SHADOW ARRAY SOUTH TERMINAL REDEVELOPMENT PROJECT. DIA. PATRICK MAROLD STUDIOS INC 2013

Similar documents
Three Chamber Bat House

FAQ: What s Included In My Handcrafted Log & Timber Frame Package?

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

Installation Instructions. Tools Needed. Tape measure. Level. Shovel or Post hole digger. Concrete. Drill. Stakes. Mallet or hammer.

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

FENCE INSTALLATION GUIDE 8 HIGH WALLS

Principles of Architectural Design Lec. 2.

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

Installation Guide. deckorum Composite Decking

Architectural Design Process

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc.

Review: Sculptor Patrick Marold Explores New Directions at Goodwin

TRELLIS. Trellis SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION

Checklist for Minor Plan Modification

MIRA Purpose MIRA Tomographer MIRA MIRA Principle MIRA MIRA shear waves MIRA

Connect Transit Shelter

FLUSH WOOD DOOR AND MODERN JAMB SPECIFICATION GUIDE

Checklist for Tentative Subdivision Map

Unirac Installation Manual

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives.

ART 212 THREE DIMENSIONAL DESIGN COURSE ASSIGNMENTS

10x10 Trellis Pergola

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

TRELLIS. Trellis Project Plan #852 Sheet 1 of Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks.

Allow 2 on either side extra at the eave. Allow 2 on either side extra for the base of the house. Min. 22 for wheels

Structural Criteria for Residential Flush-Mounted Solar Arrays

Oakland Watershed Art Markers: Final Design by Wowhaus. Presented June, 2010 & July 2010

Unirac Installation Manual

Load Tables, Technical Data and Installation Instructions

Foundation Specifications for Type ES45T-T and ES45T-R 4.5-Meter Earth Station Antennas

PV System Structural Criteria

ROOFING City of Grand Rapids Building Safety Division

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

Structural Criteria for Residential Rooftop Solar Energy Installations

PROJECT INSTRUCTIONS Roofing

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Structural Criteria for Residential Rooftop Solar Energy Installations

Section 808. FENCING

Steep-Slope ApplicAtionS

A. Rough carpentry includes but is not limited to the following:

The Bluffs at Eagle. Design Review Application. Date Bluffs Lot Number Street Address. Address. and/or fax. Address. Owner (if different) Phone

Connection Design Examples

COMPACT DECK. Compact Deck SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION

PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.

This specification describes the minimum requirements for structural steel drawings.

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

GROUND-LEVEL DECK. Ground-Level Deck Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks.com

Slope Floor. Measurement Methods

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE

COMPACT DECK. Compact Deck Project Plan #850 Sheet 1 of Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks.

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603

Precast s Plasticity Enhances Design Options - Articles I & II

Precast s Plasticity Enhances Design Options - Articles I & II

Installation Guide. Deckorum. Composite Decking

COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles

(Toll Free); 7am-7pm Pacific Time, Monday-Saturday REGAL SUNROOM GAZEBOS

Multi-Institutional Academic Health Science & Research Center Evansville, IN

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

FENCE INSTALLATION GUIDE 6 HIGH FENCE

Installation Instructions

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Sections & Details VOCABULARY

SECTION WOOD DOORS

10x10 Trellis Pergola

White Paper WP008. Cover. 1/14 1/14 Architectural Precast Applications. Architectural Precast Applications

Installation Instructions for Solar Snow Pad (SSP-T-3)

Standard 25 Wide Structure

DECK PERMIT APPLICATION PACKET

4Wrap piece 7 around a rod. 5Remove piece 7 from the. 6Close up the join in both

Promontory Architectural Review Committee

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

Wisconsin Technical College System. Curriculum Standards & Program Design Summary CARPENTRY APPRENTICE (ABC)

10 CTN 5 BDL 3 WF 1 SKID 1 SLIDE 20 TOT. PCS. 1067# TOT. WT. Class 70

FENCE INSTALLATION GUIDE 3, 4, & 6 HIGH FENCE

Construction Tolerances - The following tolerances apply to cast-in-place structures:

1.1 RELATED DOCUMENTS

24' - 0" 99' - 0" B15 B16 B17 B18 B19 SLOPE SLOPE BIKE STOR. / SERVICE 2 ACCESSIBLE COMMUNITY ACCESIBLE BIKE BIKE STORAGE ROOM STORAGE

TRASH CAN & FIREWOOD STORAGE UNIT

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later

Installation Instructions

PART XII: TOPOGRAPHIC SURVEYS

SMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)

(Toll Free); 7am-7pm Pacific Time, Monday-Saturday LATTICE GAZEBOS

580 - NOISE BARRIERS OPSS 580 INDEX

TREX POST MOUNT DECKING AND CONCRETE

CEDAR SOLID BOARD FENCE

Project Booklet. Structural Drafting with AutoCAD

FACE PANELS & INSTALLATION INSTRUCTIONS MANUAL, MECHANICAL ASSIST & ECLIPSE POWERED SYSTEMS TM SECTION I SECTION II SECTION III SECTION IV SECTION V

Horizontal Cable Systems

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

The Vienna Trellis. Tools You Will Need. General Information

Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing.

Gateway Island Ashland, Oregon A Public Art Proposal. Pete Beeman NW Lovejoy St Portland, OR (971)

Transcription:

SHADOW ARRAY SOUTH TERMINAL REDEVELOPMENT PROJECT. DIA. PATRICK MAROLD STUDIOS INC 2013

The Shadow Array is a sculptural installation that will enhance and activate the valley of the South Terminal Redevelopment Project at DIA. The log elements will introduce an environment that utilizes the solar exposure of this space and its grand scale to visually engage the viewer with the land and sky, enveloping them as they enter the valley on the arriving train or as they leave the terminal and walk onto the platform. From the public plaza and the hotel, the shadow and patterns will become distinctly apparent, as will the entire panoramic composition of the work. Seasonal transitions and the daily passage of the sun will produce multiple characteristics, and the evening lighting will be calibrated to fully reveal the array, balancing the light with the surrounding environment and cyclical variations. The concept presents a linear composition aligned to project a shadow array onto the valley s ground plane, inverting the role of the physical elements to become the negative space, while the shadows become strokes projected on the slopes of the valley. Each individual element is calibrated and treated independently to align a collective body that acts as one form on this scale, blending characteristics of land and sky. Superposed patterns between the logs and their shadows will change and respond to the viewers changing perspectives, as well as the sun s position in the sky. This concept utilizes the collective appearance of the log and shadow array with the geometry and proportions of the valley to enrich our awareness and experience of the South Terminal Valley.

SHADOW ARRAY. DIA STRP. PATRICK MAROLD STUDIOS 2013 NORTHERN VIEW FROM BRIDGE

SHADOW ARRAY. DIA STRP. PATRICK MAROLD STUDIOS 2013 VIEW FROM AIR

SHADOW ARRAY. DIA STRP. PATRICK MAROLD STUDIOS 2013 SOUTHERN VIEW FROM PLAZA DECK

SHADOW ARRAY. DIA STRP. PATRICK MAROLD STUDIOS 2013 SOUTHWESTERN VIEW FROM THE PLATFORM

SHADOW ARRAY. DIA STRP. PATRICK MAROLD STUDIOS 2013 VIEW FROM ROADWAY

The final lighting design for the Shadow Array is still under development. The favorable approach is to flood each array with a series of white LED lamps. These lamps will be mounted on the opposite side of the valley, casting an evenly dispersed body of light, that is controlled and limited to the opposing valley slopes. The lighting values and hues, all in the range of white, will transition throughout the night from dusk to dawn to further activate the sculpture and engage the characteristics of the surrounding evening environment. Installation of the lighting system will be coordinated with the STRP site schedule. SHADOW ARRAY. DIA STRP. PATRICK MAROLD STUDIOS 2013 LIGHTING CONCEPT

SHADOW ARRAY. DIA STRP. PATRICK MAROLD STUDIOS 2013 PLAN VIEW AND LAYOUT

The Shadow Array consists of approximately 245 unique log elements, mounted on the East and West slope of the South Terminal Redevelopment Valley at DIA. Each log is paired with another, joined at the wide ends to create an obtuse angle that is elevated above the sloping grade. There is an array of approximately 65 of these angled components on each side of the valley, placed and calibrated to cast shadows onto the ground plane. Each component corresponds with the neighboring components to complete an elliptical composition that measures approximately 700 feet from the North to the South, and from valley edge to edge. The log components are supported by structural steel posts and knife plates that are anchored by concrete foundation piers below grade. Each component is elevated 6 above grade at its lowest point and approximately 10 at the tips. The logs will range in size, and will typically average 22 in diameter at the butt end, and about 8-12 at the tip. The species of logs that will be used are Douglas Fir, Englemann Spruce and Lodgepole Pine. That majority of these will be trees salvaged from burn areas, beetle kill zones, or as part of a forest thinning program to improve the health of the Colorado Forests. The logs will be trimmed of all branches and peeled to remove all bark, and will retain the natural character and irregularity of the tree they once were. Processing of the logs will be performed off site at a staging location near DIA. The entire installation will be staged and sequenced in preparation for installation. Concrete piers will be drilled and poured on the valley slopes in order to support the structural steel elements that the logs will be placed on. Each component, or matched pair of logs, will have 3 piers supporting it. The engineering documents detail this construction. Once the concrete foundations are in place with the steel supports, the final grade will be applied to the valley slopes by another contractor in coordination with Valerian Landscape Architecture and the STRP. At this point the logs will then be installed and fastened into position. It is expected that the logs will be craned into place, with a ground crew handling and securing each pair to the steel posts and knife plates. For general schedule projections, refer to the Estimated Project Schedule of this document. grade adjustable steel el post log elements steel knife plate adjustable steel post concrete piers Valley Slope

SHADOW ARRAY. DIA STRP ESTIMATED SCHEDULE 2013 2014 2015 4th quarter 1st quarter 2nd quarter 3rd quarter 4th quarter 1st quarter 2nd quarter 3rd quarter 4th quarter Finalize Layout and Engineering. Submit plans and Collect Logs, Store and Process at Staging Site documents Stage Log Array and Prepare for Installation Survey Site, Drill and pour concrete piers Fabricate Structural Steel Components Deliver Log Array Install Structural Steel Components Install Shadow Array finalize lighting design run power to site to feed lighting install lighitng hardware and controls test and focus lighting system irrigation installed for landscape final soil ammendment and final grade applied Milestones Preliminary and Final Design Fabrication of Artwork Installation of Artwork Final Acceptance