MS-CEFB Filter Box. Installation Guide

Similar documents
Installation Guide. Grid Tie Interface (GTI) SW Series SW4024, SW4048, SW5548

Signal Mirror Installation Instructions Toyota Tacoma

Electro-Mech Scoreboard Co. Product Guide

AC MASTER Switch mode sine wave inverter

HUSTLER 7' & 8' POOL TABLE ASSEMBLY INSTRUCTIONS

INTELLIMETER REGISTER

MFJ-1835K34 40,30 METER ADD ON KIT FOR THE MFJ-1835 COBWEB ANTENNA INSTRUCTION MANUAL. CAUTION: Read All Instructions Before Operating Equipment

Single Arm Pole Mount. Installation Manual Edition v1.01. For models: UNI-SA/14 UNI-SA/21.5 UNI-SA/26 UNI-SA01-MAN

Digital Lighting Systems, Inc. PD804-DMX. Eight Channel DMX Pack. (includes information for PD804-DMX-S) USER'S MANUAL. PD804-DMX-UM Rev.

Instruction Sheet SNE SERIES. Cable Chase

Digital Lighting Systems, Inc.

Installation & Operating Manual. iwap202

Bi-Color Signal Mirror Installation Instructions

ASSEMBLY INSTRUCTIONS

Elliptical Unpacking and Installation Instructions

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Signal Mirror Installation Instructions

GMR FANTOM 50/120 SERIES INSTALLATION INSTRUCTIONS

ASSEMBLY INSTRUCTIONS

GMR 420/620/1220/2520 XHD2 SERIES INSTALLATION INSTRUCTIONS

WARNING Mercedes Benz GL550 4Matic Installation Instructions BX1992. Serial Number

WARNING Mercedes Smart for two CDI Installation Instructions BX1990. Serial Number

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Signal Mirror Installation Instructions

Please read BOTH these Installation Instructions and the General Instructions before attempting to install or operate this equipment.

INSTALLATION INSTRUCTIONS ATV WINCH MULTI-MOUNT Multi-Mount Mounting-Kit: PN Application: YAMAHA BIGBEAR 00+

Custom Pendant- Hardwire Assembly and Installation Instructions

Cisco Aironet 2.4-GHz/5-GHz 8-dBi Directional Antenna (AIR-ANT2588P3M-N)

ASPEN OUTDOOR TABLE TENNIS

Subject: P0052 Bed Locator Installation Instructions

MFJ-2100 INSTRUCTION MANUAL. CAUTION: Read All Instructions Before Operating Equipment

For detailed specifications and ordering info go to

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

STANDARD MICROWAVE COMBINER MODEL SMC-XX-X-HP-X

Installation and Operation Manual MSI. Multi-Sensor Interface Hub. Interface Module for all Sensors Network and Wireless CAUTION

GMR 420/620/1220 xhd2 Series Installation Instructions

Circuit Breaker Finder

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Installation Guide Flat Panel Antenna Mounting Kit For

Direct Burial Floodlight - DBF Installation Instructions Above Grade Housing

MODEL 3810/2 Line Impedance Stabilization Network

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

VAN STORAGE SOLUTIONS FOR THE WAY YOU WORK

POCKEY 3 IN 1 GAME TABLE

19" EIA SRD Swing Rack Installation Instructions

AIS 300 Installation Instructions

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Vi6208, Vi6216, Vi6232 Vi6308, Vi6316, Vi6332

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Please read BOTH these Installation Instructions and the General Instructions before attempting to install or operate this equipment.

WARNING VW Jetta New Installation Instructions BX3823. Serial Number

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

SURE SHOT DUAL ELECTRONIC BASKETBALL GAME ASSEMBLY INSTRUCTIONS

4-Piece Table Tennis Table

OSMAC RDR Low-voltage Retrofit Kit

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Included in Hardware Kit 4. Toyota Tundra, B- & D-Cab, CrewMax. Set Part # Rev STEP 1 PRIOR TO INSTALLATION

Model: SS660-PT-R Stainless Steel Poly-Top Floor Scale Series. Installation, Set-Up and Operation Manual

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

PLEASE CHECK ALL BOXES FOR HARDWARE BEFORE DISCARDING

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

PRIMO 56" FOOSBALL TABLE ASSEMBLY INSTRUCTIONS

Fletcher F-3000 / F-3100 Accessory Laser Kit

LJ element beam for 10 or 12 meters INSTRUCTION MANUAL. CAUTION: Read All Instructions Before Operating Equipment

WARNING. Serial Number. BX Ford Taurus With Adaptive Cruise Control Installation Instructions

RAZOR. Class D Full Range & Monoblock Amplifiers RZ4-1200D RZ4-2000D RZ1-1500D RZ1-2300D

GE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -

Signal Mirror Installation Instructions Honda Odyssey

For all Davis weather consoles including Vantage Pro2,

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

TOYOTA TACOMA LED BED LIGHTS Preparation

Digital Lighting Systems, Inc. PD402-DMX-RP. DMX512 4 x 300W Reverse Phase dimmer. DMX Address Hexadecimal = [ (S2 x 16) + S1 + 1 ]

5001 INSTALLATION AND OPERATING INSTRUCTIONS

#27541 Mobile Laptop Charging Station

IMPORTANT WARRANTY & INSTALLATION INSTRUCTIONS ATTACHED

PLEASE CHECK ALL BOXES FOR HARDWARE BEFORE DISCARDING

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

AFB (AIR FAN BEARING) INSTALLATION GUIDE

WORLD-BEAM QS18AFF200 Sensors with Foreground Suppression

WARNING Honda CR-V Honda Element Installation Instructions BX2232. Serial Number

QuadroMAX. Installation Manual. QM Series. LED Outdoor Lighting Fixtures REV: 3/22/16

BX Chevy Suburban/Tahoe (No Adaptive Cruise) 2015 GMC Yukon/Yukon XL (Includes Denali)

MASS SINE 24/ V

DB-2345 INSTRUCTION MANUAL. 308 Industrial Park Road Starkville, MS USA ph:(662) Fax: (662) Made in USA

MODEL M1023 QUICK CHANGE COLLET ATTACHMENT INSTRUCTION MANUAL. Phone: On-Line Technical Support:

Installation Procedures For Corvette Basic/C-6 SNS 28

4 Channel Frequency Conscious Noise Gate. Operation Manual

Assembly Instructions. GK2200T TREADMILL ASSEMBLY INSTRUCTIONS Frame Assembly 120V 220V

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

OWNER S MANUAL #DC2V3 #DC2V3CF 1-1/2 HP, 1500 CFM DUST COLLECTOR. VERSION 1 -w/ 6 INLET PORT. Model #DC2V Global Rd.

PLOW MOUNT KIT FOR CAN-AM MAVERICK P/N ASSEMBLY / OWNERS MANUAL

WARNING. Bolt Torque Specifications Torque in Foot-Pounds for Inch Bolts Bolt Size Grade 5 Grade 8

AT Advanced Wire Tracer. Users Manual

HOLE CUTTER SHARPENER ASSEMBLY & SERVICE MANUAL

Installation Instructions

Transcription:

MS-CEFB Filter Box Magnum Energy, Inc. 2211 West Casino Rd. Everett, WA 98204 Phone: 425-353-8833 Fax: 425-353-8390 Web: http://magnumenergy.com Installation Guide

Introduction Introduction The CE Filter Box (PN: MS-CEFB) is an EMI (electromagnetic interference) filter designed to control conducted emissions on the AC and DC side of Magnum Energy s MS-E and MS-PE Series inverters. It is used to ensure that stringent international standards for electromagnetic compatibility (EMC) are met. For specific EU directives and standards see info on the back page. Refer to Figures 1 & 2 below to identify the MS-CEFB filter box s features. Top Cover Air Intake Vents Cover screws (x4) (#25 Torx) Filter Base DC Ground Connection Dual knockouts (x3) (1.9 and 2.5 cm) Negative DC Terminal Positive DC Terminal Figure 1, MS-CEFB Front Side Features Inner Flange AC Output Wires AC Input Wires Negative DC Busbar Positive DC Busbar Mounting Holes (x2) Toroid AC Ground Connections AC Input/Output Terminal Block DC Ground Connection Negative DC Terminal Positive DC Terminal Figure 2, MS-CEFB Inside Features 1 2014 Magnum Energy, Inc.

Knockouts and Dimensions Introduction The MS-CEFB provides knockouts for use with ¾ and 1 trade size* conduit, and adds just over 20 cm to the length of the inverter (see Figure 3). * Trade size refers to standard North American conduit. Actual openings are approximately 2 cm and 2.7 cm. 16.8 cm 20.3 cm 16.5 cm Top 32.1 cm 27.1 cm 29.8 cm 28.7 cm 14.5 cm Front Right Side Note: All four mounting holes are approx. 6.4 mm (¼ ) 7.6 cm Left Side Figure 3, MS-CEFB Dimensions 2014 Magnum Energy, Inc. 2

GENERATOR POWER (230VAC OUTPUT) UTILITY POWER (230VAC OUTPUT) AC TRANSFER SWITCH MS-CEFB WITH MAGNUM INVERTER 230VAC POWER TO INVERTER DC SHUNT DC BREAKER ME-ARC BTS MAIN PANEL 230VAC PASS-THRU POWER TO SUB-PANEL SUB-PANEL BATTERY BANK Figure 4, Simplified Installation Diagram 3 2014 Magnum Energy, Inc.

Installation CAUTI: Before installation, closely read and review all safety information and procedures in this guide and in your inverter owner s manual. WARNING: The inverter uses power from both AC and DC sources. Before beginning the installation, ensure all AC power (utility/generator) and any negative/positive battery cables are safely disconnected from the inverter. Review the simplified system diagram shown in Figure 4 to assist you in planning and designing your installation. This drawing is not intended to override or restrict any national or local electrical codes. This drawing should not be the determining factor as to whether the installation is compliant, that is the responsibility of the electrician and the on-site inspector. Safety Requirements The MS-CEFB should be reliably and permanently grounded (i.e., earthed) to the system s earth terminal. No plug or socket connection of the ground wire is allowed. The EMI (electromagnetic interference) filter should be grounded before connecting any power to the MS-CEFB. This bleeds relatively high leakage currents through the filter common-mode capacitors to safety ground, and removes hazardous voltage potentials from the filter body. Installation Considerations In all installations, the inverter and the MS-CEFB should be installed on the same metallic ground plane. Ensure all metal mating surfaces used for connecting the inverter to the MS-CEFB are clean of paint, oil or grease. It is recommended that equipment sensitive to EMI should be kept at least 25 cm away. Any communication cable (remote, network, stacking and BTS) should be separated from the AC IN and AC OUT power cables. Parallel runs of cables should be avoided when possible. Cross-over of all cables should be done at 90 degrees. Unpacking and Inspection Carefully remove the MS-CEFB filter box from the shipping container and inspect all contents. Verify the following are included: MS-CEFB filter box Ferrite core DC terminal insulators (one black, one red) MS-CEFB Owner s Manual If items appear to be missing or damaged, contact your authorized Magnum dealer or Magnum Energy. Save your proof-of-purchase as a record of ownership; it will be needed if the unit should require in-warranty service. Tools Needed #2 Phillips screwdriver 3/16 ( 4.8 mm) flat-bladed screwdriver 1/2 wrench/socket 11/16 wrench/socket 7/16 wrench/socket 2014 Magnum Energy, Inc. 4

MS-PE or MS-E inverter Remove AC access cover (#2 Phillips*) * Tool needed to remove Stage I Prepare Inverter Remove DC +/- terminal nuts (1/2 Hex*) Remove DC ground hardware (7/16" Hex*) Remove cover screws on each side (#25 Torx*) Stage II Connect Filter Box to Inverter Note: Before re-attaching the inverter s DC terminal nuts, ensure the filter s DC busbars are properly fitted over the terminal bolts. Stage III Attach & Tighten Hardware Figure 5, Attaching the MS-CEFB to the Inverter 5 2014 Magnum Energy, Inc.

Installing the MS-CEFB Installation Prior to installation of the filter box, the inverter/charger must be prepared. To prepare the inverter (Figure 5, Stage I): 1. Remove the inverter s AC access cover (will need access to inside the inverter to remove the DC ground connection and to wire AC connections). 2. Remove the inverter s DC positive and negative terminal nuts/washers. 3. Remove the DC ground connection from the bottom left corner on the front side of the inverter (reach into the AC terminal block compartment to secure the hex nut while unscrewing the bolt on the outside of the inverter using a 7/16 wrench/nut driver). Refer to Figure 6. 4. Remove the two #25 Torx screws that hold the inverter cover to the base located on each side of the inverter s front. To prepare the MS-CEFB filter box: 5. Detach the top cover of the filter box by removing the four #25 Torx screws that secure the cover to the base. 6. Determine the AC and DC wiring through the filter box, and then remove the appropriate knockouts (Figure 3). Note: Magnum does not provide additional strain reliefs or conduit for the knockout holes; to add either, you must supply the hardware. To attach the MS-CEFB to the inverter (Figure 5, Stages II & III): 7. Attach the filter box to the inverter using the two #25 Torx screws that were removed from the inverter cover in Step 4. Ensure the filter box s DC busbars align over the inverter s positive and negative DC terminals. 8. Secure the filter box s mounting flanges preferably to the same mounting surface used for the inverter. 9. Re-attach the DC ground connection removed in Step 3 the ground s Hex screw fits through the inner flange on the filter box (Figure 6). 10. Re-attach and tighten the inverter s DC positive and negative terminal nuts/washers that were removed in Step 2 securing the filter box s DC busbars to their respective DC terminals on the inverter. Torque to between 13.6 and 16.3 N-m (10 to 12 ft lbf). ¼-20 Hex nut* Inverter Int. tooth ¼ lock washer (x2) * Use 7/16" wrench (or socket) MS-CEFB inner flange Ground lug ¼-20 x ¾ Hex screw* Figure 6, Re-Attaching the DC Ground Hardware 2014 Magnum Energy, Inc. 6

To wire the inverter s AC terminal block (top of Figure 7): 11. Route the filter box s AC input/output wiring through the appropriate knockouts/strain reliefs on the inverter, and then connect to the inverter s AC terminal block. Connect wire A (white w/ black stripe) to Terminal #1 (AC NEUT OUT). Connect wire B (blue) to Terminal #2 (AC HOT OUT). Connect wire C (black) to Terminal #3 (AC HOT IN). Connect wire D (white) to Terminal #4 (AC NEUT IN). Tighten all to a maximum torque of 3.6 N-m (32 in lbf). To wire the filter box s AC terminal block (bottom of Figure 7): 12. Route the AC input source/output load wiring through the appropriate knockouts/strain reliefs on the filter box, and then connect to the filter box s AC terminal block. Connect wire F (brown) to Terminal #1 (INV HOT OUT), and then route and connect to the sub-panel. Connect wire G (blue) to Terminal #2 (INV NEUT OUT), and then route and connect to the sub-panel. Connect wire H (blue) to Terminal #3 (INV NEUT IN), and then route and connect to the main panel. Connect wire I (brown) to Terminal #4 (INV HOT IN), and then route and connect to the main panel. Tighten all to within a minimum/maximum torque of 1.2 N-m (10.6 in lbf)/1.5 N-m (13.3 in lbf) using a 3/16 (4.8 mm or less) flat-bladed screwdriver. Note: The AC input source, output load, and grounds ( i.e., brown, blue, and green with yellow stripe wires) are field wires and must be provided by the installer. Info: Approved wire sizes for the MS-CEFB s AC terminal block are 0.5-16 mm² (#20-6 AWG). To wire the AC input/output grounds (bottom left of Figure 7): 13. Connect an AC ground wire from one of the filter box s ground terminals to the main panel s ground busbar. 14. Connect another AC ground wire from the filter box s other ground terminal to the sub-panel s ground busbar. Tighten both grounds to a maximum torque of 5.1 N-m (45 in lbf). Info: Approved wire sizes for the MS-CEFB s ground terminals are 2-33.6 mm² (#14-2 AWG) copper stranded. To inspect the AC wiring: 1. Verify all wire runs are secured. 2. Verify strain reliefs or grommets are in place to prevent damage to the wiring or conduit where it passes through walls or other openings. 3. Verify that all AC connections are correct, and all inverter and filter box AC terminal screws are properly torqued. 4. Replace the inverter s AC wiring access cover. 7 2014 Magnum Energy, Inc.

A B C AC Terminal Block (AC input/output wiring) D Note: AC GROUND not needed AC NEUT OUT (to Sub-Panel) AC HOT OUT (to Sub-Panel) 1 2 3 4 AC NEUT IN (from Main Panel) AC HOT IN (from Main Panel) MS-E or MS-PE Series Inverter/Charger MS-CEFB B A INV NEUT OUT (to Sub-Panel) INV HOT OUT (to Sub-Panel) 1 2 INV NEUT IN (from Main Panel) 3 INV HOT IN (from Main Panel) 4 C D F G H I AC GROUNDS in/out E Figure 7, AC Wiring 2014 Magnum Energy, Inc. 8

To wire the MS-CEFB filter box to the battery bank: 1. Route the end of the positive DC battery cable from the battery bank through the supplied red DC terminal insulator (do the same for the negative DC cable using the black DC terminal insulator). The insulators protect the MS-CEFB s DC terminals and can help prevent accidental shorts. WARNING: Before connecting the DC cables from the battery bank to the MS-CEFB, ensure DC overcurrent protection has been installed and the correct DC voltage and polarity have been verified. 2. Connect the positive and negative battery cables to their respective terminal posts on the front of the filter box. When connecting the battery cables to the filter s DC terminals, the cable s ring lug should be placed directly against the filter terminal (Figure 8). Torque to 20.4 N-m (15 ft lbf). 3. Fit the red and black DC terminal insulators (that were routed over the DC battery cables in Step 1) over their respective terminal posts. WARNING: DO NOT close the DC circuit breaker or connect the fuse to bring battery power to the inverter at this time. This will occur in the Functional Test after the installation is complete. Info: Refer to your inverter owner s manual for the required DC wiring sizes and overcurrent protection. MS-CEFB DC terminal (3/8"-16 bolt, 22 mm usable length) CAUTI: Ensure nothing is placed between the DC terminal and ring lug. Battery cable (with ring lug) 3/8" SS Flat washer 3/8" SS Spring washer 3/8"-16 SS Hex Jam nut* * Use a 11/16" wrench or socket Figure 8, MS-CEFB DC Hardware Installation Communication Cables When connecting a communication cable (remote, network, stacking or BTS) to the inverter, a ferrite core must be connected to one end of the cable. A ferrite core is shaped like a metal doughnut and is a passive electronic component used to suppress high frequency noise in electronic circuits. It is used to reduce EMI that may be transmitting, and prevents the cable from acting as an antenna and receiving interference from other devices. Info: The BTS cable and another communication cable (e.g., remote cable) can both fit and be separately wrapped three times into a single ferrite core. However, if using more than one cable with a single ferrite, all must go in the same direction around the core. 9 2014 Magnum Energy, Inc.

To attach the ferrite core to a communication cable (Figure 9): 1. For each communication cable, route one end through the ferrite core and wrap it several times around/through the core. There needs to be at least three full turns around the ferrite core. 2. While wrapping the cable around the core, ensure the core is located as close as possible to one end of the cable [within 2.5 to 5 cm (1-2 inches) from the end]. The result should look something like Figure 9 below. Note: Once the core is attached to the cable, plug the core-connected end of the cable into the appropriate RJ11 port (Stack/Accessories, Remote, Network, or BTS) on the inverter. Communications Cable Note: Multiple cables can be wrapped around a single ferrite core, but each should have three full turns ensure each goes in same direction around core. Ferrite Core Note: This end to be connected to inverter port. Figure 9, Ferrite Core Attached to a Communication Cable Final Inspection After all electrical connections to the inverter, batteries, AC source, and sub-panel have been completed, follow the steps for the Functional Test as directed in your inverter owner s manual. Note: When verifying the correct DC voltage, check the filter box s positive and negative DC terminals with a multimeter. When verifying the correct AC output voltage, check the filter box s AC terminal block NEUT OUT, HOT OUT, and GROUND poles with a voltmeter (Figure 10 below). Once your system passes all the steps, attach and secure the filter box s cover. AC Output 230 VAC (± 5%) Blue Brown Neutral to Ground < 0.5 VAC Figure 10, AC Voltage Checks 2014 Magnum Energy, Inc. 10

EU Standards/Limited Warranty EU Directives and Standards A MS-CEFB (CE Filter Box) connected to a MS-E or MS-PE Series inverter/ charger conforms to the provisions of EMC Directive 1999/5/EEC, per: EN 55014-1 (2006) +A1, +A2, (> 1000W) Electromagnetic compatibility Requirements for household appliances, electric tools and similar apparatus Part 1: Emission EN 55014-2 (1997) +A1, +A2, Electromagnetic compatibility Requirements for household appliances, electric tools and similar apparatus Part 2: Immunity Product family standard EN 61000-3-2 (2006) +A1, +A2, Electromagnetic compatibility (EMC) Part 3-2: Limits Limits for harmonic current emissions (equipment input current 16 amps per phase) Additionally, these products conform to the C-Tick Mark requirements based on the provisions in standard AS/NZS CISPR 14-1:2005. Limited Warranty Magnum Energy, Inc. warrants the CE Filter box for a maximum of 12 months from the product s original date of purchase according to the following terms and conditions: 1. The limited warranty extends to the original purchaser of the product and is not assignable or transferable to any subsequent purchaser. 2. During the limited warranty period, Magnum Energy will repair or replace at Magnum Energy s option any defective parts, or any parts that will not properly operate for their intended use with factory new or remanufactured replacement items if such repair or replacement is needed because of product malfunction or failure during normal usage. The limited warranty does not cover defects in cosmetic appearance, or any decorative, structural, or non-operative parts. Magnum Energy s limit of liability under the warranty shall be the actual cash value of the product at the time the original purchaser returns the product for repair determined by the price paid by the original purchaser. Magnum Energy shall not be liable for any other losses or damages. 3. Upon request from Magnum Energy, the original purchaser must prove the product s original date of purchase by providing a dated bill of sale or itemized receipt. 4. This limited warranty is voided if: the product has been modified without authorization; the product has been damaged through abuse, neglect, accident, or corrosion; the product was not installed according to this installation guide. 11 PN: 64-0066 Rev A