SECTION III SUBMITTALS AND APPROVALS

Similar documents
BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

Clarifications in italics added July 2018

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

KC Water Rules and Regulations For Water Main Extensions and Relocations

Lincoln County Public Works Water and Sewer Submittal Application

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

10010 RECORD DRAWING INFORMATION

1.1 GENERAL RECORD DRAWING REQUIREMENTS

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

Babcock Ranch Water Utilities as operated by Town & Country Utilities and Babcock Ranch Irrigation

PLANNING AND DEVELOPMENT

List of Figures. List of Forms

Public Works City of Lebanon, Tennessee; Department of Public Works

Facility Services Subgroup Preface for Divisions 21` through 28

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

Peters Township Sanitary Authority 3244 Washington Road McMurray, PA 15317

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

Plan Submittal and Review Checklist

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

Oil-Water Separator Design Checklist

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

Residential Construction Checklist Single and Two Family Construction

Grease Interceptor Design Checklist

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

Washington County Road Engineering Plan Submittal/Review Checklist

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

3. DESIGN SPECIFICATIONS

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

CITY OF MUSKEGO DRAFTING STANDARDS

TOWN of LAKESHORE SITE PLAN CHECKLIST

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Sewer Line Extension Permit Design Checklist

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Onslow Water & Sewer Authority

Application for Site Plan Review

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

SUBDIVISION PLAT APPLICATION

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

.1 Applicability: These criteria shall be applied as follows:

HAMILTON SOUTHEASTERN UTILITIES, INC. SANITARY SEWER COMPLETION SPECIFICATIONS

Section Meetings Section Material and Equipment. None Required

Appendix C Construction Details

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

CONCEPT REVIEW GUIDELINES

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

APPENDIX D: DRAWING SUBMISSION STANDARDS

CHAPTER 11. Plan Standards

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Procedure to Petition for Plat Review and Site Plan Review

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

B17. Sewer Site Plans BULLETIN

City of Massillon Site Plan Checklist

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

STATE UNIVERSITY CONSTRUCTION FUND

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

APPLICATION FOR SITE PREPARATION PERMIT

Lee Lake Water District

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION SUBMITTAL PROCEDURES

Operating Standards Attachment to Development Application

1. Land survey Work. 2. Civil and Structural engineering services.

STREETSCAPE FEASIBILITY TERMS OF REFERENCE

CITY OF NAPERVILLE DEVELOPMENT SERVICES TEAM ELEVATOR INSTALLATION/MODERNIZATION/REPAIR

Subdivision Application Checklist

Plan Review and Standards

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

CONSULTANT ACCREDITATION SCHEME SEWER DESIGN

Transcription:

SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District (hereinafter referred to as the District ) has divided the process into three (3) parts: Preliminary Approval, Final Approval, Notice of Construction Activity, Shop Drawings, Operation and Maintenance Manuals and Project Completion and Takeover. The submittals required for each part are described herein: A. GENERAL 1. Developers shall secure all necessary permits for any projects that are submitted to the District office for review. Copies of permits shall be forwarded to the District. 2. All developments to be served with public water shall also be served with public sewer. Likewise all developments to be served with public sewer shall be served with public water. 3. All developments shall install utility services to all adjacent properties located along major avenues of approach as identified by the master service plans for the area. 4. All connections to the existing District water system or sanitary sewer system must be approved and inspected by the District s personnel. 5. No water or sanitary sewer system shall be put into service until the permit to operate as issued by the South Carolina Department of Health and Environmental Control (SCDHEC) is received by the District. 6. A project "checklist" for new water and sewer system construction is included in the Appendix. This "checklist" will be utilized by the District to track the status of development projects. All applicable items must be "checked off" prior to the District s acceptance and takeover of the system(s). 7. The District shall have exclusive retail rights. III-1

8. If a meeting is necessary between the Developer, the Developer s Design Engineer, and the District, an appointment should be made by calling the District Engineer, telephone (843) 681-5525. 9. Submittal packages are to be sent to the District as follows: District Representative Hilton Head No. 1 Public Service District PO Box 21264, Hilton Head, SC 29925-1264 (843) 681-5525 Attention: R. Gregory Rushing, P.E. 10. Allow four (4) weeks for review by the District. B. CAPACITY AND CONNECTION FEES 1. The Developer shall pay the District all applicable capacity fees before the issuance of any service commitments from the District. 2. Capacity fees shall be calculated as follows: a. Sewer capacity shall be as listed on the SCDHEC Contributory Loading Schedule 61-67, Appendix A. b. A 25% credit shall be allowed for water saving devices. c. Water capacity shall be calculated by multiplying the sewer loading determined above by 1.5. d. Residential Equivalent Units (REUs) shall be calculated by dividing the total sewer loading by 300 GPD. e. Capacity fee rates are as follows: i. Sewer Capacity $3,040 per REU ii. Water Capacity $2,400 per REU 3. Connection fees shall be paid when the actual connections for service are made. Connection fees shall be as follows: a. Water Meter Installation Fee (Existing Service Line) i. ¾ Inch Meter $355 ii. 1Inch Meter $490 iii. 1-1/2 Inch Meter and Above Time and Materials III-2

b. Water Meter Installation Fee (No Existing Service Line) i. 3/4 Inch and 1 Inch Meters $1,020 ii. 1-1/2 Inch and Above Meters Time and Materials c. Sewer Inspection Fee (Existing Service Line) i. $100 d. Sewer Service Installation Fee i. Individual 4 Inch Lateral $1,200 ii. Main Extensions, Laterals above 4 Inches, and Mains Greater than 6 feet in depth Time and Materials 4. The District retains the right to withdraw capacity commitments upon a 30-day notice for any reason. 5. The Developer may not obtain capacity from a third party without the written permission of the District. 6. The District retains the right to repurchase capacity. C. PRELIMINARY PLAN APPROVAL 1. Developers, Designers, Planners, Engineers and others associated with implementing projects should meet with the District s Planning Staff to review plans and specifications and coordinate proposed projects with the District s long-term development master plan. 2. The Developer s Design Engineer shall submit a preliminary review package to the District. The package is to include two (2) sets of plans and specifications stamped Preliminary Not For Construction and one (1) copy of all design considerations and calculations for the proposed systems. Plans shall show pump station site dimensions, location of access roads to the site, all easements and rights-of-way necessary for the site, water mains, sewer lines, force mains, and appurtenances. 3. When the above items 1 and 2 are completed to the District s satisfaction and when all applicable fees are paid, the District will issue capacity and service commitment letters to SCDHEC with copies to all involved parties. D. FINAL PLAN APPROVAL III-3

1. The Developer s Design Engineer shall: a. Submit a final review package to the District indicating corrections requested by the preliminary review. The final review package shall contain two (2) sets of corrected plans and specifications to be checked and approved by the District prior to submission to SCDHEC. b. Upon approval of the project by SCDHEC and the issuance of all required permits and prior to construction, provide the District with the following: 1) Two sets of approved plans and specifications, stamped For Construction. 2) One copy of all required permits. 3) Name and address of all Contractors and Sub-Contractors. 4) Proposed Construction Schedule. 5) Signed request to tie on to the District s system. 6) Written permission for on-site observation of the work by the District s personnel. 7) All property information including County Tax Map Number. c. Following all final approvals of the project, schedule a pre-construction conference with the District. d. Notify the District in writing of commencement of work seven (7) days prior to starting construction. e. Submit to the District a written Monthly Project Inspection Report indicating each time the Developer s Design Engineer inspected the project and a summary of work observed. E. NOTICE OF CONSTRUCTION ACTIVITY 1. Immediately prior to the beginning of construction the Notice of Construction Activity form, as included in the appendix, is to be completed and mailed to the District. III-4

F. SHOP DRAWINGS 1. Provide shop drawings of items specified herein for review and approval. 2. The Developer s Design Engineer is to review shop drawings in compliance with the District approved plans and specifications and the District s for Water and Sanitary Sewer System Design. a. Shop drawings not having the Developer s Design Engineer stamp of "Approval" or "Approved As Noted" will not be accepted. 3. Submit two (2) copies of shop drawings to the District for review. 4. Make shop drawings accurately to a scale sufficiently large to show all pertinent aspects of the item and its method of connection to the Project. 5. Where contents of submittal literature from manufacturers include data not pertinent to the submittal, clearly show which portions of the contents are being submitted for review. 6. Installation of equipment or materials prior to the District s approval of shop drawings will not be allowed without prior written approval from the District. 7. Review by the District does not relieve the Developer s Design Engineer from responsibility for errors which may exist in the submitted data. 8. Make revisions required by the District and resubmit revised shop drawings. 9. Submittals are required on the following items: a. Water system 1) Hydrants 2) Gate valves 3) Ball valves 4) Butterfly valves 5) Valve boxes 6) Curb stops 7) Corporation stops 8) Piping a) Ductile iron b) PVC III-5

c) Polyethylene 9) Ductile iron pipe fittings 10) Restrained joint appurtenances (including gaskets) 11) Metallic detection tape 12) Copper tracer wire 13) Hydrant offset fitting 14) Service saddles 15) Air release valves 16) Blowoff hydrant b. Sanitary sewer - gravity 1) Piping a) Ductile iron pipe b) PVC 2) Manholes 3) Manhole covers and frames 4) Manhole coatings and liners 5) Service line c. Sanitary sewer - force main 1) Piping a) Ductile iron b) PVC 2) Air release valves 3) Manholes 4) Manhole coatings and liners 5) Manhole frames and covers 6) Ball valves 7) Plug valves 8) Check valves 9) Restrained joint appurtenances (including gaskets) 10) Metallic detection tape 11) Copper tracer wire d. Sanitary sewer - pump station 1) Ductile iron piping 2) Ductile iron fittings 3) Plug valves 4) Check valves 5) Ball valves 6) Pressure gauges revised March 1, 2006 III-6

7) Uniflange fittings 8) Pipe couplings 9) Access hatches 10) Quick connect couplings 11) Wetwell vent 12) Concrete vault 13) Concrete wetwell 14) Wetwell liner 15) Cable holder 16) Electrical equipment 17) Pump control panel 18) Pumps 19) Float switch 20) Ultrasonic level controller 21) Valve vault drain 22) Double check backflow preventer and box e. Pipe in casing 1) Casing 2) Spacers 3) End seals 10. Duplicate submittals for items that apply to both gravity sewers, force mains and pump stations, i.e. ductile iron pipe, etc., will not be required. G. OPERATION AND MAINTENANCE MANUALS 1. Prior to start-up provide the District with operation, maintenance, and service manuals (O&M Manuals) for each piece of equipment. 2. Prepare and submit six (6) copies of O&M Manuals for each piece of equipment. 3. The O&M Manuals will be prepared in the format that follows: a. Manuals shall be specific to the equipment supplied. 1) Manuals applicable to many different configurations and which require the operator to selectively read portions of the instructions will not be accepted. 2) The equipment model that the manual applies to shall be indicated by an arrow. III-7

b. Table of Contents specific to each manual. c. At the beginning of each manual, provide a description of the equipment to include model numbers, purchase order numbers, serial numbers, motor information, and performance and design criteria. d. Correlate manuals with approved shop drawings and include the following minimum information: 1) Parts list, including recommended spare parts list. 2) Guaranties. 3) Recommended maintenance instructions. 4) Recommended lubricants and lubrication instructions. 5) Address and telephone numbers of the source for repairs, spare parts, and service. 6) Detailed description of operating procedures for the item of equipment specifically written for this installation, including startup and shut-down procedures. 7) Equipment performance specifications, including pump curves. 8) Results of start-up and any further recommendations resulting from start-up. e. Provide a maintenance and lubrication schedule to be a summary of all preventative maintenance and lubrication, including the following information: 1) Title 2) Type of activity (inspection, adjustment, oil changes, etc.) 3) Brief description of activity 4) Type of lubricant 5) Frequency (daily, weekly, etc.) f. Provide clear and legible copies. Type parts lists, etc. g. Layout and detail drawings shall be reduced to a maximum size of 11" x 17", unless written approval is received from the District prior to submittal of manuals. h. Provide a clearly labeled three-ring binder for manuals having thickness greater than ¼. 1) Provide sheet lifters. III-8

H. PROJECT COMPLETION AND TAKEOVER 1. Upon completion of construction, the Developer s Design Engineer shall: a. Submit to the District a written request for final inspection. This may be a copy of the letter sent to SCDHEC requesting final inspection. b. Certify in writing that the water and/or sanitary sewer system has been constructed in accordance with the District approved Plans, Specifications, applicable permits and good engineering practice. Be available on site for a final inspection by the to insure that all construction adheres to these guidelines. c. Submit to the District a water system certification form signed by a registered professional engineer in the State of South Carolina (See Appendix D). d. Prior to final inspection provide the District with two (2) disks with AutoCAD release 2002 (minimum) files, three (3) sets of prints of "As Constructed Record Drawings. These drawings shall reflect all as constructed conditions for mains, water service and sewer lateral placement in the format that follows: 1) Show station marks at all valves, manholes, fire hydrants, blowoffs, water and sewer services and air release valves. 2) Show line lengths and termination points. 3) Valves are to be located by distance to two permanent reference points. 4) Water and sewer laterals are to be located by distance to two permanent reference points. 5) Indicate top elevation of manholes and invert elevation of manholes. 6) Show final gravity sewer and force main profiles. 7) Reference benchmarks on drawings and tie to National Geodetic Vertical Datum of 1929 (NGVD29). 8) Show all recorded plat and easement information on the Mylar plan. 9) Drawing data must be submitted in the State Plane Coordinate System. 10) Drawings must be clearly legible and of good quality. III-9

e. The District will verify the accuracy of the As Constructed Record Drawings prior to issuing an acceptance letter. If errors are found to exist, then the drawings will be returned to the Developer s Design Engineer and the system acceptance letter will not be issued until corrections are made. 2. The Developer shall provide the District with an instrument of conveyance, conveying the constructed system to the District free and clear of all liens, at no cost to the District and the system shall thereafter be owned, operated, and maintained by the District (See Appendix). 3. As part of the conveyance, the Developer and/or the Developer s Design Engineer shall furnish the District with a copy of the plat for pump station sites and all easements for water and sewer mains, service laterals, and appurtenances that will be conveyed to the District along with the original of the deed to the pump station site and all originals of the legal instruments conveying the easement to the District (See Appendix). 4. The Developer shall furnish an irrevocable one (1) year guarantee of all construction completed (See Appendix H). 5. The Developer shall furnish certified letters indicating: a) The value of the water distribution system and the sanitary sewer system and the value of any associated pump stations (See Appendix I). b) The quantities of the systems installed: i.e., the number of manholes, valves by size, fire hydrants, clean outs, and the length of each size of mains, service and laterals. 6. The Developer shall certify in writing that all applicable fees have been satisfied. 7. When the above Items 1 through 6 are completed to the District s satisfaction and all other buried utilities have been installed, the District will issue an acceptance letter to SCDHEC with copies to all involved parties. Until such time as this letter is provided and SCDHEC s letter allowing the systems to be placed into operation has been received, NO CONNECTIONS TO THE SYSTEMS WILL BE PERMITTED. III-10