NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

Similar documents
Onsite Mobile AC High Voltage Test System

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:

700 Series AC Dielectric Test Sets

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

Distribution/Substation Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment

VI 3 - i TABLE OF CONTENTS

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Mobile Power Transformer Test Systm

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES

700 Series AC Dielectric Test Sets

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

Arc Suppression Coils

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO

AC Resonant Test Systems Tank Type Up to 500 kv

STS Fully automatic. Large graphic display. Primary injection testing capabilities: up to 3000 A, with the optional module BUX 3000

AC Resonant Test Systems Tank Type Up to 150 kv

AC Dielectric Test Systems

TECHNICAL SPECIFICATION FOR POWER TRANSFORMER

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

The NOVA Recloser shall be designed and tested in accordance with the following standards as applicable:

AC Dielectric Test Sets

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

CATALOG including...

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Stabilized Differential Relay SPAD 346. Product Guide

SPAD 346 C Stabilized differential relay

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

Protection of Electrical Networks. Christophe Prévé

Capacitor Switching Contactors

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned

INDEX. Micro-ohmmeter MH-10 Page 3. MI (5, 10, 15, 20 kv) Page 4 Mega-ohmmeter MD (5 kv) Page 4

ELECTRICAL POWER ENGINEERING

Section 16621A - AUTOMATIC TRANSFER SWITCH. Part 1 General

Contents. Measurement and checking equipment for transformation centers Micro-ohmmeter MH-10 Page 3. Indirect earth contact simulator TL-5 Page 5

Breakdown indication by visual signal (BUZ in option) breakdown voltage and current are stored on the LCD display

AC Dielectric Test Sets

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

Item ref: UK MTTR01 TRUE RMS DIGITAL MULTITESTER WITH USB INTERFACE. User Manual

1. General Instructions 2 2. Safety 2 3. Lamp Starting Test Instrument LSTI 5 3

APPLICATION: The heart of the system is a DSR 100 Digital Static Regulator used in conjunction with standard SCR based rectifier bridges.

Title: Southern States Type SLS Smart Sectionalizer Solid Dielectric Three Phase Sectionalizer. Product Specification Guide TABLE OF CONTENTS

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

Neutral Earthing. For permanent or temporary neutral earthing in HV systems

ELECTRICAL POWER TRANSMISSION TRAINER

Electrical And Electronics Engg

SAUDI STANDARD NO. SASO IEC : 2007 SWITCHES FOR HOUSEHOLD AND SIMILAR FIXED ELECTRICAL INSTALLATIONS

Maintenance/Connection/Installation Service life C/O cyclesx1000

TOSHIBA International Corp

LET-60-VPC USERS MANUAL. REFERENCE: AIBVMV02 Edition: 01/07/96 Version: 2 LET-60-VPC TOUCH & STEP VOLTAGE AND EARTH MEASUREMENT UNIT.

CableTroll 2410 PN: /03. User Manual

Electronic Circuit Breaker ESS20-0..

Portable Appliance Testers. OmegaPAT MI 2140 BetaPAT MI 2141 User Manual Ver Code No

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

No. 139 Jinghai Third Road, BDA, Beijing, China, Office TEL. +86 (10) Website

Table of Contents. Introduction... 1

NOTE: Fully read and understand this manual before using this Digital Multimeter.

Three-Phase Transformer Test Systems

TECHNICAL SPECIFICATIONS for 300KV CONSTANT POTENTIAL X RAY EQUIPMENT (for industrial applications) S. No. PARTICULARS BHEL SPECIFICATIONS

MINISTRY OF ELECTRICITY

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

Power Processor - Series 700F 10KVA to 150KVA

SECTION TRANSFORMERS

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS

2.14 Main Cable Type HO7RN-F4G10-15 Metres each Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type

7. INSPECTION AND TEST PROCEDURES

MIT400/2 CAT IV Insulation testers

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

Capacitive voltage transformers

Insulation Co-ordination For HVDC Station

Technical Data Sheets

200ADM-P. Current Injection System with Phase Shift A 3.000s 2.000A 50.00Hz 0.0. Features

About us. Vision. To lead our field in innovation, quality and customer service.

Phase and neutral overcurrent protection

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

Motor-protective circuit-breaker, 3p, Ir=40-50A, screw connection. Product range PKZM4 motor protective circuit-breakers up to 65 A

Comparison of recloser and breaker standards

2kVA EARTH TESTING CURRENT INJECTION SYSTEM 4046 / 4047 DATASHEET REDPHASE INSTRUMENTS

شركة الوقت للكهرباء والمقاوالت ذ.م.م.

I -limiter The world s fastest switching device

Industrial Electrician Level 3

Thyristorised Automatic Power Factor

Dielectric strength tester RMG15AC

Electrical Description

TABLE OF CONTENT

Substation Preventive Maintenance

Power-Sure 700. Technical Data TD158001EN. Contents

MIT400/2. CAT IV Insulation testers MIT430/2: CAT IV Insulation testers

KENYA ELECTRICITY GENERATING COMPANY LTD

EE 1402 HIGH VOLTAGE ENGINEERING

C.A 6115N. Safety at all costs. IEE 16th: Electrical installation IEC/EN I E C. Insulation RCD. Earth. Loop. Continuity.

VARIABLE FREQUENCY RESONANT TEST SYSTEM

SUGGESTED SPECIFICATION for Series 300 Automatic Transfer Switches

ALPHA 50 MULTIFUNCTION METER (ALPHA SERIES)

DLVP A OPERATOR S MANUAL

NSL-10 STANDARD LIFE MODULAR CAPACITORS

Transcription:

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE TEST SET SERIES: ACHVOCAU TYPE: 050K10A-5mins The above automated test equipment is suitably designed and manufactured to test AC High Voltage Power Frequency (HVPF) dielectric withstand test on all type of electrical equipments like transformer, motor, generator, switchgear, cable etc. for which the testing requirement is within the output scope of this test set. The set is capable of giving continuously variable High voltage from zero to 50 KV AC. TECHNICAL FEATURES Input : 415 Volts +10%, 50 Hz+ 5%, 1 Phase (Between two phase of three phase system) AC. Output : Continuously variable 0 to 50 KV AC. Capacity : 10A max. at HT side. Duty Cycle : 5 mins. ON, 10 mins. OFF, Continuous at 5A. Overall Accuracy : + 1.5% or better. Impedance : Not more than 8%. Operation Control : Microcomputer based automatic control (programmable test voltage, test current, test duration, rate of rise, ramp and dwell control, automatic controls of motorized voltage regulator). Over load Tripping adjustment: Over the range of 500mA to 10A. Over Voltage Indication & Interlock Protection will be provided. GENERAL ARRANGEMENT The above test kit will be in multiple units i.e. Power Mains Control Panel with Air Circuit Breaker Microcontroller Based Automatic Control Unit Regulator Page 1 of 6

Reactor AC HV Transformer HV Potential Divider All the above units will be provided with wheels and lifting arrangement for easy movement. 1. POWER MAINS CONTROL PANEL WITH AIR CIRCUIT BREAKER Power Mains ON OFF operation is done by means of an Air Circuit Breaker which is coupled to the over current trip circuit, under voltage trip circuit and other protective device like zero start interlock, over current protective device at LT side, Reactor over current protection circuit. An auxiliary main ON/OFF circuit with fuse arrangement is provided for control circuit only. 2. MICROCONTROLLER BASED AUTOMATIC CONTROL UNIT Power MAINS ON lamp indication. Control ON-OFF switch along with CONTROL ON lamp indication & fuse protection. Isolation transformer for control operation, auxiliary supply to meters and power supply for electronic PCBs. HT ON-OFF push button along with HT ON lamp indication and EMERGENCY OFF mushroom type push button. Lamp Indication on REGULATOR NOT AT ZERO, TEST PROGRAM START, END of TEST & TEST FAILURE. Audio alarm for OVERVOLTAGE, END OF TEST & TEST FAILURE. INCREASE/DECREASE circuit to control motor operated Voltage Regulator. When high voltage test circuit is switched ON the regulator will rotate to increase the output test voltage at preset speed up to the preset test voltage level. Max. HV test level can be adjusted at any value between 5 to 50KV. After reaching the set voltage the Regulator will stop and one lamp will indicate such event. 1) Electronic control circuitry will be capable to control.. 2) Rate of Rise : At the variable rate of 0.5KV/Sec to 2KV/Sec. in steps of 0.5KV/Sec 3) Rate of Fall: At the fixed rate of 2KV/Sec. 4) Dwell Time : a) Automatic Mode : From 30 Sec. to 300 Sec. in steps of 30 Sec b) Manual Mode : Operator specific within specification limit. Zero start interlocking will be provided to ensure that HV circuit cannot be energized unless the regulator is initially kept or brought back to zero position. Page 2 of 6

Automatic tripping mechanism for protecting the HV transformer against over loading. The tripping mechanism can be adjusted at values as mentioned above. On tripping the last applied test voltage will be latched & indicated in the LCD. In addition to that, a protective device against overloading will be provided in the regulator output side and that will be set at maximum permissible loading in the regulator output side. These protective devices will be coupled to the Mains Air Circuit breaker unit. ON tripping, High Voltage will be switched OFF. HV Test Equipment & sample under test should be kept within an enclosure. Enclosure interlocking will be provided i.e. high voltage circuit cannot be energized unless the door of the enclosure is closed. However, this interlock can be by-passed by shorting corresponding terminals. One LCD display and key pad will be provided to set programs. This LCD will indicate the following: Current at the input side Output HV Current at the HT side Reactor current Rate of Rise Test Duration Protective status/error message ( if any, Over Voltage, Over Current, Regulator Over Run, Trip ) The whole control circuitry will be housed within a sheet metal cabinet with proper treatment and powder coated. 3. REGULATOR Continuously variable motorised voltage regulator of suitable capacity & control circuitry will be provided to increase & decrease the test voltage. Minimum & maximum position interlock will be provided so that limit switch will automatically disconnect Increase/Decrease circuit of motor connection at maximum and minimum position respectively. Over voltage protection i.e. in case the output voltage crosses the maximum rated value a buzzer will indicate over voltage and the increase mode circuit will not function further, even if INCREASE push is pressed. 4. REACTOR The device or component under testing being mainly capacitive a Reactor is required to avoid too low power factor as well as for compensating the mains supply current. The Reactor unit is a combination of Shunt Reactor along with a Variable Reactor. Page 3 of 6

The range of Reactor setting can be done by brief manual link changeover arrangement. This Bank is so designed that the mains input current may be restricted within 40% of the rated input current. The Variable Reactor will be motor controlled. Minimum & maximum position interlock for the Reactor will be provided so that limit switch will automatically disconnect INCREASE/DECREASE circuit of motor connection at maximum and minimum position respectively. Apart from the interlock facility overload tripping for the Reactor current will be provided. 5. HV TRANSFORMER HV Transformer used in the test set will be oil natural cooled type and of suitable capacity. One end of the high voltage winding will get earth connection through a CT operated Ammeter & protective device while the other end will be connected to HT terminal. One end of the high voltage winding will get earth connection through an insulated bushing housed in a small separate cabinet at the side of LV Terminal Box. The HV point will be brought out through suitable porcelain insulator. 2 core CT will be provided at HV winding Neutral side of which 1 st C.T will be able to measure HV side Current & 2 nd C.T shall be used to trip Incomer Breaker beyond pre-set value of HV winding Current. The transformer will be designed to withstand frequent intermittent spark over or short circuit conditions under which such testing transformers are designed to operate. 6. HV CAPACITIVE POTENTIAL DIVIDER This is well known that for high capacitive loading the HV output may be more than the expected voltage i.e. voltage ratio of the transformer. Hence, HV measurement is very vital in this high capacity AC HV test set. There will be a capacitive HV Potential Divider provided with low voltage arm. A UHF connector with co axial cable is used to connect a metering circuit (provided in the panel) to indicate High Voltage. Rated max working voltage : 50KV AC rms. Capacitance : 100pF (nominal) The capacitor will be oil-cooled type, provided with corona guard and will be movable with wheels at bottom. TEST MODES In the Test Set two Test Modes are provided, a) Automatic & b) Manual. Before starting the test in either of the modes, the Operator has to select the following required fields, Page 4 of 6

Test Voltage Test Current Limit Mode of Test ( Automatic / Manual ) Dwell Time ( Only for Automatic Mode ) Automatic Cycle: In this mode the test sequence will run automatically when a push button located close to the operator is activated. Manual Mode: In this mode increase in voltage up to the required level will be controlled by the operator pushing a button and holding until the required voltage is reached. In this mode the timing is operator dependent. Programmable microcontroller system will measure the time duration of HV applied i.e. dwell time. The Units will be powder coated except Regulator, HV Transformer, Reactor which will be coated with rust preventive paint. ACCESSORIES DISCHARGE ROD: In AC High Voltage test, after testing, the device under test is normally discharged through transformer winding. However, for device under test having large capacitance a discharge rod may be used and hence it is provided with the set. POWER & INTERCONNECTING CABLES: Power cables, interconnecting cables along with suitable plug & sockets will be provided. Multicore cables with due termination on multiway Terminal block will be supplied for interconnection between the units. Flexible earthing wire with yellow green insulation will be provided. DOCUMENTS: Operation Manual, Works Test Report, Warrantee Certificate, Circuit diagram of each unit and total system will be supplied along with the set. Soft Copy of all the above documents including Circuit diagram of the system in CAD & PDF will be submitted in two CDs along with the system. TESTS TO BE CONDUCTED AT NTPL WORKS DURING INSPECTION: 1. Programming features like Control sequential operation such as "ACB ON/OFF", "H.T. ON/OFF", "zero start interlock, Door Interlock,Regulator & Reactor motor, Control operation, Increase/Decrease operation for output voltage control, function etc. Overvoltage indication, Timer Page 5 of 6

2. Performance verification of output voltage in open circuit condition. 3. Performance verification of output current in equivalent short circuit condition. 4. Overload tripping at equivalent short circuit mode. *************** Page 6 of 6