SCIENCE BUILDING OFFICE RENOVATION C

Similar documents
DETAIL A SCALE 1 : 85

LORING THE SMARTER WAY TO ROAST PROPRIETARY ITEM:

UTMDA - R8 LEUKEMIA LAB RENOVATION CONSTRUCTION. Copyright 2018 Perkins+Will

LORING THE SMARTER WAY TO ROAST PROPRIETARY ITEM:

A PROJECT FOR: (AIM X) NEW MEXICO STATE UNIVERSITY CARLSBAD CAMPUS CEMRC LAB 150 & 158 RENOVATIONS LOCATION MAP E-001 -

REMOTE IR/LED MODULE REMOTE 3 REVISION HISTORY C DETAIL A SCALE 1 : 1.5 I\O PANEL - SHEET 1 OF 6 ECO ZONE REV. DESCRIPTION DATE APPR'D

EARL GREY SCHOOL GYM CONSTRUCTION: 845 HILLCREST AVENUE SW, CALGARY, ALBERTA CONSULTANTS: ARCHITECTURAL: STRUCTURAL: MECHANICAL: ELECTRICAL:

BACK DOOR GLASS REPLACEMENT HINT:

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF PROJECT DELIVERY

DO NOT SCALE DRAWING TITLE: AWNING INSTL 100-SERIES

DCM Series DC T-Series Non-Spring Return Rotary Electronic Damper Actuators

TN017 - HVAC RESET 104 E. OAK RIDGE TURNPIKE, OAK RIDGE, TN ST REGIONAL SUPPORT COMMAND. *** Safety Pays ***

APPENDIX C APPENDIX C DRAWINGS

MOE FLEXIBLE LEARNING SPACE NELSON 2-STOREY BLOCK WELLINGTON AND CHRISTCHURCH - OPTION 1

DIN C-FORM & R-FORM PLUG, DIN SERIES VERTICAL, RIGHT ANGLE, SOLDER TAIL OR PRESS-FIT TERMINATION,.100" BACKPLANE REAR PLUG 3M TM

Aluminium Roof Outlets - Introduction to Detail Outlets

ASY P.O. BOX 729 TERRELL, TEXAS / PAGE 1 OF 13 SAM

PANEL ASM-VALANCE AN0 ANGLE SCREW TRIM-FEATURE A SCREW 000G B (9) CAP-TRIM A A

AT 500 V DC WITHSTANDING VOLTAGE: 1,000V RMS AT SEA LEVEL

METAL CONCRETE CONCRETE BATT INSULATION, SOUND ATTENUATION BLANKET MASONRY UNIT RIGID INSULATION WOOD BITUMINOUS PAVING PLYWOOD EARTH

TEE-STL BLK 1/2" (SCH 80) TEE-STL BLK 1/2" REGULATOR-TWO STAGE REGULATOR-TWO STAGE

SAMPLE GENERAL NOTES FOR REPAIR METHODS:

X O X HORIZONTAL SLIDER - LARGE MISSILE IMPACT 8200 PVC HORZ. SLIDER IMPACT

Proposed Cable Tables for SAS2

CABLE-MONITOR (REF) ROUTE THRU ROOF COVE, DOWN A-POST TO RADIO ROUTE TEMPERATURE SENSOR THROUGH FIREWALL BOOT IN THIS AREA SENSOR-TEMPERATURE (REF)

ASI #2 DATE: 10/26/17 ARCHITECT S PROJECT NUMBER: CONTRACT DATE: CONTRACT FOR: Anchorage Hyatt Place

Danger of electrical shock, burns or death.

SCREWHEAD 0.25 INTERPOSER 0.28 FPC STIFFENER TOTAL 1.22

3M TM PIN STRIP HEADER, 951 SERIES 2MM AND 2MM X 2MM STRAIGHT, RIGHT ANGLE AND SURFACE MOUNT, SOLDER TAIL

LAYOUT OF STONE PILE SCALE=1:100 SECTION OF PILE FOUNDATION SCALE=1:100 BUILDING LINE TRENCH LINE

ANTENNA-TPMS W/ EXT CABLE / SENSOR-WHEEL, TPMS / (8) 84 TO GROUND BAR

Danger of electrical shock, burns or death.

MODEL 351 POWERGLIDE SERIES INSTRUCTIONS FOR INSTALLING SARGENT DOOR CLOSERS WITH "H" HOLDER ARMS

FALEALUPO CANOPY WALK PROPOSED NEW REST FALE & TOILET BLOCK REFURBISHMENT GEF CLIMATE RESILIENCE PROJECT SAMOA

SEAL TRIM (838mm) (AROUND OPENING) BUMPER SCREW 000G T

1 OF / Nov-2017

WIRE ASM-A/V / WIRE ASM-A/V TO EXTERIOR TV (COIL ABOVE FLOOR)

EA FA. 1 OF / Dec-2017 NOTES:

Danger of electrical shock, burns or death.

BONNEVILLE ADULT FISH FACILITY IMPROVEMENTS

3.6 (SH) INTERPOSER 0.28 SCREWHEAD 0.25 FPC STIFFENER TOTAL Default/QTY. 1 SCREW, WAFERHEAD, M1.

Copyright 2015 Winnebago Industries, Inc.

Danger of electrical shock, burns or death.

GENERATOR EXTENSION 4X4 J-BOX DETAIL DETAIL POWER CORD BOX ASM / SCREW G U (4) DETAIL BLU,BLK,BRN

1 OF / Jan-2018

PORCH. Canopies and Accessories DECKING SYSTEMS. For more information. STOCKISTS For details of your nearest stockist for any product:

STEP ASM-ELECTRIC,DOUBLE A CHANNEL-MOUNT B (2) NUT 000D B (4) DOOR COMPL-PROP ROD XXX 64V

Cairns Field MOBILE, ALABAMA MOBILE DISTRICT S.D.MCDAVID W.KNAPP. US Army Corps of. Mobile District US ARMY CORPS OF ENGINEERS DESCRIPTION DATE APPR

1 OF / Aug-2018

* * 98/9949WDC. 1-Point Latch (LBL) 2-Point Latch includes these additional parts. Customer Service

ANTENNA-TPMS W/ EXT CABLE / SENSOR-WHEEL, TPMS / (6) CODES/STANDARDS-CSA/CMVSS CABLE ASM (GRN)

B WIRE ASM-AUX HOLDING TANK

1 OF / Oct-2018

Copyright 2014 Winnebago Industries, Inc.

A 3 WIRE PASSES THROUGH FLOOR IN THIS AREA.

DEVELOPMENT VARIANCE PERMIT & DEVELOPMENT PERMIT

P34Y A SECTION JB-JB DO NOT SCALE DRAWING TITLE: ACCESSORY INSTL /26/2009 ROD-AWNING CLIP (2) RIVET A (2)

WIRE ASM-A/V TO MAIN TV (BRN) CABLE ASM- INVERTER NEGATIVE (BLK) 5 CABLE ASM (BLK) CABLE ASM- INVERTER (ORG)

PORCH. Canopies and Accessories. For more information. STOCKISTS For details of your nearest stockist for any product:

B 12 PIN HOUSING TO WIRE ASM-IP,MIRROR (IN DRIVERS DOOR)

Copyright 2015 Winnebago Industries, Inc.

SEAT 1A6 CHASSIS SUPPLIED SEAT-CAB,FORD, DRIVER XXX COVER-BACK XXX

VERSION 2 #BB_0001. Four complete assemblies to be made for the following tests: RFQ Major Vane to Minor Vane. Joint Test Assemblies

1 OF / Jan-2018

M1911-A1 REDUX. re dux (rē-dŭks ) adjective Brought back; returned. Used postpositively.

R O M CARGO COVER / HOSE BED COVER HORIZONTAL SHUTTER

COOK INLET LENDING CENTER

Danger of electrical shock, burns or death.

STEED CREEK CLUBHOUSE WASHINGTON CO, OREGON

COVER-ELECTRICAL CHT LABEL-SLIDEOUT WIRE ASM-AUX HOLDING TANK PIN HOUSING TO WIRE ASM-AUX HOLDING TANK LSS-1

WIRING INSTL-BODY,12V. 1 OF / Sep-2016 NOTES: PLATE-WALL, DUAL COAX CHT SCREW G U (2)

For installation help please visit Please Do Not Return Product to Store!

CCT AUTO TRANS STRUCTURAL DRAWINGS

Danger of electrical shock, burns or death.

PENINSULA - TYPE 1 3/8"=1'-0" ADA PENINSULA - TYPE 3 3/8"=1'-0" PENINSULA - TYPE 2 3/8"=1'-0" VANITY TYPES - NOTES 3/8"=1'-0"

C WIRE ASM-IP,MAIN

DRAWING LIST. Curre nt Revisi on SHEET NAME. T-001 TITLE SHEET A Peer Review, 2nd Submittal

36C 10 MOBILEYE WJ,AFM TO STABILIZERS DOWN INDICATOR LIGHT AND ALARM 64A LJ,LR,KE TO BATTERY BOOST SWITCH STARTER CABLE TO CHASSIS BATTERY DETAIL

B 6 PIN HOUSING TO LEFT MIRROR

INSTALLATION & OPERATION INSTRUCTIONS LEVER HANDLE LOCKSETS.

STEP ASM-PULLOUT CHT CHT NUT D B (4) MAT-ANTI SLIP

D TO PSM (AEU,AEW,AEX,AEZ, AEY,AFA,AFB,AFC)

M O T I O N A S S Y 7

SEE LOAD CENTER ASM FOR ADDITIONAL INFORMATION. COPYRIGHT 2016 WINNEBAGO INDUSTRIES, INC. DSNR:

Danger of electrical shock, burns or death.

Whapmagoostui Warehouse Expansion/ FOR COORDINATION

PART OF WIRE ASM-CHASSIS. COPYRIGHT 2016 WINNEBAGO INDUSTRIES, INC. DSNR:

1 OF / Sep-2017

NEW MEXICO STATE UNIVERSITY NMDA

Copyright 2015 Winnebago Industries, Inc.

Elettra Evolution OK! OK! b. User manual

Staff Review Date: September 13, 2017 HDC PID#

DB 1200 LOOP TO BATH RCP

CENTRAL PARK VILLAGE 3068 Gladwin Road, Abbotsford, BC. Prepared By: Daniel Lee,* Principal

Analog Input Modules

Copyright 2014 Winnebago Industries, Inc.

VARNA TINY TIMBERS DRYDEN ROAD - N.Y.S. ROUTE 366 PRELIMINARY NOT FOR CONSTRUCTION NICK BELLASARIO & BUZZ DOLPH L100 JR. R/W TOWN OF DRYDEN, NY

GENERAL NOTES THE CONTRACTOR IS TO BE FAMILIAR WITH THE EXISTING JOB SITE CONDITIONS AND IS TO ACCEPT THOSE CONDITIONS AS HE FINDS THEM

Staff Review Date: August 9, 2017 HDC PID#

SECTION A-A SECTION B-B AI - AMP DUOPLUG 2.5 MARK II FEMALE CONNECTOR 2-20 POSITION 5:1 1 4 D (3/11) D33 ECR MAR2017 LZ RR

Transcription:

HV Plumbing Fire Protection 0 th Street ugusta, G 090 (706) 77-00 THIS OUMENT IS THE PROPERTY OF ING ONSULTING, IN. THE UNUTHORIZE REPROUTION, OPYING, OR OTHERWISE USE OF THIS OUMENT IS STRITLY PROHIITE N N INFRINGEMENT THEREUPON MY E SUJET TO LEGL TION. OPYRIGHT 0 - ING ONSULTING, IN. ONSULTNTS 06//0 SIENE UILING OFFIE RENOVTION 7 UNIVERSITY PKWY. IKEN, S 980 JUNE, 0 SIENE UILING OFFIE RENOVTION SHEULE OF RWINGS SHEET: TITLE: S-.0 OVER SHEET G-.0 G-. EMOLITION N NEW WORK FLOOR PLN, NEW RP PLN, N ETILS ETILS N OOR SHEULE M-.0 M-.0 M-. MEHNIL EMOLITION & NEW WORK PLNS MEHNIL SPEIFITIONS MEHNIL SPEIFITIONS P-.0 PIPING NEW WORK PLN MRK TE PROJET NO: ESRIPTION 6-0 WG FILE: MEH.RVT RWN Y: LM HK' Y: SP PROJET LOTION MP NOT TO SLE US IKEN MPUS MP NOT TO SLE LEGEN OVER SHEET = PROJET LOTION SHEET NUMER: S-.0

EXISTING RPET TO REMIN. ' - 0" HV Plumbing Fire Protection 0 th Street ugusta, G 090 (706) 77-00 THIS OUMENT IS THE PROPERTY OF ING ONSULTING, IN. THE UNUTHORIZE REPROUTION, OPYING, OR OTHERWISE USE OF THIS OUMENT IS STRITLY PROHIITE N N INFRINGEMENT THEREUPON MY E SUJET TO LEGL TION. 0' - 0" OFFIE 7' - 6" EMOLITION KEY NOTES GENERL EMOLITION NOTE: IT IS THE RESPONSIILITY OF THE ONTRTOR TO PROPERLY ISPOSE OF LL ITEMS SHEULE FOR EMOLITION. ONSULTNTS OPYRIGHT 0 - ING ONSULTING, IN. 06//0 REMOVE EXISTING RPET. LEN N REMOVE LL HESIVE RESIUE N PREPRE ONRETE FOR PINTING. OFFIE NEW WORK KEY NOTES EN OF EXISTING RPET INSTLL NEW METL FRME WLL PER ETIL ON RWING G-.0. INSTLL NEW VINYL WLL SE ON EH WLL FE; MTH WITH EXISTING WLL SE. PRIME N PINT WLL - TO SELET PINT OLOR. L UT NEW '-0" OOR OPENING IN EXISTING ONRETE LOK WLL. INSTLL NEW OOR PER ETIL ON G-.0. INSTLL PROVIE FUME HOO WITH INET SE HERE. PINT LL EXISTING ONETE FLOOR IN L R. L INSTLL NEW T GRI. PROUT TO E EQUL TO RMSTRONG ULTIM, "x" SQURE LY-IN EILING TILES. SIENE UILING OFFIE RENOVTION EMOLITION N NEW WORK PLN RP NEW WORK PLN KEY PLN G-.0 /" = '-0" G-.0 /" = '-0" MRK TE ESRIPTION PROJET NO: 6-0 WG FILE: RWN Y: HK' Y: EMOLITON & NEW WORK FLOOR PLN, NEW RP PLN SHEET NUMER: G-.0 LM SP

HV Plumbing Fire Protection 0 th Street ugusta, G 090 (706) 77-00 THIS OUMENT IS THE PROPERTY OF ING ONSULTING, IN. THE UNUTHORIZE REPROUTION, OPYING, OR OTHERWISE USE OF THIS OUMENT IS STRITLY PROHIITE N N INFRINGEMENT THEREUPON MY E SUJET TO LEGL TION. ONSULTNTS OPYRIGHT 0 - ING ONSULTING, IN. MRK LOTION 8 - L 8 - OFFIE SIZE HGT W OOR SHEULE OOR FRME ETILS: /G-0 THK TYPE MTERIL HE JM SILL TYPE FIRE RTING HRWRE NOTES - - - - - - - - - - - EXISTING OOR TO REMIN 7'-0" '-0" /" WOO - - - - LEVER HNLE - /8" THRU OLTS @ '-0" O.. MX., SNUG ONLY, O NOT OVERTIGHTEN. - 6 x / x /8 06//0 7' - 0" ' - 0" EXTEN TOP OF NEW WLL TO '-6". RE TOP OF NEW METL STU WLL TO EXISTING STRUTURE. OORINTE HEIGHT WITH EXISTING N NEW UT WORK. /8" METL RUNNER 6" METL STU. NHOR TO EXISTING WLL. 8" O.. NEW OUSTIL TILE EILING & SUSPENSION SYSTEM. OORINTE HEIGHT WITH TOP OF EXISTING WINOWS ±'-0". /6-8 MOIFITION NOTES: PL /8 x 0 x OPENING LENGTH. SWUT EXISTING WLL MINIMUM OF 8" EYON PROPOSE ROUGH OPENING. INSERT HORIZONTL LEG OF NGLE INTO OPENING. GROUT ERINGS. SOLI ORE FLUSH WOO OOR (PINT GRE) ETIL - OOR TYPE "" G-. /6" = '-0" /8" GYPSUM WLLOR TYP. RESILIENT SE TYP. NOTE: LL METL STUS SHLL E MIN. 0 GUGE. /8" METL STUS/ SPING 6" O.. /8" METL RUNNER NHORE TO FLOOR. REPET STEP ON OTHER SIE OF WLL.. INSTLL THRU OLTS.. REMOVE EXISTING WLL.. INSTLL /8" PL. ETIL - WLL TYPE "" G-. " = '-0" G-. SETION SLE: /"='-0" SIENE UILING OFFIE RENOVTION MRK TE ESRIPTION PROJET NO: 6-0 WG FILE: RWN Y: uthor HK' Y: hecker ETILS N OOR SHEULE SHEET NUMER: G-.

(E) " WV (E)"W UP TO (E)"VTR "W (E)"F (E)/"SW (E)/"SW (E)/"G (E)/" "WV FH- (E) " W/WV "WV (E)/"SHW (E)/"SW /"SW (E)" (E)/"G (E)"SW (E)/"SHW (E)"F GENERL NOTES: ONTRTOR SHLL MOIFY EXISTING "W TO EXTEN NEW "W RNH TO NEW HOO. ONTRTOR SHLL FIEL VERIFY INVERT FOR SLOPE THROUGH EXISTING EILING VITY ELOW N JUST ROUTE S REQUIRE FOR INTERFERENES N REQUIRE PITH. LL I WSTE N VENT PIPING SHLL E PER SPEIFITIONS. NEW WORK KEY NOTES. OORINTE LL SHUTOWN N STRTUP OF PLUMING SERVIES N TESTING WITH.. EXISTING ONITIONS: NOT LL EXISTING WORK IS EPITE ON THESE PLNS N IS SHOWN FOR ONTRTOR'S REFERENE ONLY. FOR FURTHER LRIFITIONS OF EXISTING ONITIONS, ONTRTOR SHLL ONUT N ONSITE INSPETION N SHLL REFERENE EXISTING FILITY RWINGS VILLE FOR REVIEW N LOTE T US FILITIES/PLNNING OFFIES. THE ONTRTOR IS RESPONSILE FOR VERIFYING PROJET SITE EXISTING ONITIONS PRIOR TO ORERING MTERILS N FRITION. ISREPNIES ISOVERE SHLL E MRKE ON S-UILT RWINGS N REPORTE TO N ENGINEER.. LL PIPING SERVIE RE LOTE IN RWSPE ELOW. ROUTE N ONNET NEW WV OVERHE TO (E) WV STK T EXTERIOR WLL. PLUMING LEGEN NEW/EXSITING (E) EXISTING IR G GS SW SERVIE WTER SHW SERVIE HOT WTER W I WSTE WV I WSTE VENT VTR VENT THRU ROOF HV Plumbing Fire Protection 0 th Street ugusta, G 090 (706) 77-00 THIS OUMENT IS THE PROPERTY OF ING ONSULTING, IN. THE UNUTHORIZE REPROUTION, OPYING, OR OTHERWISE USE OF THIS OUMENT IS STRITLY PROHIITE N N INFRINGEMENT THEREUPON MY E SUJET TO LEGL TION. ONSULTNTS OPYRIGHT 0 - ING ONSULTING, IN. 06//0 (E)/"SHW (E)/"SW ONTRTOR TO INSTLL NEW FUME HOO N OMPLETE ROUGH-IN WITH FINL TIE IN OF W TO UP RINS, ½, ½ G N ½ SW FOR OMPLETE FUNTION HOO. LL PIPING SHLL E PER SPEIFITIONS. INSTLL NEW RNH PIPING OFF EXISTING PIPING OF EQUL OR GRETER SIZE. INSTLL NEW LINE SIZE FULL PORT LL VLVE RTE FOR GS/FLUI SERVIE PER SPEIFITIONS N PROPERLY LOTE FOR ESE OF OPERTION N MINTENNE. ONTRTOR SHLL ORE RILL PENETRTIONS FOR LL PIPING. ONTRTOR SHLL SLEEVE N FIRE ULK/SEL LL PENETRTIONS IN FLOOR PER PPLILE HILTI UL LISTE ETIL FOR HR. FLOOR SL PENETRTION. SIENE UILING OFFIE RENOVTION NEW PIPING PLN P-.0 /6" = '-0" KEY PLN MRK TE ESRIPTION PROJET NO: 6-0 WG FILE: MEH.RVT RWN Y: HK' Y: LM SP PIPING NEW WORK PLN SHEET NUMER: P-.0

EMOLITION KEY NOTES GENERL EMOLITION NOTE: IT IS THE RESPONSIILITY OF THE ONTRTOR TO PROPERLY ISPOSE OF LL ITEMS SHEULE FOR EMOLITION. EMO EXISTING UTWORK, PHOENIX VLVE, REHET OIL, N PIPING S SHOWN. OFFIE 6"ø 00 FM FUME HOO PURHSE Y N INSTLLE Y ONTRTOR. ONTRTOR RESPONSILE FOR INSTLLTION OF SE INET, WORK SURFE, N PIPING. NEW WORK KEY NOTES REPIPE HOT WTER SUPPLY N RETURN PIPING TO NEW REHET OIL. REVISE EXISTING PNEUMTI ONTROL VLVE. HV Plumbing Fire Protection 0 th Street ugusta, G 090 (706) 77-00 THIS OUMENT IS THE PROPERTY OF ING ONSULTING, IN. THE UNUTHORIZE REPROUTION, OPYING, OR OTHERWISE USE OF THIS OUMENT IS STRITLY PROHIITE N N INFRINGEMENT THEREUPON MY E SUJET TO LEGL TION. ONSULTNTS OPYRIGHT 0 - ING ONSULTING, IN. INSTLL NEW PHOENIX ONTROL VLVE. (E)R- "x8" "x8" (E) 0"ø M L FH- (E) 0"ø M 6"ø S 6 L 6 7 ENLRGE OPENING IN EXISTING ONRETE LOK WLL FOR NEW 0" UT. PROVIE NEW ONIL ESUTHEON ON EH SIE OF WLL. NEW SUPPLY UT SHLL E OULE WLL SPIRL UT, GLVNIZE PINT GRIP. PRIME N PINT OLOR TO MTH EXISTING SYSTEM OLOR OE. NEW EXHUST UT SHLL E SINGLE WLL SPIRL UT, GLVNIZE PINT GRIP. PRIME N PINT OLOR TO MTH EXISTING SYSTEM OLOR OE. EXISTING THERMOSTT LOTION TO REMIN. 06//0 EQUIPMENT SHEULE 0"ø HWR HWS 8"ø R- "ø S 0"ø E "x8" FM x FH-: PROVIE FUME HOO. ONTRTOR TO PROVIE N INSTLL FUME HOO MONITOR EQUL TO PHOENIX X0 SERIES MOEL#FHM. R-: REHET OIL 6"x6" u/l OIL. GPM FLOW @ 0 T. (E)HWR (E)HWS 8"ø VV- "ø S (E)HWR (E)HWS 0"ø E VV- 7 T VV-: MEIUM-PRESSURE VRILE IR VOLUME VLVE EQUL TO PHOENIX MOEL#MV0MMEHZ. VV-: MEIUM-PRESSURE VRILE IR VOLUME VLVE EQUL TO PHOENIX MOEL#EXV0MMEHO. IFFUSER TGS : -WY LY-IN PLQUE IFFUSER EQUL TO TITUS MOEL#OMNI. "x" FE SIZE IN WHITE. PROVIE K PN WITH FTORY INSTLLE FOIL K INSULTION WITH MINIMUM R-VULE OF 6. SIENE UILING OFFIE RENOVTION (E) 8"ø E (E) 8"ø E : LUMINUM /6" PERFORTE SUPPLY GRILLE EQUL TO TITUS MOEL#S8F. "x8" FE SIZE IN WHITE. HV EMOLITION PLN M-.0 /6" = '-0" HV NEW WORK PLN M-.0 /6" = '-0" KEY PLN MRK TE ESRIPTION PROJET NO: 6-0 WG FILE: RWN Y: HK' Y: MEH.RVT LM SP MEHNIL EMOLITION N NEW WORK PLNS SHEET NUMER: M-.0

MEHNIL SPEIFITIONS: SI MEHNIL MTERILS N METHOS. LL WORK SHLL ONFORM TO NFP 99, 0 I, 0 INTERNTIONL PLUMING OE, 0 INTERNTIONL MEHNIL OE N WITH LL LOL, & STTE MENMENTS.. RRNGE FOR PIPE SPES, HSES, SLOTS, N OPENINGS IN UILING STRUTURE URING PROGRESS OF ONSTRUTION, TO LLOW FOR MEHNIL INSTLLTIONS.. RWING PLNS, SHEMTIS, N IGRMS INITE GENERL LOTION N RRNGEMENT OF PIPING SYSTEMS. INITE LOTIONS N RRNGEMENTS WERE USE TO SIZE PIPE N LULTE FRITION LOSS, EXPNSION, PUMP SIZING, N OTHER ESIGN ONSIERTIONS. INSTLL PIPING S INITE UNLESS EVITIONS TO LYOUT RE PPROVE ON OORINTION RWINGS.. INSTLL PIPING IN ONELE LOTIONS, UNLESS OTHERWISE INITE N EXEPT IN EQUIPMENT ROOMS N SERVIE RES. E. INSTLL PIPING TO PERMIT VLVE SERVIING, T INITE SLOPES, FREE OF SGS N ENS. INSTLL PIPING TO LLOW PPLITION OF INSULTION. F. SELET SYSTEM OMPONENTS WITH PRESSURE RTING EQUL TO OR GRETER THN SYSTEM OPERTING PRESSURE. G. ONTRTOR SHLL OORINTE WITH EXISTING ONITIONS N RWINGS FOR FIRE WLL / RRIER / PRTITION PENETRTIONS. ONTRTOR SHLL PROVIE FIRE STOPPING S REQUIRE TO MEET WLL RESISTNE RTING REQUIREMENTS. H. INSTLL PIPING IN ONELE LOTIONS, UNLESS OTHERWISE INITE N EXEPT IN EQUIPMENT ROOMS N SERVIE RES. I. INSTLL PIPING INITE TO E EXPOSE N PIPING IN EQUIPMENT ROOMS N SERVIE RES T RIGHT NGLES OR PRLLEL TO UILING WLLS. IGONL RUNS RE PROHIITE UNLESS SPEIFILLY INITE OTHERWISE. J. INSTLL PIPING OVE ESSILE EILINGS TO LLOW SUFFIIENT SPE FOR EILING PNEL REMOVL. K. INSTLL PIPING TO PERMIT VLVE SERVIING. L. INSTLL PIPING T INITE SLOPES. M. INSTLL PIPING FREE OF SGS N ENS. N. INSTLL FITTINGS FOR HNGES IN IRETION N RNH ONNETIONS. O. INSTLL PIPING TO LLOW PPLITION OF INSULTION. P. SELET SYSTEM OMPONENTS WITH PRESSURE RTING EQUL TO OR GRETER THN SYSTEM OPERTING PRESSURE. Q. INSTLL ESUTHEONS FOR PENETRTIONS OF WLLS, EILINGS, N FLOORS ORING TO THE FOLLOWING:. PIPING: a. PIPING WITH FITTING OR SLEEVE PROTRUING FROM WLL: ONE-PIEE, EEP-PTTERN TYPE. b. HROME-PLTE PIPING: ONE-PIEE, ST-RSS TYPE WITH POLISHE HROME-PLTE FINISH. c. INSULTE PIPING: ONE-PIEE, STMPE-STEEL TYPE WITH SPRING LIPS. d. RE PIPING T WLL N FLOOR PENETRTIONS IN FINISHE SPES: ONE-PIEE, ST-RSS TYPE WITH POLISHE HROME-PLTE FINISH. e. RE PIPING T WLL N FLOOR PENETRTIONS IN FINISHE SPES: ONE-PIEE, STMPE-STEEL TYPE. f. RE PIPING T EILING PENETRTIONS IN FINISHE SPES: ONE-PIEE OR SPLIT- STING, ST-RSS TYPE WITH POLISHE HROME-PLTE FINISH. g. RE PIPING T EILING PENETRTIONS IN FINISHE SPES: ONE-PIEE, STMPE-STEEL TYPE OR SPLIT-PLTE, STMPE-STEEL TYPE WITH ONELE HINGE N SET SREW. h. RE PIPING IN UNFINISHE SERVIE SPES: ONE-PIEE, ST-RSS TYPE WITH POLISHE HROME-PLTE FINISH. i. RE PIPING IN UNFINISHE SERVIE SPES: ONE-PIEE, STMPE-STEEL TYPE WITH ONELE OR EXPOSE-RIVET HINGE N SET SREW OR SPRING LIPS. R. FIRE-RRIER PENETRTIONS: MINTIN INITE FIRE RTING OF WLLS, PRTITIONS, EILINGS, N FLOORS T PIPE PENETRTIONS. SEL PIPE PENETRTIONS WITH FIRESTOP MTERILS. REFER TO SPEIFITION SETION "THROUGH-PENETRTION FIRESTOP SYSTEMS" FOR MTERILS. S. VERIFY FINL EQUIPMENT LOTIONS FOR FINL ROUGHING-IN. T. REFER TO FUME HOO EQUIPMENT SPEIFITIONS, INSTLLTION, OPERTING T FOR FINL ROUGHING-IN REQUIREMENTS. PIPING JOINT ONSTRUTION. REM ENS OF PIPES N TUES N REMOVE URRS. EVEL PLIN ENS OF STEEL PIPE.. REMOVE SLE, SLG, IRT, N ERIS FROM INSIE N OUTSIE OF PIPE N FITTINGS EFORE SSEMLY.. SOLERE JOINTS: PPLY STM8, WTER-FLUSHLE FLUX, UNLESS OTHERWISE INITE, TO TUE EN. ONSTRUT JOINTS ORING TO STM88 OR 'S "OPPER TUE HNOOK," USING LE-FREE SOLER LLOY OMPLYING WITH STM.. RZE JOINTS: ONSTRUT JOINTS ORING TO WS'S "RZING HNOOK," "PIPE N TUE" HPTER, USING OPPER-PHOSPHORUS RZING FILLER METL OMPLYING WITH WS.8. PINTING. MGE N TOUHUP: REPIR MRRE N MGE FTORY-PINTE FINISHES WITH MTERILS N PROEURES TO MTH ORIGINL FTORY FINISH. PIPING SYSTEMS. WTER SERVIE PIPING: HR OPPER TUE, TYPE K; OPPER PRESSURE FITTINGS; N SOLERE JOINTS.. LL WTER SERVIE PIPING SHLL E INSULTE WITH TYPE I MINERL OR GLSS FIERS ONE WITH THERMOSETTING RESIN. OMPLY WITH STM 7, TYPE I, GRE, WITH FTORY-PPLIE SJ-SSL. MIN. THIKNESS OF " REQUIRE FOR LL PIPING. REPIR EXISTING PIPING T TIE-IN LOTION EXTENING ' EH WY.. PROVIE N INSTLL GLVNIZE INSULTION SHIELS T HNGER LOTIONS.. IR SERVIE PIPING: HR OPPER TUE, TYPE K, OPPER PRESSURE FITTINGS; N RZE JOINTS.. GS SERVIE PIPING: HR OPPER TUE, TYPE K, OPPER PRESSURE FITTINGS; N RZE JOINTS. SPEILTIES. LL VLVES: MSS SP-0, LSS 0, 600-PSI WP, STM 6 TWO-PIEE, OPPER-LLOY RONZE OY N ONNET WITH FULL-PORT, HROME-PLTE RSS LL; PTFE OR TFE SETS, LOWOUT- PROOF RSS OR RONZE STEM, THREE OR SOLERE EN ONNETIONS:. OPERTOR: VINYL-OVERE STEEL LEVER HNLE. W/STEM EXTENSION FOR VLVES INSTLLE IN INSULTE PIPING. I WSTE RINGE PIPE N VENT:. PIPE N FITTINGS: ONFORMING TO STM F. POLYPROPYLENE MTERIL SHLL ONFORM TO STM 0.. FLME-RETRNT POLYPROPYLENE PIPE N FITTINGS.. PIPE N FITTINGS SHLL E JOINE USING NO-HU/PLIN EN OUPLING.. PIPE SHLL E SUPPLIE IN FTORY GROOVE 0-FT. LENGTH. E. FITTINGS RE TO MEET OR EXEE SHEULE 0 IMENSIONS. F. OUPLING SHLL HVE 00 SERIES STINLESS STEEL OUTER N N /6" OLTS, NUTS N WSHERS PLTE TO MEET 00-HOUR SLT SPRY TEST PER STM 7. G. MNUFTURERS:. ORION INUSTRIES. T ONTRTOR'S OPTION N PPROVL OF THE N ENGINEER; MTH EXTLY WITH NO EVITIONS EXISTING SYSTEM MNUFTURER N JOINING METHO. H. TEST SNITRY RINGE N VENT PIPING ORING TO PROEURES OF UTHORITIES HVING JURISITION OR, IN SENE OF PULISHE PROEURES, S FOLLOWS:. TEST FOR LEKS N EFETS IN NEW PIPING N PRTS OF EXISTING PIPING THT HVE EEN LTERE WITH 0FT OF WTER HE ON VENT SYSTEM STKS. MKE FINL ONNETIONS TO EXISTING W N WR SYSTEM N INSPET FINL PIPING JOINTS VISULLY UNER FLOWING ONITIONS.. REPIR LEKS N EFETS WITH NEW MTERILS N RETEST PIPING, OR PORTION THEREOF, UNTIL STISFTORY RESULTS RE OTINE. HNGERS N SUPPORTS. PIPE HNGER N SUPPORT INSTLLTION: OMPLY WITH MSS SP-69 N MSS SP-89. INSTLL HNGERS, SUPPORTS, LMPS, N TTHMENTS S REQUIRE TO PROPERLY SUPPORT PIPING FROM UILING STRUTURE. PROVIE INSULTION SHIELS T SUPPORTS.. INSTLL HNGERS N SUPPORTS OMPLETE WITH NEESSRY INSERTS, OLTS, ROS, NUTS, WSHERS, N OTHER ESSORIES. INSTLL HNGERS N SUPPORTS TO PROVIE INITE PIPE SLOPES N SO MXIMUM PIPE EFLETIONS LLOWE Y SME.9 RE NOT EXEEE.. INIVIUL, STRIGHT, HORIZONTL PIPING RUNS: ORING TO THE FOLLOWING: a. 00 FEET N LESS: MSS TYPE, JUSTLE, STEEL LEVIS HNGERS.. INSTLL HNGERS FOR OPPER TUING WITH THE FOLLOWING MXIMUM HORIZONTL SPING N MINIMUM RO IMETERS: a. NPS -/ N SMLLER: 7 INHES WITH /8-INH RO.. INSTLL VINYL-OTE HNGERS FOR "PP" PIPING WITH THE FOLLOWING MXIMUM HORIZONTL SPING N MINIMUM RO IMETERS: a. NPS-/ TO NPS: 8 INHES (00 MM) WITH /8-INH (0-MM) RO. b. NPS-/ TO NPS: 60 INHES (00 MM) WITH /-INH (-MM) RO. MEHNIL IENTIFITION. SME OMPLINE: OMPLY WITH SME., "SHEME FOR THE IENTIFITION OF PIPING SYSTEMS," FOR LETTER SIZE, LENGTH OF OLOR FIEL, OLORS, N VIEWING NGLES OF IENTIFITION EVIES FOR PIPING.. MNUFTURE PIPE MRKERS, GENERL: PREPRINTE, OLOR-OE, WITH LETTERING INITING SERVIE, N SHOWING IRETION OF FLOW.. OLORS: OMPLY WITH SME., UNLESS OTHERWISE INITE.. LETTERING: USE PIPING SYSTEM TERMS INITE N REVITE ONLY S NEESSRY FOR EH PPLITION LENGTH.. PIPES WITH O, INLUING INSULTION, LESS THN 6 INHES (0 MM): FULL-N PIPE MRKERS EXTENING 60 EGREES ROUN PIPE T EH LOTION.. PIPES WITH O, INLUING INSULTION, 6 INHES (0 MM) N LRGER: EITHER FULL-N OR STRIP-TYPE PIPE MRKERS T LEST THREE TIMES LETTER HEIGHT N OF LENGTH REQUIRE FOR LEL.. RROWS: INTEGRL WITH PIPING SYSTEM SERVIE LETTERING TO OMMOTE OTH IRETIONS; OR S SEPRTE UNIT ON EH PIPE MRKER TO INITE IRETION OF FLOW.. SELF-HESIVE PIPE MRKERS: PLSTI WITH PRESSURE-SENSITIVE, PERMNENT-TYPE, SELF-HESIVE K. PIPING IENTIFITION. INSTLL MNUFTURE PIPE MRKERS INITING SERVIE ON EH NEW N EXISTING PIPING SYSTEM ONSTRUTION LIMITS. INSTLL WITH FLOW INITION RROWS SHOWING IRETION OF FLOW.. PIPES WITH O, INLUING INSULTION, LESS THN 6 INHES (0 MM): SELF-HESIVE PIPE MRKERS. USE OLOR-OE, SELF-HESIVE PLSTI TPE, -/ INHES (8 MM) WIE, LPPE T LEST -/ INHES (8 MM) T OTH ENS OF PIPE MRKER, N OVERING FULL IRUMFERENE OF PIPE.. LOTE PIPE MRKERS N OLOR NS WHERE PIPING IS EXPOSE IN FINISHE SPES; MHINE ROOMS; ESSILE MINTENNE SPES SUH S FURRE WLL HSE N PLENUMS; N EXTERIOR NON- ONELE LOTIONS S FOLLOWS:. NER EH VLVE N ONTROL EVIE.. NER EH RNH ONNETION, EXLUING SHORT TKEOFFS FOR FIXTURES N TERMINL UNITS. WHERE FLOW PTTERN IS NOT OVIOUS, MRK EH PIPE T RNH.. NER PENETRTIONS THROUGH WLLS, FLOORS, EILINGS, N NONESSILE ENLOSURES.. T ESS OORS, MNHOLES, N SIMILR ESS POINTS THT PERMIT VIEW OF ONELE PIPING.. NER MJOR EQUIPMENT ITEMS N OTHER POINTS OF ORIGINTION N TERMINTION. 6. SPE T MXIMUM INTERVLS OF 0 FEET ( M) LONG EH RUN. REUE INTERVLS TO FEET (7.6 M) IN RES OF ONGESTE PIPING N EQUIPMENT. VLVE-TG INSTLLTION. INSTLL TGS ON VLVES N ONTROL EVIES IN PIPING SYSTEMS.. EXEPT HEK VLVES; VLVES WITHIN FTORY-FRITE EQUIPMENT UNITS; PLUMING FIXTURE SUPPLY STOPS; SHUTOFF VLVES; FUETS; ONVENIENE N LWN-WTERING HOSE ONNETIONS; N HV TERMINL EVIES N SIMILR ROUGHING-IN ONNETIONS OF EN-USE FIXTURES N UNITS. JUSTING N LENING. RELOTE MEHNIL IENTIFITION MTERILS N EVIES THT HVE EOME VISULLY LOKE Y OTHER WORK. HV Plumbing Fire Protection 0 th Street ugusta, G 090 MRK TE ESRIPTION PROJET NO: 6-0 RWN Y: HK' Y: (706) 77-00 THIS OUMENT IS THE PROPERTY OF ING ONSULTING, IN. THE UNUTHORIZE REPROUTION, OPYING, OR OTHERWISE USE OF THIS OUMENT IS STRITLY PROHIITE N N INFRINGEMENT THEREUPON MY E SUJET TO LEGL TION. ONSULTNTS OPYRIGHT 0 - ING ONSULTING, IN. SIENE UILING OFFIE RENOVTION WG FILE: LM SP 06//0 MEHNIL SPEIFITIONS SHEET NUMER: M-.0

SELETIVE EMOLITION, REMOVL & REPLEMENT/REPIR: GENERL. PROJET REQUIRES REMOVL, REPIR N REPLEMENT OF EXISTING EILING SYSTEMS, GYPSUM OR N SSOITE FINISH WITHIN THE ONSTRUTION LIMITS TO INSTLL NEW WORK. ONTRTOR SHLL ETERMINE THE EXTENT, INLUE IN THE I LOR N MTERIL NEESSRY FOR THE SELETIVE EMOLITION, REMOVL, REPIR REPLEMENT N INSTLLTION OF THESE MTERILS TO PLE LL ITEMS WITHIN ONSTRUTION LIMITS K TO NEW ONITION. MTERILS REMOVE THT RE NOT MGE MY E LENE N REINSTLLE WHERE PPLILE.. PRE-ONSTRUTION ONFERENE: ONUT ONFERENE T PROJET SITE.. INSPET N ISUSS ONITION OF ONSTRUTION TO E SELETIVELY REMOVE FOR INSTLLTION OF NEW WORK.. REVIEW N FINLIZE SELETIVE REMOVL SHEULE N VERIFY VILILITY OF MTERILS, EQUIPMENT, N FILITIES NEEE TO MKE PROGRESS N VOI INTERRUPTION TO OUPIE FILITY.. REVIEW REQUIREMENTS OF WORK PERFORME Y OTHER TRES THT RELY ON SUSTRTES EXPOSE Y SELETIVE REMOVL OPERTIONS.. REVIEW RES WHERE EXISTING ONSTRUTION IS TO REMIN N REQUIRES PROTETION. INFORMTIONL SUMITTLS. PROPOSE PROTETION MESURES: SUMIT THE MESURES PROPOSE FOR PROTETING INIVIULS N PROPERTY,FOR UST ONTROL NFOR NOISE ONTROL. INITE PROPOSE LOTIONS N ONSTRUTION OF RRIERS.. SHEULE OF SELETIVE REMOVL TIVITIES: INITE THE FOLLOWING:. ETILE SEQUENE OF SELETIVE REMOVL WORK, WITH STRTING N ENING TES FOR EH TIVITY. ENSURE ON-SITE OPERTIONS RE UNINTERRUPTE.. INTERRUPTION OF UTILITY SERVIES. INITE HOW LONG UTILITY SERVIES WILL E INTERRUPTE.. OORINTION FOR SHUTOFF, PPING, N ONTINUTION OF UTILITY SERVIES WITH PHYSIL PLNT PERSONNEL.. OORINTION OF 'S ONTINUING OUPNY OF PORTIONS OF EXISTING UILING N OF 'S PRTIL OUPNY OF OMPLETE WORK. FIEL ONITIONS. WILL OUPY PORTIONS OF UILING IMMEITELY JENT TO ONSTRUTION RE. ONUT SELETIVE REMOVL SO 'S OPERTIONS WILL NOT E ISRUPTE.. ONITIONS EXISTING T TIME OF INSPETION FOR IING PURPOSE WILL E MINTINE Y S FR S PRTIL.. NOTIFY RHITET OF ISREPNIES ETWEEN EXISTING ONITIONS N RWINGS EFORE PROEEING WITH SELETIVE REMOVL.. HZROUS MTERILS: IT IS NOT EXPETE THT HZROUS MTERILS WILL E ENOUNTERE IN THE WORK.. IF SUSPETE HZROUS MTERILS RE ENOUNTERE, O NOT ISTUR; IMMEITELY NOTIFY RHITET N. HZROUS MTERILS WILL E REMOVE Y UNER SEPRTE ONTRT. E. UTILITY SERVIE: MINTIN EXISTING UTILITIES INITE TO REMIN IN SERVIE N PROTET THEM GINST MGE URING SELETIVE REMOVL OPERTIONS.. MINTIN FIRE-PROTETION FILITIES IN SERVIE URING ONSTRUTION. EXMINTION. VERIFY THT UTILITIES HVE EEN ISONNETE N PPE EFORE STRTING SELETIVE REMOVL OPERTIONS.. SURVEY EXISTING ONITIONS N ORRELTE WITH REQUIREMENTS INITE TO ETERMINE EXTENT OF SELETIVE REMOVL REQUIRE.. WHEN UNNTIIPTE MEHNIL, ELETRIL, OR STRUTURL ELEMENTS THT ONFLIT WITH INTENE FUNTION OR ESIGN RE ENOUNTERE, INVESTIGTE N MESURE THE NTURE N EXTENT OF ONFLIT. PROMPTLY SUMIT NOTIFY RHITET.. SURVEY OF EXISTING ONITIONS: REOR REMINING EXISTING ONITIONS Y USE OF MESURE RWINGS. MEHNIL SYSTEMS. EXISTING SERVIES/SYSTEMS TO REMIN: MINTIN SERVIES/SYSTEMS INITE TO REMIN N PROTET THEM GINST MGE.. OMPLY WITH REQUIREMENTS FOR EXISTING SERVIES/SYSTEMS INTERRUPTIONS SPEIFIE.. EXISTING SERVIES/SYSTEMS TO E REMOVE, RELOTE, OR NONE: LOTE, IENTIFY, ISONNET, N SEL OR P OFF INITE UTILITY SERVIES N MEHNIL/ELETRIL SYSTEMS SERVING RES TO E SELETIVELY EMOLISHE.. ONTRTOR SHLL ONTT TO RRNGE FOR SHUT OFF INITE SERVIES/SYSTEMS WHEN REQUESTE Y ONTRTOR.. RRNGE TO SHUT OFF INITE UTILITIES WITH PHYSIL PLNT PERSONNEL.. IF SERVIES/SYSTEMS RE REQUIRE TO E REMOVE, RELOTE, OR NONE, PROVIE TEMPORRY SERVIES/SYSTEMS THT YPSS RE OF SELETIVE EMOLITION N THT MINTIN ONTINUITY OF SERVIES/SYSTEMS TO OTHER PRTS OF UILING.. ISONNET, EMOLISH, N REMOVE FIRE-SUPPRESSION SYSTEMS, PLUMING, N HV SYSTEMS, EQUIPMENT, N OMPONENTS INITE TO E REMOVE. a. PIPING TO E REMOVE: REMOVE PORTION OF PIPING INITE TO E REMOVE N P OR PLUG REMINING PIPING WITH SME OR OMPTILE PIPING MTERIL. b. PIPING TO E NONE IN PLE: RIN PIPING N P OR PLUG PIPING WITH SME OR OMPTILE PIPING MTERIL. c. EQUIPMENT TO E REMOVE: ISONNET N P SERVIES N REMOVE EQUIPMENT. d. EQUIPMENT TO E REMOVE N REINSTLLE: ISONNET N P SERVIES N REMOVE, LEN, N STORE EQUIPMENT; WHEN PPROPRITE, REINSTLL, REONNET, N MKE EQUIPMENT OPERTIONL. e. EQUIPMENT TO E REMOVE N SLVGE: ISONNET N P SERVIES N REMOVE EQUIPMENT N ELIVER TO. f. UTS TO E REMOVE: REMOVE PORTION OF UTS INITE TO E REMOVE N PLUG REMINING UTS WITH SME OR OMPTILE UTWORK MTERIL. g. UTS TO E NONE IN PLE: P OR PLUG UTS WITH SME OR OMPTILE UTWORK MTERIL. PREPRTION. TEMPORRY FILITIES: PROVIE TEMPORRY RRIES N OTHER PROTETION REQUIRE TO PREVENT INJURY TO PEOPLE N MGE TO JENT UILINGS N FILITIES TO REMIN.. PROVIE PROTETION TO ENSURE SFE PSSGE OF PEOPLE ROUN SELETIVE EMOLITION RE N TO N FROM OUPIE PORTIONS OF UILING.. PROTET WLLS, EILINGS, FLOORS, N OTHER EXISTING FINISH WORK THT RE TO REMIN OR THT RE EXPOSE URING SELETIVE EMOLITION OPERTIONS.. OVER N PROTET FURNITURE, FURNISHINGS, N EQUIPMENT THT HVE NOT EEN REMOVE.. OMPLY WITH REQUIREMENTS FOR TEMPORRY ENLOSURES, UST ONTROL, HETING, N OOLING Y LOKING RETURN IR PTHS N SUPPLY Y INSTLLING TEMPORRY UTWORK PS N UTSEL. EXHUST SYSTEM UTS MY REMIN OPEN. SELETIVE EMOLITION, GENERL. GENERL: EMOLISH N REMOVE EXISTING ONSTRUTION ONLY TO THE EXTENT REQUIRE Y NEW ONSTRUTION N S INITE. USE METHOS REQUIRE TO OMPLETE THE WORK WITHIN LIMITTIONS OF GOVERNING REGULTIONS N S FOLLOWS:. PROEE WITH SELETIVE EMOLITION SYSTEMTILLY, FROM HIGHER TO LOWER LEVEL. OMPLETE SELETIVE EMOLITION OPERTIONS OVE EH FLOOR OR TIER EFORE ISTURING SUPPORTING MEMERS ON THE NEXT LOWER LEVEL.. NETLY UT OPENINGS N HOLES PLUM, SQURE, N TRUE TO IMENSIONS REQUIRE. USE UTTING METHOS LEST LIKELY TO MGE ONSTRUTION TO REMIN OR JOINING ONSTRUTION. USE HN TOOLS OR SMLL POWER TOOLS ESIGNE FOR SWING OR GRINING, NOT HMMERING N HOPPING, TO MINIMIZE ISTURNE OF JENT SURFES.TEMPORRILY OVER OPENINGS TO REMIN.. UT OR RILL FROM THE EXPOSE OR FINISHE SIE INTO ONELE SURFES TO VOI MRRING EXISTING FINISHE SURFES.. O NOT USE UTTING TORHES UNTIL WORK RE IS LERE OF FLMMLE MTERILS. T ONELE SPES, SUH S UT N PIPE INTERIORS, VERIFY ONITION N ONTENTS OF HIEN SPE EFORE STRTING FLME-UTTING OPERTIONS. MINTIN FIRE WTH N PORTLE FIRE-SUPPRESSION EVIES URING FLME-UTTING OPERTIONS.. MINTIN EQUTE VENTILTION WHEN USING UTTING TORHES. 6. LOTE SELETIVE EMOLITION EQUIPMENT N REMOVE ERIS N MTERILS SO S NOT TO IMPOSE EXESSIVE LOS ON SUPPORTING WLLS, FLOORS, OR FRMING. 7. ISPOSE OF EMOLISHE ITEMS N MTERILS PROMPTLY.. REMOVE N REINSTLLE ITEMS:. LEN N REPIR ITEMS TO FUNTIONL ONITION EQUTE FOR INTENE REUSE.. REINSTLL ITEMS IN LOTIONS INITE. OMPLY WITH INSTLLTION REQUIREMENTS FOR NEW MTERILS N EQUIPMENT. PROVIE ONNETIONS, SUPPORTS, N MISELLNEOUS MTERILS NEESSRY TO MKE ITEM FUNTIONL FOR USE INITE.. EXISTING ITEMS TO REMIN: PROTET ONSTRUTION INITE TO REMIN GINST MGE N SOILING URING SELETIVE EMOLITION. WHEN PERMITTE Y RHITET, ITEMS MY E REMOVE TO SUITLE, PROTETE STORGE LOTION URING SELETIVE EMOLITION N LENE N REINSTLLE IN THEIR ORIGINL LOTIONS FTER SELETIVE EMOLITION OPERTIONS RE OMPLETE. ISPOSL OF EMOLISHE MTERILS. GENERL: EXEPT FOR ITEMS OR MTERILS INITE TO E REUSE, SLVGE, REINSTLLE, OR OTHERWISE INITE TO REMIN 'S PROPERTY, REMOVE EMOLISHE MTERILS FROM PROJET SITE.. O NOT LLOW EMOLISHE MTERILS TO UMULTE ON-SITE.. REMOVE N TRNSPORT ERIS IN MNNER THT WILL PREVENT SPILLGE ON JENT SURFES N RES.. REMOVE ERIS FROM ELEVTE PORTIONS OF UILING Y HUTE, HOIST, OR OTHER EVIE THT WILL ONVEY ERIS TO GRE LEVEL IN ONTROLLE ESENT.. ISPOSL: TRNSPORT EMOLISHE MTERILS OFF 'S PROPERTY N LEGLLY ISPOSE OF THEM.. LENING: LEN JENT STRUTURES N IMPROVEMENTS OF UST, IRT, N ERIS USE Y SELETIVE EMOLITION OPERTIONS. RETURN JENT RES TO ONITION EXISTING EFORE SELETIVE EMOLITION OPERTIONS EGN. HV Plumbing Fire Protection 0 th Street ugusta, G 090 MRK TE ESRIPTION PROJET NO: 6-0 RWN Y: HK' Y: (706) 77-00 THIS OUMENT IS THE PROPERTY OF ING ONSULTING, IN. THE UNUTHORIZE REPROUTION, OPYING, OR OTHERWISE USE OF THIS OUMENT IS STRITLY PROHIITE N N INFRINGEMENT THEREUPON MY E SUJET TO LEGL TION. ONSULTNTS OPYRIGHT 0 - ING ONSULTING, IN. SIENE UILING OFFIE RENOVTION WG FILE: LM SP 06//0 MEHNIL SPEIFITIONS SHEET NUMER: M-.