Application for Site Plan Review

Similar documents
Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Porter County Plan Commission

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

Minor Site Plan Review Process

PLANNING AND DEVELOPMENT

City of Massillon Site Plan Checklist

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

Rezoning Application for Planning Commission

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Conceptual, Preliminary and Final Site Plan Review in Holladay City

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

City of Romulus Administrative Review Committee (ARC) Sketch Plan Submittal Checklist and Review Process

SITE PLAN APPLICATION

ADMINISTRATIVE DESIGN REVIEW Information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Procedure to Petition for Plat Review and Site Plan Review

Site Plan/Building Permit Review

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

City of Palmetto Florida

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

List of Figures. List of Forms

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

Town of Skowhegan Application For Development Review

CONCEPT REVIEW GUIDELINES

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

Checklist for Tentative Subdivision Map

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3

CHAPTER 26 SITE PLAN REVIEW

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

Promontory Architectural Review Committee

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

Subdivision Application Checklist

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

DESIGN REVIEW PROCESS AND APPLICATION

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

Land Use & Development Application

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

SECTION SITE SURVEYS

Last Name: First Name: M.I:

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

CITY OF MUSKEGO DRAFTING STANDARDS

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

Checklist for Minor Plan Modification

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

ARTICLE 5 PLOT PLANS & SITE PLAN REVIEW

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

5.7 Plan Documentation and Supporting Information.

Applying for a Site Development Review

CITY OF MERCER ISLAND

Town of Apex, North Carolina

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

FREMONT COUNTY. APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1.

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

GENERAL REQUIREMENTS (Print or Type) PROJECT DESCRIPTION OWNER CERTIFICATION

PLANNING Development Services Department

Planning and Zoning Application & Checklist

Permit Application. General Information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

PROJECT ENTITLEMENT APPLICATION

PRELIMINARY PLAT CHECK LIST

APPLICATION FOR SITE PREPARATION PERMIT

MINOR SITE PLAN APPLICATION COVER SHEET

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

ADMINISTRATIVE PERMIT SUBMITTAL REQUIREMENTS

Operating Standards Attachment to Development Application

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

SITE PLAN REVIEW GUIDELINES Rev. 2016

Minor Site Plan Application and Checklist Land Disturbing Activities

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION

NON-RESIDENTIAL DEVELOPMENT

DEVELOPMENT PERMIT / SPECIAL USE PERMIT or MAJOR MODIFICATION TO ABOVE APPLICATION SUBMITTAL INSTRUCTIONS

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

Town of Rotterdam Office of the Planning Commission

Washington County Road Engineering Plan Submittal/Review Checklist

Transcription:

Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission for approval be submitted to the City at least six (6) weeks in advance of the next regular meeting. This lead time is necessary to provide an adequate review period of the application materials for compliance with applicable codes, requirements and regulations, and to publicly post the meeting in accordance with State law. The Planning Commission meets on the third (3 rd ) Wednesday of every month at 7:00 p.m., with the exception of December. NO application will be placed on a Planning Commission agenda until it has been determined by staff to meet ALL applicable codes, requirements, and regulations. As such, there is no guarantee that an application will be placed on the next regularly scheduled meeting agenda, even if submitted six (6) weeks in advance. It is the applicant s responsibility to modify (as requested by staff) and resubmit application materials in a timely matter. The Site Plan Review application fee is $750 plus engineering, legal, and other professional costs. An Amendment to a Site Plan Review application fee is $475 plus engineering, legal, and other professional costs. The site plan shall consist of an accurate, reproducible drawing at a scale of 1 inch equals 100 feet or less, showing the site and all land within 100 feet of the site. Six (6) hard copies and a digital copy of the plans must be submitted initially with the application and fee (4 full size and 2 11 x 17 ). Sixteen revised hard copies (4 full size & 12 11 x 17 ) and revised digital and CAD compatible copies will be required after initial review. Attendance by the owner or owner s representative is required at all Planning Commission or City Commission meetings at which this request is considered. Date: Application Number: SPR - Base Fee: PPN: APPLICANT OWNER OF PROPERTY (if different than applicant):

Page 2 TYPE OF SITE PLAN REVIEW: Original Amendment ENGINEER INFORMATION: Name: PARCEL AND PROJECT INFORMATION: Address of property to be developed: Project Title and description: Current zoning designation of the property: Existing use(s) of the property: Uses proposed for the property: Project completion schedule and development phases: INFORMATION TO BE INCLUDED WITH SITE PLAN: Each site plan shall depict the following: 1. North arrow, scale, and date of original submittal and last revision; 2. A vicinity map; 3. A legal description of the property; 4. The gross and net acreage of all parcels in the project; 5. The land uses and zoning classifications of the subject parcel and adjoining parcels, including those parcels which are adjoining but are divided by a road right-of-way; 6. The location of proposed and/or existing lot lines and dimensions of same;

Page 3 7. All required building setbacks; 8. The grading plan showing finished contours at a minimum interval of 2 feet for the subject parcel and enough of the adjoining parcels to determine drainage patterns onto and off of the subject parcel, and correlated with existing contours so as to clearly indicate cut and fill required; (All finished contour lines are to be connected to existing contour lines at or before the lot lines) 9. The description of measure to be taken to control soil erosion and sedimentation during and after completion of grading and construction operations; 10. The location and type of significant vegetation, including woodlots and individual trees of 6 inches in diameter or greater; 11. The location and elevations of existing water courses and water bodies, including county drains, and man-made surface drainage ways, 100 year flood plains, and all wetlands; 12. The location of existing and proposed buildings, as well as the length, width, height and total square footage of each building; 13. Information for multiple-family residential developments, including: a. total number of residential units, b. breakdown of units by number of bedrooms, c. dwelling unit sizes including dimensions and total square feet, and d. distance between buildings; 14. The location of all existing buildings or structures within 50 feet of the subject property; 15. The proposed location of accessory structures, buildings, and uses, including, but not limited to, all flagpoles, light poles, storage sheds, transformers, air conditioners, generators, and similar equipment (Details of the method of screening, where applicable, shall be included); 16. The name, location, dimensions, and associated right-of-way of all existing and proposed streets (public or private), and typical cross section of same (Cross section shall show surface, base, and subbase materials; location and typical details of curbs; location, dimensions, and details of all passing lanes and deceleration/acceleration tapers or lanes; and the location, width, surface elevations, radii, and grade of all access points to the site.) 17. The information necessary to demonstrate that required sight distance and driveway spacing standards as identified in Article 9 of the Hudsonville Zoning Ordinance are being met (all driveways located within 100 feet of the site must be shown on the site plan.); 18. The location, design, and number of all parking spaces and unloading areas, including information on proposed curbing, barrier-free-access design, and dimensions for parking spaces, circulation aisles, and unloading spaces (A determination of the number of parking spaces as required in Article 6 of the Hudsonville Zoning Ordinance shall be provided.); 19. The design and dimension for all exterior lighting, including any element relative to shielding light spillover onto adjacent properties and roadways; 20. The location and design of all sidewalks, walkways, bicycle paths, and areas for public use; 21. The location, design, sizing, and easements related to all existing and proposed utility systems to be located on the site, including, but not limited to: a. water lines and fire hydrants,

Page 4 b. sanitary sewer lines, c. septic systems, if applicable, and d. retention and detention areas (Inverts, hydrants, underground tanks, and transportation pipelines shall also be shown or included.) 22. The following storm water information should be submitted with site plan; reference: City of Hudsonville's design criteria for storm water management The location, design, sizing, drainage flow patterns, location of manholes and catch basins, and the calculations for release rate and storage capacity of the storm water sewer system to be located on the site; Water detention facility - submittal materials; a. design calculations for the storm water detention facility b. calculations for detention pond size c. current release rate from undeveloped site, 3 yr storm d. current run-off rate from developed site, 3 yr storm e. proposed run-off rate from developed site, 25 yr storm f. proposed run-off rate from developed site, 100 yr storm g. volume to be detained h. size & dimensions of detention basin i. orifice size in detention basin discharge j. maximum release rate through orifice k. configuration and size of overflow spillway l. maximum capacity of overflow spillway and orifice 23. Include the following utility specifications on your site plan drawing: a. Water main - ductile iron class 52 b. Hydrants - EJIW per City of Hudsonville c. Sanitary Sewer - PVC trusts pipe D-2680 solvent weld d. Manholes - ASTM C-478 rubber joint e. Castings - EJIW 1120 f. Storm Sewers - C-76 RCP class III g. Full sand backfill on all pipe under roadway and parking areas. 24. The location and design specifications for required fire lanes, emergency access key boxes and supplemental fire hydrants pursuant to Ordinance No. 182 Fire Safety and Prevention Ordinance. Ordinance No. 182 should be reviewed prior to site plan preparation. 25. The location and specifications for all fences, walls, and other screening features with cross sections; 26. The location and specifications for all proposed perimeter and internal landscaping, and other buffering features (For each new landscape material, the proposed size at the time of planting must be indicated. All vegetation to be retained on the site must also be indicated, as well as its typical size by general location, or range of sizes as appropriate.); 27. The location, size and specification for screening of all trash receptacles and other solidwaste disposal facilities; 28. The number of employees on largest shift (If shifts overlap, indicate the number of employees for the largest 2 shifts which overlap); 29. The proposed deed restrictions, if applicable; and

Page 5 30. The proposed building elevations to meet the Architectural Design Elements Portfolio. NOTES: 1. Selected site plan information requirements may be waived if deemed by the Zoning Administrator as unimportant in the consideration of the site plan. All required information should be submitted unless expressly waived by the Zoning Administrator. 2. The required site plan information may be prepared on multiple sheets, as required, to provide for clear presentation of such information. With the exception of drainage and utility information, 16 copies of all required site plan information shall be provided to the Zoning Administrator for distribution to the Planning Commission. If the drainage and utility information is prepared on a separate sheet only 5 copies shall be required. 3. All signs shall be approved by a separate sign permit process. 4. Representation by the owner and/or the designer is required at all Planning Commission meetings at which their site plan or application will be considered for action. 5. Expiration of Site Plan Approval: (C) Unless a zoning compliance permit and a building permit has been issued within 180 days of the date of the Planning Commission s approval of the site plan, approval of a site plan shall expire and be of no effect. Approval of a site plan shall expire and be of no effect 1 year following the date of Planning Commission approval unless construction has begun on the property and is diligently pursued to completion. (D) Development shall, in any case, be completed within 18 months of the date of Planning Commission approval of a site plan. (E) If an approved site plan has expired as set forth herein, no permits for development or use of the subject property shall be issued until the site plan has been resubmitted and approved, subject to the provisions of the Hudsonville Zoning Ordinance. I do hereby submit application for Site Plan Review and understand that all engineering, legal, and other professional costs must be paid by the applicant. I also authorize the Planning Commission and City Staff to access the property for inspection purposes. The answers and statements herein contained and the information submitted are in all respects true and correct to the best of my knowledge. CHECK ONE: I am the owner lessee legal representative involved in the request Applicant s Name (Please Print) Applicant s Signature Date