Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN

Similar documents
TOP HOLE DRILLING WITH DUAL GRADIENT TECHNOLOGY TO CONTROL SHALLOW HAZARDS

SubSea MudLift Drilling: from JIP to the Classroom

EC-Drill MPD Dual Gradient Drilling

Offshore Drilling Rigs

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

ECDM System. November, Security Classification: Restricted - Status: Draft

Development. JOGMEC Techno Forum November 2014 Japan Drilling Co., Ltd. Drilling Technology Department Masahiro Nakamura

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Marathon Drilling Indonesia

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

Deepwater well design, construction & drilling operations

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

Marine Risers. Capability & Experience

/chesssubseaengineering. Deepwater Mux Subsea BOP Control System & Marine Riser System. Oseghale Lucas Okohue Bsc.Msc.CPMP.

Single / Dual Barrier HP Drilling Risers

Investor Relations Presentation April 30, 2013

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

@balance Deepwater. MPD services

Industry Response - Post Macondo

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

Dry trees for cost effective solution with the Wellhead Barge: WHB

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

Company Overview DEDICATED TO SAFETY, QUALITY, VALUE, AND PROJECT EXECUTION EXCELLENCE!

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

OTC seems to be able to afford to fix the problems associated with downtime due to an incomplete design.

Case Study: Value in Drilling Derived From Application-Specific Technology Diane Langley, JPT Features Editor

A marginal field (re-)development using several alternative methodologies 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

Deep Water Definitions

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

To Jackup Conductors And Risers

Challenges of Deep Water To Jackup Conductors And Risers

Refining the DP Watch Circle

Cost Reduction in Frontier Deepwater Riser Systems

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

OFFSHORE SERVICES PIPELINE CONSTRUCTION

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

Click to edit Master title style

SAFER, SMARTER, GREENER

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference

HELIX ENERGY SOLUTIONS

Deepwater Precommissioning Services

Casing while Drilling. Advanced Casing Deployment Drillable Casing Technology

Experience, Role, and Limitations of Relief Wells

Riser Installation in Deep & Ultra Deep Water

Application of FRP Pipes & Other Composites in Oil & Gas Sector: Opportunities and Challenges

Seeing through software

Deep Water Technology A Focus on Drilling US-China Oil & Gas Industry Forum

Pipeline Design & Installation Systems

Global Subsea University Alliance: Subsea education and research programs. Prof Brian Evans Curtin University, Perth Australia

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Well Control Considerations of MPD on Deepwater Rigs

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

Drilling Courses Overview Pressure control and drilling equipment course offering

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

James Fisher Offshore. Your specialist partner in the delivery of subsea and topside projects.

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Subsea Wellhead Solutions

Table of Contents. Gregg S. Perkin, P.E. Engineering Partners International August 26, 2011 EXPERT REPORT MACONDO

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Lifting & Positioning Solutions for the Oil & Gas Industry. Onshore Offshore Subsea Marine

Macondo Blowout Lessons Learned for Prevention and Mitigation

Subsea Well Engineering

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

Design and Concept Integration- MPD Technology in Deepwater Rigs. Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion

july aug HPHT operations pose escalating challenges for operators, suppliers all drilling, all completions, all the time

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company

Casing while Drilling. Enhanced Casing Installation

Composite Drilling Riser Investment Program PANGAEA DRILLING TECHNOLOGY LLC

Building Subsea Capability in a Major Operating Company

PDynamic. Positioning Committee. Marine Technology Society. Dynamic Positioning Conference September 18-19, 2001

ENSCO 8500 Series. 11 April Mark Burns Senior Vice President Western Hemisphere. David Hensel Vice President North and South America

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Marine Well Containment Company Outer Continental Shelf Summer Seminar

Transitions in Natural Gas Systems, including Transportation

Chapter 02. Casing and Tubing

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

Using new monitoring and control technology to advance safety and asset integrity in the oilfield

Sinking of the Deepwater Horizon. 11 perish and 115 survive

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

UCON Connection Systems

The Lease Pumper s Handbook. Chapter 4 Understanding the Oil Well. Section B DRILLING OPERATIONS

Recent advancement in well-control technology improves safety and allows cost savings for well designs

Research for Ultra-Deepwater Production

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Learn more at

Offshore Pipelines. Capability & Experience

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

Comprehensive Plug and Abandonment Systems

AADE Houston Chapter. Group. 26 January 2011

DNV GL s 16 th Technology Week

INVESTIGATION REPORT VOLUME 2

Transcription:

INVEST White Paper Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole Engineering Development Advisory Committee J-DESC, JAPAN Corresponding Author: Yoshiyasu WATANABE, Tokai University ywata@scc.u-tokai.ac.jp Abstract Project Mohole was suggested in 1957 and started in1961 off the coast of Mexico, but ended in 1966 with 177 m drilling depth and 3560 m water depth. Since then, reaching the Moho has been a dream of mankind. Today, the project is called 21 st Century Mohole, which requests the operating water depth of more than 4000 m and drilling depth of more than 7000 m. Steel riser drilling system is the main current in the oil industry and Shevron succeeded in drilling the 3866 m deep hole under 3051 m water depth in GOM in March 2003 1). Further more, Discoverer Clear Leader, whose operating water depth is 3,658 m and drilling depth capability is 12,192 m, was constructed in March 2009 and Shevron plans to operate it in GOM for five years 2). Here, the present state of various technology developments such as managed pressure drillings, BOPs, casings and risers which will contribute to the 21 st Century Mohole will be reviewed and the outlook of the application of these technology developments to ultra deep water and ultra deep drilling will be discussed. 1. Present state of deep water drilling technology developments (1) Dual Gradient Drilling (DGD) system 3) and Riserless Mud Recovery (RMR) system 4),5) As shown in Fig. 1, DGD system returns drilling mud and cuttings from the seabed to the rig while drilling the top-hole section of the well, where the pore pressure and fracture pressure is proximate. As shown in Fig. 2, DGD system makes the difference between the pore pressure and fracture pressure of the top-hole increase and saves the quantity of casing strings. AGR Drilling Services calls the DGD system as RMR system with using riserless drilling for top-hole section instead of riser drilling, which is shown in Fig. 1. AGR, together with their Joint Industry Project partners Shell, BP and the Norwegian Research

Council, have undertaken a successful field trial of the RMR system at 1500 m water depth, prior to the installation of the riser in Malaysia in September 2008. Seawater Pumps (Existing Mud Pumps) Mud Return and Pump Seawater Power Line, Control Umbilicals Wellhead and BOP Return Line Drillpipe Seawater Filled Marine Riser Rotating Diverter Seawater-Driven MudLift Pump D e p t h f t Pressure, psi Seawater HSP Seafloor @ 10,000 12.4 ppg mud 13.5 ppg mud 23,880 psi @ 37,500 BHA Drill String Valve Fig. 2 Comparison of pressure gradient between single and dual gradient drilling Fig. 1 SubSea MudLift Configuration (2) Electro Hydraulic Multiplex Control System (EH-MUX) for BOPs 6) Cameron has developed EH-MUX for BOPs, which is required for subsea exploration in deep waters to provide rapid actuation of the subsea BOPs. This system reduces response time normally encountered with hydraulic control signals which may require excessive amounts of time, potentially resulting in unsafe conditions. Helix Energy Solution developed a Surface BOP Well Control Package for the use of 3,048 m water depth 7), where EH-MUX is adapted as shown in Fig. 3. Fig. 3 EH-MUX designed by Helix Energy Solution

(3) Surface BOP Surface BOP sits on the riser top, which locates above the sea surface or under the sea surface free from the effect of wave and tide. In this case, as the riser needs to endure the well pressure, the diameter of the riser and the maximum quantity of the casing strings become small. Furthermore, the drilling is limited to generally benign sea and weather conditions and the inner pressure of the riser could be limited to 5,000 psi (16-in. SBOP riser) or 10,000 psi (10 3/4-in. SBOP riser) 8). Fig. 4 designates the Surface BOP Well Control Package for 10,000 ft water depth, designed by Helix Energy Solutions 7). It consists of Surface BOP, Emergency Disconnected Package and Subsea Shut-Off Device. (4) Expandable Casing The diameter of the casing pipe is maximum at its upper end and decreases when the pipe goes down. The minimum diameter of the casing pipe at its lower end is determined by the minimum diameter of the drilling pipe that passes through the inside of the casing pipe. Expandable casing technology means that the casing pipe is expanded by an oversized hardened mandrill, which will be pulled through the pipe as shown in Fig. 5. The commercial application of the expandable casing started in 1999 and nearly 700 installations have been achieved to May 2007 worldwide by Enventure Global Technology 9). Accordingly, the expandable casing technology is applicable to the casings for the ultra deep water and ultra deep drilling. Fig. 5 Expandable casing technology by Enventure Global Technology Fig. 4 Surface BOP system designed by Helix Energy Solutions 7

(5) CFRP Riser Regarding the riser, the axial resonance of the riser with the heaving of the drill ship should be avoided in case of ultra deep water drilling. The axial period of the riser T, where the drill ship is in riser hung-off condition, is estimated as T=2π{(m+m r /3)/k r } 1/2, where m, m r and k r are the mass of LMRP, the mass of the riser and the axial rigidity of the riser, respectively, as shown in Fig. 6. The steel riser is used for Transocean Discoverer Clear Leader for 3658 m deep water drilling. However, composite risers such as CFRP (Carbon Fiber Reinforced Plastic) riser are indispensable for 4000 m and over 4000 m deep water drilling. In case of CFRP riser, m r decreases and k r increases. Accordingly, the axial period decreases and the resonance can be avoided. CFRP riser consists of CFRP pipe and steel connectors at the end of the CFRP pipe as shown in Fig. 6. The most important part of the CFRP riser is the connecting part of the CFRP pipe and steel connectors and the axial load is transferred through several pairs of threads provided at the connecting parts. The development of CFRP riser pipe for the water depth of 4000 m is now being pursued 10). It is shown that the tensile and fatigue strength of the CFRP riser is enough and the design for the 4000 water depth CFRP riser will be finished after checking the collapse strength under inner and outer pressure. Hoop Helical Hoop Helical 14 14 Strain gauge F2 F1 Helical layer 60 R2 R1 2r 5 Hoop layer Steel connector 6.41 F3 3.56 7.63 Unit : mm 280 280 LMRP Riser hung-off condition Steel connector 842.4 660 CFRP pipe Φ100 : Strain gauge : Displacement measuring point (1/5 scale experiment model of CFRP riser) Fig. 6 Riser hung-off condition and connecting part of CFRP pipe and steel connecter 2. Outlook of ultra deep water and ultra deep drilling The construction of Discoverer Clear Leader, whose operating water depth is 3,658 m and drilling depth capability is 12,192 m, encourages Chikyu to operate in the waters of more than 4000 m and drill the hole of more than 7000 m below the seabed. CFRP riser

and EH-MUX for BOP are the most promising technologies and with using them, the 21 st Century Mohole will be attained by Chikyu in the very near future. The technologies of Surface BOP, Expandable Casing and DGD/RMR system will also contribute to Chikyu. References 1) J. Dieffenbaugher,R. Dupre,G. Authement,G. Mullen,Y. Gonzalez,P.B. Tanche-Larsen: Drilling Fluids Planning and Execution for a World Record Water Depth Well,SPE/IADC Drilling Conference, 23-25 February,2005. 2) Offshore: New design drillship pushes operations depths to meet future needs, http://www.deepwater.com/_filelib/filecabinet/pdfs/offshore_magazine_drillships%2 01.pdf?FileName=Offshore_Magazine_Drillships%201.pdf 3) Jerome J. Schubert: Dual Gradient Drilling Basic Technology - Lesson 1, Introduction to DGD, 6 November, 2000. 4) RMR TM Riserless Mud Recovery System - a dual gradient system, agr_rmr_roger_stave.pdf 5) http://www.subseaworld.com/technology/agrvs-subsea-riserless-mud-recovery-rmr-tech nology-is-successfully-field-tested-02471.html: AGR s subsea Riserless Mud Recovery (RMR) technology is successfully field tested, 2008.10.13 6) http://www.c-a-m.com/content/products/product_detail.cfm?pid=2887:eh-mux: electro hydraulic multiplex control system 7) Helix Energy Solutions: Surface BOP Well Control Package for Well Ops Q4000 8) Drilling Contractor, Nov./Dec.2005: Pride s near surface BOP concept can increase water depth of semisubmersibles 9) Mark Holland: Expandable tubulars add to well-planning options, May, 2007. http://www.epmag.com/archives/features/402.htm 10) Yoshiyasu Watanabe etc.: Optimization of a Multiple Traplock Structure of CFRP Riser Pipe for Deep Sea Drilling, Proceedings of the Seventeenth (2007) International Offshore and Polar Engineering Conference.