Institut Kemahiran MARA Kuching Sarawak

Similar documents
Standards and Competencies

WELDING FABRICATION NYS

SMAW LESSON #1: Initiating and maintaining an arc using the scratch start method

WELDING FABRICATION. First, download and review the General Regulations at: updates.skillsusa.org.

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings

Agricultural Mechanics I

Welding 2 go. alhuzaim_af [Type the company name] 8/2/2012

STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES

Syllabus. Metal fabrication/drafting. Agriculture Instructor-FFA FFA Advisor. Silverton High School 1456 Pine Street. et Silverton, OR 97381

BC WELDER TRAINING PROGRAM

Make a Safe. Description. Lesson Objectives. Assumptions. Terminology

Boot Scraper. Description: Materials: Tools: Procedure: Name: Date:

Welding Qualification/Certification

Fig. 9 Different weld positions. There are five basic types of common joints. They are

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR

LABORATORY MANUAL W-SHOP TECHNOLOGY LAB ME-105-F

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS FEBRUARY 2015

stringer bead tack welds tee joint trailing electrode angle weave pattern

Advanced Optical Communications Prof. R. K. Shevgaonkar Department of Electrical Engineering Indian Institute of Technology, Bombay

SAULT COLLEGE OF APPLIED ARTS AND TECHNOLOGY SAULT STE. MARIE, ONTARIO COURSE OUTLINE

Technical Information

Guidance for producing centre devised tasks for 2660

Module 4 Design for Assembly IIT BOMBAY

MAGNETC ARC OSCILLATOR MODEL : HTW-05-MG I HTW-05-MG II

SUPPORTS FOR SPRINKLER RISER PIPES

Surface Developments. Sacramento City College Engineering Design Technology. Surface Developments 1

DIVISION APPROVED MATERIAL LIST AND STANDARD DETAILS

Welding-Oxy Fuel Metals Joining

Curriculum for Mechanical Sub Overseer

HEARTH PRODUCTS KITS AND ACCESSORIES VERTICAL TERMINATION KITS FOR SECURE FLEX VERTICAL VENTING

Electromagnetic Flow Transmitter

Mechanical Workshop Practice

Conductivity sensor for hygienic applications

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

Process: DC TIG (GTAW) AC TIG (GTAW) Input Power: 230V, 1-Phase Amperage Range: A Rated Output at40 C (104 F): Maintenance and Repair

Bolted Joint Types Grip Washer

SEMPEO SQA Unit Code FP38 04 Preparing and using manual flame brazing and braze welding equipment

Make a Pencil Holder. Description. Lesson Objectives. Assumptions. Terminology

UPDATE LOG FOR STANDARD DRAWINGS Item(s) Changed 6/1/18 STANDARD DRAWINGS

Pembroke Hopkins Park Construction Outreach Program E S. Rd., Pembroke Township, IL Tel: (815) Fax: (815)

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

Welding Symbols. Faculty of Engineering Mechanical Dept.

RS/2/C/003MR Published August RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

COASTAL BEND COLLEGE WELDING SYLLABUS (Revised 8/10) Introduction to Blueprint Reading for Welders

Digital flow ELEMENT transmitter for continuous flow measurement

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

GE018: Interpretation of Engineering Drawings

Apprentice has demonstrated satisfactory skill in performing the following tasks in actual on-the-job situations using air-tugger.

ANTENNA EXPERTS. Website: AP MHz. 2.4 Meters 30dBi. Gain

Submerged Arc Welding Equipment

Machinist NOA (1998) Subtask to Unit Comparison

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

TH TU PR Paper Hrs TH TEST PR OR TW TOTAL

Welding and cutting technology

THE GOOD GUIDE TO ELECTROFUSION JOINTING....Connect

INSERTION paddle wheel flowmeter for continuous flow measurement

1. To practice arc welding and produce three parallel lines as shown in Figure To practice arc welding for Butt joint as shown in Figure 2.

TIG Welding in the Product Realization Lab

C4E NUMERICAL SENSOR User manual

FORM TP m a y /ju n e 2010

West Sound Technical Skills Center 101 National Avenue N. Bremerton WA Welding Trades Course Syllabus updated October 2012

Installation Instructions for. Handrail Component System

ASSEMBLY, INSTALLATION AND OPERATION MANUAL

INLINE flowmeter for continuous flow measurement

FLUX CORE 90 WELDER ASSEMBLY & OPERATING INSTRUCTIONS

Tapered or Conical Tee

INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR HAND OPERATED SILENT STEEL ADC HEAVY DUTY CURTAIN TRACK MODELS: 280, 281, 282, 280-A, 283-N, 283-R

Oroville Union High School District Industrial Technology

Make a Welded Die. Description. Lesson Objectives. Assumptions. Terminology

INSTALLATION INSTRUCTIONS 12' x 18' x 7' FRAME (12 x 20 x 7 ROOF COVERAGE) 2 SQUARE CARPORT

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

NCCER Progress Blvd, Alachua, Florida Phone: (888)

Submerged Arc Welding Equipment

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

Thank you for your interest in the Electrical Technician program. Following is the application process:

FORM TP MAY/JUNE 2007

2019 Welding- Individuals Secondary & Post-secondary

ISO 6947 INTERNATIONAL STANDARD. Welding and allied processes Welding positions. Soudage et techniques connexes Positions de soudage

Gas Metal Arc Welding: Sheet Metal

CITY OF MUSKEGO DRAFTING STANDARDS

Ch.2 Solutions posted on web page, go thru them for review.

Installation and Maintenance Manual IM 770-1

Maintenance of the pilot bits

DEPARTMENT #16 YOUTH INDUSTRIAL ARTS

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Windsor Arbor. Parts List: General Information: Tools required: Assembly & installation Instructions

INLINE flowmeter for continuous flow measurement

STEEL REPAIR PROCEDURES OPERATIONS MANUAL

Digital flow ELEMENT transmitter for continuous flow measurement

CONTINUING EDUC ATION

Dehydrator Box Build Plan

Job Ready Assessment Blueprint. Collision Repair. Test Code: 4106 / Version: 01. Copyright All Rights Reserved.

Tarheel Antennas, Inc.

Manufacturing Instructions

IBEX 1132 REAR AXLE UCA TRUSS GOAT BUILT IBEX REAR AXLE UPPER CONTROL ARM BRACKET/TRUSS

Ph.D. Preliminary Qualifying Examination. Cover Page. Thermodynamic. January 17, 2013 (Thursday) 9:30 am 12:30 noon Room 2145 Engineering Building

Transcription:

Institut Kemahiran MARA Kuching Sarawak SCHEME OF WORK COURSE : SIJIL TEKNOLOGI BEKALAN AIR DAN PEMBENTUNGAN SESSION : JAN JUN 2009 SEMESTER : 2 2 CODE/SUBJECT : TCP 2114 External Water Supply System HOURS/WEEK : CREDIT HOUR : 4 LECTURER : EN ISMAIL BIN MT DAUT 1. WATER DISTRIBUTION SYSTEM 1.1 Understand various type of distribution system. 1 05/01-09/01/09 3.0 MAINTAIN TOOLS AND MACHINE 3.1 Perform Maintenance Of Tools And Machine 1. WATER DISTRIBUTION SYSTEM 1.2 Understand various type of distribution layout. 2 12/ 01-16/01/09 4.0 INTRODUCTION TO SYSTEM 4.1 Main Pipe - Identify type of pipe used in water supply main laying. Page 1 of 6

1. WATER DISTRIBUTION SYSTEM 1.3 Identified terms and definitions used in water main laying works. 3 19/01-23/01/09 4.0 INTRODUCTION TO SYSTEM 4.2 Identify various type of valves, fitting and special used. 4 26/01-30/01/09 2. REGULATION AND BYE LAW 2.1 Understand regulation code of practice standard approved by the local water authority. 5.1.1 Install All Types Of Valves 2 CHINESE NEW YEAR 26 JAN 27 JAN 2009 5 02/02-06/02/09 2. REGULATION AND BYE LAW 2.2 Joints and lay pipe in trenches in accordance to code of practice, local byelaw, regulations and standards approved by JBA/JKR as job per specification. 5.1.1 Install All Types Of Valves 2. REGULATION AND BYE LAW 2.4 Identified method and procedures of tapping main pipe and comply with the code of practice and local water byelaw. 6 09/02-13/02/09 5.1.2 Construct Anchor And Thrust Block Page 2 of 6

3. MAINTENANCE OF TOOLS AND MACHINE 3.1 Identified tools and machine used 7 16/02-20/02/09 5.1.2 Perform Pressure And Leakage Test 23/02-27/02/09 3. MAINTENANCE OF TOOLS AND MACHINE 3.2 Identified method of tools and machine maintenance 5.1.3 Perform Sterilizing Test TEST 1(15%) 3. MAINTENANCE OF TOOLS AND MACHINE 9 02/03-06/03/09 3.3 Identified the source of electricity supply and fix the appropriate wire to a tool or machine.. 5.2.1 Perform Tapping Of Main Pipe 4. INTRODUCTION TO SYSTEM 4.1 Main Pipe - Identify types of pipe used in water supply main laying 10 09/03-13/03/09 5.2.1 Install Communication Pipe Page 3 of 6

11 16/03-20/03/09 ACTIVITY WEEK 12 23/03-27/03/09 4. INTRODUCTION TO SYSTEM 4.2 Main Pipe - Identify types of pipe used in water supply main laying 5.2.1 Install Water Meter As Per Specification 4. INTRODUCTION TO SYSTEM 4.3 Identify various type of valves,fitting and special used. 13 30/03-03/04/09 5.2.2 Perform Pressure And Leakage Test 5. SYSTEM INSTALLATIONS 5.1 Pipe Installation 14 06/04-10/04/09 5.2.2 Perform Sterilizing Test 15 13/04-17/04/09 5. SYSTEM INSTALLATIONS 5.3 Cross Over And Bend 5.3.1 Construct Cross Over Or S Bend TEST (30%) Page 4 of 6

5. SYSTEM INSTALLATIONS 5.3 Cross Over Or S Bend 16 20/04-24/04/09 5.3 Cross Over And Bend 5.3.2 Perform Pressure And Leakage Test TEST 2 (15%) 17 27/04-01/05/09 6.1 Identify Welding Joints And Symbols 6.1.1 Butt 6.1.2 Lap 1 04/05-0/05/09 6.2 Identify Tool And Equipment 6.2.1 Holders 6.2.2 Cables 6.2.3 Clamps 6.2.4 Transformers 6.2.5 Shields 6.3 Identify Welding Substances. 6.3.1 Electrodes 6.4 Identify Welding Techniques And Procedures 19 11/05-15/05/09 6.4.1 Flat position 6.4.2 Vertical and horizontal position 6.4.3 Overhead position 6.4.4 Angle 6.5 Perform Arc Welding And Practices 20 1/05-22/05/09 6.5.1 Generate the arc. 6.5.2 Preheating, beading, crater. 6.5.3 Beads appearance penetration, undercut, overlap. Page 5 of 6

21 25/05-29/05/09 FINAL EXAM WEEK / REVISION WEEK 22 01/06 05/06/09 FINAL EXAM WEEK 23 0/06 12/06/09 FINAL EXAM WEEK Prepared by : Checked by : Approved by : Signature : Signature : Signature : Name : ISMAIL BIN MT DAUT Designation : PPLV Name : ZULKARNAIN MD YUNUS Designation : PPLV Name : AZMAN BIN ALIAS Designation : Date : 05 JAN 2009 Date : 06 JAN 2009 Date : Page 6 of 6