ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS

Similar documents
SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

Subdivision Application Checklist

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

SITE PLAN APPLICATION

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

City of Massillon Site Plan Checklist

PLANNING AND DEVELOPMENT

APPLICATION FOR SITE PLAN CONTROL

Site Plan/Building Permit Review

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

Porter County Plan Commission

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

Application for Site Plan Review

PRELIMINARY PLAT CHECK LIST

Promontory Architectural Review Committee

APPLICATION FOR COMMERCIAL/OFFICE/INDUSTRIAL DEVELOPMENT PERMITS

5.7 Plan Documentation and Supporting Information.

Applying for a Site Development Review

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

Conceptual, Preliminary and Final Site Plan Review in Holladay City

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

City of Cambridge. Site Plan Approval. Reference Guide. D e v e l o p m e n t P l a n n i n g D i v i s i o n

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

Operating Standards Attachment to Development Application

PROJECT ENTITLEMENT APPLICATION

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

Town of Skowhegan Application For Development Review

Planning and Zoning Application & Checklist

STATE UNIVERSITY CONSTRUCTION FUND

1 MUNICIPAL INFRASTRUCTURE

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

NON-RESIDENTIAL DEVELOPMENT

ADMINISTRATIVE DESIGN REVIEW Information

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

List of Figures. List of Forms

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

GENERAL REQUIREMENTS (Print or Type) PROJECT DESCRIPTION OWNER CERTIFICATION

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

Checklist for Minor Plan Modification

MINOR SITE PLAN APPLICATION COVER SHEET

I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

Minor Site Plan Review Process

VARIANCE APPLICATION INFORMATION SHEET

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Santa Paula Planning Department

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

STREETSCAPE FEASIBILITY TERMS OF REFERENCE

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

City of Del Mar Planning Department Submittal Checklist ADR ADMINISTRATIVE DESIGN REVIEW PERMIT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

CITY OF MERCER ISLAND

Checklist for Tentative Subdivision Map

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

GENERAL DEVELOPMENT APPLICATIONS. General Submission Requirements

CHAPTER 11. Plan Standards

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Grading, Erosion and Sediment Control (GESC) Checklist

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

TOWN OF NORTH BRANFORD

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

Telecommunication Application Form

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST

ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS

City of Palmetto Florida

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

Site Development Permit Submittal Requirements

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

Essential Skills: Reading and Interpreting Maps and Plans

Last Name: First Name: M.I:

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

APPENDIX D: DRAWING SUBMISSION STANDARDS

TOWN OF AJAX DESIGN CRITERIA SECTION A GENERAL INFORMATION

City of Romulus Administrative Review Committee (ARC) Sketch Plan Submittal Checklist and Review Process

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

SECTION 2 GENERAL REQUIREMENTS

SECTION SITE SURVEYS

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

SITE PLAN REVIEW GUIDELINES Rev. 2016

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

Transcription:

SITE PLAN CONTROL ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS Site Plan Control is a process involving municipal approval of the lay-out, design and appearance of certain new developments, as authorized under Section 41 of the Planning Act. In addition to the Official Plan, Zoning By-Law and Building Permits, Armour Township Council governs the Site Plan Control process in the municipality. For land under Site Plan Control, Building Permits for new development are not issued until the owner has entered into a Site Plan Agreement with the Township. This document summarizes the Site Plan Control procedures and requirements in Armour Township under the following numbered headings: 1. Application Procedures and Requirements 2. Site Plan Review Process 3. Finalization of Site Plan Agreement and Letter of Credit 4. Letter of Credit Reduction and Warranty Procedures 5. Required Format For All Drawings 6. Site Plan Drawing Required Content 7. Additional Requirements For Waterfront Development 8. Landscape Plan Drawing 9. Detail Drawings 10. Building Design Details 11. Servicing Plans Schedule A Cost Estimate of Site Works 1) Application Procedures and Requirements a) Pre-consultation Following a mandatory pre-consultation meeting with Armour Township staff and/or Council, a development application for a Site Plan Agreement may be submitted to the Clerk-Administrator with the appropriate fees as follows:\ Minor Agreement - $1,500.00 deposit, the unused portion being refundable with the exception of a $800.00 non-refundable application fee; or Major Agreement - $6,000.00 deposit, the unused portion being refundable with the exception of a non-refundable application fee of 5% of the cost of site works to a maximum fee of $6,000.00. This fee is explained in greater detail in Section 3 below.

b) Copy of Deed A copy of the deed showing ownership of the subject lands, including any registered rights-of-way or easements, must be provided when submitting the application. This ensures that all registered owners have been accounted for and that all rights-of-way and easements are protected. Please also ensure that the PIN number assigned to the property by the Land Registry Office is provided with the application. c) Copy of Survey Plan A survey plan prepared by an Ontario Land Surveyor showing a lot, lot frontage, and dimensions of the subject lands must be included with any application for a Site Plan Agreement. A temporary to scale sketch plan may also be acceptable at the discretion of the Armour Township Clerk-Administrator. Council and staff will not approve any application until complete site drawings have been received in the format described in Sections 5 11 of these Guidelines. If the applicant is seeking a re-zoning in conjunction with the site plan application, the re-zoning will not be finalized until the site plan agreement has been entered into by the owner of the subject property. 2) Site Plan Review Process On receiving a complete application, staff and township council will review the site plan, and comments will be relayed to the applicant. A meeting between the applicant and the Council may be necessary. When the Site Plan is approved by Council, a draft Site Plan Agreement will be forwarded to the applicant for review. 3) Finalization of Site Plan Agreement and Letter of Credit When all parties are satisfied, the owner of the property will sign the final agreement and deliver a Letter of Credit to the Clerk-Administrator for 100% of the site-related works (excluding the buildings) plus an administration fee of 5% of the value of the site works paid to the municipality, for site works of $100,000.00 or less. This administration fee is capped at $6,000.00. Refer to Schedule A attached hereto, for site work costs to be used in calculating Letters of Credit. Council will enact a by-law authorizing the Reeve and the Clerk-Administrator to enter into the agreement with the owner. The agreement may be registered on title. Page 2 of 11

The building permit will then be issued. 4) Letter of Credit Reduction and Warranty Procedures Upon substantial completion of site works outlined in the Agreement, the Clerk- Administrator will entertain written requests for a reduction in the Letter of Credit. Upon receipt of such a request, the Township will establish a final inspection date which will serve as a commencement date for a specified guarantee/warranty period established in the Agreement. During the guarantee/warranty period, 10% of the original Letter of Credit will be retained by the municipality. Should any deficiencies in the site works be discovered at the time of the final inspection date, the municipality will retain a portion of the 10% which is equal to the cost of the deficiencies. 5) Required Format For All Drawings Print/plot size A-1 841mm x 594mm (36 X 24 ) plus 11 x 17 copies including digital PDF s if requested by the Clerk-Administrator. Scale................... Maximum 1:200 Minimum 1:1,000 All Site Plan drawings shall be provided to the Clerk-Administrator showing both a linear sale and a graphical (bar) scale in both metric and imperial units. Key Plan (scale 1:50,000) showing: i) Location of the property in relation to: - major roads, laneways and waterfront - adjacent properties showing constructed features - natural drainage ii) Adjacent property owned by the applicant or in which the applicant has a monetary interest iii) North Arrow Title Block showing: - Name and location of the subject development with a north arrow - Owners name - Title of the drawing - Name of the company / person who prepared the drawing - Linear and graphical (bar) scales both required - Date the drawing was prepared Revisions Block showing dates of all revisions made to the drawing Page 3 of 11

Signature Block with space reserved for Engineer (P.Eng.), Architect (OAA), Landscape Architect (OALA) or Planner (RPP/CIP) stamps if required. 6) Site Plan Drawing Required Content Five (5) copies based on an actual survey by an Ontario Land Surveyor which shows: a) Land use of the subject lands and abutting properties. b) Dimensions and area of the property showing: i) Road widening s and right-of-way widths ii) Easements iii) Parks c) Location of all existing and proposed buildings and structures showing: i) Exterior dimensions ii) Ground floor area iii) Building height iv) Setback to property lines v) Building separations vi) Siting of on-site water and sewage disposal systems d) Natural features showing: i) Watercourses and wetlands ii) Slopes and banks iii) Drainage ditches iv) Existing trees and wooded areas v) Requirements for protection and conservation of vegetation e) Artificial features showing: i) Berms ii) Docks, saunas, pump houses, wood furnaces iii) Ponds iv) Ditches f) Normal high water mark and the Regulatory Flood Elevation (if applicable) defined by the Ministry of Natural Resources as set out in Section 2.3 of the Armour Township Official Plan. g) Existing and proposed: i) Site grading/fill contours, slopes and/or spot elevations, benchmarks Page 4 of 11

ii) Elevations of roads and adjacent property boundaries h) Parking areas showing: i) Surface treatment and curbing ii) Numbered parking spaces iii) Typical parking space dimensioned iv) Aisle widths v) Disabled parking spaces with dimensions i) Loading bays with dimensions, if required j) Location and dimensions of existing and proposed: i) Entranceways ii) Access driveways iii) Sidewalks iv) Retaining walls v) Protective railings vi) Emergency access routes including centre line radii k) Location of existing and proposed fences with enlarged detail if required l) Location of existing and proposed site signage m) Lighting Plan showing the location, height and type of all exterior site lighting which must all be dark sky friendly n) Location of garbage enclosures including screening and buffering including enlarged detail o) Location of mechanical equipment including screening and buffering including enlarged detail p) Phasing of the development, if applicable q) Site summary chart including the following information: i) Total site area ii) Total ground floor area iii) % of site to be covered by buildings iv) % of site to be landscaped v) Total number of parking spaces required by the Zoning By-law vi) Total number of parking spaces provided vii) Total number of units, if applicable viii)site density (net/gross), if applicable Page 5 of 11

7) Additional Requirements For Waterfront Development (see also Armour Official Plan 2.2.17) a) A natural vegetative buffer of not less than 15 m (49.2 ft.) in depth along the designated shoreline or watercourse with a landscaped corridor not greater than 9 m (29.5 ft.) in width for access between any proposed development and the shoreline. Council may require that a professional competent in shoreline landscaping be engaged to prepare a shoreline vegetation management plan suitable for conserving and sustaining the natural environment. b) Location of dockage, boat houses, fuel storage areas, and beach / swimming areas. c) Exact location of the normal high water mark and the Regulatory Flood Elevation (if available) defined by MNR as required in Section 2.3 of the Armour Township Official Plan. d) Flood proofing plans if required by the Chief Building Official in accordance with Appendix 6 of the Ministry of Natural Resources Technical Guide: River and Stream Systems: Flooding Hazard Limit. e) Where deemed necessary, a soils report which identifies site soil characteristics including soil type, depth, leaching characteristics, depth to water table, and mitigation measures for any soil deficiency related to a proposed use. The soils report may also address slope stability and erosion concerns based on the nature of the proposal and existing site conditions. f) Where deemed necessary, a groundwater or surface water quality impact study which shows the impact of the proposed use on water quality and how this impact can be effectively minimized. g) Where deemed necessary, a fisheries habitat assessment of the existing shoreline or stream with recommendations on how the existing habitat conditions can be preserved and/or enhanced. h) Where deemed necessary, a screening plan showing how the proposed uses will be screened from view or how the existing aesthetic landscape of the waterfront will be preserved or enhanced. That a private well for an individual on-site water service can be located without danger of contamination by any on-site or off-site sewage system; and That suitable conditions exist for an individual on-site sewage disposal system. Page 6 of 11

8) Landscape Plan Drawing (if required during pre-consultation meeting) Five (5) copies to be prepared by a certified Landscape Architect which show: a) In addition to the information provided on the Site Plan Drawing, detail showing the following: i) Location, quantity and type of all existing and proposed vegetative plantings ii) Grassed areas iii) Existing trees and vegetation to be maintained or removed iv) Vegetative buffering v) Patios and decks vi) Ornamental ponds vii) Berms b) Landscaping Schedule showing: i) Botanical and common name of each species ii) Quantity of each plant type iii) Height when planted and at maturity iv) Caliper c) Walkways including dimensions and materials to be used d) Trees on municipal road allowances may be required by the Township in certain circumstances and in such cases the planting of these trees must meet the following criteria: i) Trees to be salt tolerant ii) Trees to have a minimum caliper of 60-70mm (2.5 ) iii) Trees to be from the following species list: Sugar Maple Hard Maple Honey Locust Linden Ash (except Mountain Ash) Red Oak Blue Spruce White Spruce Colorado Spruce Austrian Pine Red Pine White Pine Other acceptable species native to southeast Parry Sound District Page 7 of 11

9) Detail Drawings (if required during pre-consultation meeting) Extra detail to be provided with the Site Plan and/or Landscape Drawings: Signage Detail including ground signs, pylon signs and wall mounted signage showing: Type of sign Dimensions Graphics including colour and lettering Garbage Enclosures showing: Buffering and/or vegetative screening Dimensions Platform Screening for Mechanical Equipment showing: Buffering and/or vegetative screening Architectural detail for roof mounted mechanical equipment Fencing Detail showing: Typical Fence Section Materials Dimensions 10) Building Design Details (if required during pre-consultation meeting) a) Areas affected: In accordance with Section 5.7.3 of the Armour Township Official Plan, areas zoned Commercial (C), Recreational Commercial (RC), Public (P) and Institutional (I) in the Armour Township Comprehensive Zoning By-law. b) Approvals of Building Design required: No person shall undertake any development in the areas specified above unless Armour Township Council has approved plans, drawings, and any necessary elevations, cross-sections, shadow studies, conservation studies or other technical aspects as reasonably required for Council s approval to address among other matters: i) External building design details, including but not limited to, sustainable design, character, scale, finish, colours and appearance; and Page 8 of 11

ii) Sustainable and accessible design elements within any adjoining municipal right-of-way, including without limitations, trees, landscaping, permeable paving materials, street furniture, curb ramps, waste and recycling containers and bicycle parking facilities; and iii) Facilities designed to have regard to accessibility for persons with disabilities. c) Drawings required: Five (5) copies of drawings clearly showing: i) Four building faces of the existing and proposed buildings ii) Building Height iii) Exterior finish including type, colour and finish iv) Roof treatment v) Window treatment, doors and entranceways vi) Digital 3D perspective drawing in colour (if requested during preconsultation meeting with Armour staff and Council) showing: (1) Façade of the building street view (2) Parking areas (3) Landscaping (4) Signage (5) Fencing (6) Natural and artificial features 11) Servicing Plans (if required during pre-consultation meeting) Five (5) copies to be prepared by a Professional Engineer showing the following information: a) Existing and proposed grades and floor elevations, including top of foundation and apron elevations. b) Existing and proposed sanitary sewer system showing: i) Sizing ii) Grades iii) Invert elevations c) Land drainage and storm water management showing: i) Catch basins ii) Soak ways iii) Ponding areas iv) Impediments to the free flow of water v) Intended direction of surface flows vi) Storm water management report, if applicable Page 9 of 11

vii) On-site storm water management facilities for quantity and quality controls viii) Overland flows d) Drinking water distribution system showing: i) Location of water mains including sizes ii) Location of existing and proposed fire hydrants iii) Firefighting connections e) Utility Servicing arrangements showing: i) Location of underground or overhead utility lines ii) Existing hydro poles iii) Location and size of meters iv) Transformers v) Vaults vi) Valves f) Road widening s g) Easements h) Rights-of-Way i) Entranceways j) Emergency access routes k) Fire routes including dimensions and centre line turning radii l) Surface treatment and grading showing: i) Driveways ii) Ramps iii) Walkways/sidewalks iv) Edging or curbs v) Proposed retaining walls m) Catch basins and manholes n) Location of septic bed, if applicable Page 10 of 11

SCHEDULE A: ARMOUR TOWNSHIP SITE PLAN CONTROL REQUIREMENTS COST ESTIMATE OF SITE WORKS On-Site Works 1 Site grading and preparation $... 2 Paving and curbs $... 3 Landscaping and walkways $... 4 Site drainage $... 5 Fencing $... Off-Site Works 1 Storm drainage and culverts $... 2 Roadwork $... 3 Other works or services agreed to in pre-consultation $... TOTAL VALUE OF SITE WORKS: $ SUBMIT LETTER OF CREDIT in the amount of the above total $ NON REFUNDABLE ADMINISTRATION FEE: Administration Fee: 5% of the cost of site works (NOTE: This fee is capped at $6,000.00) TOTAL FEE: $... $ Cost Estimate Completed on: Date Page 11 of 11