R/V L ATALANTE D SHEET METAL WORKS SHIP REPAIRS In your fixed prices, you shall include the paint treatment after sheet metal works.

Similar documents
Kiosk Solution W1000. Installation and Assembly Instructions July 2015 Edition

Table of Contents. Prime Industries, Inc.

More Storage Space Under Yacht Bed

T3500 #131 Sole Repair & Re-setting. Adding Access to the Hidden Bilge

SE5a Instrument Board part 2 - rev 1.1

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

installation guide 1 GUIDE#: pwb-assault-004

Design Guide for Hot Dip Galvanizing best practice for venting and draining

535A. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

HYDRAULIC CONTROL DETAILS PARTS LIST

INSTALLATION INSTRUCTIONS

HAPPY HUNTER BUILD LOG

FORWARD FUSELAGE SIDES & REAR TOP SKINS

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

Precision Steel Car s 100 T Steel Coil Car

STANDARD CANOPY WORK REPORT B-1

NAVSEA STANDARD ITEM

Building Instructions Diva cabin boat

BEFORE YOU BEGIN Read these instructions completely and carefully.

Main Drive Components

Heavy and Medium Duty Fire Doors

Introduction: The model should be assembled following the sequence of the stages of construction described in these instructions.

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

installation guide 1 GUIDE#: pwb-assault-001

NAVSEA STANDARD ITEM. 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure

Building a Gas Forge Some New Thoughts on Gas Forges

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent.

FINNEY7 4500G May17 SR 4500G TENDER. Fig 1. Original Appearance. Side raves Sanding gear Front water fillers TIA Water treatment system

NAVSEA STANDARD ITEM. 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure

TECHNICAL SPECIFICATION FOR STEEL DRY CARGO CONTAINER 6'x1960mmx1920mm TYPE

ALFRA PRESS. Made in Germany by ALFRA

ITB-48 - Industrial Tool Box (48") 2 x Gas Struts

How to Build Your Custom Teardrop Camper. 5 x 10 Trailer. 5 Tall Cabin

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard

BUILDING A SHIP S STOVE

BMW E46 Coupe 3dr MP Bolt in (BMW Race Days Only) Roll Cage (B045) Fitting Instructions

Body Repair. Collision Repair. Specification. Fastener Specifications Fastener Specifications. Blind Rivet. Flow Drill Screw (FDS) Torque FDS

LAN84207 Installation Instructions Single Point Hydraulic Kit for 50 Series STS Combines. 270 West Park Avenue Huron, SD

March weeks. surcharge for

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

RESolution V2 Manual

no mm no Dividers with scriber 150 mm NEW Square wedge-shaped knife edges on the length side

San Felipe: Step by Step Pack 6

EMB MANUFACTURING INC.

Privacy Wall Glass Selections - Polished Edge Slider Door

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B

BEFORE YOU BEGIN Read these instructions completely and carefully.

Over the Range Microwave Oven

Stand Alone Rudder Angle Indicator System

MSR/MSB Mechanical Setting Tool

PERFORM WITH PRECISION MAGNETIC PRODUCTS FOR PRECASTING CONCRETE CONSTRUCTION SOLUTIONS BROCHURE

MUTINEER AND BUCCANEER TOP-MOUNTED CENTERBOARD HANGERS. Note, drawing not to scale Bob DeRoeck May 31, 05

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Insertion Transducer On-line Install Instruction

INSTRUCTION MANUAL Q-HYDRAULIC

Feed Drawer Rebuild, for Models, 22HF, 16HF, 1600 machines

Continue gluing the remaining top parts ensuring the angled piece is glued well. Set aside and let dry. See photo below

STC-COMBI - Industrial Storage & Tooling Cabinet Package Deal

Hunter 34 Compression Post Repair

installation guide 1 GUIDE#: PWB-wwpontoon-pol-004

Ford F150 Front Bumper

Manufacturing Process:

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket.

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

SECTION COMMON WORK RESULTS FOR HVAC

Owner s Manual #TSGUARD

DX450 Red-D-Arc PARTS LIST FOR RETURN TO MAIN INDEX

WTC Industrial Mobile Tooling Cabinet Workstation

CS3 represents manufacturers of products for use in the municipal waterworks industry.

BP Brine Pro Brine Maker. Parts List. This Parts List is for BP-2000 brine makers with serial numbers beginning with and higher.

INSTALLATION INSTRUCTIONS

BEFORE YOU BEGIN Read these instructions completely and carefully.

Cabins and Hatchways. Bluenose II Part 5

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

SELF-PROPELLED SCISSOR LIFTS PARTS MANUAL. ( For JCPT0807HD / JCPT0807DC ) WARNING

Factory Assistance: Phone: Fax: Page 1

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

D300K 3+3 SE KUBOTA PARTS LIST FOR RETURN TO MAIN INDEX

10. Vents, Baffle Guard and Blocking

Dura-Lock Roof System

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

Bateau.com PH18 CNC kit notes 1/5

CHIP AND DUST EXTRACTION SYSTEMS

535-Manual. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens

Liner Replacement (Stainless Steel Internal Components)

M-1 CORE RIG PARTS LIST. July 6, Part #

Merloni Elettrodomestici. Technical Fitting Manual FRIDGE. Language Issue/Edition Page GB /

1. Underframe/Tank Bottom

Spring Loaded All Season Roll-Up Doors

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

Installation and Maintenance Manual IM 770-1

Installation Instructions Student 101 Fume Cupboard

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

PARTS LIST COMMANDER 20 VAC-TRAC COMMANDER 27 VAC-TRAC FH 541V

Transcription:

R/V L ATALANTE D SHEET METAL WORKS SHIP REPAIRS 2014 In your fixed prices, you shall include the paint treatment after sheet metal works. 1. DECK THREADED HOLES OF THE AFT WORKING DECK SWL: 2,5 T Repair of the threaded holes, the thread of which (M 30) is damaged. At the beginning of the work, the location of the deck threaded holes concerned will be presented to the shipyard. A location plan will be given to the shipyard. Two actions are possible: 1.1 Complete replacement of the threaded hole - Removal of the threaded hole, cutting of underlying stiffeners. - Chamfering of the deck sheet metal. - Check of positioning between-centres of the threaded hole. It is imperative to be sure of the thread defined in the transversal and longitudinal directions. Unless there is another definition on the plan the following holes threads shall be observed : - Transversal thread: 800 mm. - Longitudinal thread: 1100 mm. - Upper welding in several passes. - Grinding of the welding in order to be flush on deck. - Rewarding of under-deck stiffeners (gussets, flats, carlings) and welding under the deck of the threaded hole. - Inspection of the wildings with dye penetration test.. Chapter D D - 1

1.2 Repair by insert - By a carefully centred magnetic pillar drill, drilling from one side of threaded hole to the other to the suited diameter, - Via 2 taps supplied by owner, tapping of the drilled hole at thread M 50 x 1.5 Taps: Brand: TITEX PLUS M 50 x 1.5 B 218 No. 1 and no. 3 - Installation of the insert supplied by owner Insert: Material: a.c.42 Outside threading: M 50 x 1.5 Inside threading: ISO M 30 - Braking of the insert by strong thread brake Loctite. - The upper surface of the insert shall be flush on deck or lightly recessed.. General note for the 2 options: - The threaded holes and inserts are supplied by owner. - At the request of the Bureau Veritas inspector: - Some welds can be X-rayed. - Some threaded holes can be tested at SWL of 2.5 tons. - Removing and refitting ceiling panels under the decks may be necessary as shall be work in state control. - For option 1 Welding the approach work under the decks (remove / refit of pipes, etc.) shall be included. Chapter D D - 2

2. ULTRASONIC THICKNESS MEASUREMENT OF SHEETS See BV rules and table on the next page (age>15). Note: commissioning of the vessel is 1990. Following plans will be read on board before measurement : - 278 CM 0/1 B : structure générale - planche 1-278 CM 0/2 B : structure générale - planche 2-278 CM 0/3 A : coupes d échantillonnage milieu - planche 1-278 CM 0/4 A : coupes transversales d échantillonnage - planche 2-278 CM 2/1 C : développement de bordé Before survey, a meeting will be carry out with Bureau Veritas inspector, the superintendent and society responsible of measurement thickness. Your prices include an expert report, in 3 copies and 1 computerized copy with the requirements of Bureau Veritas and IACS. Each point must be in tables with localization, type of structure, reading thickness and origin thickness. Thickness measurement shall be carrying out by an Bureau Veritas agreed society. To eventually carrying out quickly the replacement of sheet, a handwritten report will be given to the superintendent. FIXED PRICE per measure: Number of point < 500: Number of point > 500 and < 1000:.. Number of point > 1000 and < 2000:. Number of point > 2000:.. Note: in addition of requirements of Bureau Veritas, thickness measures will be carrying out in following rooms: - Bow thruster room floor - Tube hole floor - Midship store floor Chapter D D - 3

Chapter D D-4

3. MIDSHIP STORE FRESH AIR VENTILATOR FLAP VALVE Position: Deck C, Starboard of aft working deck - Removal of the flap valve - Supply and installation of an identical flap valve (with paint treatment) 4. STEERING GEAR ROOM USED AIR VENTILATOR FLAP VALVE Position: Deck C, starboard of the working deck - Removal of these flap valve, - Flaps condition check, protective paint. - Scrapping, picking, protective painting of ventilator flap valve, - Replacement of ball if necessary, - Refit. Chapter D D - 5

5. CONTAINER HANDLING Position: deck C, starboard passageway Number: 2 - Welding of brackets aft and fore of each eyebolt, - Test under 3 tons - Paint repair 6. STARBOARD DAVIT FRAME Location: deck C, starboard passageway under deck D floor. - Removal corroded plates, - Welding new plates with same origin thickness Chapter D D - 6

7. SEA WATER BALLAST N 7 Surface: 3 m² - Removal floor plate of the hold around manholes (starboard and port side) of sea water ballast n 7, - Weld a new plate and a new flush manholes (two), - Cut the sea water ballast n 7 air discharge pipe inside DO ballast n 10 - Paint treatment inside ballast and outside include Chapter D D - 7

8. TUBES HOLD To contain sea water on the front of the hold: - Gas freeing of DO ballast n 11, - Confection and weld a steel plate of height 100 mm just forward of a man hole across the width of the hold, - Confection of a pipe DN 40 until the drip tray of the hatch cover to the drain hole. 9. BULKHEAD PASSAGEWAYS Concern 3 cables passageways: - One located on deck G, on aft port side : diameter 110 mm Chapter D D - 8

- One located on deck E, aft starboard side: diameter 140 mm - One located on deck D, aft starboard side: diameter 140 mm - One located on aft deck F (removal the ceiling in the master cabin) For each cable passageway: - Cut the old part, - Refit a new part including the lock system Chapter D D - 9

10. AFT ROLLER FAIRLEADS - Removal rollers, - Cut the base of fairleads - Confection of a new base, - Refit rollers. 11. HAWSE HOLE ROLLERS See plan 278-AC-0/2 - Removal rollers - Sand blasting rollers - Paint treatment, - Refit rollers. Chapter D D - 10

12. FOLDING FLOOR FOR CONTAINER ACCESS Number: 2 Located deck E port and starboard side Dimensions: 2080 x 600 Thickness: 5 mm with bent edge of 60 mm - Removal of folding floors, - Confection of new folding floors, - Refit. 13. DECK HATCH Concern 2 deck hatches: - Hatch to access scientist control room: deck F - Hatch to access aft bridge Work to do: - Removal of hatch, - Cut corroded parts (flanged edge) and refection, - Paint treatment - Set a new gasket - Refit on board, - Tightness test. Chapter D D - 11

14. DOOR TO ACCESS AFT BRIDGE Located port side deck F. - Removal the door, - Removal ceiling inside, - Removal upper hinge, - Cut the support plate, - Refection hinge, - Weld the support plate, - Paint treatment, - Refit the door, - Tightness test. Chapter D D - 12

15. TECHNIC ROOM PORTHOLE Location: Deck F Dimension of porthole: 600 x 400 mm - Removal porthole - Replacement of hinges and axes, - Refit - Tightness test Chapter D D - 13

16. FREON CIRCUIT ON DECK G - Removal ceiling under the hole in the bridge (just above the ladder) - Removal protection of Freon circuit on deck G - Cut bracket mounting clamps, - Weld a double plate at level of the hole (dimensions: 200 x 200), - Weld plates (50 x 50 mm) on bracket mounting clamps, - Glue plates on deck with TEROMIX 6700 (supply by owner), - Paint treatment. 17. AFT CRANE - Total refection of the hydraulic unit box. - Paint treatment Chapter D D - 14

18. PORTHOLES (RECTANGULAR SECTION) WATERTIGHTNESS WORK Concerns the portholes (rectangular section) of deck F and deck E Deck F Fore wheelhouse: 14 portholes (13 fixed and 1 opening) Aft wheelhouse: 8 portholes (7 fixed and 1 opening). Deck E 4 portholes on the front. Dimensions of a porthole: 600 mm x 400 mm For each porthole: - Removal, - Replacement of seals (seal between glazing and frame if necessary) supplied by vessel. - Sanding, grinding and surfacing of the mating faces. - Replacement of hinges on the deadlight if necessary (for deck E), - Lubrication of hinges (for opening portholes). - Refit. - Inspection of the mating faces with chalk (for opening portholes). - Water tightness checks using a fire hose. FIXED PRICE by porthole... Note: If metal sheet work is necessary, this will be subject to an additional submission of prices. The painting work shall be work in state control. 19. PORTHOLES (CIRCULAR SECTION) WATERTIGHTNESS WORK Concerns the portholes (circular section) of decks B and C on the hull side Number of portholes: 35 as follows: 10 fixed and 25 opening. For each porthole: - Removal. - Replacement of seals supplied by vessel. - Sanding, grinding and surfacing of the mating faces. - Lubrication of hinges (for opening portholes). - Refit. - Inspection of the mating faces with chalk (for opening portholes). - Water tightness checks using a fire hose. FIXED PRICE by porthole... Chapter D D - 15

20. DOOR OF BATTERIES ROOM Location: Deck E on port side - Replacement of the door supplied by owner. 21. TRANSOM PLATE - Removal all Delta fenders, - Grinding of the part located under fenders, - Ultrasonic thickness measurement of the sheet, - Paint treatment, - Refit fenders. Note: If metal sheet work is necessary, this will be subject to an additional submission of prices. Chapter D D - 16

22. ACCESS LADDER FOR PILOT LADDER Currently, this ladder is not removable: - Cut pipes welded on the main rail, - Weld a tube on the main rail as shown on the scheme below - Refection of upper tubes on the access lader. Chapter D D - 17

23. SAFETY GUARD - Confection of four elements to close the aft part of the ship. - Material: aluminium - Dimensions: see scheme below Chapter D D - 18

24. AFT PORT SIDE SHELL PLATE Location: frame n 3 - Cut the frame around the deformation over a height of 800 mm, - Cut the shell plate of 300 mm either side of the deformation - Reconstitution of the shell plate (thickness: 8,5 mm) and the frame. - Paint treatment after work. 25. PORT GENAVIR LOGO - Removal the logo, - Cut stainless steel plates, - Weld steel plates - Paint treatment - Refit the logo. Chapter D D - 19

26. MAGNETOMETER WINCH - Removal winch (electric connexion by the crew), - Removal stanchions and footbridge, - After eventually sheet metal works and paint treatment, refit stanchions, footbridge and winch. Note: If metal sheet work is necessary, this will be subject to an additional submission of prices. The painting work shall be work in state control. 27. AFT ENGINE ROOM BLOWER DUCT Location: at port side, under the aft crane. - Cut the grid and the end of the blower duct (50 mm as shown below on picture), - Refection of the air duct, - Confection of a new grid that will be fixed by screw on the air duct, - Confection of a new plug, articulations, and locked system, - Paint treatment. Area to cut Chapter D D - 20

28. ADJUSTABLE PROJECTOR - Removal the direction system of the projector (axe and wheel) - Refection of the deck passageway - Refit axe end wheel, - Water tightness test. 29. NAVIGATION LIGHTS BOXES Number: 2 Location: on deck F - Removal lights and cables, - Removal boxes - Confection and fit new boxes, - Paint treatment, - Refit cables and lights. Chapter D D - 21

30. PROVISION CRANE FRAME Location: on fore deck E - Cut the upper forward part of the frame, - Identical refection, - Paint treatment. 31. SCIENTIST ROOMS BLOWER DUCT GRID - Removal of the grid, - Confection of a new grid - Paint treatment, - Refit the new grid. Chapter D D - 22

32. 50% AIR HANDLING UNIT - Removal the air register, - Cut the elbow of air duct to adapt the new air register, - Fit the new air register supplied by owner. Elbow to cut Air register to change Chapter D D - 23

33. PLATES UNDER DELTA FENDERS DECK D AND E Number: 8 Removal delta fenders, Removal ceiling inside at deck E (no ceiling deck D) Thickness measurement of the plate, Replacement of plate if necessary, Welding new screws Note: If metal sheet work is necessary, this will be subject to an additional submission of prices. The painting work shall be work in state control. Chapter D D - 24

34. CTD CONTROL UNIT BOXES Number: 2 Actual dimensions: 400 x 300 x 160 mm (without cover) - Removal cables and connexion, - Removal all equipment inside, - Confection of new boxes (in stainless steel) with dimensions: 450 x 370 x 210 mm (without cover), - Refit all equipment in the new boxes, - Cabling and trials. 35. GALLEY EXTRACTION DUCT Cleaning and degreasing of the duct. To be done while the duct extraction fan is being overhauled by the electrical team (avoid removing the fan). Area to clean and degrease: From the galley hood included to the extraction box on deck D starboard outside passageway. This corresponds, other than the hood and extraction unit, with the following duct segments marked on the attached plans: - 19, 18, 17 (section: 900 x 400 mm.) : length = 3600 mm. - 39, 40, 41, 42, 43 : length = 4000 mm. - 38, 37, 36, 35, 34, 33, 32 : length = 3500 mm. - 31, 30, 29, 28, 27, 26 : length = 4500 mm. Chapter D D - 25

36. SERVICE BOAT CRADLE - Confection a cradle for the service boat. - The size will be imperatively as a 20 container. - The three brackets in wood will be adapted to the shape of boat keel. Chapter D D - 26

37. EMERGENCY STOP FOR WILDEN PUMP - Confection of 3 bulkhead passageways for a cable of 16 mm, - Confection of a chipping on air pipe. Diameter of pipe: 22 mm Chapter D D - 27

38. DECK THREADED HOLES OF THE 800MM INSTRUMENTS WELL The 8 threads (M16) used to support the instruments are corroded and need to be drilled to the upper size (M18). See plans below. The work requested is, for each of the 8 threads : - Cleaning - Drilling to 18mm - Threading to M18 - Providing a brass cap to protect the new thread from further corrosion The 4 holes from the supporting structure must also be enlarged to 18mm, and appropriate screws must be provided (for example, FHC 18 x 30 stainless steel A4). Once done, the system will be tested by the crew to ensure proper operation.. Chapter D D - 28

39. WEIGHT 1 TONNE - Replacement of lifting rings, - Sandblasting - Paint treatment of two coats of anti-corrosive epoxy. 40. GALLEY FRIDGE - Removal the double plate on the bottom of the fridge, - Confection of a new double plate in stainless steel (without fixation to clean), - Dimensions of the bottom: 700 x 1280 mm. Chapter D D - 29

41. WORK IN STATE CONTROL Normal hourly rate:... Additional hourly rate (indicating the corresponding hourly slots):........................ Hourly rate for Saturday and Sunday:... (Idem) Hourly rate for public holidays:... (Idem) Enclose your special tool rates. NOTE: A statement of work, clearance, wear, replacement parts will be returned at board at the end of the technical stop: - 3 copies «paper», - 1 copy in digital format Are included in the visited items: cleaning units recovered, and removal of foreign matters in the bilge after works. When this is indicated, «paint treatment» includes: - 2 coats of anti-corrosive epoxy : 2 x 140 µm - 2 finishing coats : 2 x 50 µm - Paint is provided by Genavir. Chapter D D - 30