IEEE WORKING GROUP ON VOLTAGES AT PUBLICLY AND PRIVATELY ACCESSIBLE LOCATIONS. Web Cast November 30, 2006

Similar documents
IEEE WORKING GROUP ON VOLTAGES AT PUBLICLY AND PRIVATELY ACCESSIBLE LOCATIONS. Web Cast May 17, 2007

Contact Voltage Detection

Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee:

Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee:

Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee:

IEEE Working Group on Broadband Wireless Access (BWA)

Standardized Measurements for Elevated NEV and Energized Object Concerns Doug Dorr, Charles Perry, Mark McGranaghan Arindam Maitra, Wes Sunderman

Stray Voltage and Swimming Pools

Ad Hoc Call Agenda. IEEE P802.3cb CU4HDD Task Force. Dan Smith, Chair Seagate Technology February 25, Page 1

AGENDA AND GENERAL INFORMATION IEEE P802.3CK GB/S, 200 GB/S, AND 400 GB/S ELECTRICAL INTERFACES TASK FORCE

Electrical Interface Ad-hoc Meeting

IEEE 1722a/ Weekly Call. Dave Olsen

Light Pole Safety Testing Mark Voigtsberger VP of Operations Power Quality Testing

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

The Isolator/Surge Protector (ISP)

IEEE Session #14 Opening Plenary Presentation

The Isolator/Surge Protector (ISP)

INSULATED CONDUCTORS COMMITTEE

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design

The Isolator/Surge Protector (ISP) Technical Literature

Upgrading Your Electrical Distribution System To Resistance Grounding

Contact Voltage Detection and Testing. David Kalokitis CTO Power Survey Company

EPRI Contact Voltage R&D Program Update Doug Dorr EPRI

Single Earthed Neutral and Multi Earthed Neutral. Single Earthed Neutral and Multi Earthed Neutral: Multi Grounded Neutral System (MEN):

Guide for Conducting a Stray Voltage Evaluation Under the MPSC Stray Voltage Rule 1

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

AC Voltage- Pipeline Safety and Corrosion MEA 2015

Technique for Accurate Voltage Measurement of Energized Street Level Objects

ECE 528 Understanding Power Quality

The Standards Development Process. Substations Committee Erin Spiewak IEEE SA May 20, 2012

To Float or Not to Float? Analysis of a floating vs. grounded output Associated Power Technologies

Customer Requirements RF Antenna Installations

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

Boat Dock Exposure Voltage Mitigation

TS RES - OUTSTANDING ISSUES

Network Management Study Group Closing Plenary Report

Southern Company Interconnection Requirements for Inverter-Based Generation

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

Product Classroom. Introduction. Grounding Systems. TN system. Title. Grounding System Introduction. Date October, 2016.

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

A DUMMIES GUIDE TO GROUND FAULT PROTECTION

Education & Training

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

Technical Committee106 Methods for the assessment of electric, magnetic and electromagnetic fields associated with human exposure

Grounding for Power Quality

IEEE Broadband Wireless Access Working Group < Proposed PAR to convert P802.16d from Amendment to Revision

MINING EARTH LEAKAGE PROTECTION WITH VARIABLE SPEED DRIVES

Title: LE Task Group Report - Session #45

Harmonic control devices. ECE 528 Understanding Power Quality

IEEE Southern Alberta Section, Industrial Applications and Power & Energy Chapter Technical Program. Venue: Operator. Speaker Travel: Stantec

ELECTRICITY NETWORKS ACCESS CODE SERVICE STANDARD PERFORMANCE REPORT for the year ended 30 June 2016

AC INTERFERENCE OF TRANSMISSION LINES ON RAILWAYS: INFLUENCE OF TRACK-CONNECTED EQUIPMENT I. ABSTRACT

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

Well Casing Cathodic Protection - Design Issues, Lessons Learned and a Case History

Wind Power Facility Technical Requirements CHANGE HISTORY

Exhibit DD Specific Standards for Transmission Lines. Boardman to Hemingway Transmission Line Project

Table of Contents. Introduction... 1

Problems connected with Commissioning of Power Transformers

Los A LA-UR Los Alamos National Laboratory Los Alamos, New Mexico 87545

Environmental Exposures to ELF Georg Neubauer

INTERNATIONAL STANDARD

Shunt Reactors. Global Top Energy, Machinery & Plant Solution Provider

Harmonic Distortion Levels Measured at The Enmax Substations

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)

This is a preview - click here to buy the full publication. Exposure assessment methods for wireless power transfer systems

Generation Interconnection Requirements at Voltages 34.5 kv and Below

The Confusion Surrounding Stray Voltage

Protection of Electrical Networks. Christophe Prévé

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

Low Voltage Products. Enclosed Third Harmonic Filter THF and THF star Enclosed units. Brochure THFS1GB 03_04 1SCC330003C0201

Utility System Lightning Protection

Licensed Electricians Practical Assessment (LEP)

TECHNICAL MEMO ON POWER FREQUENCY ELECTRIC AND MAGNETIC FIELDS PUGET SOUND ENERGY ENERGIZE EASTSIDE PROJECT

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

Article 250 Grounding & Bonding

Technical Requirements for Resistibility of Telecommunications Equipment to. Overvoltage and Overcurrent

ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013

GridLiance Reliability Criteria

Slide 1. New Delhi India Oct CIGRE AORC Meeting New Delhi October 2017

Unofficial Comment Form Project Geomagnetic Disturbance Mitigation

NEMA Standards Publication ICS Adjustable Speed Electrical Power Drive Systems

Roadmap For Power Quality Standards Development

SWITCHING SAFETY & RELIABILITY CONFERENCE

QUESTIONNAIRE ON FAULT LOCATION SYSTEMS

Underground System Design TADP 547

ACCURATE SIMULATION OF AC INTERFERENCE CAUSED BY ELECTRICAL POWER LINES: A PARAMETRIC ANALYSIS

Appendix 6-F: Electric and Magnetic Field Study Report

LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES

INTERNATIONAL STANDARD

2017 ELECTRICAL SAFETY SERVICES. Arc Flash Electrical Maintenance Lockout/Tagout And More

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

Technical Seminar for Cathodic Protection to GOGC Design Unit Specialists. Dr. Nick Kioupis, Cathodic & Lightning Protection Section Head, DESFA

CONTINUING EDUC ATION

American Electrical Institute

The InterNational Electrical Testing Association Journal. BY STEVE TURNER, Beckwith Electric Company, Inc.

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

Earthing of Electrical Devices and Safety

FTTH ENGINEERING AND INSTALLATION INTRODUCTION

Transcription:

IEEE WORKING GROUP ON VOLTAGES AT PUBLICLY AND PRIVATELY ACCESSIBLE LOCATIONS Web Cast November 30, 2006 CHAIR CHUCK DENARDO (414) 221-3073 (chuck.denardo@we-energies.com) VICE CHAIR JIM BOUFORD (508) 421-7648 (james.bouford@us.ngrid.com) SECRETARY RUSS EHRLICH (302) 283-6097 (russ.ehrlich@pepcoholdings.com) Working Group Web Site: (http://grouper.ieee.org/groups/td/dist/stray/)

IEEE-SA Standards Board Bylaws on Patents in Standards 6. Patents IEEE standards may include the known use of essential patents and patent applications provided the IEEE receives assurance from the patent holder or applicant with respect to patents whose infringement is, or in the case of patent applications, potential future infringement the applicant asserts will be, unavoidable in a compliant implementation of either mandatory or optional portions of the standard [essential patents]. This assurance shall be provided without coercion. The patent holder or applicant should provide this assurance as soon as reasonably feasible in the standards development process. This assurance shall be provided no later than the approval of the standard (or reaffirmation when a patent or patent application becomes known after initial approval of the standard). This assurance shall be either: a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement either mandatory or optional portions of the proposed IEEE standard against any person or entity complying with the standard; or b) A statement that a license for such implementation will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination. This assurance is irrevocable once submitted and accepted and shall apply, at a minimum, from the date of the standard s approval to the date of the standard s withdrawal.

Inappropriate Topics for IEEE WG Meetings Don t discuss the validity/essentiality of patents/patent claims Don t discuss the cost of specific patent use Don t discuss licensing terms or conditions Don t discuss product pricing, territorial restrictions, or market share Don t discuss ongoing litigation or threatened litigation Don t be silent if inappropriate topics are discussed do formally object. If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at patcom@ieee.org or visit http://standards.ieee.org/board/pat/index.html This slide set is available at http://standards.ieee.org/board/pat/pat-slideset.ppt

This Web cast will have two parts: Graciela Varela-Maloney: Consolidated Edison's Program for Detection and Mitigation of Stray Voltage Chuck DeNardo: Do We Have Big Picture Consensus? Can we move forward? Questions at any time during the presentation. Please mute your phones when not speaking.

Consolidated Edison's Program for Detection and Mitigation of Stray Voltage

Program for Detection and Mitigation of Stray Voltage Distribution Engineering November 30, 2006

Outline Overview PSC Requirement Implementation Additional Mitigation Programs

Con Edison Service Territory Con Edison Company of NY NYC and Westchester Area: 660 sq. mi. (Elec & Gas) Population: 9.1million 3.1 million electric customers 13,141 MW 2006 Peak In some areas, Load Density greater than 2100 MW per Sq Mile

Background 2003 Columbus, OH 9 year old boy Las Vegas, NV 39 year old woman 2004 New York City, NY Jodie Lane 2005 France - Dog Baltimore Dog South Korea 23 year old woman Some Recent Incidents (2006) Model shocked in Manhattan Dog Barkis died in Brooklyn after snow storm 8 year old Briana shocked in Staten Island

Service Box Findings January 16, 2004 Service Box Representation Service Box Representation

Public Service Commission (PSC) Order (CASE 04-M-0159) State Wide Safety standards: (1) Annual Stray Voltage Testing (2) Inspections on a minimum of a five-year cycle (3) National Electric Safety Code (NESC) compliance Non-compliance revenue based penalty (~ $120 million for 2006)

PSC Definitions Stray Voltage The term stray voltage means voltage conditions on electric facilities that should not ordinarily exist. These conditions may be due to one or more factors, including but not limited to damaged cables, deteriorated, frayed or missing insulation, improper maintenance, or improper installation. 1 1 : CASE 04-M-0159 Proceeding on Motion of the Commission to Examine the Safety of Electric Transmission and Distribution Systems.

Annual Testing Program Underground Structures Overhead Streetlights HD Voltage Detector Multi-meter Shunt Resistor

Manhole

Service Box

Transformer and Equipment Vault Gratings

Overhead Structures

Streetlights

Testing Results Slightly over half are non-con Ed (~55%) Stray Voltage Location ~ 85% on Street/Traffic Lights Municipally owned ~ 15% Variety (CE Structures, Pole/Riser, etc.) Root Causes ~90% Services (primarily Street light services) Insulation Breakdown Neutral Corrosion ~10% Other (Mains, Abandoned Services, etc.)

Inspection Plan Inspect each electric structure every 5 years Identify and make safe immediate hazards Identify items for future upgrade

OH inspections Inspection ~280,000 inspections completed in 2005 What are we looking for? Stay voltage, rotting or damaged poles, damaged cross arms, damaged or leaking equipment, damaged riser, cracked/broken insulators, etc. UG inspections ~86,000 inspections completed since the beginning of 2005 What are we looking for? Stray voltage, condition of cable and joints, condition of structure cover, condition of the structure, etc.

Other Mitigation Methods Mobile Stray Voltage Detection Vehicle Isolation Transformers Secondary Upgrade Plan

Mobile Stray Voltage Surveys Principal of Operation Capacitive coupling between detector and charged surface Detects E Field, not voltage Geometry dependent AC specific E 15 mph 15V 15 ft

Positive Attributes Detection of voltage possible on any surface Voltage surveys may be targeted to specific areas based on operational needs or perceived high risk situations Surveys may be completed quickly with a small workforce Easy repetitive testing of specific areas Tests ANYTHING in its range

Streetlight Isolation Transformer Provides electrical separation between line & load side of S/L circuit Provides no return path for stray current Expected to prevent 78% S/L stray voltages Joint pilot program between Con Ed and DOT

Secondary Upgrade Plan Secondary Rebuild: Budgeted to spend $65 million / year Structure enlargements Structure conductor upgrades Transformer replacement/upgrade Mains and Service upgrades

Conclusion As a result of these programs efforts Con Edison s Electric Shock Events have been reduced by 21% over last year 200 190 150 46% 100 103 81 21% 50 0 2004 2005 2006

Questions?

Project Authorization Request (PAR) PAR Submittal Date - March 13 th 2006 PAR On Hold Until IEEE 80 Concern Resolved Scope and Purpose Language Modified in Montreal Two NESCOM Concerns Received and Resolved: Conflict with Existing Standards Affiliations and Openness PAR Approval Date September 15, 2006 Approved Until December 31, 2010

Voltages at Publicly and Privately Accessible Locations (a.k.a. Stray Voltage) Complicated Technical Issue Publicly Misunderstood Controversial & Emotional Litigious

Imperative Principles of the Standards Process Due Process Openness Balance Right of Appeal Consensus

P1695 SCOPE This guide addresses the normal and abnormal voltages that exist at publicly and privately accessible locations as a result of the delivery and use of electrical energy (often referred to as stray voltage). It focuses primarily on the presence of power frequency related voltages, and discusses definitions, causes, impacts, testing techniques, mitigation strategies, and hazard levels.

From the Scope of P1695 Normal and Abnormal Voltages That Exist at Publicly and Privately Accessible Locations As a Result of the Delivery and Use of Electrical Energy Focuses Primarily on the Presence of Power Frequency Related Voltages Discusses Definitions, Causes, Impacts, Testing Techniques, Mitigation Strategies, and Hazard Levels

That Exist at Publicly Accessible Locations Lamp post to sidewalk voltage Pad mounted equipment to earth voltage Manhole cover to street surface voltage Water fountain to earth voltage

That Exist at Privately Accessible Locations Animal contact voltage (private barn) Water faucet to earth voltage (private back yard) Pool water to pool apron voltage That Are Not Accessible: Properly insulated phase conductors Voltages found within any electrical enclosure Voltages found within any substation, manhole, or vault

Measurable Voltages at Locations Accessible to the Public are from Many Sources: Naturally Occurring Earth Surface Voltage Gradients (Earth s Magnetic Field) Lightning Induced Transient Voltages Radio Frequency Transmission Induced Voltages Cathodic Protection Voltages Galvanic Cells Due to Dissimilar Metals Power System Operation

Power Frequency Related Voltages From IEEE 100: power frequency (1) The value of frequency used in the electrical power system, such as 50 Hz or 60 Hz. (EMC) C63.13-1991 Related to the operation of the power system: harmonic voltages switching transients (sub-cyclical, i.e. higher frequency) loose connection transient voltages power line carrier voltages fault voltages

As a Result of the Delivery and Use of Electrical Energy Voltages resulting from the operation of: Transmission Systems Distribution Systems Secondary Electrical Systems (Utility & Customer) Not voltages from the operation of: Cathodic Protection Systems Telephone Systems Radio Stations Baby Monitors

Normal Voltages Voltages that exists at accessible locations when the electrical system, from generator to appliance, is operating as intended. These voltages: Can be found everywhere regardless of power system grounding technique. Are usually below levels that can be perceived by people and their animals. Are often described as less than 10 volts. Are generally considered a nuisance voltage, not a hazardous voltage.

Normal Voltages (Primary and Secondary Neutral Return Current) Measurable voltages at accessible locations develop as normal neutral return current flows through the impedances of the neutral conductor and all of its parallel conductive pathways. Parallel Pathways Include: Grounding Conductors (Primary & Secondary) Telephone and CATV Messengers Building Steel Waterlines (Mains & Bldg Plumbing) The Earth

Normal Voltages (Power System Induced Current) Measurable voltages at accessible locations develop during normal system operation from currents that are induced in the conductive loops formed by the neutral conductor (where one exists) and all of its parallel conductive pathways; and from currents that are induced in nearby conductive loops that are not directly connected to the electrical system.

Abnormal Voltages Voltages that exist at accessible locations as a result of the presence of a system fault (i.e. short and/or open). These voltages: Are uncommon. Can be hazardous. Can be easily detected. Can be successfully managed.

Abnormal Voltage (Fault Related) From IEEE 100: fault (1) (wire or cable) A partial or total local failure in the insulation or continuity of a conductor. See also: center of distribution. (T&D/PE) [10] Whether a ground fault, a phase to phase fault through a grounded object, or an open conductor: a fault is an abnormal and potentially hazardous system condition.

Normal and Abnormal Voltages (Grounded v. Ungrounded) Publicly accessible voltages related to normal or abnormal system operation can exist, at some level, nearly everywhere. This is true regardless of whether the electrical system (utility s or customer s) is grounded or un-grounded, three wire, four wire, five wire, or single wire earth return.

Discusses Causes, Impacts, Testing Techniques, and Mitigation Strategies Causes, Impacts, Testing Techniques, and Mitigation Strategies are generally well understood. True for both Normal or Abnormal Voltages

Discusses Hazard Levels Hazard levels in terms of current, for both people and animals, are well understood but vary slightly depending on the information source (e.g. IEEE, ICNIRP, NRPB, EU) Hazard levels are the same regardless of voltage source (i.e. normal or abnormal system operation). Hazard levels vary with frequency. Hazard levels in terms of voltage that are consistent with existing guidelines will be difficult to achieve because the amount of current in the exposure circuit is dependent on exposure circuit characteristics.

Discusses Definitions The terms we have used to describe theses voltages and their definitions often vary creating confusion. Stray Voltage Neutral-to-Earth Voltage Contact Voltage Urban Stray Voltage Metallic Object to Earth Voltage Animal Contact Voltage

At some point we have to agree on the terms and definitions that will be used to describe the normal and abnormal publicly accessible voltages covered in the proposed Trial Use Guide. In order to avoid confusion as we move forward in this discussion I propose we temporarily use the following terms: Stray Voltage - Voltages that are the result of normal system operation (caused by return and induced currents). Contact Voltage Voltages that are the result of abnormal system operation (caused by fault currents).

Stray Voltage: Historically synonymous with the neutral-to-earth voltages issues that result from normal system operation (e.g. dairy farms and swimming pools). Historically considered a nuisance voltage, not a hazardous voltage. No existing IEEE definition. Consistent with several non-ieee definitions.

Contact Voltage: The IEEE 100 definition of "Contact Voltage" is: Contact Voltage (human safety): A voltage accidentally appearing between two points with which a person can simultaneously make contact. (PE) [8], [84]

Existing documents that include a description of the difference between Stray and Contact voltage, but may use different terminology. From EPRI: - Understanding Nuisance Shocking (March 2005) - Neutral to Earth Voltage and Urban Stray Voltage Measurement Protocols, Test Equipment and Procedures, 1010652 (December 2005) From NEETRAC: - Stray Voltage: Concerns, Analysis & Mitigation (September 2001)

The Plan: Use feedback from this presentation to make certain the Working Group is headed in the right direction. If a majority of us agree that we should proceed along two tracks (i.e. Stray Voltage and Contact Voltage), then focus our initial efforts on Contact Voltage. Use the January meeting in Orlando to discuss an outline for the Contact Voltage portion of the document. Solicit contact voltage volunteers to begin a draft.

Your Homework Provide Feedback: In general: What do you agree with and why? What do you disagree with and why? More specifically: Are you OK with a normal versus abnormal voltage approach? Are you concerned about use of the terms Stray and Contact voltage?

Your Homework (continued): Should the guide be about people, or people and their animals? Are you OK with limiting our efforts to power frequency related voltages? Do we establish exposure limits, or do we simply define exposure assessment protocols and reference existing exposure standards (e.g. IEEE, ICNIRP, NRPB, EU)?

More Homework Comments, Concerns, & Recommendations for the Contact Voltage Section of the Trial Use Guide. What should be included in this section? How should it be organized? Do you have an existing test protocol you could share, or have you seen useful graphics? Test instrumentation? Safety concerns?

And Finally... If you would like to volunteer to work on the issue of Contact Voltage, please let me know. If you are affiliated with another IEEE group, or a group associated with another organization such as UL, IEC, CSA etc., and you think there should be a formal link between that group and this one, please let me know.

IEEE WORKING GROUP ON VOLTAGES AT PUBLICLY AND PRIVATELY ACCESSIBLE LOCATIONS Web Cast November 30, 2006 CHAIR CHUCK DENARDO (414) 221-3073 (chuck.denardo@we-energies.com) VICE CHAIR JIM BOUFORD (508) 421-7648 (james.bouford@us.ngrid.com) SECRETARY RUSS EHRLICH (302) 283-6097 (russ.ehrlich@pepcoholdings.com) Working Group Web Site: (http://grouper.ieee.org/groups/td/dist/stray/)