METAMORPHOSIS INSTALLATION GUIDE

Similar documents
TRESSES INSTALLATION GUIDE

KUBIK INSTALLATION GUIDE

INCEPTIV INSTALLATION GUIDELINES

INCEPTIV INSTALLATION GUIDELINES

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

How to Install Elite Bayside Beadboard

Wall Installations. Chapter 16 Wall Installations 16. 1

ARK CHEVRON INSTALLATION GUIDE

Installation Instructions for Viking Hearth Engineered Wood Flooring

INSTALLATION GUIDE. Preparation The environment

INSTALLATION GUIDE. Preparation. Subfloor Preparation. Installation of Vapour Barrier Paper (asphalt-free) Model repair and maintenance kit

Installation Instructions for Engineered Wood Flooring

WOODWORKS Walls. Installation Instructions WALL

INSTALLATION GUIDE SOLID HARDWOOD FLOORING

INSTALLATION GUIDE. Preparation

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Installation Manual 0318

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

INSTALLATION MANUAL STORAGE

" BASE CABINET

Siding Systems NOVIKSTONETM FS FIELDSTONE INSTALLATION GUIDE

WoodWORKS Channeled Plank

Installation Instructions and Details

Office Installation Guidelines

Panel Installation Instructions

Cabinetry Installation

INSTALLATION INSTRUCTIONS VERTICALILLUSION.COM

Install Windsor Corners

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

Wallgard 1,3 product

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

LuxCore Installation Instructions

Installation Instructions for easy to install Texture Plus faux wall panels

Installation Instructions Palladium Square Edge Panels

Engineered Hardwood Flooring Installation Instructions

CABINET INSTALLATION INSTRUCTIONS

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Wall Panel Installation Instructions

Please read and review installation instructions completely before proceeding with the actual installation.

Install Guide. view our Install video guide online

Loose Lay Luxury Vinyl Plank

Installation Instructions

Panel Installation Instructions

FRAMED CABINETRY INSTALLATION MANUAL

Flash Coving. Chapter 8 Flash Coving 8. 1

V3 Engineered Flooring- Installation Instructions

STAIR TREAD & RISER INSTALLATION GUIDELINES

Steel Reinforced Joining Guide (Horizontal / Vertical)

Installation Instructions for. Before You Begin TOOLS REQUIRED

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Chapter 19. Interior Finish Work

TM TM DOG HOUSE Age 9+

10 Octagon Cedar Gazebo Assembly Instructions

Prior to installation, the installer assumes all responsibility for final inspection and quality of the product

DO NOT HESITATE TO CONTACT US TO BE GUIDE DURING THE INSTALLATION OF SQUAREDECKO PRODUCTS

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Chapter 1. Beam and Sill Plates

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

Installation Instructions

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE

Outdoor Deck Turf Tile. Installation Instructions

INSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation

Installation guide. MS 14 Metal Siding

SECTION INTERIOR FINISH CARPENTRY

Vinyl Windows and Doors

Safety First! Review the Safety Checklist before performing tasks in this chapter.

GreatDeck Outdoor Hardwood, Plastic, Red Cedar, and Wood Deck Tile. Installation Instructions

GRID PANEL SYSTEM Installation Instructions

General Installation Guide

Dodecagon Gazebo. Assembly Manual. If you are in the middle of your project and you need assistance Call (717)

AZEK Porch Install Guide

B. Related Requirements: 1. Section "Interior Painting" for priming and backpriming of interior finish carpentry.

4 Column Display Row Corner

ELiTE ProPanel Installation Guide

t h e h e l p f u l g u i d e t o c a b i n e t i n s t a l l a t i o n

Unit 9. Wall and Ceiling Framing

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Dresser. Materials & Tools FEATURING FORMALDEHYDE-FREE TECHNOLOGY. Free Plans to build a Dresser

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

DIY CHILD S STOOL. Instructions

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

Installation Instructions

Tools You Will Need: Pencil Chalk Line Level Rubber J-Roller Miter Saw (either hand saw or electric) Utility Knife Black Dot Stickers (provided)

Metallaire Installation Instructions

Robert Bosch GmbH. Wall organiser

DuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

Chapter 17 - Porch Trim

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

Tools required by installer: Materials required by installer:

ULTRA WINDOW & DOOR EXPANDERS AND RECEIVERS INSTALLATION INSTRUCTIONS

Transcription:

METAMORPHOSIS INSTALLATION GUIDE

THANK YOU FOR YOUR PURCHASE OF DUCHÂTEAU WALL COVERINGS. We recommend you hire an experienced finish carpenter or wood flooring installer to achieve quality results with all DuChâteau Wall Coverings. The right tools are key for a successful installation. IMPORTANT: WARNING: BE SURE TO FULLY INSPECT SHIPMENT FOR ANY DAMAGE IMMEDIATELY UPON ARRIVAL PRIOR TO INSTALLATION. ANY DAMAGE MUST BE REPORTED IMMEDIATELY TO CUSTOMERSERVICE@DUCHATEAU.COM. IMPROPERLY INSTALLING DUCHÂTEAU WALL COVERINGS MAY RESULT IN VOIDING YOUR WARRANTY. PROTECT YOUR WARRANTY AND YOUR INVESTMENT, ALWAYS FASTEN AND GLUE DUCHÂTEAU WALL COVERINGS.

CONTENTS RECOMMENDED TOOLS 4 HORIZONTAL INSTALLATION 5 VERTICAL INSTALLATION 21

RECOMMENDED TOOLS FLAT BLACK PAINT, TRAY AND PROTECTIVE FLOOR COVER BRUSH AND ROLLER BLACK TAPE LASER LEVEL OR LEVEL CHALK LINE CONSTRUCTION ADHESIVE AND APPLICATOR FINISH MITER SAW* WITH A HORIZONTAL CAPACITY OF 16 FINISH TABLE SAW* JIGSAW GAUGE NAIL GUN WITH NAILS 18 GAUGE NAIL GUN WITH NAILS FLATHEAD SCREWS - OPTIONAL DRILL AIR COMPRESSOR COUNTERSINK BIT - IF USING FLATHEAD SCREWS STEP LADDER OR SCAFFOLD - IF NECESSARY RUBBER MALLET MEASURING TAPE, RULER AND SCORING KNIFE *NOTE: MAKE SURE YOUR BLADES ARE IN PRIME CONDITION TO WORK WITH PRE-FINISHED LUMBER.

HORIZONTAL

METAMORPHOSIS / HORIZONTAL PREPARATION STEP 1 First, check the wall(s) is level from floor to ceiling and edge-to-edge. If not, be sure to note the differences in height and/or width, and adjust layout accordingly. Fix any irregularities on the surface of your installation area that would affect how the tiles lay. LASER LEVEL OR LEVEL 6

METAMORPHOSIS / HORIZONTAL PREPARATION STEP 2 Paint the desired installation area matte black to hide any potential gaps between or within tiles due to expansion and contraction of wood over time; 1/16 gap is normal between tiles. For edges, use black tape to further conceal paint imperfection, if needed. FLAT BLACK PAINT PAINT TRAY PROTECTIVE FLOOR COVER PAINT BRUSH AND ROLLER BLACK TAPE 7

METAMORPHOSIS / HORIZONTAL PREPARATION STEP 3 Leave a 1 4 gap around the perimeter of your installation area, including trim, to allow for product expansion and contraction. Use shims for an even separation, if necessary. 1/4 1/4 1/4 1/4 MEASURING TAPE RULER 8

METAMORPHOSIS / HORIZONTAL PREPARATION STEP 4 FIG. A Assess the direction of the tiles you wish to have them installed horizontal, vertical, and/or even diagonal at any angle. MARK INITIAL CUTS FIG A. Lay two rows on the floor before installing to plan your wall. Define and mark initial cuts FIG B. IMPORTANT: If centered install is desired, mark center piece and measure out ends of wall to ensure both ends of wall coverings are equal before cutting excess. FIG. B (CENTERED INSTALL) MARK CENTER PIECES *The visible hardboard back panel should always be facing the direction of installation. 9

METAMORPHOSIS / HORIZONTAL PREPARATION STEP 5 Measure and mark your horizontal and vertical guidelines using a laser level and chalk line in accordance with the tile dimensions. MARK INITIAL CUTS LASER LEVEL CHALK LINE 10

METAMORPHOSIS / HORIZONTAL PREPARATION STEP 6 In prep for outlets, light switches, etc., arrange any other rows of tiles on the floor that will require additional cuts, taking care to mark any outlets and define initial cuts once level; please see special instructions for installing mouldings. TRIM Anticipate final row might need to be trimmed to fit as well. RULER JIGSAW AND DRILL MITER SAW OR TABLE SAW 11

METAMORPHOSIS / HORIZONTAL FASTENING STEP 7 To install HORIZONTALLY, begin in either TOP RIGHT corner or BOTTOM LEFT corner, as long as the hardboard back panel is facing the direction of the install. Define and mark initial cuts. FIG. B FIG A. Starting from Left to Right from the Bottom, place the visible hardboard back panel to the Right and Up. FIG. A FIG B. Starting from Right to Left from the Top, the visible hardboard back panel to the Left and Top. FIG. A FIG. B (NOTE: Initial cuts will vary depending on your desired installation area.) CUT CUT 12

METAMORPHOSIS / HORIZONTAL FASTENING STEP 8 Cut excess tab off the wall tile in order to be flush and ensure proper coverage. FIG A. The excess tile will need to be cut on the left and below to be flush with the wall/floor. FIG B. The excess tile will need to be cut on the right and top to be flush with the wall/ceiling. FIG. A FIG. B Please note that when cutting any pattern, pieces may fall off due to the vibration of the saw. Simply, glue back on and nail from back to secure it firmly. 13

METAMORPHOSIS / HORIZONTAL FASTENING STEP 9 Add adhesive on the back panel, and place the initial tile at the starting point of the installation. CONSTRUCTION ADHESIVE APPLICATOR 14

METAMORPHOSIS / HORIZONTAL FASTENING STEP 10 Once level and aligned, fasten the exposed back panel with at least 4 #18 Gauge Nails. (OPTIONAL: If using flathead screws, be sure to use a Counter Sink bit first to drill screws below the surface.) 18 18 GAUGE NAIL GUN WITH NAILS 15

METAMORPHOSIS / HORIZONTAL FASTENING STEP 11 Apply pressure on the individual piece when nailing. 18 FIG. A: ABOVE EYE LEVEL, USE # GAUGE NAILS AT A DOWNWARD ANGLE. Using # Gauge Nails, nail in between individual wood pieces, taking care to hide the nails within the 3D volume of each design. 18 When possible, do not nail on the face of each insert to maintain the finished aesthetic of the wall covering. FIG. B: AT EYE LEVEL, USE # GAUGE NAILS, NAILING INTO THE EDGES OF EACH PANEL. 18 GAUGE NAIL GUN WITH NAILS FIG. C: BELOW EYE LEVEL, USE # GAUGE NAILS, NAILING AT AN UPWARD ANGLE TO AVOID VISIBLE NAILS. 16

METAMORPHOSIS / HORIZONTAL FASTENING STEP 12 Now, apply a very small amount of adhesive on the exposed hardwood panel in preparation for the next tile. CONSTRUCTION ADHESIVE APPLICATOR 17

METAMORPHOSIS / HORIZONTAL FASTENING STEP 13 Tightly fit the next adjacent tile; if necessary, use a rubber mallet and a scrap piece of wood to assist. Remember, a 1/16 separation is normal, as each handmade piece must be allowed to expand and contract. RUBBER MALLET 18

METAMORPHOSIS / HORIZONTAL FASTENING STEP 14 Make sure each tile and row is level. LASER LEVEL OR LEVEL 19

METAMORPHOSIS / HORIZONTAL FASTENING STEP 15 Repeat this fastening process across the wall, making sure to cut any tiles to fit as you approach the end of the wall. REMEMBER: THE PANELS MUST BE GLUED AND NAILED FOR THE WARRANTY TO APPLY; THIS METHOD WILL ALSO PREVENT THE PANELS FROM WARPING IN THE FUTURE. 20

VERTICAL

METAMORPHOSIS / VERTICAL PREPARATION STEP 1 First, check the wall(s) is level from floor to ceiling and edge-to-edge. If not, be sure to note the differences in height and/or width, and adjust layout accordingly. Fix any irregularities on the surface of your installation area that would affect how the tiles lay. LASER LEVEL OR LEVEL 22

METAMORPHOSIS / VERTICAL PREPARATION STEP 2 Paint the desired installation area matte black to hide any potential gaps between or within tiles due to expansion and contraction of wood over time; 1/16 gap is normal between tiles. For edges, use black tape to further conceal paint imperfection, if needed. FLAT BLACK PAINT PAINT TRAY PROTECTIVE FLOOR COVER PAINT BRUSH AND ROLLER BLACK TAPE

METAMORPHOSIS / VERTICAL PREPARATION STEP 3 Leave a 1 4 gap around the perimeter of your installation area, including trim, to allow for product expansion and contraction. 1/4 Use shims for an even separation, if necessary. 1/4 1/4 1/4 MEASURING TAPE RULER 24

METAMORPHOSIS / VERTICAL PREPARATION STEP 4 FIG. A FIG. B (CENTERED INSTALL) Assess the direction of the tiles you wish to have them installed horizontal, vertical, and/or even diagonal at any angle. FIG A. Lay two rows on the floor before installing to plan your wall. Define and mark initial cuts FIG B. IMPORTANT: If centered install is desired, mark center piece and measure out ends of wall to ensure both ends of wall coverings are equal before cutting excess. MARK INITIAL CUTS MARK CENTER PIECES *The visible hardboard back panel should always be facing the direction of installation. 25

METAMORPHOSIS / VERTICAL PREPARATION STEP 5 Measure and mark your horizontal and vertical guidelines using a laser level and chalk line in accordance with the tile dimensions. LASER LEVEL CHALK LINE 26

METAMORPHOSIS / VERTICAL PREPARATION STEP 6 In prep for outlets, light switches, etc., arrange any other rows of tiles on the floor that will require additional cuts, taking care to mark any outlets and define initial cuts once level; please see special instructions for installing mouldings. Anticipate final row might need to be trimmed to fit as well. TRIM RULER JIGSAW AND DRILL MITER SAW OR TABLE SAW 27

METAMORPHOSIS / VERTICAL FASTENING STEP 7 CUT To install VERTICALLY, begin in either TOP LEFT corner or BOTTOM RIGHT corner, as long as the hardboard back panel is facing the direction of the install. Define and mark initial cuts. FIG. A FIG. A FIG A. Starting from Left to Right from the Top, place the visible hardboard back panel to the Right and Down. FIG B. Starting from Right to Left from the Bottom, the visible hardboard back panel to the Left and Up. FIG. B FIG. B (NOTE: Initial cuts will vary depending on your desired installation area.) CUT 28

METAMORPHOSIS / VERTICAL FASTENING STEP 8 FIG. A Cut excess tab off the wall tile in order to be flush and ensure proper coverage. FIG A. The excess tile will need to be cut on the left and top to be flush with the wall/ceiling. FIG B. The excess tile will need to be cut on the right and below to be flush with the wall/floor. Please note that when cutting any pattern, pieces may fall off due to the vibration of the saw. Simply, glue back on and nail from back to secure it firmly. FIG. B 29

METAMORPHOSIS / VERTICAL FASTENING STEP 9 Add adhesive on the back panel, and place the initial tile at the starting point of the installation. CONSTRUCTION ADHESIVE APPLICATOR 30

METAMORPHOSIS / VERTICAL FASTENING STEP 10 Once level and aligned, fasten the exposed back panel with at least 4 #18 Gauge Nails. (OPTIONAL: If using flathead screws, be sure to use a Counter Sink bit first to drill screws below the surface.) 18 18 GAUGE NAIL GUN WITH NAILS 31

METAMORPHOSIS / VERTICAL FASTENING STEP 11 FIG. A ABOVE EYE LEVEL, USE # GAUGE NAILS AT A FIG. B AT EYE LEVEL, USE # GAUGE NAILS, NAILING INTO THE FIG. C BELOW EYE LEVEL, USE # GAUGE NAILS, NAILING AT AN UPWARD DOWNWARD ANGLE. EDGES OF EACH PANEL. ANGLE TO AVOID VISIBLE NAILS. Apply pressure on the individual piece when nailing. Using # Gauge Nails, nail in between individual wood pieces, taking care to hide the nails within the 3D volume of each design. When possible, do not nail on the face of each insert to maintain the finished 18 aesthetic of the wall covering. GAUGE NAIL GUN WITH NAILS 32

METAMORPHOSIS / VERTICAL FASTENING STEP 12 Now, apply a very small amount of adhesive on the exposed hardwood panel in preparation for the next tile. CONSTRUCTION ADHESIVE APPLICATOR 33

METAMORPHOSIS / VERTICAL FASTENING STEP 13 Tightly fit the next adjacent tile; if necessary, use a rubber mallet and a scrap piece of wood to assist. Remember, a 1/16 separation is normal, as each handmade piece must be allowed to expand and contract. RUBBER MALLET 34

METAMORPHOSIS / VERTICAL FASTENING STEP 14 Make sure each tile and row is level. LASER LEVEL OR LEVEL 35

METAMORPHOSIS / VERTICAL FASTENING STEP 15 Repeat this fastening process across the wall, making sure to cut any tiles to fit as you approach the end of the wall. REMEMBER: THE PANELS MUST BE GLUED AND NAILED FOR THE WARRANTY TO APPLY; THIS METHOD WILL ALSO PREVENT THE PANELS FROM WARPING IN THE FUTURE. 36

SPECIAL APPLICATIONS

METAMORPHOSIS / SPECIAL APPLICATIONS FOR OUTLETS, LIGHT SWITCHES, BUTTONS, ETC... STEP 1 STEP 2 STEP 3 Mark your outlet distance and elevation on your test pattern and on the wall. Mark your tile and drill 4 holes for each corner of the outlet. Using a Jigsaw to cut a line from corner to corner. STEP 4 STEP 5 Turn the piece around, trim and detail. Test on wall before applying glue/nails. 38

METAMORPHOSIS / SPECIAL APPLICATIONS FIREPLACES & HEATERS We do not recommend the use of DuChâteau Wall Coverings around a fireplace or a heater. Being made from wood, DuChâteau Wall Coverings are inherently flammable. Check your local codes. In most areas, this is prohibited by code. Optional A Rating fire retardant is available for an additional fee. 39

METAMORPHOSIS / SPECIAL APPLICATIONS BATHROOMS DuChâteau Wall Coverings may be used in bathrooms as long as they are NOT installed at or near splash areas. 40

METAMORPHOSIS / SPECIAL APPLICATIONS CEILING APPLICATIONS In general, we do not recommend using these products for ceiling applications; this specifically includes Arc Chevron, Crest, Curva Chevron, Curva, Krescent, Kuadra, Metamorphosis, Parallels, Scale Reckt, Tresses, Vertex, and Wave styles. However, if Edge, Infuse and Kubik styles are used in a ceiling application, use three #18 Gauge Nails over each solid part of the tile as an extra precaution and must be installed by a Licensed Flooring Contractor or Licensed Finish Carpenter with ceiling installation experience. Special glues and nail size must be specified by the Project Engineer and/or signing Architect for the project and also combined with the use of #18 Gauge Nails along the edges of each tile. 41

METAMORPHOSIS / SPECIAL APPLICATIONS CONCRETE WALLS For installation over concrete walls, wood separators and OSB boards are recommended. Direct installation over concrete is NOT covered by the warranty. 42

METAMORPHOSIS / RELATIVE HUMIDITY RELATIVE HUMIDITY WHAT IS RELATIVE HUMIDITY? AND HOW RELATIVE HUMIDITY AFFECT YOUR DUCHÂTEAU WALL COVERINGS RELATIVE HUMIDITY (RH) IS THE AMOUNT OF WATER VAPOR PRESENT IN AIR EXPRESSES AS A PERCENTAGE OF THE AMOUNT NEEDED FOR SATURATION AT THE SAME TEMPERATURE. RH 75% - 65% 60% - 40% 35% - 30% 20% - 5% CAUTION ZONE: May experience greater than normal movement SAFE ZONE: Well experience normal seasonal movement (gapping) CAUTION ZONE: May experience greater than normal movement GUARENTEED FAILURE ZONE: Will experience excessive gapping, cupping, checking, cracking and/or splitting 43