Kanban Tetris ABOUT ITERATIVE The benefits of Iterative are that it:

Similar documents
Assembly and Installation Guide

Sentinel Series Cigar Humidor End Tables

Programmable Timer Teaching Notes Issue 1.2

ILLUSTRATOR BASICS FOR SCULPTURE STUDENTS. Vector Drawing for Planning, Patterns, CNC Milling, Laser Cutting, etc.

Sketch-Up Guide for Woodworkers

ORTHOGRAPHIC PROJECTION


The Revolve Feature and Assembly Modeling

SolidWorks Design & Technology

Write It Do It #1: Stereotypical Build - Images. Front view:

Missing Sequence. You have 10 minutes to complete this test. Select the square that comes next in the sequence.

We have made a summary with a few steps to follow, to help you solve the most common problems.

ILLUSION CONFUSION! - MEASURING LINES -

Harmony Remote Repair

PRODIM CT 3.0 MANUAL the complete solution

Mountain Girl Bracelet

ADVICE FOR USING THE BLUEPRINT

788XL Dado Jig Owners Manual Please Read Carefully!

Fryer's Trebuchet Paper Kits

Modular ottoman. assembly instructions

the complete parts reference bricks

Allen Diagnostic Module. Instructions For Making Sample

1. Creating geometry based on sketches 2. Using sketch lines as reference 3. Using sketches to drive changes in geometry

Paper Prototyping Kit

INSTALLATION AND CARE INSTRUCTIONS

How To Make A Simple Circuit & Switch

Trebuchet Construction Instructions

Full details of the products you ll need including the colours of Decracraft Felt, can be found on the next page.

3B SCIENTIFIC PHYSICS

Build your own. Pack. Stages 23-26: Begin assembling Robi s right foot

DARC MANSION ASSEMBLY INSTRUCTIONS page 1.

EBTRON a measurable difference!

Installation And Care Instructions. Vertical Honeycomb Shades

machines 608 Trestle Point Sanford, FL Phone Fax

INSTALLATION AND CARE INSTRUCTIONS

Copyrighted Material. Copyrighted Material. Copyrighted. Copyrighted. Material

A smaller drawing space in proportion to these sizes works just as well.

How To Install Asphalt Shingles. Part 1 of 3: Preparing the Roof. Tutorial

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS

southpaw enterprises, inc.

Wheelchair Quilts. A guide to make fitted quilts for those in a wheelchair

Engineering Graphics- Basics.

BUILD YOUR OWN. Pack 12

2016/02 Hideo Nakano STRAW KITE

Hubble Space Telescope Paper Model Directions Downloads, patterns, and other information at:

ATLANTIS RAIL Contact Information

Customized Foam for Tools

Applying Fret Space Numbers and/or the Label Set to a Fretted Fingerboard

The first task is to make a pattern on the top that looks like the following diagram.

Cambridge International Examinations Cambridge International General Certificate of Secondary Education. Published

Stitch- A- Long with Carol

Facings and Lining - Part 2

Dutch Sudoku Advent 1. Thermometers Sudoku (Arvid Baars)

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Custom Grille Insert

Xylophone Teaching Notes Issue 1.3

WARNING: Prior to installation, turn the power off to the vending machine and unplug it from its power source. Also, make sure to level the machine.

Chapter 22. Shed Construction

Graceful Gathers Bag Instructions 5x7 Hoop Size

Big Oz. Rocket. User Guide V0313

How to Make a Template

Fall is Here! Draw Package Drawing and Coloring Tools. October 2014

CODINCA. Print & Play. Contained in this document are the files needed to print out and make the following game components:

understanding sensors

1Smooth pieces 4, 5 and 6, using

4" Round Fieldstone Tower

TIP FOR GETTING STARTED

UNIVERSITY OF WATERLOO Physics 360/460 Experiment #2 ATOMIC FORCE MICROSCOPY

Solutions to Exercise problems

The Value Uncertainty Game

I've Seen That Shape Before Lesson Plan

Lawson SSR Registration System Instructions

Sentinel Series Cigar Humidor End Tables

Product must be installed as shown using the screws and brackets provided. Use of incorrect hardware could result in damage to the product.

Sample Questions for the Engineering Module

Long & Short Stitch Lesson 5: Shading on a Curve

Module 2: Radial-Line Sheet-Metal 3D Modeling and 2D Pattern Development: Right Cone (Regular, Frustum, and Truncated)

Instructions. Assembly

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Installation Instructions

Over the Range Microwave Oven

with MultiMedia CD Randy H. Shih Jack Zecher SDC PUBLICATIONS Schroff Development Corporation

Top Down Assembly Modeling Release Wildfire 2.0

[INTERMEDIATE 3D MODELING IN TINKERCAD]

EBTRON a measurable difference!

790XL Dado Jig Owners Manual Please Read Carefully!

BEFORE YOU BEGIN Read these instructions completely and carefully.

31 Notes EMBROIDERY STITCHES MODULE - 6B. Embroidery Stitches

Margaret Moorehead s. Virtual Sewing Guild Video Series

This chapter gives you everything you

Additional Supplies: Tools, Adhesives & Ink: Notes:

P.O. Box 8400 Green Bay, WI (920)

Micro USB Lamp Kit TEACHING RESOURCES. Version 2.1 DESIGN A STYLISH LAMP WITH THIS

USS ENTERPRISE BRIDGE

A Cross Drilling Tape, Version 1.2

week ONE Sewing 101 Getting Familiar with your Sewing Machine NOTES TO THE ADULTS #janomecamp18 Page 1

Your EdVenture into Robotics 10 Lesson plans

THE GREEN CLUB PROJECT

#MADEUNIQUE SHELL YEAH BAG BEGINNER

Sean Skirt. By: burdastyle.

Transcription:

Kanban Tetris Section 1. Overview 1.1 Purpose This game introduces the basic mechanics of Kanban to a team already familiar with Iterative (scrumlike) development. It demonstrates how Kanban regulates production flow. 1.1.1 ABOUT ITERATIVE The benefits of Iterative are that it: enables regular, periodic feedback from the customer allows the team to self-limit the amount of work done in any iteration By having breaks in the work, encourages Kaizen on a periodic basis 1.1.2 ABOUT KANBAN The benefits of Kanban are that it Is a continuous-flow production method limits the amount of Work in Progress that a system can have By making the process flow visible, encourages Kaizen The Kanban system is a pull system. The signal to produce for the upstream processes is a depletion of their finished inventory store below a certain amount. In the diagram below, all stations have a target inventory store of three units, so will produce if there are less than three items. Diagram of the Kanban System Modeled By This Game Prioritized Backlog Design Des Construct Done Test CUSTOMER PUSH Req Req PULL WIP PULL IDLE PULL WIP Done Req Reg Completed Product This station is idle because it has a full inventory store (two items)

Section 2. The Game We are a lego construction company, specializing in multi-colored tetris walls. The greater the area of contiguous (solid) wall, the more successful the wall is likely to be in the market place. Our company is divided across the basic functions that you would expect in any development team: 2.1 Set Up 1. Customer Requirements / Product Mangement 2. Design 3. Construction / Development 4. Testing & Integration / Quality Assurance The process goes anti-clockwise around the table. Sheets of white paper are taped between the stations to indicate the inventory stores are. The Lego (three colors) is placed in the center, reachable by the Construction Station. Each station is set up as follows: Customer Requirements A thick pen (Sharpie etc), scrap Quad-Ruled paper, Sticky Note pad (upside down) Design - A thick pen (Sharpie etc), several sheets Quad-Ruled paper, Scissors Construction - Lego Test & Integration Lego platform base (32x8)

Section 3. Customer Requirements Station 3.1 Inputs We are building a wall 32 units across, and as high as possible. As the Customer, you will specify your requirements in terms of the base dimensions. The team will deliver units of Lego that will go to construct your wall. The top of the wall will not be flat, however, so as you build up, your requirements will have to take into account the shape of the top of the wall. It is advised to keep a sketch of your requirements 3.2 Process 1. Each customer is associated with a unique color of Sticky Note notes so that the Products are clearly identifiable as being theirs (in this example, Blue) 2. TIP: Write on the BACK of the Sticky Note, as this will help the downstream teams keep the requriements and the designs together 3. Write the priority order (the order in which you will be constructing your wall) on the Sticky Note, and circle this number so it is clear. Each customer will have their own sequence. You should work from left to right. 4. Specify your requirements for the blocks that you want the team to construct. Draw a sketch of what the base should look like for the first row of course, these will all be a straight line as the wall will start on the ground. Indicate how many across and up by writing the dimension next to the drawing. 5. You are only allowed 32 across in total (and will not know until the wall starts to be constructed what the second row will look like, so don t get too far ahead of yourself 3.3 Output Acceptance Criteria Each customer should use a unique color for their requirements Number your requirements in the order from left to right that the wall should be constructed. The dimensions you specify are the dimensions of the base that this block needs to fit on to. Dimensions should be between 3 and 7 wide

Section 4. Design Station 4.1 Inputs What it Means You should pull the requirements from the backlog in the order specified. Each color represents a different customer. Treat each one equally unless told otherwise The dimensions are the dimensions of the base that this block needs to fit on to. As designer you have discretion over the rest of the shape. 4.2 Process 4.3 Output 1. Wait until there is a empty slot in the Design Inventory on your right. 2. Pick out the highest priority Requirement Sticky Note (the lowest number) from the backlog on your left. 3. Draw out the detailed requirements on the Quad Ruled paper. 4. Cut around the shape. 5. Attach the design to the requirement card. 6. Attach the completed design the Sticky Note, and place both onto the empty slot on the Design Inventory. 7. Repeat Acceptance Criteria - The total number of squares must equal 15 No overhangs are allowed. This is to ease the integration stage. Indicate which way is up using an arrow Every shape should be unique you can t just specify rectangular building blocks for example! Blocks also need to be unique across customers don t give two customers the same design!

Section 5. Construction Station 5.1 Inputs 5.2 Process 5.3 Output What it Means Your end result needs to look like this when viewed head-on Each square along the x axis represents one block width. Each vertical represents a line of blocks. The arrow indicates which way the lego should face. There should be no over-hangs in the design. If there are, reject the design The design should encompass 15 squares in total 1. Wait until there is an empty slot on the Construction Inventory on your right. 2. Take a Design & Requirements Sticky Note out of the Design Inventory on your left. 3. Use up to three colors to construct the shape. 4. Place the constructed Lego blocks, along with the Design, and the Requirements, on the empty slot on the Construction Inventory to your right. 5. Repeat. Acceptance Criteria - No two adjacent blocks should be the same color Only the face matters it does not matter if you have lego blocks overhanging at the back of the structure (this is to make the brick selection easier)

Section 6. Test & Integration Station 6.1 Input 6.2 Process What it Means Your are presented with the Requirements (the Sticky), the design (the Quad-ruled outline), and the finished story Different colored Sticky Notes represent different customers (and hence different walls!!!) The circuled number on the Requirements Sticky Note indicates the order of construction, from left to right. Walls are only 32 units across once you ve reached 32, start the next row. 1. From the Construction Inventory on your left, take a the highest priority constructed Lego Block (this is the lowest numbered as per circled number on the Sticky Note) 6.2.1 VERIFICATION 2. Check that the base dimensions match the requirements on the Sticky Note 3. Count the squares enclosed on the design it should be 15 4. Verify that the construction meets the design shape 5. Verify that no adjacent blocks are the same color. 6.2.2 INTEGRATION / ASSEMBLY PROCESS 1. Assemble the wall from the pieces in the order specified by the requirements. 2. Start each customer s wall on a different base We really don t care what the back looks like.

6.3 Output A beautiful wall without any missing bricks in the middle!