Content of Presentation

Similar documents
HMA Acceptance Specifications Assessing Contractor Risk

Percent Within Limits The NDOT Story

A Contractor s View of PWL (Michigan Experience)

SUPPLEMENT 1127 PAY FACTORS DETERMINATION FOR PAVEMENT AND STRUCTURE CONCRETE

Step 1 Calculate the square feet of roadway covered with tack 1,000 ft. x 12 ft. = 12,000 square feet

To Develop a Quality Control/Quality Assurance Plan For Hot Mix Asphalt. AASHTO PP qq

Female Height. Height (inches)

Statistics Laboratory 7

CHAPTER 2 NOTES. Chapter 2 Level 1

UNIT TWO: Data for Simple Calculations. Enter and format a title Modify font style and size Enter column headings Move data Edit data

CHAPTER 13A. Normal Distributions

This page intentionally left blank

Wheels Diameter / Conversion of Units

Graphing with Excel. Data Table

USE OF BASIC ELECTRONIC MEASURING INSTRUMENTS Part II, & ANALYSIS OF MEASUREMENT ERROR 1

INDEPENDENT AND DEPENDENT EVENTS UNIT 6: PROBABILITY DAY 2

PASS Sample Size Software

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT SUBMITTAL AND APPLICATION REQUIREMENTS FOR ProVAL PAVEMENT SMOOTHNESS SOFTWARE

EE EXPERIMENT 3 RESISTIVE NETWORKS AND COMPUTATIONAL ANALYSIS INTRODUCTION

How To Start An Embroidery Business Lesson 3 Creating Projections For Your Working Embroidery Business Plan

Excel Lab 2: Plots of Data Sets

PPAP 3rd Edition Check List

Develop a PWL System for Dense Graded Hot Mix Asphalt Construction, Including Pay Factors

FHWA s Demonstration Project for Enhanced Durability Through Increased Density

Describe the variable as Categorical or Quantitative. If quantitative, is it discrete or continuous?

Process Monitoring: Sensitometric Parameters

Commonwealth of Pennsylvania PA Test Method No. 402 Department of Transportation January Pages LABORATORY TESTING SECTION. Method of Test for

Trial version. Resistor Production. How can the outcomes be analysed to optimise the process? Student. Contents. Resistor Production page: 1 of 15

University of Tennessee at Chattanooga. Stead State Operating Curve Report. Engr 3280L/Week 3. William Disterdick. Brown Team

Excel Tool: Plots of Data Sets

Pave-IR Scan TM Primer

C/I = log δ 3 log (i/10)

A. Extent of structural precast concrete work is shown on drawings and in schedules.

Evaluation of In-Pavement Light Fixture Designs and Performance

Report No. K-TRAN: KSU-09-7 P1 FINAL REPORT December Daba Gedafa, Ph.D., P.E. Mustaque Hossain, Ph.D., P.E. Lon Ingram, P.E.

Section Meetings Section Material and Equipment. None Required

HIGH CARD POINT DISTRIBUTIONS

SPECIAL SPECIFICATION Inch LED Traffic Signal Lamp Unit

To describe the centre and spread of a univariate data set by way of a 5-figure summary and visually by a box & whisker plot.

CAMWorks How To Create CNC G-Code for CO2 Dragsters

POWER CORPORATION. Power Quality. Specifications and Guidelines for Customers. Phone: Fax:

Application Brief TROXLER MODEL 3450

CVO/169897A OCTOBER 29, GROUT

Frequently Asked Questions

Introduction to Chi Square

Math 247: Continuous Random Variables: The Uniform Distribution (Section 6.1) and The Normal Distribution (Section 6.2)

Device Characterization Project #1

Steady State Operating Curve Voltage Control System

Fitting Multidimensional Measurement Data to Tolerance Zones Taking into Account for the Uncertainties of Measurements

Extract 8.7 When dimensioning an acute angle the tangential lines shown in Figure 4 shall be used. (C) Figure 4 - Dimensioning of an acute angle

Assignment 5 due Monday, May 7

Instructions [CT+PT Treatment]

Module 7-4 N-Area Reliability Program (NARP)

Measurement Systems Analysis

1) What is the total area under the curve? 1) 2) What is the mean of the distribution? 2)

Environmental Stochasticity: Roc Flu Macro

USE OF TEAR-OFF RECYCLED SHINGLES IN ASPHALT PAVEMENTS

Try what you learned (and some new things too)

EXPERIMENT 7 The Amplifier

2. The value of the middle term in a ranked data set is called: A) the mean B) the standard deviation C) the mode D) the median

CONSTANT RATE OF CHANGE & THE POINT-SLOPE FORMULA

FALL 2015 STA 2023 INTRODUCTORY STATISTICS-1 PROJECT INSTRUCTOR: VENKATESWARA RAO MUDUNURU

(Notice that the mean doesn t have to be a whole number and isn t normally part of the original set of data.)

Using the SDT in Access ARSI Training

Industry Perspective on New FHWA QA Guidelines

Statistics 101: Section L Laboratory 10

National 4/5 Administration and I.T.

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Revised 9/10/2015 Page 1 of 5

The lump sum amount that a series of future payments is worth now; used to calculate loan payments; also known as present value function Module 3

An Evaluation of Artifact Calibration in the 5700A Multifunction Calibrator

Increase Your Twitter Traffic Worksheet

Control of Manufacturing Processes. Spring 2004 Lecture #1 Introduction

The development of EME in Europe requires an. for the climate. Tine Tanghe Hilde Soenen NCCA, Nynas NV

Randomness Exercises

Introduction. Chapter Time-Varying Signals

PROCUREMENT OF GOODS UNDER OPEN TENDER PROCEDURE

Statistics 1040 Summer 2009 Exam III

8. Statistical properties of grayscale images

MATH , Summer I Homework - 05

General PRINTER LINEARIZATION

Report on Extended Kalman Filter Simulation Experiments

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

POWER QUALITY SPECIFICATIONS AND GUIDELINES FOR CUSTOMERS ENGINEERING STANDARDS CITY OF LETHBRIDGE ELECTRIC

BAL Standard Project Frequency Response and Frequency Bias Setting Industry Webinar

May 15, 2012 Hugh Anderson Legal Counsel to the Engineers Joint Contract Documents Committee

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

GPSC Academy Leaders Teach & Leaders Learn. Supplier Technical Review Training Revision 1.0

How to Properly Select a Laser Power or Energy Sensor

Human Capital Management: Step-by-Step Guide

Tolerancing in Zemax. Lecture 4

What Are Submittals?

Excel Module 2: Working with Formulas and Functions

PHYS 1112L - Introductory Physics Laboratory II

Statistics, Probability and Noise

CAMWorks How To Create CNC G-Code for CO2 Dragsters. III.1. Save the rough tool path for the bottom of the CO2 Dragster as Dragster bottom 001 rough.

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

CREATED BY SHANNON MARTIN GRACEY 107 STATISTICS GUIDED NOTEBOOK/FOR USE WITH MARIO TRIOLA S TEXTBOOK ESSENTIALS OF STATISTICS, 4TH ED.

Lab Report 4: Root Locus and Proportional Controller

Benchmark Excel 2010 Level 1, Chapter 4 Rubrics

Transcription:

Statistical Analysis Determining payment NEC/AAAE 2017 Annual Airport Conference Hershey, PA Content of Presentation Explain concept behind Percentage Within Limits (PWL) Demonstrate importance of process control on PWL Testing results as outliers Resampling Present ERLPM PWL calculation sheet and FAA Spreadsheet 1

FAA Acceptable Quality Item P-401--FAA assumes process control parameters that are not unreasonable for mat density, joint density, and air voids. All acceptance criteria is based on processes with variation in quality conforming to a normal distribution bell curve. Each day s production is evaluated and pay is based on daily evaluation of 4 random samples. Basic Concept Contractor quality control Random samples of a small fraction of production material Acceptance: decision to accept or reject lot for payment based upon random samples of a small fraction from the lot 2

NEC/AAAE 2017 Annual Airport Conference 3

4

5

6

7

8

9

10

11

12

13

14

15

16

FAA Pay Adjustment Schedule Percentage of Material Lot Pay Factor Within Specification (Percent of Contract Limits (PWL) Unit Price) 96-100 106 90-95 PWL + 10 Full Pay 90 PWL or Greater 75-90 0.5 PWL + 55 55-74 1.4 PWL - 12 Below 55 Reject 17

18

19

20

21

Another Outlier Example Outlier Determination for Mat Density. Density of four random cores taken from Lot 98.9 Average = 97.65 98.5 Sample s = 1.79 98.2 n = 4 95.0 PWL = 76 (93% lot pay factor) Q = Lot Average - Lower Spec. Limit Lot Standard Deviation Outlier Outlier Determination for Mat Density. E-78 with n=4, 5 percent significance level, critical value for test criterion = 1.463 Compare Max ( 98.9-97.65 ) / 1.79 = 0.70 < 1.463 No Min ( 97.65 95.0 ) / 1.79 = 1.48 > 1.463 Yes 22

Outlier Recalculate PWL after eliminating outlier Density of 3 random cores taken from Lot A. 98.9 Average = 98.53 98.5 Sample s = 0.351 98.2 n = 3 PWL = 100 (106% lot pay factor) NOTE: Outliers exist if: Density greater than (97.65+1.463x1.79), or Density less than (97.65-1.463x1.79) Lot Average +/- Test Criterion*Lot Standard Deviation are Critical Values 23

Use of PWL Spreadsheet Asphaltic Concrete Payment Adjustments for Densities and Air Voids, Item P401 https://www.faa.gov/airports/engineering/design_software/ Latest version: AC1000-P401-PWL-5370-10G-9-13-16.xlsm Check for updates PWL Spreadsheet Step 1: Enter Airport Information 24

PWL Spreadsheet Step 1a: Project Specifications Need to set option to one or two sided \ Need to set max pay for project Note individual lots may still be used to offset low lots within the restrictions of specification PWL Spreadsheet Step 2: Enter Lot Data Sampling & Testing per 401-5.1 4 sublots / lot Air Voids / 1 per sublot (Rice / Lab BSG) Mat & Joint Density 1 core per sublot (Lab / Field) Remember since calculating standard deviation need at least 3 samples 25

PWL Spreadsheet Step 2: Enter Lot Data from laboratory tests PWL Spreadsheet Step 3: Enter Lot Data from testing of field cores 26

PWL Spreadsheet 3 spreadsheets in the workbook If you ever turn on sheet tabs to look at the worksheets do not run formulas from sheet 1 2 most common problems with spreadsheet Trying to run with only 2 samples Formulas corrupted because ran from sheet 1 If outlier check results in data being eliminated, be sure to check the E178 button (Spreadsheet is not set up to cycle through multiple outlier tests) Questions 27