STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES

Similar documents
Introduction to Substation Design TADP 542

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

2.0 PROJECT DESCRIPTION

City of San José, California CITY COUNCIL POLICY

THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION PREPARED TESTIMONY OF RUSSEL D. JOHNSON

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

Colorado PUC E-Filings System

Energy Delivery. Holland Bottom 500/161/115kV Substation. Delivering energy safely, reliably, efficiently and affordably.

II Design Criteria for Electrical Facilities Connected to the PJM 765 kv, 500 kv, 345 kv, 230 kv, 138 kv, 115 kv, & 69 kv Transmission Systems

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

Site Plan/Building Permit Review

David J. Gellner, AICP, Principal Planner

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

Zoning Amendment Carlson Z AP 8234 Carlson under separate cover Development Permit/Specific Use PSCo DP AP 8237 PSCo

PLANNING BOARD CITY OF BAYONNE MINUTES OF REGULAR MEETING MARCH 10, 2015

ECP HV INSULATION TESTING

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

INTRODUCTION. General Design Criteria o (include charts from Section 2 of TSS) Functional Criteria o (from TSS section 3) Accessibility and Layout

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Single Line Diagram of Substations

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021

Applying for a Site Development Review

RRC POWER & ENERGY STATEMENT OF QUALIFICATIONS. experience matters

Frequently Asked Questions about Wireless Facilities on Wooden Utility Poles and Streetlight Poles

General Technical Specifications of Frequency Converters for Tokyo-Chubu Interconnection Project

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009

Hillside & Foothills Development Application

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

PRELIMINARY PLAT CHECK LIST

CHAPTER 26 SITE PLAN REVIEW

STATE OF NEW JERSEY Board of Public Utilities 44 South Clinton Avenue, 9th Floor Post Office Box 350 Trenton, New Jersey ;ww.nj.

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

Information for Digital Antenna System (DAS)/ Bi-Directional Amplification (BDA) Systems

Customer Connection Guide Updates Effective May 2017

ECP HV INSULATION TESTING

Customer Requirements RF Antenna Installations

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

CONCEPT REVIEW GUIDELINES

SOUTH BAY CORPORATE CENTER

Delivering Reliability. Services. Strength You Can Count On. oldcastleprecast.com/services

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

DESIGN REVIEW PROCESS AND APPLICATION

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber

APPLICATION DESIGN REVIEW Please Print or Type

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

INSTRUMENT TRANSFORMERS. Product Spectrum


RELEVANT ELECTRICAL STANDARDS

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

Applying for a Site Development Review (Sign CVCBD only)

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

C. CEQA Determination: Categorically exempt pursuant to Section of the CEQA Guidelines ( Existing Facilities ).

Operating Standards Attachment to Development Application

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

7000 Fifteen Mile Road Sterling Heights, Michigan

Designer s NOTEBOOK DESIGN ECONOMY, PART 3

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

SITE PLAN REVIEW GUIDELINES Rev. 2016

PLANNING AND DEVELOPMENT

VI 3 - i TABLE OF CONTENTS

SITE PLAN APPLICATION

3.0 AFFECTED ENVIRONMENT

Unit 2. Single Line Diagram of Substations

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

Appendix 6-F: Electric and Magnetic Field Study Report

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

2014 NEC Changes Part 1

INTEGRATED TRANSMISSION PLAN Glossary

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

Cabaniss Engineering Inc.

REPLY OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) TO PROTESTS AND REQUESTS FOR HEARINGS

BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON * * * *

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

ACCESS TO HIGH VOLTAGE APPARATUS

Checklist for Tentative Subdivision Map

EMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION

FAQ ON EARTHING STANDARDS 16/08/2018

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

Residential Construction Checklist Single and Two Family Construction

ARTICLE 25 WIRELESS COMMUNICATIONS TOWERS AND ANTENNAS Updated

Last Name: First Name: M.I:

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

OAK RUN BUILDING PERMIT

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING

Transcription:

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES : IN THE MATTER OF THE PETITION OF : PUBLIC SERVICE ELECTRIC AND GAS : COMPANY FOR A DETERMINATION : PURSUANT TO THE PROVISIONS OF : N.J.S.A. 0:D-1 : BPU DOCKET : (SUSQUEHANNA-ROSELAND) : : TO THE HONORABLE COMMISSIONERS OF THE NEW JERSEY BOARD OF PUBLIC UTILITIES: SUMMARY OF PRE-FILED DIRECT TESTIMONY OF RICHARD I. JACOBER ON BEHALF OF PUBLIC SERVICE ELECTRIC AND GAS COMPANY Richard I. Jacober, the Project Manager for Black and Veatch s ( B&V ) Power Delivery Business Line, testifies on behalf of Public Service Electric and Gas Company ( PSE&G ) in this proceeding. Mr. Jacober has worked on over 0 transmission projects and is responsible for all aspects of the conceptual/detailed design, material procurement, and construction of electric transmission line and switching station projects for B&V. Mr. Jacober s responsibilities in connection with the Project were to perform the conceptual design of the proposed East Hanover 00kV gas insulated switchgear ( GIS ) switching station and the Jefferson 00kV open-air switching station. In connection therewith, Mr. Jacober has sponsored the attached Site Plans and Architectural Drawings of each station. Mr. Jacober explains that PSE&G is proposing to install a GIS switching station in East Hanover. Mr. Jacober explains that a GIS Station allows PSE&G to install the 1

same switching facilities found in a typical open air switching station in a much smaller, environmentally and aesthetically pleasing design. Mr. Jacober also explains that PSE&G is proposing an open air switching station in Jefferson, New Jersey. PSE&G is proposing an open air station in Jefferson because the property on which the station is located is very large and remotely located from any residential properties.

1 1 1 1 1 1 1 1 0 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES : IN THE MATTER OF THE PETITION OF : PUBLIC SERVICE ELECTRIC AND GAS : COMPANY FOR A DETERMINATION : PURSUANT TO THE PROVISIONS OF : N.J.S.A. 0:D-1 : BPU DOCKET : (SUSQUEHANNA-ROSELAND) : : PRE-FILED DIRECT TESTIMONY OF RICHARD I. JACOBER ON BEHALF OF PUBLIC SERVICE ELECTRIC AND GAS COMPANY IN SUPPORT OF SUSQUEHANNA-ROSELAND TRANSMISSION LINE PROJECT I. BACKGROUND 1 Q. Please state your name and business address. A. My name is Richard I. Jacober. My address is: Black & Veatch Corporation, Lamar Avenue, Overland Park, KS. 0 1 DUTIES AND RESPONSIBILITIES Q. By whom are you employed and how long have you been so employed? A. I have been employed by Black & Veatch Corporation for the past 1 years. Black & Veatch is an engineering and construction company that specializes in the energy and infrastructure industries. 1

1 1 1 EXPERIENCE AND EDUCATION Q. Please describe your professional experience and educational background. A. I have a BSEE in Electrical Engineering from the University of Missouri-Rolla (1). I am a Licensed Professional Engineer in seven () states, one of which is the State of New Jersey (NJ PE #GE0). Upon graduation from the University of Missouri-Rolla, I joined Black & Veatch and have held various engineering and management positions related to the design and construction of electric transmission lines and switching stations. I currently hold a position as a Project Manager in the Black & Veatch s Power Delivery Business Line. In this role, I am responsible for all aspects of the conceptual/detailed design, material procurement, and construction of electric transmission line and switching station projects. 1 1 1 1 1 0 1 PURPOSE OF TESTIMONY Q. Please describe the purpose of your testimony. A. The purpose of my testimony is to discuss the conceptual design performed for the PSE&G proposed East Hanover 00kV GIS switching station and the proposed Jefferson 00kV open-air switching station. Q. Have you ever provided testimony previously to the New Jersey Board of Public Utilities? A. No.

1 1 Q. Have you ever testified as an expert in connection with municipal land use hearings in the State of New Jersey? A. Yes. Specifically, I testified before the Hillsborough Township and Branchburg Township Zoning Board s in connection with PSE&G s construction of the Branchburg-Flagtown transmission project in September and October 00. The Branchburg-Flagtown Transmission Project involved the construction of a new four () mile 0kV transmission line on an existing transmission right-of-way in Branchburg and Hillsborough townships in Somerset County, New Jersey. Q. Are you sponsoring any exhibits? A. Yes. I am sponsoring the East Hanover Switching Station Site Plans and Elevation Drawings ( sheets), which are attached hereto as Exhibit RIJ-1 and the Jefferson Switching Station Site Plans and Elevation Drawings ( sheets), which are attached hereto as Exhibit RIJ-. 1 1 1 1 1 1 0 DESCRIPTION OF SWITCHING STATIONS Q. Please briefly explain your responsibility in connection with the Project. A. Black & Veatch is the engineering/construction company that has been retained by PSE&G to perform the conceptual design of the proposed East Hanover 00kV GIS switching station and the proposed Jefferson 00kV open-air switching station. 1

1 1 1 1 1 1 1 1 0 1 Q. Briefly describe the Jefferson site and the surrounding properties. A. The proposed Jefferson switching station site is located on a large parcel of property in a remote area that is presently surrounded by trees. Q. Briefly describe the East Hanover site and the surrounding properties. A. The proposed East Hanover 00kV switching station site is located to the west of the existing PSE&G Roseland switching station across the Passaic River. The proposed site is intersected by an existing 0kV transmission line right-of-way. The properties on the north and south sides of the proposed East Hanover switching station property are generally single-family homes located in a residential area. Q. Please describe the functions a switching station performs. A. Electrical switching stations are the infrastructure within the electrical transmission grid which allow transmission companies to control and monitor the flow of electrical power, provide protection of transmission assets in order to clear system instabilities, provide a location for the safe step-down or step-up of electrical voltage level of the power system, and provide locations for the safe interconnection of transmission lines within the transmission grid to form a safe and reliable power network. Q. Briefly explain the locations necessary for the two switching stations that are part of the Project. A. The proposed 00kV East Hanover GIS switching station is located at the eastern end of the Project. This location was chosen to allow for the interconnection of the transmission line into the PSE&G transmission system at the existing

1 1 1 1 1 1 1 1 0 1 Roseland switching station. A GIS switching station has been proposed on the East Hanover side of the Passaic River (i) to minimize environmental impacts associated with developing the proposed 00kV switching station and (ii) to reflect the fact that there is insufficient land area for the proposed 00kV switching station on the existing Roseland switching station property. The proposed 00kV Jefferson open-air switching station is located in the general vicinity of the intersection of the Project and the existing Branchburg Ramapo 00kV transmission line. This location was chosen to facilitate the required interconnection of Project with the Branchburg Ramapo 00kV transmission line. Q. Briefly explain GIS technology. A. GIS in the context of switching station equipment means Gas Insulated Switchgear. The technology is used to reduce the size of the footprint required to install the needed switching station equipment. A GIS switching station can be installed to have all of the same types of electrical components as an open-air switching station; however, the footprint size of the GIS switching station will be smaller. The reason that the GIS switching station can be built in a smaller footprint is the electrical equipment components (buses, circuit breakers, disconnect switches, etc.) are enclosed in a tube that is filled with SF gas. Although the GIS technology provides benefits of a reduced footprint, it also is more costly than open-air equipment.

1 1 1 1 1 1 1 1 0 1 Q. Why did PSE&G choose to use GIS technology for the design of the East Hanover switching station? A. The proposed East Hanover switching station site is large enough to accommodate an open-air switching station design. However, the use of GIS technology for this installation allows PSE&G to minimize the overall footprint of the switching station site. The smaller site footprint minimizes the environmental and visual impacts associated with building the 00kV switching station on the proposed site. The Jefferson 00kV switching station is proposed as an open-air switching station design on a section of property that is large enough to accommodate the specified design. Environmental and visual impacts on the proposed Jefferson switching station site are minimal and do not warrant the additional cost associated with the implementation of GIS technology. Q. Briefly describe the facilities PSE&G is proposing to install at each switching station. A. (a) East Hanover 00kV Switching Station: The proposed East Hanover 00kV GIS switching station includes a four position, breaker-and-a-half (six breakers) GIS switchyard configuration that is expandable to a six position, breaker-and-ahalf (nine breakers) switchyard configuration in the future. The GIS switching station equipment will be located inside of an architectural finished building located on the proposed East Hanover project site. The four positions in the proposed 00kV GIS switching station will be used for two () 00/0kV transformer positions, one (1) line termination position for the Project, and one

1 1 1 1 1 1 1 1 0 1 (1) future 00kV line termination position. Other major equipment to be installed in the proposed East Hanover 00kV switching station include: two () 00/0kV power transformer banks, gas-insulated buswork, two 00kV transmission line termination structures, two 0kV transmission line termination structures, an emergency diesel generator, control and relaying equipment, building HVAC equipment, and auxiliary power systems. (b) Jefferson 00kV Switching Station: The proposed Jefferson 00kV open-air switching station includes a four position, breaker-and-a-half (six breakers) openair switchyard configuration. The four positions in the proposed 00kV open-air switching station will be used for four () 00kV line termination positions for the four () 00kV transmission lines intersected by this switching station (Jefferson Roseland, Jefferson Susquehanna, Branchburg Jefferson, and Jefferson Bushkill). Major equipment to be installed as part of the proposed Jefferson 00kV switching station include circuit breakers, disconnect switches, instrument transformers, open-air buswork, four () transmission line termination structures, four () overhead conductor strain bus structures, a switching station control enclosure, an emergency diesel generator, control and relaying equipment, and auxiliary power systems. The facilities to be installed at each station are more clearly shown on the Site Plans attached hereto as exhibits to my testimony. Q. What type of foundations will these facilities require? A. Switching station equipment and structures will be installed on either drilled pier and/or spread footing type foundations that are typical for the construction of

switching stations. The size and foundation types used will be determined during the detailed design phase of the Project. Q. What is the height of these facilities? A. (a) East Hanover 00kV Switching Station The conceptual design of the proposed 00kV East Hanover switching station includes the following proposed structure heights: 00kV Line Termination Structures: feet above grade 0kV Line Termination Structures: 0 feet above grade 00kV GIS Building: 0 feet above grade (Building height may vary based on GIS equipment chosen) 1 1 1 1 1 1 1 1 (b) Proposed Jefferson 00kV Switching Station The conceptual design of the proposed 00kV Jefferson switching station includes the following proposed structure heights: 00kV Line Termination Structures: feet above grade 00kV Bus Elevations: High Bus: 0 feet Low Bus = 0 feet Switchyard Control Enclosure: 1 feet above grade

The height of all structures are more clearly shown on the elevation drawings attached hereto as exhibits to my testimony. Q. What is the size of the layout for each of the stations? A. Proposed East Hanover 00kV Switching Station: The conceptual layout design of the proposed 00kV East Hanover GIS switching station includes a fenced area of approximately 0 feet by 0 feet. Proposed Jefferson 00kV Switching Station: The conceptual layout design of the proposed 00kV Jefferson open-air switching station includes a fenced area of approximately 0 feet by 00 feet. 1 1 1 1 1 1 1 1 0 1 ACCESS AND CONSTRUCTION Q. Who will be responsible for construction of the stations? A. PSE&G will subcontract the construction of the switching stations to qualified contractors and will ultimately be responsible for the construction of the facilities. Q. How will PSE&G access the stations in order to construct the facilities? A. (a) Proposed East Hanover 00kV Switching Station: The conceptual design of the proposed East Hanover 00kV GIS switching station includes an access road that approaches the station from the southeast corner of the station property. This road will be used to provide site access for vehicles and equipment required to construct the switching station. (b) Proposed Jefferson 00kV Switching Station: The conceptual design of the proposed Jefferson 00kV open-air switching station includes the upgrade of the existing right-of-way access road to access the proposed switching station site

1 1 1 1 1 1 1 1 0 1 from the east side. This road will be used to provide site access for vehicles and equipment required to construct the switching station. Q. Please briefly describe the construction process for the switching stations. A. The construction process to be followed for both the East Hanover 00kV GIS switching station and the Jefferson 00kV open-air switching station will be very similar and comprised of the following major activities: Implement site grading and soil erosion control measures Install equipment and building foundations Install below grade grounding and raceway facilities Install GIS building (East Hanover site only) Install site surfacing material (crushed stone) Install switching station steel structures Install switching station equipment Install switching station control enclosure (Jefferson site only) Install control and relay equipment Pull and terminate control and auxiliary power cable Test and commission switching station Q. How long will it take to complete construction? A. The estimated construction duration for both the East Hanover 00kV GIS switching station and the Jefferson 00kV open-air switching station is approximately 1 months.

1 1 1 1 1 1 1 1 0 1 Q. Will PSE&G notify adjacent property owners prior to beginning construction? A. Yes, PSE&G will notify adjacent property owners prior to the beginning of construction and will work to minimize impacts to adjacent property owners throughout the construction process. Q. Will the proposed facilities create a noise? If yes, please explain. A. The proposed facilities at both the East Hanover and Jefferson sites will act as a source of noise at times. Both of the switching stations will contain switchyard equipment that will make noise when operated. For example, a circuit breaker will emit an impulse noise when operated (opened or closed). Both of the proposed switching station sites will be designed to include an emergency diesel (or propane) generator to supply emergency station power for the proposed facilities. The emergency generators will only run in emergency situations, and for short periods of time during normal daytime hours once a month, to ensure proper operation and maintenance of the system. The East Hanover site will contain two 00/0kV transformer banks that will emit a steady state humming noise when in operation. In the case of the proposed East Hanover site, the GIS switching station equipment will be installed indoors in an architectural type of building. The building will buffer the noise emitted by the GIS switching station equipment, resulting in only a negligible level of noise detected on the outside of the building. The transformers to be installed at the proposed East Hanover site will be installed between firewalls on the East (Roseland) side of the building away from

1 1 1 1 1 1 1 the residential areas. The presence of the building and firewalls will buffer the noise emitted by the transformers, thus minimizing the noise at the East Hanover switching station property line to levels that are below New Jersey State noise requirements. The proposed Jefferson switching station site is located on a large parcel of property in a remote area that is presently surrounded by trees. The sources of noise associated with the Jefferson switching station are described above and are normal to switching station installations. Noise levels at the Jefferson switching station will also be below New Jersey State noise requirements. Q. Will the operation of either station cause a danger to any of the surrounding properties? A. The proposed designs of both the East Hanover and Jefferson switching stations are in accordance with National Electric Safety Code (NESC) requirements and are consistent with Good Utility Practice. Therefore, if the proposed switching stations are properly operated in accordance with the proposed designs, there should be no danger posed to any of the surrounding properties. Q. Does this conclude your direct testimony? A. Yes, it does. 1 1