Determine the stairway pitch based on tread and riser dimensions. For the main stairway in a house, the pitch can be no greater than 37º.

Similar documents
How-To-build guide Garden shed

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

How-To-build guide carport

Build Outdoor Stairs. Stair Building Terms There are five basic design elements you'll need to consider when planning outdoor stairs:

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

COMPOSITE RAILING INSTALLATION

EXTERNAL HANDRAILS. Section 6. External Handrails. Handrail Fixings. TQ TDS 23 -Timber Handrails and Balustrades

External Timber Stairs

DECKING INSTALLATION GUIDE

Typical Deck Details

1 to 17 Steps KAREM WOODCRAFT. Timber external stair range. made to suit any height you require. Any Rise Any Going Any Timber

Typical Deck Details

A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.

Staircase and Handrail Parts

Cabonyx Installation Manual

Title: Construct and install straight flight stairs Level: 4 Credits: 10

Perennial Wood Decking Installation Guide

APPLICATION FOR A BUILDING PERMIT

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

stairs Design Preliminaries by Ness Tillson WOOD designer

INSTALLATION GUIDE Timber Stairs

How To Build An. External Closed Staircase

TIMBER HANDRAILS & BALUSTRADES

Twin plate stanchions supporting folded metal panels

Typical Deck Details Based on the City of Nixa Residential Deck Ordinance

When is a Building Permit Required? Deck Details: What Must be Submitted with a Building Permit Application?

REVISION CHANGES: REV. NO. REV. DATE

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

COPYRIGHTED MATERIAL. Chapter 1. Stairs

Deck Evaluation Checklist

City of Virginia Beach, Virginia Typical Deck Details

STAIRSERVICE.COM. Stair system design and selection catalog. A step ahead, a step above 1 (800) Fax (408)

Installation Guide: Timber stairs. A Guide to safe stair installation from the BWF Stair Scheme

Timber Handrails and Balustrades

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

Straight Stringer Installation Instructions

Typical Deck Details

Stainless SHS stanchions with glass infill and offset handrail

PREPARATION & TOOL CHECK LIST

Installation Guide: Timber stairs. A Guide to safe stair installation from the BWF Stair Scheme

SUREWOOD ~ LNL. How to build a staircase like a pro. Post-To-Post Staircase System. Identify Your Type of Post-to-Post Staircase: Landing Newel Post

FREDERICK COUNTY USBC/IRC 2015

GOLDENEDGE MDF PANELBRACE WALL BRACING SYSTEMS. Product. Scope. Building Regulations. Appraisal No. 779 [2018] Logo

12X20 Breeze Pergola Assembly Manual Outdoor Living Today

Stair Buying Guide. The Right Steps to a Custom Stair Company

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

Pulaski County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code

Deck Designer Specification Kit For AZEK. All rights reserved copyright 2015 AZEK Building Products

TREX SELECT RAILING Installation Instructions

2015 Feeney (8/15) # D. Aluminum Railing Systems

Deck Designer Specification Kit For. TimberTech. All rights reserved copyright 2015 AZEK Building Products

A LUMINIUM. Modular Handrail Installation Guide. Tools and Materials Required. Hardware Included. See WARNING on inside panel

2018 StairCraft Awards

TREX SELECT RAILING. Installation Instructions PARTS

8X10 Breeze Pergola Assembly Manual Outdoor Living Today

10x10 Shed Plans and Building Guide

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Deck Design Guide. One and Two Family Residential Dwellings

B E S P O K E S T A I R C A S E S

Stair Parts Installation. Tricks

NewTech - CleverDeck Composite Decking Installation Guidelines

Deck Designer Specification Kit For. TimberTech. All rights reserved copyright 2015 AZEK Building Products

Deck Designer Specification Kit For. TimberTech. All rights reserved copyright 2015 AZEK Building Products

Dave's Glossary of Construction Terms. by Dave Osborne (

Deck Designer Specification Kit For AZEK. All rights reserved copyright 2015 AZEK Building Products

4. Components and Stairs

Maryland Building Officials Association Typical Deck Details

BRACKET FIX SYSTEM FITTING INSTRUCTIONS

Intex Engineered Pergola System Installation Instructions. NOTE: See Appendix for Foundation Requirements

STEEL PIPE GUIDERAIL 01/01/

Bedroom Window Egress

Deck Designer Specification Kit For. TimberTech. All rights reserved copyright 2015 AZEK Building Products

ALUMINUM PIPE GUIDERAIL 01/01/

Installation Instructions for. Handrail Component System

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

Spiral Stairs Endeman s Ironcraft Ltd PH/FAX:

Joshua Woodsman

4256HM JAMES HARDIE MONOLITHIC CLADDING

installation care & maintenance instructions moistureshield.com limited lifetime warranty

Log Railing Systems. Cedar Naturally Develops Cracks and Checks. This is an unavoidable process that enhances the rustic beauty.

Chapter 17 - Porch Trim

DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints

Deck Designer Specification Kit For. TimberTech. All rights reserved copyright 2015 AZEK Building Products

AXXYS Stairparts Fitting Instructions

2013 Feeney (2/14) # B. Aluminum Railing Systems

The following instructions will guide you through the installation of your new vinyl railing stair kit.

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

SDWH TIMBER-HEX Screw

T r e x Art i s a n Se r i e s Railing

ONE AND TWO FAMILY DWELLINGS Uncovered Decks July, 2007

External Handrails. TQ TDS 23 -Timber Handrails and Balustrades

INSTALLATION INSTRUCTIONS and OPERATIONS & MAINTENANCE MANUAL for SUPER SIMPLEX DISAPPEARING STAIRWAYS

SUREWOOD ~ LNL. How to build a staircase like a pro. Post-To-Post Staircase System. Identify Your Type of Post-to-Post Staircase: Landing Newel Post

A ledger/header board is the next step if you are attaching your deck to an existing structure.

APPENDIX 1 : Post and Beam Model

DECK PERMIT APPLICATION PACKET

EZYMESH CABLE MESH EZYMESH. Cable Support Systems

Pristine Precise Perfection

Transcription:

How-To-build guide Timber Stairs and steps What you can build using this guide This guide shows you how to order (and explains the construction of) a factory-made internal single flight of stairs for a house. It also covers two options for building a simple set of outdoor steps. Before you begin Timber stairs are normally custom-built in a joinery shop. When ordering a timber stair unit you will need to provide initial information on the total rise, the total going, preferred minimum tread and riser sizes, pitch and nosing (see Figure 1 for terms) as well as the materials to be used (timber species of MDF) and the finishes required. The New Zealand Building Code Compliance Document D1/AS1 sets minimum design criteria for stairways. This can be downloaded for free from www.dbh.govt.nz/userfiles/file/publications/building/compliance-documents/clause-d1.pdf. The ratio of tread depth, or going, to riser height determines a stairway s pitch (Figure 1). For main stairways within a house there is a maximum permitted pitch of 37º with a maximum riser height of 190 mm and minimum tread depth of 280 mm, with all riser height and tread depths being equal over the stair. Note that stairs that have a pitch less than 30º can be uncomfortable to use for most active people. Setting out the stairs Get the joiner to site measure once floors are constructed. Determine the total rise, i.e. the height from finished floor level (FFL) to finished floor level. Head room should be greater than 2000 mm 2100 mm is better. Determine the number and height of the risers by the following: Divide the total rise by the maximum permitted riser height for the stairway type (190 mm for the main stairway in a house). The result will generally not be a whole number so the actual required number of risers will be the whole number plus 1. Divide the total rise by the required number of risers to get the exact riser height. Determine the plan length (total going) of the stairway by determining the number of treads using the following: Number of treads = number of risers 1. (The highest tread is the FFL of the upper floor, so is not part of the stairway requirement.) Select the tread size from D1/AS1 Table 6. Calculate the total going by multiplying the tread depth by the number of treads. Determine the stairway pitch based on tread and riser dimensions. For the main stairway in a house, the pitch can be no greater than 37º. www.nzwood.co.nz how-to-build timber stairs and steps 1

Construction Interior stair This section covers the construction steps the joiner will follow. Interior timber stairs can be constructed as shown in Figures 2a and 2b. Solid timber or medium density fibreboard sheet (MDF) may be used in the construction. MDF is normally used for treads and risers. It is glued and screwed while solid timber may be nailed and screwed. Stairs are constructed using solid timber stringers as support for the treads and risers. The treads are housed in rebates in the stringer and held in place by wedges and glue blocks (Figures 2a and 2b). A stringer that closes off the ends of the treads and risers is a closed stringer. If the stair is built between walls the stringer may be called a wall stringer. In this case the stringer is attached to the wall and transfers the stair load directly to the wall. It is generally sized to accommodate the tread and riser, and align with skirtings. Stringers may be sized for the horizontal span using the joist tables from NZS 3604. Where the stringer is rebated to house the treads (Figure 2b) and spans between the floor levels, the thickness of the stringer should be increased by the rebate depth. The stringers are routed out to a minimum rebate depth of 13 mm. It is important that the wedges hold the treads and risers securely into the rebated stringer. Failure to secure the treads and risers will cause creaking of the stairs. Fit sufficient glue blocks to tie the treads and risers securely together. Treads should be rebated into the base of the risers to prevent these members separating. The rebate will hold the tread to resist sagging. A typical detail at the top riser of the stair is shown in Figure 3. Exterior timber steps A simple form of stair can be constructed from solid timber to provide access to exterior deck areas (Figures 4 and 5) using H3.2 treated timber (H4 where in ground contact). The treads can be attached to the stringers with by 50 x 50 mm brackets. The stair timber and fixings used should meet the same durability requirements as the deck construction. Exposed bolts and other fastenings will need to be type 316 stainless steel or epoxy coated hot-dip galvanised steel. Timber treads need to be coated with a non-slip finish or grooved to provide a slip resistant surface. Balustrades and handrails will be needed if a fall greater than one metre is possible. Refer to Building Code Clause F4/AS1 and B1/AS1. Open treads that have a gap of more than 100 mm between treads are not suitable where the stair may be accessed by the public, e.g. the front steps to a house. www.nzwood.co.nz how-to-build timber stairs and steps 2

Figure 1 Pitch line Pitch line angles Tread depth or going Riser height Nosing Figure 2 (a) False nosing attached to top riser Skirting Minimum thickness of stringer 30 mm Landing Wedges Glue blocks Solid support to bottom end of stringer www.nzwood.co.nz how-to-build timber stairs and steps 3

Figure 2 (b) Riser Depth of rebate 12 mm Tread Riser fitted into rebate in tread Wedges lifted to each tread and riser Glue blocks Stringer rebated for treads, risers and wedges Figure 3 Upper floor level Top riser Tread 25 Going www.nzwood.co.nz how-to-build timber stairs and steps 4

Figure 4 Decking Deck joist Stringer H. d. galvanised metal plate embedded in 200 x 200 x 200 concrete pad Blocking 50 thick treads Figure 5 Solid timber stringer Timber treads 50 x 50 brackets screw fixed to stringer Disclaimer: Woodco has taken reasonable care to ensure that the information and the facts contained on the website are accurate and any opinions given are fair and reasonable. However, the website makes the information available to you as a general information service only. The information contained on, or provided through, the website has not been prepared by taking into account the particular objectives, situation or needs of any individual users. Accordingly, you should assess whether it is appropriate in light of your own objectives, situation and needs. For that reason Woodco strongly recommends that you confirm any information that relates to a particular product. Woodco also recommends you consult a professional before proceeding with any project or acting on any of the information or material provided on the website. www.nzwood.co.nz how-to-build timber stairs and steps 5