OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD.

Similar documents
API 8 Round Connections

API Buttress Connections

MSR/MSB Mechanical Setting Tool

26. TenarisHydril Blue Riser Connection

Global Drilling Solutions, Inc

GRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES

ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD

MSR/MSB Mechanical Setting Tool

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Wedge 513. Handling Plugs TN 9906.

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference

DRILLING & WORKING TOOLS

Visual Testing of Pipe Threads

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Wedge 521. Handling plugs TN 9711.

Multi-Bowl Applications

Chapter 02. Casing and Tubing

Requirement for Holes - Holes for Hanging

1/2/2016. Lecture Slides. Screws, Fasteners, and the Design of Nonpermanent Joints. Reasons for Non-permanent Fasteners

OnGauge. Torque-reduction sealed-bearing roller reamer

WIRELINE RODS CARE AND HANDLING

PRODUCT OVERVIEW NEXT-GENERATION (NXG) SOLUTIONS FOR THE OIL AND GAS INDUSTRY

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95

WHAT? WHERE? HOW?

Typical Group D Rear Acoustical Cover Installation

HC Hydraulic Expansion Chucks

AADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

PIONEER TRADING CO., LTD.

ISO INTERNATIONAL STANDARD

Casing while Drilling. Enhanced Casing Installation

Trunnion bearing housings for grinding mills FSDR.. K series

Eliminate Corrosion & Electrolysis Forever!

Superior Accuracy for Industrial Applications. Precision Tapered Roller Bearings

Thru Wall Floor Seals For New Installation

Installation and Operational Instructions for ROBA -DS couplings Type 95. _ (disk pack HF) Sizes

MODEL T /2-TON ARBOR PRESS INSTRUCTIONS

WIRE ROPE LUBRICATING SYSTEM

TU-3008G-16M - Opti-Turn Lathe & Mill Drill Combination Package Deal 300 x 700mm Included BF-16AV Mill Head

Copyright 2013 Boart Longyear. All Rights Reserved. XQ WIRELINE CORING ROD. Technical Overview

Mojolever Tire Mount/Demount Tool. User s Manual

Important Notice. caution: Use proper lifting equipment and correct procedures to avoid injury.

Right Tool, Right Place, Right Time

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens

General Information...SA1-SA4

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

The Lease Pumper s Handbook. Chapter 4 Understanding the Oil Well. Section B DRILLING OPERATIONS

Drill Bits & Hole Saws

MUELLER GAS. DH-5 Drilling Machine. For use on 1 1 /2 & 2 Line Stopper Fittings. Reliable Connections. General Information 2

Cutting, Grinding and Abrasive Accessories

REVERSE CIRCULATION. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD

Section Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

DRILL RODS & SUBS. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD

MUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5

AL-320G - Bench Lathe, Stand & Tooling Package Deal 320 x 600mm Turning Capacity

Lubrication 123 for Steel Wire Ropes

1. What does it mean: to drill? 2. Why do you drill? 3. What kind of different applications are there? 4. What do you need for drilling? 5.

A training course delivered at a company s facility by Matrix Engineering, an approved provider of Bolt Science Training

Instruction Manual for installing

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks

HBS-AP ASSEMBLING INSTRUCTIONS

3/2004. Core Barrel Tool Assembly and Disassembly

Casing while Drilling. Advanced Casing Deployment Drillable Casing Technology

Deep Water Definitions

Chapter 2 High Speed Machining

AL Centre Lathe 300 x 900mm Turning Capacity Includes Cabinet Stand

LINEAR MOTION Screw Jack Actuator Models

Durapipe ABS Jointing Guide

SPEED-PRO PISTON RINGS - DESIGN, FEATURES, and INSTALLATION GUIDELINES Federal-Mogul Document #1205

TABLE OF CONTENTS Page

SOFTSYNCHRO HIGH PERFORMANCE TAP H O L D E R S

BEARING AND TYPES OF BEARING

OPERATING INSTRUCTIONS

TU-2004V - Opti-Turn Bench Lathe 200 x 300mm Turning Capacity Electronic Variable Speeds

THREAD PROTECTORS & END CAPS

Pressure Vessel Assembly Instructions

Motor Power (kw / hp): Voltage / Amperage (V / amp): Shipping Dimensions (L x W x H) (cm): Nett Weight (kg): Features

Product Brochure For L682D. Description. Features. Auckland: (09)

IDEAS E-Learning Course

Yoke Type Hinged Closures Installation, Operation & Maintenance

TM-1960G - Centre Lathe 480 x 1500mm Turning Capacity - 80mm Spindle Bore Includes Digital Readout

This figure shows the difference in real time resolution of azimuthal resistivity data

HM-46 - Mill Drill - Geared & Tilting Head (X) 475mm (Y) 195mm (Z) 450mm Dovetail Column

CQ Tilting Pad Thrust Bearings

UNIT 2.1: Routine check before machines operation. Unit Objectives Tools and Equipment for Routine Check. Spanner Set

Single Roll Bead Expander

CASING PATCHES. Operation

C U T T I N G C R O S S V I L L E P O R C E L A I N S T O N E

AF-4 Grooved Flange Adapter

Technical Manual. ETP-CLASSIC incl type R. Content

MODEL T27451/T " & 20" SPIRAL CUTTERHEAD INSTRUCTIONS

Installation, Maintenance and Operating Instructions

Self-assembly and pole conversion system

Holemaking Products & Accessories

Airflex Product Line PDC Installation, Operation and Maintenance of PDC Assemblies

Operating Instructions for Flow Indicator. Model: DAZ

The Stamina of Non-Gasketed, Flanged Pipe Connections

MODEL T26413, T26414, & T26415 ARBOR PRESS INSTRUCTIONS

CL-38A - Centre Lathe 410 x 1000mm Turning Capacity - 52mm Spindle Bore Includes Digital Readout & Quick Change Toolpost

1. Enumerate the most commonly used engineering materials and state some important properties and their engineering applications.

INSTRUCTION MANUAL Q-HYDRAULIC

Transcription:

OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD. Release Notes: Release 2 Issued May 2016 Document # OM ST 001, Shock Tool Operating Manual Reviewed By: RG 1 P age

OPERATING MANUAL SHOCK TOOL CONTENTS Section Page 1. DESCRIPTION.. 3 2. PLACEMENT.. 4 3. OPERATION.. 5 4. MAINTENANCE AND STORAGE.. 7 5. SPECIFICATIONS. 8 2 P age

1: DESCRIPTION The OWS Wenzel Shock Tool effectively reduces impact loading on the bit to extend bit life and reduce bit trips. By isolating axial bit vibrations from the drill string, the shock tool will reduce axial, lateral and torsional drill string vibrations, and related fatigue damage or failure of the rotary connections. The shock tool allows optimum bit speed to be used under rough drilling conditions, increasing the rate of penetration. Features / Benefits Reliable Belleville disc springs provide optimum load/deflection characteristics Effectively reduces impact loading to extend bit life Isolates bit induced vibrations from the drill string Fully oil sealed and lubricated for extended service life Pressure balanced to eliminate the effect of downhole hydrostatic pressure Automatically compensates for pump open force Low friction torsional drive permits free vertical movement Well stabilized, with internal lateral support to minimize deflection Reduces wear and tear on rig and equipment, and fatigue failures on drill collars and drill pipe 3 P age

2: PLACEMENT For maximum effectiveness, the Shock Tool should be located immediately above the bit. Careful attention should be taken when locating the Shock Tool in the bottom hole assembly, to avoid applying unnecessary bending forces to the Shock Tool. See diagram on following page for recommended shock tool placement in various bottomhole assemblies. 1. Slick assembly, without stabilization. 2. Pendulum assembly: At least two drill collars should be located between the shock tool and the first stabilizer. 3. Packed Bottom hole assembly: When the shock tool is located between two stabilizers, a third stabilizer must be placed one drill collar length above the second stabilizer. 4. Above packed bottom hole assembly: If the Shock Tool is located above the packed bottom hole assembly, a minimum of two drill collars should be placed between the top stabilizer and Shock Tool to minimize bending stresses in the Shock Tool and provide a clear target for a string shot if required. Avoid locating the shock tool at a cross over between components of different diameters such as drill collars and heavy weight drill pipe. The shock tool should be placed a minimum of two joints above or below any cross over. See the next page for Recommended Placements Diagram. 4 P age

5 P age

3: OPERATION Protect the mandrel sealing surface from possible damage during handling or storage. Never apply tongs, slips, chains or slings to this area. The Wenzel Shock Tool must be installed in the drill string with the mandrel end up. Apply drill collar thread compound meeting A.P.I. Specification 7 to the end connections. Torque end connections to API specifications. Rig tongs should only be applied immediately adjacent to the top and bottom connections to avoid breaking or torquing the shock tool body connections. All body connections are torqued to the specified values at the service center. Avoid breaking these connections at the rig. The unique design of the Wenzel shock tool automatically eliminates the effects of pump open force. It will function effectively under a wide range of normal operating conditions without requiring special operating procedures. On each round trip the shock tool should be visually inspected. Tool should be replaced if there is any indication of damage, excessive wear or leakage. Under normal drilling conditions, the recommended rotating hours before servicing the Shock Tool is 400 hours. Shock Tool should be returned to an approved service facility for complete inspection and service following use in field. 6 P age

4: MAINTENANCE AND STORAGE New tools are shipped painted. The end connections are plated with iron phosphate and coated with rust preventative coating. Thread protectors are installed to prevent mechanical damage. The rust preventative coating must be removed using petroleum base solvent and a stiff bristle brush before the shock tool is installed into the drill string. When the Shock Tool is to be laid down the following should be done: 1. Flush all drilling fluid from the bore with fresh water. 2. Wash external surfaces of the tool. 3. Apply thread compound and protectors to the end connections. 7 P age

5: SPECIFICATIONS IMPERIAL 8 P age

METRIC 9 P age