Door Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:

Similar documents
DBP Technical Data Series Rev. 0 Jan. 1, Pre Assembled Door Canopies

ALL SEASON PATIO COVER

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

CROSSBAR RAFTER ISOMETRIC

Kai Installation Instructions

ULTRA SPACE SAVER Installation Instructions

Allow 60 from door face

GLOSSARY OF TERMS SECTION 8

Pocket Shelter. Covered bike parking earns your site LEED credits.

Flush Mount Kit. SunEarth Flush Mount Kit Installation Manual. SunEarth Flush Mount Kit. Asphalt Shingle Roofing

Free Standing Frame and Canopy

Flush Mount. SunEarth Flush Mount Installation Manual. SunEarth Flush Mount. Asphalt Shingle Roofing

Connect Transit Shelter

Dura-Lock Roof System

ROOF CURB INSTALLATION INSTRUCTIONS: VERTICAL STANDING SEAM PANEL

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

Ford Pick Up Rear leaf Spring Kit Installation Instructions

V nyl Gazebo truct c it Assembly Instr ons

Austin Standing Seam Awning with Overhead Braces Assembly and Installation Instructions. Assembly Instructions

Double Beam Freestanding Pergola Installation Guide

DOCK WEDGE - STANDARD

KOLO SHELTER Installation Instructions Parts List

Installation Instruction

Series 1500 Aluminum Door Canopy

DW HORIZONTAL INSTALLATION

Installation Manual For ToddPod Outdoor Shower Enclosures

Installation Manual for Metal Emperor Lockers

Oxford Stalls Installation Instructions

P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

NUMBER OF HORIZONTALS REQUIRED FOR 2 ON CENTER SPACING.

Series 1100 Aluminum Door Canopy

Series Sloped glazed Curtain wall. Installation Instructions

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

ASSEMBLY INSTRUCTIONS JK270

KO LO SH E LT E R. High Capacity and Flexibility

5 5 8 " 60" 53 8 " " 7" 5 1 2" 7" " FIVE MODELS TO MEET YOUR DESIGN REQUIREMENTS.

Installation Instructions

Ultra Space Saver American Bicycle Security Company

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Modular Shelter Breezeway Assembly Instructions

PRODUCT INFORMATION Dero Space Saver Bike Racks

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

CYCL E STAT IO N. High Capacity

WALL TO FABRICATED FLOOR

Horse Shelter 12 x

8 x 8 Flat Top Pergola

Clopay Models 835/837 Sliding Door System Installation Guide

IN20733 Rev. B 1/06/2016

Hardware Pkg

Series Exterior glazed curtain wall. Installation Instructions

Empire & SunWise Collectors. Imperial Collectors. Copperheart ICS (asphalt shingles)

Installation Guidelines

Secure Bike Parking. Patent Pending Dero

table of contents Sliding Door Accessories Page Latches & Snuggers Stay Rollers Brackets & Stops

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

8 Ft Wide Enclosure Assembly Guide

The Mirage Pergola ASSEMBLY GUIDE. OPTIONAL ACCESSORY Bolt Down Bracket Kit. Ver 3/2009

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS FOR AZTEC SHELTER

Level, Pliers, 3/8" Electric Drill, Carpenters Square, Tape Measure, Metal Hack Saw, Silicone Caulking, Screw Drivers (Regular & Phillips)

CLEARSPAN GABLE STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. WITH GAZEBO END ATTACHED PATIO

10 x 10 Flat Top Pergola

Installation Guidelines

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required

Obtained from Omarshauntedtrail.com

Before returning this product to the store of purchase

INSTALLATION INSTRUCTIONS 3"/4 BENT END SIDEBARS FORD F-150 SUPERCREW PART # DZ /DZ

INSTALLATION INSTRUCTIONS

Shed Assembly Instructions

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

Installation Instructions. 45 and 60-Minute Fire-Rated Neutral Pressure Veneered Door Frame UBC & UL-10C

Transmission Line Support Systems

ATTACHED PERGOLA ARBOR INSTALLATION INSTRUCTIONS

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

VENTED GABLE DETAIL ROOF PANEL GABLE FLASHING 24" C/C MAX. BUTYL SEALANT TAPE ROOF PURLIN FLASH AB-1, AB-2, AB-3, OR AB-4

CountryAccents Pergola Assembly Instructions

STRATUS SHELTER. Take bike parking to new heights

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

Straight Stringer Installation Instructions

8 x 8 Flat Top Pergola

Copper Tubing Hangers Clevis Hangers. Copper Tubing Hangers

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

LAS VEGAS PATIO COVER INSTALLATION INTSRUCTIONS

OZARK DOOR CANOPY ASSEMBLY INSTRUCTIONS

Installation Manual for Metal Toilet Partitions Elite & Elite Plus Series

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

Track Rack. * Track Racks are not lockable

10 x 10 Flat Top Two Tone Pergola

CSS Central Mount System

Pergola Installation Instructions

Studio Face Xtreme 6020 Installation Instructions (Nickel , Black )

Page 1. FIG. #1 - Shower Door Assembly SHOWER & BATH ENCLOSURES BUILT TO LAST A LIFETIME HANDLE ASSEMBLIES REMOVED FOR CLARITY.

Unirac Installation Manual

INSTALLATION INSTRUCTIONS SIDE BAR FORD ESCAPE & MAZDA TRIBUTE PART #

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

ROOM FOLD SLIDING FOLDING INTERNAL DOORSET FITTING & FIXING GUIDELINES

Installation Instructions. 45 and 60-Minute Positive Pressure Fire-Rated Veneered Door Frame UBC & UL-10C

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

INSTALLATION INSTRUCTIONS

Figure #1 - VSNEO Shower Door Assembly

Transcription:

Door Canopy Door Canopies are attractive and efficient while eliminating the need and expense of drafting and manufacturing canopies as part of the building package. Construction: 26 gauge material around an 18 gauge galvanized frame. Telescoping channels mount between girts on the interior of the building. Channels will accommodate girt spacing of up to 7' 6". l/2" threaded rod connects channels to canopy frame. All hardware necessary for installation is included. Finish: 26 gauge galvanized steel or aluminum. Unit can be painted after assembly to match most metal building colors to properly accent building trim. Design: Incorporates a flat Soffit and an integral gutter drain. Canopy drains against building to the outside of the door jambs. Canopy can be installed in conjunction with any panel type or panel location. Units can be flashed together for continuous applications. Standard Size: 4' 0" projection from face of wall, available in 4'6" width for single doors and 7' 6" width for double doors. Other sizes available upon request. Loading: 4' 6" wide canopy rated for 55# PSF gravity loading and 49# PSF wind uplift = 114 M.P.H. if canopy is hung under 20' from ground. (Optional 100# PSF available upon request.) 7' 6" wide canopy rated for 55# PSF gravity loading and 38# PSF wind uplift = 100 M.P.H. if canopy is hung under 20' from ground. (Optional 100# PSF available upon request) 2-1

Metal Panel Applications Note: Additional Support Columns and Pipe Hangers may be required for larger Canopies and/or higher wind loads. Step 1: Install Vertical Support Columns Install vertical support column to girt framing. (Girt spacing max 6 0 ) 1A Center canopy over door. If necessary, shift canopy towards door so that pipe hangers penetrate in the high or low areas of panel. When the canopy is positioned at the desired location match drill 9/16 holes through predrilled canopy angle holes. (These holes are aligned with the center of the zee rafter holes used for the pipe hangers at the all attachment angle of the canopy.) 1B Align centerline of support columns with 9/16 holes drilled in step 1A and center line of zee rafters on canopy between girts. Attach mounting clips to each end of telescoping support columns with (2) ¼ x ¾ bolts and nuts per clip. Slide adjust columns to proper length in or to fit between girts (6 ft. maximum). Column should be flush with back of the wall panel. Secure to girts with (2) ¼ x ¾ bolts and nuts per clip. Step 2: Install Lower Support Bolts 2A Match drill through previously drilled holes in wall panel through centerline of support columns. 2B with canopy re-positioned and matching holes in canopy and wall panel aligned, attach canopy to wall panel and support column using ½ X 7 bolt with washer. (use PVC spacer sleeve if hole in wall panel is through the high rib) (Typical each side) NOTE: before tightening bolts apply sealant at penetration points. Step 3: Attach Pipe Hangers to Canopy 3A Thread ½ nut on the short end, slide on ½ washer and insert into hole on top of canopy rafter. Secure with ½ nuts and washers on underside of rafter. (Typical for each pipe hanger assembly.) Step 4: Attach Pipe Hangers to Wall 4A Locate the elevation at the point where long rod will penetrate the wall. Drill 9/16 hole through panel and support columns. Thread ½ nut on long rod end and slide on ½ washer. Insert long rod through wall panel and support columns. Secure at support column with ½ nuts and washers. NOTE: before tightening, apply sealant at penetration under washer or decorative plate. Step 5: Adjust Pitch of Canopy 5A Adjust pipe hanger yoke ends, and/or short rod at rafter so the canopy slopes toward wall ½ to 1 (for rear mounted drains.) 2-2

Support column install 2-3

Multiple Canopy Installation 2-4

Masonry Wall Applications Note: Additional Support Columns and Pipe Hangers may be required for larger Canopies and/or higher wind loads. Step 1: Install Lower Support Bolts Center canopy over door. Mark wall at locations where pre-attached canopy rafter angle holes meet wall. Drill holes in masonry and install wall anchors sized to accept ½ bolts and appropriate design for masonry type (Note: wall anchors by others.) Insert ½ X 3 bolt with washer through canopy angle and into wall anchor. Step 2: Attach Pipe Hangers to Canopy Thread ½ nut on one end of the pipe hanger rod end, slide on ½ washer and insert into hole on top of canopy rafter. Secure with ½ nuts and washers on underside of rafter. Step 3: Attach Pipe Hangers to Wall Locate elevation at the point where opposite rod end will penetrate the wall. Drill holes in masonry and install wall anchors sized to accept ½ bolts and appropriate design for masonry. Thread rod into wall anchor. Attach rod and pipe hanger with clevis pin. Step 4: Adjust Pitch of Canopy Adjust pipe hanger yoke ends, and/or short rod at rafter so the canopy slopes toward wall ½ to 1 (for rear mounted drains.) Masonry wall install 2-5

Multiple Canopy Installation 2-6