New Bridges with new Technology. Experiences of product modelling in bridge construction projects

Similar documents
A-SL-1 A-SL-1 HAND RAIL STAIRS STRUCTURE/ ARCH SLIDE FOUNDATION 12" ROUND PIER 20" SQUARE PIER CAP DRILL AND EPOXY BOLTS *SEE FOUNDATION DETAILS

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives.

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations

Standard 25 Wide Structure

Current Standard Plates including Transmittal Letters are available on the web at:

Installation Instructions

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Steel Framed Miter Saw Bench

THE TRANSPORTATION ISSUE

Table of Contents. What's New in GRAITEC Advance BIM Designers 2018 R2 ADVANCE BIM DESIGNERS CONCRETE SERIES... 4

24" B B Joint X501 Joint See MARKINGS Note PCB-RXX-350-TL3 " X501 Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOT

VPN: ISBXLR. Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

Innovative composite dowel for steel concrete composite bridges. Neil Westmacott, Wolfram Schwarz

Product Art.no. Ø Wall thickness Meter per mm mm bundle

32 Gallon Perforated Square Receptacle

3. Barrier elements. Barrier posts. Stainles steel

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

d e n v e r a r t m u s e u m

2D Laser Cutting. Rotary Laser Cutting. Folding and Bending. Fabrication. Mig & Tig Welding. Complete Project Management

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

Composite Sections. Introduction BETON PRATEGANG TKS Session 10: 2015/4/27

ALUMINUM PIPE GUIDERAIL 01/01/

No limitations to precast

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

STEEL PIPE GUIDERAIL 01/01/

Barrier posts of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm

Proven precast solutions for every application

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

Product Art.no. Ø Wall thickness Meter per mm mm bundle

CrowdTuff Loop Top Pedestrian Barrier Fencing

Bio-Sand Filtration Mould Construction Guidelines

FORM - 2 THE PATENTS ACT, (39 of 1970) THE PATENTS RULES, 2003 COMPLETE. Specification. (See Section 10; Rule 13) OVERPASS BRIDGE

Current Standard Plates including Transmittal Letters are available on the web at:

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

Installation Instructions Kit, Base Rail Bracket Part # 31413

Separating lanes our way Steel guard rail

CONCRETE ACCESSORIES BAR-LOCK REBAR COUPLER SYSTEM

HIGHWAY T S echnical installation Guide

How to Use the Jahn Forming System

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch

ENGINEERING STRUCTURES MADE OF PRECAST ELEMENTS

Installation Instructions Kit, Base Rail Bracket Part # 31413

ABC and Innovative Bridge Construction for Minnesota Local Roads

Quality Control and Quality Assurance Guide

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

PRECAST FLOOR PRODUCTION LONG LINE FOR HALF SLABS

ProConcrete. Gernot Jeromin Product Manager Bentley Systems, Incorporated

Sika at work precast tubbing production for the tunnel in gdańsk,

Update on Bridge Deck Fastener Performance on the FAST Steel Bridge. By Duane Otter and Brian Doe ABSTRACT

Installation Instructions

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

Risk control online deformation monitoring inside an urban TBMdriven tunnel using the tshape measurement system

REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS. September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter

21 st Century Math Projects

FixPad - Create and Assembly instructions

SKT-SP Tangent Terminal

Bio-Sand Filtration Mould Construction Guidelines

State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA )

Mounting Hardware Guide

Thanks for shopping with Improvements! 7 Wood Garden Bridge with Removable Plugs Item #573366

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6

Profiling press braking CNC MACHINING FABRICATION FINISHING

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

SWITCH STAND Switch Stand Assembly Connecting Rod Target Assembly (when required) TURNOUT ACCESSORIES Standard Tie Plates Rail Anchors Joints

Arch Bridge in Nijmegen - new 3D Approach to Workshop Plans

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Reinforcing Mesh Product Guide

A - Railing Frame Material Specifications

WORKSHOP FURNITURE. Rugged, Heavy Duty, Quality Steel Construction. Optional drawer. Lower shelf same length as worktop

1. CONNOLLY KEYJOINT 1. PRODUCT NAME 2. SUPPLIER 3. PRODUCT DESCRIPTION 4. KEY FEATURES 5. FIXING INSTRUCTIONS 6. SPECIFICATIONS 7.

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

HELCOR druk_geosyntetyki II.qxd :22 Strona 2 HELICALLY CORRUGATED STEEL PIPES. HelCor & HelCor PA

Exit point. Can you do it?

SUBSTATION SECURITY WALL INSTALLATION MANUAL

ROUND STEEL POLE STRAIGHT

Straight staircases. Practical staircase solutions, outside and indoors

ADI CABLE RAILING FOR METAL. AS&D TM Aluminum Railing. Solutions TM Aluminum Railing

Piazzola Pergola Awning Manufacturing and installation guide

AB INDUSTRIES FENCING PRODUCTS

Service Release for PLANBAR

Precision Machinery for Wire and Tube

ONE STEP AHEAD WITH BIM CHANGING OF ORGANISATIONS PROJECTS MINDS

Geodetic network design and strategies followed for drilling a 25 km tunnel in a high speed railway in Spain

Open shipping crate and separate all of the different parts. Over The Top Shelters LLC

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SOME PARTICULARITIES OF STANDARD GROOVED RAIL TURNOUT USED ON ROMANIAN TRAMWAY NETWORKS

Bentley Rail Track Update

Reinforcing Mesh Product Guide

INSTALLATION INSTRUCTIONS

All-Terrain Wheelchair System

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

GENERAL ELEVATION SECTION A-A

Steel Door Frame Installation in Steel Stud Construction

CrowdTuff Flat Top Pedestrian Barrier Fencing

Transcription:

New Bridges with new Technology Experiences of product modelling in bridge construction projects NVF Annual Bridge Conference 2014

Chenab Bridge - modelling of the steel structures 2 New Railway bridge in Jammu - Kashmir in India Steel arch Total length of 1315 metres with the main arch span 467 metres. 13.5 meters wide, carry two tracks 320 metres above the Chenab river NVF Annual Bridge Conference 2014

3

4

5

6 NVF Annual Bridge Conference 2014

7 NVF Annual Bridge Conference 2014

Crusell Bridge New Landmark Bridge in the Helsinki City Center Completed 2010 Spans 92+52,5m, width 24,8m Pylon top +49,0 Product modeling applied comprehensively from design to construction NVF Annual Bridge Conference 2014

Geometry of all structural, and almost all non structural components, in the construction coordinate system Steel structures Steel structures plates and profiles Parts joined by welds or by bolting Include material properties Reinforcement Standard bending shapes Include and number, size, placement and material properties

10

Use of model at the site Collision, detected before installation Drilled steel tube piles and laser scanned points Model viewing for work planning Installation order, collisions Geometrical surveys Single points, measurements, laser scanning NVF Annual Bridge Conference 2014

New possibilities Plans and structures for the Pylon leg formwork Scheduling tool was used with the temporary structures NVF Annual Bridge Conference 2014

Nahkuri Bridge - Designed 2013, under construction NVF Annual Bridge Conference 2014

Design according to the Guidlines for the information modelling by Finnish Transport Agency NVF Annual Bridge Conference 2014

NVF Annual Bridge Conference 2014

NVF Annual Bridge Conference 2014

Required design documentation for construction design Product Model Construction drawings Particular specification Bill of Quantities Cost Estimate Bar bending lists Plan for prestressing works NVF Annual Bridge Conference 2014

Proof checking Based on the documentation other than the model Where do you need the drawings if you expect the information read from the model? Drawings shall be prepared according the common practise Filing - Drawings of the standard format are required for filing

City Rail Loop (Pisararata) The City Rail Loop is a planned urban railway line for commuter trains under the Helsinki city centre. The loop-shaped railway starts in Pasila and runs in a tunnel via Töölö, Helsinki city centre, Hakaniemi and back to Pasila. At present, problems in train traffic easily lead to disturbances affecting the whole country, since the commuter and longdistance traffic are so closely connected. This new railway line will smooth traffic flow not only for the 1.4 million inhabitants in the Helsinki region, but in the whole country.

Largest design project based on information / product modelling in Finland. Complex, built, urban and historical environment. Multidiciplinary Integration of all fields of expertise by modelling In City Rail Loop design process the modelling is expected to: improve communication with authorities and decicion makers give support for city planning help finding possibilities and best practicies improve quality and cost controll in design improve productivity in construction

Thank you for your attention. NVF Annual Bridge Conference 2014