-hole punch, metal ruler or other good straight-edge, sharp knife or Exacto-knife.

Seascape Bungalow Assembly instructions. Laser Dollhouse Designs

NEPAL Installation procedure

Assembly instructions for the Simple Marble Machine

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled

DO-IT-YOURSELF DISNEY-INSPIRED GIFT WRAP DISNEY

How to make a... Strictly Dancing Tri Fold Box

JAGUAR E-TYPE : Assembly Instructions 1 Canon is a registered trademark of Canon Inc. M.Kajiwara

SPUNKY ASSEMBLY MANUAL

Sky Eagle. User Guide. Cautionary and Warning Statements

Building the Circular Tower

D.I.Y. Dog and Cat Manual

Mickey Mouse Clubhouse New Year Mickey s Top Hat

Instructions for Lighting an S Scale Caboose

~MINI Scrapbooks~ By: Charlene Adair Hunter Of the Dating Divas Step 1) Make sure you have ALL the supplies you will need.

Assembly Instructions

2017 UPDATED INSTALLATION INSTRUCTIONS

Makes Sense SCIENCE GRADE LEVEL KINDERGARTEN FIRST MATERIALS

HOW TO MAKE A COMPOSITION ZISA DOLL

DO NOT PULL ON THE SHEATH.

How to install a leather Redline Goods armrest cover on your Audi B5 ( A4, S4)

Instructions: PS-2CD 4000 Model Kit Revised 7/2008

Welcome to our Wee Work section that will provide you and your. child with a learning activity that will engage their senses and

Spandrel Information and Installation Guide

c Fold the two outer flaps inside and then fold in half so it so it looks like this. While it is folded cut along the red lines to create a notch.

Instructions and Assembly Guide

LAGGING PIPES UP TO 125 mm IN DIAMETER WITH K-FLEX TUBING

Pump Assembly. Lloyd Matthews September 2013

1.0: Table of Contents

TF Model Jet Ranger 700

Building a Shadow Box - Instructions

How to fit an Internal Door

Diane Burton, STEM Outreach.

Write It Do It #1: Stereotypical Build - Images. Front view:

Winter Lantern Designed By: Amanda Corbet January 2012

Hull Modifications. General Introduction

Wire Epoxy filled groove

A Class A Gas Model That Looks Like a Full Scale Plane and Performs Like a Contest Ship

BUILDING INSTRUCTIONS

How to assemble the Reims Gueux Pit Centre Module #005

Read This Before Printing Anything!

Simple Thanksgiving Day Crafts

Installing Your Electronic Deadbolt

TeacherGeek Launcher Example Build

Aerospace Speciality Products

Elastic-powered Bus : Assembly Instructions

TF Model Jet Ranger 700

Print. Cut, Score, Crease. Stage 1 Gluing. First, print out the pieces on good, thick card stock.

3Position the hull of the ship as

Straw support Fusion 360

Crocodile : Assembly Instructions

Assembly Instructions

Mold #328. Roller Bot. Nail Bot. You will need the following. pieces from mold #328 for this robot. mold #328 for this robot.

Build the. Steam Locomotive. Pack 06

Transcription:

Instruction Manual: Ariane V (ESC-A cryogenic upper stage) Instruction Manual: Ariane V ESC-A (cryogenic upper stage) Designer s comments: This model has been designed based on engineering blueprints, conceptual diagrams and illustrations. A certain degree of artistic licence has been used to create a model that exhibits at least a modicum of realism. The assembly of a model should follow a procedure that vaguely resembles the method for cooking a meal; i.e. Prepare a place where you can work, without distractions. Get all of your equipment (utensils) out and ready. Get all of your parts for the model (ingredients) printed, cut out and ready to start. Lastly, try to have a location for your model prepared in advance, so that when it is finished, you will know where to place it. 1. These are the parts that you will need to create the ESC-A 1

2, The parts ESC-A-8, 6, and 7 will create the cylindrical structure. 5. The bottom of ESC-A-8 will protrude out from the bottom of the cylinder. This is perfectly OK. 3. ESC-A-6 (exterior) is glued to ESC-A-7 (interior). ESC-A-7 acts as a giant glue tab, while ESC-A-8 is made into another cylinder but with the printed side facing inwards. 6. The base of ESC-A-8 acts as a connector between the entire upper stage and the cryogenic core stage. The parts have been checked and have the correct measurements simple cut and glue. 4. Glue ESC-A-8 inside ESC-A-7, making sure that the top of ESC-A-8 is lined up with ESC-A-7. 7. There are exterior markings for access panels. Optional parts for the panels are provided. 2

8. The cylinder is then placed on top of the core module, to test whether is has been assembled correctly. 11. Glue them in numerical order; i.e. SYLDA-1, 2, 3 and 4 to create the final structure. The above image is the interior. 9. If done correctly, it should be a firm fit it should not fall out even when tipped on it s side. 12. The exterior should have the [orange] cabling lined up correctly. 10. The SYLDA module parts are now collected, ready to assemble. 13. This is what the finished SYLDA module should look like (mine was made with sticky tape). 3

14. Parts SYLDA-5 (right) and SYLDA-6 (left). These are simple glued together. 17. The SYLDA module should then fit (rest) perfectly on top of SYLDA-6. 15. When glued together, you end up with a satellite support structure. 18. The thrust structure (ESC-A-3) is glued together and placed in the cylinder to check the size (fit). 16. You have the option of making a small satellite and placing it on top of SYLDA-5. 19. Roll the engine mount (ESC-A-4) over a small pencil so that it becomes a small cylinder. 4

20. The cylinder should appear (as above) if done correctly. 23. Remove the cylinder from the cone and place it over the circle (red dot) in the middle of ESC-A-2. 21. Check the size of the cylinder by inserting it into the hole of the thrust structure (ESC-A-3). 24. Glue the cylinder onto ESC-A-2. This will provide a backbone for attaching the engine. 22. Then the cone is pushed down, the cylinder should be forced up (slightly). This small piece of the cylinder is all that you have to glue on the engine. 25. Now you can glue the cone onto the other parts: ESC-A-2 and the cylinder (ESC-A-4). 5

26. While it dries, you can prepare the next part: ESC-A-1. 29. Glue ESC-A-1 onto ESC-A-2. This will create a recessed area to glue the next part. 27. To state the obvious cut out the centre of ESC-A-1. 30. Glue SYLDA-5 and 6 into the recessed area of ESC-A-1. 28. The following three parts are then to be glued together. Make sure that they are dry before commencing. 31. You have the option of either gluing the upper stage into the cylinder or merely placing it there so that it can be removed at a later time. 6

32. The finished model. No satellite models have been provided with this I leave that up to you. 35. This is what the ESC-A upper stage looks like on the Ariane V core stage. 33. As already mentioned, you have the option of attaching the access panels. At smaller scales (1:144) this may not be necessary (or wise). 36. Your SYLDA module will sit on top. A small satellite model can be placed inside the SYLDA while another model sits on top of SYLDA. 34. The SYLDA module should balance and sit on the rest of the model. 37. The payload fairing should then be able to sit on top of the entire structure 7

38. The base of the payload fairing should fit snugly into the top of the upper stage. 39. Here is what is will look like. This is an image of my first test-model. Only one SRB was built. 40. The above image shows the relative height of the finished model when using the ESC-A upper stage. The model (at 1:96 scale) should stand at approximately 59 centimetres. Obviously, smaller scales (1:100 or 1:144) will result in shorter heights. 8