SOFF-CUT EARLY ENTRY SAWING. Ben Pevreall

Similar documents
Why Do We Saw Equipment Types Matching Equipment to the Project Blade Selection Ensuring Construction Quality When Things Don t Go Right The Sawing

Diamond Dowel. Load Transfer System INDUSTRIAL SLAB ON GROUND

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND

A. Extent of structural precast concrete work is shown on drawings and in schedules.

Initiating Cracks in PCC Pavements. Malcolm K. Lim, PE

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by

PD 3 Dowel Cradle. Load Transfer System Industrial Slab on Ground

Double Bar Plate Dowels for Saw-Cut Contraction Joints

POSTPRINT UNITED STATES AIR FORCE RESEARCH ON AIRFIELD PAVEMENT REPAIRS USING PRECAST PORTLAND CEMENT CONCRETE (PCC) SLABS (BRIEFING SLIDES)

Design and Construction of Highway Pavement Joint Systems

ATD AMP Variable Speed Reciprocating Saw Owner s Manual

PCCP Preservation Steps to Take to Extend Pavement Life and Performance of Your Concrete Pavements


Installation Guidelines

Thread protection accessories are installed at the MODIX production factory and delivered with couplers.

Helical Pier Frequently Asked Questions

Operators Manual: Diamond Rock Saw Excavator Attachment Austramac Flashcut Series

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING DISC GRINDER

Semi-Finished Lens Processing & Edging Guide and Technical Data

JVI Vector Connector

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Wedge 513. Handling Plugs TN 9906.

Jointed Precast Concrete Pavement

R&T UPDATE. An Alternative to Traditional Round Dowel Bars Plate Dowel Innovations Driven by Industrial Concrete Paving

RECOMMENED TOOLS FOR MACHINING COUNTERTOPS

Design and Construction of Highway Pavement Joint Systems

Free Standing Pedestal Mounting Installation Manual

Table 5G-2.01: Transverse Joint Requirements. Transverse Joint Type 6 C 12 7 C 15 8 CD CD CD 1 20


Cablelink Plus Flush Technical

TECHNICAL MANUAL. TERADOWEL and ULTRADOWEL. Reliable Dowel System for Floor Joints

Section 7. Pouring Concrete. Section 7: Pouring Concrete

TECHNICAL MANUAL. OPTIMAJOINT Free Movement Joint. Free Movement Joint System for Heavy Traffic

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

PLK CJ PRODUCT INSTRUCTION PI002 REV Page 1

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Wedge 521. Handling plugs TN 9711.

A Solution to Cracking and Stresses Caused by Dowels and Tie Bars

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION

Life* Installation Instructions & User Care Instructions. (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone)

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

Fir and pine wood (52 %) Portland cement (38 %) made by firing limestone and clay Water (9 %) Wood mineralisation substances (1 %)

LuxCore Installation Instructions

StreetPrint Templates Care and Maintenance Guide

Precast Concrete. Installation Guide V GR-WI-599. Page 1

BETTER - FASTER - STRONGER

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING CUT-OFF MACHINE

1. CONNOLLY KEYJOINT 1. PRODUCT NAME 2. SUPPLIER 3. PRODUCT DESCRIPTION 4. KEY FEATURES 5. FIXING INSTRUCTIONS 6. SPECIFICATIONS 7.

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

SECTION MANHOLES

Columbia Laminate Installation Instructions

M A N U A L 6 June 2017

Feature T&G Timber Floor Installation and Finishing Recommendations

THE B6 HEEL BEAD SEAL SECURITY GLAZING SYSTEM

Session 8: Load Transfer Restoration. (Dowel Bar Retrofit, Cross-Stitching, and Slot Stitching)

INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes

A Bobcat loader becomes an efficient, cost-effective

For ANGLE-DROP Styles

Quick Set Dovetail Jig

WELDING. Section nine 9.1 CORRECT TOOLS

installation manual m y w a l l a r t. c o m

Hyper ArmourMate. Joint Edge Protection INDUSTRIAL SLAB ON GROUND

STANDARD 3-PIECE CULTURED MARBLE PANEL INSTALLATION GUIDE

CE2045-PREFABRICATED STRUCTURES QUESTION BANK

6X3 Patio Garden Shed Assembly Manual

Premium quality tools are important; not only will high quality rollers, brushes, and products create a better result, they ll make your job easier.

Installation instructions AZ120 (Anchor foot with placement hinge, to be embedded: type Albatros)

Dowel. Design. Performance-Based World of Concrete Official Show Issue. Lift-truck design changes require a new look at joint durability

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

Tools Hand and Power. OSHA Office of Training and Education 1

Mounting instructions SZ210 Full-frame pedestal with screw-on tube with placement hinge, for type SCHATTELLO

Full-Depth Concrete Pavement Repairs on the Ohio Turnpike

Installation Instructions

Plate 60 ArmourMate. Joint Edge Protection INDUSTRIAL SLAB ON GROUND. Plate 60 AmourMate. Joint Edge Protection

Au. di VoglFuge data sheet

BONDED ABRASIVE PRIMER

Installation Instructions for. Before You Begin TOOLS REQUIRED

PRIVACY FENCE WITH LATTICE INSTALLATION INSTRUCTIONS

Installation Guide. Step-by-Step Guide

The Basics of Insulation Testing

Circular Drying Time Recorder

Section 914. JOINT AND WATERPROOFING MATERIALS

Requirements for manufacture of anchors

Argon 02 Installation Instructions & Parts List

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS

for Hardscapes BASIC TOOLs PAVEREXTRACTOR

12 x 12 Flat Top Pergola

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

COMPOSITE SIDING INSTALLATION GUIDE

26. TenarisHydril Blue Riser Connection

A 1 Vertical Pole I 1 BA47/47A/47P Backboard (2 req d on Model BA872)

College of Forestry 610: Power Tools

PRIVACY FENCE WITH SCALLOPED PICKET INSTALL INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

SC02 BOAT SANDPIT COVER OWNER'S MANUAL

QUARTZ FABRICATION MANUAL

Installation Guide (888)

HOW TO CREATE AN OPENING IN BRICKWORK.

DOUBLE-DEE. DIAMOND Stone. Construction. Diamond Wire +Beads.

Installation Instructions

Transcription:

SOFF-CUT EARLY ENTRY SAWING Ben Pevreall

Manufacturing Footprint - Machines Huskvarna, Swe ~ 100 empl. Xiamen, China ~100 empl. Åsbro, Swe ~ 20 empl. Olathe, KS, USA ~ 50 empl.

Manufacturing Footprint Diamond Tools Jönkoping, Swe (46 empl.) Hebei, China (620 empl.) Columbia, SC-USA (80 empl.) Ath & Portugal

Conclusion Husqvarna : currently the biggest diamond tools & machine producer and developer in the world

Soff-Cut - Early Entry Sawing Systems Soff-Cut is the leading early entry concrete sawing system. Soff-Cut, allows you to cut in the Green Zone as part of the finishing process.

Soff-Cut Early Entry Sawing Systems THE PROBLEM Random cracking THE SOLUTION Soff-Cut has the only Ultra Early Entry dry-cutting system which controls random cracking through the early timing of the cut.

Soff-Cut - Early Entry Sawing Systems HOW IT WORKS As concrete hydrates and begins to set, it develops internal stresses. The objective in controlling random cracking is to relieve these stresses before they seek their own relief in the form of a random crack. Soff-Cut technology is based on the combination of the Soff-Cut blade and skid plate. The up-cutting rotation of the blade combines with the Skid Plate, which applies pressure to the surface to prevent chipping or spalling.

Husqvarna Soff-Cut Systems Why concreters use it? No slurry stains on finished concrete No slurry collection costs less EPA problems No need for on site water No noise complaints from other workers No need to come back tomorrow job completed to-day Risk of late saw cut cracks almost non existent Risk of unplanned and/or random cracking is minimized Why Engineers Specify it? Control joints are sawn before shrinkage stresses occur Risk of unplanned cracking is minimized Soff-Cut sawn joints are shallower thus providing greater aggregate interlock Proven system Sawn joints can be installed before final curing

Husqvarna Soff-Cut Systems The Green Zone The SOFF-CUT Ultra Early Entry dry-cutting system reduces the risk of random cracking by cutting control joints in the Green Zone - within zero to two hours after completion of the final finish at each control joint

Husqvarna Soff-Cut Systems Placing and Finishing Process Pumping Placing Finishing Soff-Cut Final curing

Husqvarna Soff-Cut Systems Some Key Points: The depth of saw cut should be greater than the depth of drying The earlier a cut is installed the shallower the depth of cut required The upper layer has the most stress therefore the cutting depth must cut through the upper layer and be deeper than the maximum aggregate size when to saw cut.

Husqvarna Soff-Cut Systems. Above: By cutting concrete at this stage, the depth of cut is less than conventional methods and the risk of random cracking is reduced significantly.

Husqvarna Soff-Cut Systems The Results No chipping or spalling at control joint No random cracking Induced crack with greater aggregate interlock

Husqvarna Soff-Cut Systems Some things to notice: Depth of cut is less than conventional methods No chipping, spalling or random cracks Induced cracks are vertical almost late saw cut cracks usually descend at 45 degrees from saw cut Greater depth of aggregate interlock

Husqvarna Soff-Cut Systems Some advantages of Soff-Cut : Soff-Cuts are installed before significant stresses occur risk of cracking minimized. Shallow cuts allow for maximum aggregate interlock Blade is enclosed for safety, dust control and reduced noise levels No slurry clean up no water is used, this means no slurry stains! No slurry stains collection costs less EPA problems! No need to come back tomorrow job finished today Cutting completed before final curing process is commenced

Husqvarna Soff-Cut Systems HOW DO I KNOW WHEN I CAN Soff-Cut?

Husqvarna Soff-Cut Systems If cutting too early the concrete will chip, spall or ravel and the skid plate will leave a mark When cutting at the correct time there will be: - Minimal chipping - Minimal spalling - Minimal raveling - No skid plate marks

Husqvarna Soff-Cut Systems Sawing Too Early Chipping & Raveling Sawing Too Late Random Cracks

Husqvarna Soff-Cut Systems Saw Cutting Just Right Cross section of a slab which has been Soff-Cut correctly

Husqvarna Soff-Cut Systems Applications

Husqvarna Soff-Cut Systems Applications

Husqvarna Soff-Cut Systems When using Soff-Cut saw: Look for slightly damp concrete dust during the cutting process Damp concrete dust suggests that the depth of the cut is greater than the depth of drying Use Joint Protectors to ensure joint faces do not collapse when cross cuts are installed

Husqvarna Soff-Cut Systems Depth of Cut - Should it be 40 or 400?

Husqvarna Soff-Cut Systems Qualifying Customers Saw Requirements Footpaths, Bikeways, Driveways - Usually 30mm Cut = X150 Sports Facilities - Tennis & Basketball, etc - Usually 30-40mm Cut = X150 or X2000 Commercial - Usually 35-40mm Cut = X-2000 or X2500 Industrial - Usually 45-50mm Cut = X4000 or GX4200 Infrastructure - Usually 75-100mm Cut = X5000

SAW CUTTING FOR CRACK CONTROL 3 topics for discussion to-day are: 1. Grid Plans 2. Depth of Saw Cuts 3. Timing of Saw Cuts

Statements There is no such thing as a good day to place or cut concrete each day has its individual problems and challenges What is done to concrete in the first 24 hours of its life determines future sustainability

GRID PLAN Designed by Engineer taking into account: The Purpose for which the pavement was constructed Thickness of pavement Type and quality of reinforcing used Concrete mix design Position of service ducts (drains etc.)

GRID PLAN Concrete cracks naturally to a 4 metre grid The most common Grid Plans for Industrial pavements are therefore 4 metres ENGINEERED SLABS: Airport Taxiways (400+ thick) are now cut to a 5.5 metre grid (previously 7 metres) Concrete Roads (250+ thick) have a Grid Plan of 4.2 metres

EXAMPLES OF POOR GRID PLAN 10m centre 8m centre Cuts offset from services Cuts too far from Services

DEPTH OF SAW CUTS Depth of Drying - Upper layer drying - Centre layer partially saturated - Bottom layer fully saturated Depth of cut must exceed depth of drying and deepest pre-existing crack or defect The earlier a saw cut is installed the shallower the cut required The later a saw cut is installed the deeper the cut needs to be Depth of saw cut required is directly linked to the timing of the saw cuts

DEPTH OF SAW CUTS Depth of Cut Guidelines: Deeper than pre-existing cracks or defects Deeper than maximum aggregate size Cutting depth should be at least twice the maximum aggregate size Deeper than the depth of drying Depth of cut should be 25% of total slab thickness (D/4) Ultra Early Entry saws, cutting 8 hours after casting (under normal conditions), should be cutting to 25% of total slab thickness (D/4)

TIMING OF SAW CUTS Cutting Window: The earliest a saw cut can be installed without causing excessive raveling/chipping The latest a saw cut can be installed before random or unplanned cracking is likely Minimum cutting window should be 4 hours

FIELD RESEARCH Shrinkage activity commences about 2 hours after casting - under normal drying conditions and much earlier under aggressive drying conditions (wind) Shrinkage activity accelerates quickly Under normal conditions concrete should be cut within 8 hours of casting

TIMING OF SAW CUTS Shallow cut required with Soffcut 80 70 60 50 40 30 20 10 0 6.00 AM 12 MD 6.00 PM 12 MN 6.00 AM 12 MD 6.00 PM East Depth of Drying Chart approx timing 175mm thick slab

TIMING OF SAW CUTS Skid Plates are the Answer

TIMING OF SAW CUTS Skid Plates are the Answer Sawn joint without skid plate 7 hours after casting (Winter) Soff-Cut sawn joint using skid plate 7 hours after casting (Winter)

Effect of Slump on Timing (under NORMAL conditions) Type of Saw 40mm Slump 80mm Slump Early Entry Saw With Metal Skid Plate UPCUT Cutting Time After Final Finish Minutes to 2 hours Cutting Time After Slip Form Paver 4 to 6 hours Wet Cut Saw Without skid plate DOWNCUT 6 to 8 hours 8 to 10 hours

RESULT OF LATE SAW CUT

Husqvarna Soff-Cut Systems Cutting Tips First thing after arriving on site ask the concreter where they started to pour Where concrete was first poured is the area where you should start to cut Do not put saw onto slab until you think it is ready to cut unnecessary marks in concrete should be avoided

Husqvarna Soff-Cut Systems Cutting Tips If you think a slab is ready to cut: Start with a test cut of 750mm to 1 meter Lift blade out of cut Inspect test cut for chipping (raveling) If chipping is evident wait 30 minutes and repeat test If still chipping wait another 30 minutes and repeat process until there is no visible chipping

In Summary... The Benefits: - Job can be completed same day as pouring/finishing. - Cuts can be installed much shallower improving integrity of slab - Cutting is dry cutting no slurry clean up - Low noise compared to conventional sawing - Ultra-early intervention to minimize risk of unplanned cracking.