SkillsUSA 2013 Contest Projects Electrical Construction Wiring

Similar documents
PROVINCIAL CONTEST DESCRIPTION & INSTRUCTIONS ELECTRICAL WIRING TRADE 18. Post Secondary 2016

Round/Octagon Boxes and Accessories

Spring Steel Fasteners

Wiring Devices. Description. Lesson Outcomes. Assumptions. Electrician

Electrical Wiring Projects

ELECTRICAL PANEL SYSTEM

Gross Automation (877)

Part VIII Electrical GENERAL REQUIREMENTS CHAPTER 33

Bracket guide. LK Pipe Pole. LK Radiator fixture Uni

GLOSSARY OF ELECTRICAL INDUSTRY TERMS

Universal Voice Coil and 70 Volt Door Speaker V / V

05 Pg A75-90.qxp 6/9/2008 9:36 AM Page A75 RACO Floor Boxes

Range height adjustable assembly

Modular & Hardwired Hub Assembly to "X" and "Y" Posts

Floor Boxes. Concealed Service Floor Boxes. Engineering Data 663 Series. Faces Plates for 663 Floor Box. 663 Series Floor Box

Installation Manual MODEL AE-46

Installing LOW EMR Surface mount IS panels in a Custom Cut Sauna TyloHelo Inc.

ST90 SADDLE STITCHER TP10564 MISSING STITCH INSTALLATION MANUAL

Instruction page index: Installation Instructions for Bosca Models BOS-XX-C-XX, & BOS-XX-S-XX. Page 1 of 5

The V2100 Series Steel Raceway provides wiring

Stud Wall Pages

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Installation Manual MODEL E-42

RANGE DIGITAL HANDSET OPERATION. 1. Panel. 2. Initialization Procedure. 3. Move Up & Down. 4. Set Memory Positions. 5. Move to the Memorized Positions

Tylo Custom Infrared Sauna Heater Kit Installing LOW EMR Surface mount IS panels

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL

Steel Raceways BASE SECTIONS. SnapMark SMS3000 Series FITTINGS, CONNECTORS & BOXES RIGID COUPLING COUPLING BLANK END FITTING ENTRANCE END

Infinity. Surface Mounted Headwall. Installation Instructions. The.

INSTALLATION INSTRUCTIONS Xenix Incandescent Series XN12, XN24, XN36, XN48

Phone: Installation Instructions

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

Assessment Blueprint

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

P /8 Ring Diameter 90. Trim Ring Mounting Holes P /8. 393/16 Ring Diameter. Stud Minimum

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

A. Product Data: For each electrical identification product indicated.

Multiples EM_ 1.4. Install 1X1/1X2/1X3/1X4 Housings. Installation Instructions for. This product is suitable for indoor locations.

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Rough-In Frame OVERVIEW OF INSTALLATION PROCEDURE PLANNING GUIDE MODEL IR-105 INSTALLATION DON'TS

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

N Nail on mounting H Face bracket for steel and wood stud mounting QT Quick Thread device hole option 16 Bar hanger max 16 joist spacing

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

with Lamp Install the Housing with Adjustable Bars Installation Instructions for LED E3_-L_DN 1.1 ½ to ¾ ¾ or thicker

Interra Installation Manual

Hi5 s Expert Guide to Specify afix Lecture Hall Tables

Answer Power Beam and Boundary Screen

Assembly Instructions

Top Mount Ultra Modern Hanger

Framing & Electrical Rough-in for Recess Mount IS Panel System

Desk/Wall-Mount Rack

Wiring of the Main Distribution Panelboard

High Performance Nylon Wallplates. Nylon Wallplates

Revised April Unit/Standard Number. Proficiency Level Achieved: (X) Indicates Competency Achieved to Industry Proficiency Level

OXYGEN INSTALLATION. Revision date

Vertical Offset Base and Safety Rail System Installation Instructions

Installation Manual MODEL NE-42

GENERAL SUBSCRIBER SERVICES TARIFF Pembroke Telephone Company, Inc. Third Revised Contents Sheet 1 Cancels Second Revised Contents Sheet 1

Single Sided Height Adjustable Benching

BELL. RACO, TayMac and BELL offer a full line of electrical products that are ideally suited to help you complete your next solar project

Subject: P0052 Bed Locator Installation Instructions

Original Gallery System

ULTRA SPACE SAVER Installation Instructions

Mounting Accessories. Installation Guide. VIVOTEK SD83XXE Speed Dome

Ledgewood Farm greenhouse. construction

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

System Components and Accessories

Installation Manual MODEL ANE-42

1. TRACER WIRE. I. Application. Material Specification. Page 1 of 16

Outdoor Enclosure. VIVOTEK Pan/Tilt & Fixed Dome Series. Installation Guide

MultiTable Mod-E 2 Electric Standing Desk

In-Wall Mounting Kit. Grandstream Networks, Inc. Quick Reference Guide. (GDS3710 NOT Included)

LINESSE LINEAR LUMINAIRE 3 CEILING MOUNT CM2420

AUXILIARY FRAMING AND ACCESSORIES

INSTALLATION MANUAL VERITY. friant.com/verity

Lightplane 3.5 Recessed

Customer Requirements RF Antenna Installations

SMARTfit Functional and Brain Fitness Training Multi-Station Trainer Installation for Stud and Concrete Walls (US)

EOS LED Surface Mounted Luminaire

NEW OR UPGRADED ELECTRICAL SERVICE

PCS. Patient Security Service Console. Installation Instructions.

Modular Gazebo Kit Series Victorian / Queen Anne 9

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

For all Davis weather consoles including Vantage Pro2,

Yes 20 Charging Wall Cabinet for Tablets

POWER TRACE TM TASCO, INC.

MODELS: AE46, AE42, E46, E42, ANE46, ANE42, NE46, NE42

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

OFS ED-6C Instruction Sheet LIGHTGUIDE CROSS-CONNECT Comcode: LGX DISTRIBUTING FRAME INSTALLATION

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

Arlington Industries, Inc.

Footer & Base Plate Assembly. installation guide. ILINE power/data beam

High-impact resistant thermoplastic construction

Figure A. Figure B. Figure C. Figure D

ULTRA SPACE SAVER SQUARED Installation Instructions

Thanks for shopping with Improvements! Deluxe 10 Closet Organizer (12 deep) Item #461609

SMARTfit High Intensity Cognitive Training. SMARTfit Trainer Installation Manual for Stud and Concrete Walls Revision 1.3

SECTION H -- GROUNDING AND BONDING

Transcription:

SkillsUSA 2013 Contest Projects Electrical Construction Wiring Click the Print this Section button above to automatically print the specifications for this contest. Make sure your printer is turned on before pressing the button.

Download additional contest files.

2013 SkillsUSA NLSC Electrical Construction Wiring Contestant Number: LETTER DEVICE TYPE BOX DESCRIPTION HEIGHT LOCATION BOX MOUNTING CIRCUIT CABLE LIST A Keyless Receptacle 4" Round Plastic with Bar Hanger 60 Inches Top Stud Wall A 2 screws 1 B Keyless Receptacle 4" Round Plastic Nail Up 58 Inches Bottom Stud Wall B Nail Up 2 RX - Nonmetallic Sheeted Cable C Keyless Receptacle 4" Round Plastic Nail Up 61 Inches Bottom Stud Wall C Nail Up 3 UF-Underground Feeder and Branch Circuit Cable D Three Way Switch Plastic 1-gang N.W. Box 36 Inches Top Stud Wall B Nail Up 2 MC - Metal Clad Cable E Single Pole Switch Plastic 2-gang N.W. Box 42 Inches Bottom Stud Wall A Nail Up 1 F 4 Way Switch Plastic 2-gang N.W. Box 42 Inches Bottom Stud Wall A Nail Up 2 G Tamper Proof GFCI Receptacle Plastic 1-gang N.W. Box 42 Inches Bottom Stud Wall A Nail Up 1 H Junction Box 4 11/16"x 4 11/16 Square Box See Notes See Notes Screws NA I Single Pole Switch Plastic 1-gang N.W. Box 44 Inches Top Stud Wall B Nail Up 3 J Keyless Receptacle 4" Metal Octagon Box 69 Inches Bottom Plywood 2 Screws 4 K Duplex Receptacle Metal Cut-in Box 12 inches Bottom Stud Wall A Madison Straps(F-clips) 1 L Tamper Proof Duplex Receptacle Plastic 1-gang N.W. Box 14 Inches Bottom Stud Wall B Nail Up 1 M 3 Way Switch 4"X4" Square Box w/1gang Device Ring 36 Inches Bottom Stud Wall C 2 Screws 2 N Flush Mount Telephone Jack Handy Box 6 Inches Bottom Plywood 2 Screws NA P Single Pole Switch 4"X4" Square Box w/1gang Device Ring 31 Inches Bottom Plywood 2 Screws 4 Q Flush Mount Telephone Jack Single Gang Low-Voltage Cut-in Ring 6 Inches Top Stud Wall A N/A NA R Main Panel Main Panel 51 Inches Bottom Plywood 4 Screws NA S GFCI Receptacle 4"X4" Square Box w/1gang Device Ring 10 Inches Bottom Plywood 2 Screws 4 T Disconect Disconect 51 inches Bottom Plywood 3 Screws 2,3 U AC/DC Smoke Detector 4" Metal Octagon Box w/mounting Bracket 48 Inches Top Stud Wall C 2 screws 3 1. Use Outside Back K.O.'s 14. Devices "I" to control Device "C" 26. Device "S" To be only GFCI Protected Device on circuit 2. Center Box "A" Between Studs 15. Devices "D", "M" and "F" to control Device "B" 27. Box "K", "Q" to be center between studs, Heights per Notes above 3. All Saddles to be 3-point Saddles 16. Write your Contestant Number on all paper work on the line provided 28. Circuits "2 and 3" shall share a grounded conductor 4. Box Height "H" to be determined by pipe feed from box "S" 17. Device "G" to protect Devices "A","E","L", and "K" 29. Use 1/2" K.O. in Box "M" nearest to the stud 5. Box "H" To be mounted on face of stud between wall "B" and "C" 18. Device "P" to control Device "J" 30. Smoke Detector To be Hot all the time( Wiring Harness Only) 6. Box "K" to be mounted Long Side parallel to the ground as shown. 19. Telephone Jacks to be interconnected with Blue Pairs as Primary Line 30. Wire between Box "E" and "K" to be 14/3 7. "K" to be Right Half Switched and Left Half Hot controlled by Device "E" 20. Panel is a Main Panel 31. Do NOT Drill holes in studs with out asking first. 8. All wire to be R/X unless otherwise noted on the Prints 21. Do Not stab ANY Devices 32. Use Orange Pair as the secondary line on the phone jack 9. All Ciruits in the same conduit shall share a common grounding conductor 22. Do Not Mount ANY devices to boxes 33. Use Romex staples for Romex only 10. Fittings are not of grounding type 23. All heights to be measured off of finished floor. 34 Keep your area clean at all times 11. Use box offsets for all pipe terminations where possiable 24. Any measurements on plywood to be off edge of plywood. 35. Device "L" to be hot all the time 12. Ground all metal boxes 25. Use Proper wire nuts for all locations 36. Draw a Smiley Face Next to Contestant Number 13. Use Low voltage staples for telephone wire 26. Device "E" to control Device "A" 37. Have a Wonderful Day and GOOD LUCK

2013 SkillsUSA NLSC Electrical Construction Wiring LETTER DEVICE TYPE BOX DESCRIPTION HEIGHT LOCATION BOX MOUNTING CIRCUIT A Keyless Receptacle 4" Round Plastic with Bar Hanger 60 Inches Top Stud Wall A 2 screws 1 B Keyless Receptacle 4" Round Plastic Nail Up 58 Inches Bottom Stud Wall B Nail Up 2 C Keyless Receptacle 4" Round Plastic Nail Up 61 Inches Bottom Stud Wall C Nail Up 3 D Three Way Switch Plastic 1-gang N.W. Box 36 Inches Top Stud Wall B Nail Up 2 E Single Pole Switch Plastic 2-gang N.W. Box 42 Inches Bottom Stud Wall A Nail Up 1 F 4 Way Switch Plastic 2-gang N.W. Box 42 Inches Bottom Stud Wall A Nail Up 2 G Tamper Proof GFCI Receptacle Plastic 1-gang N.W. Box 42 Inches Bottom Stud Wall A Nail Up 1 H Junction Box 4 11/16"x 4 11/16 Square Box See Notes See Notes Screws NA I Single Pole Switch Plastic 1-gang N.W. Box 44 Inches Top Stud Wall B Nail Up 3 J Keyless Receptacle 4" Metal Octagon Box 69 Inches Bottom Plywood 2 Screws 4 K Duplex Receptacle Metal Cut-in Box 12 inches Bottom Stud Wall A Madison Straps(F-clips) 1 L Tamper Proof Duplex Receptacle Plastic 1-gang N.W. Box 14 Inches Bottom Stud Wall B Nail Up 1 M 3 Way Switch 4"X4" Square Box w/1gang Device Ring 36 Inches Bottom Stud Wall C 2 Screws 2 N Flush Mount Telephone Jack Handy Box 6 Inches Bottom Plywood 2 Screws NA P Single Pole Switch 4"X4" Square Box w/1gang Device Ring 31 Inches Bottom Plywood 2 Screws 4 Q Flush Mount Telephone Jack Single Gang Low-Voltage Cut-in Ring 6 Inches Top Stud Wall A N/A NA R Main Panel Main Panel 51 Inches Bottom Plywood 4 Screws NA S GFCI Receptacle 4"X4" Square Box w/1gang Device Ring 10 Inches Bottom Plywood 2 Screws 4 T Disconect Disconect 51 inches Bottom Plywood 3 Screws 2,3 U AC/DC Smoke Detector 4" Metal Octagon Box w/mounting Bracket 48 Inches Top Stud Wall C 2 screws 3 1. Use Outside Back K.O.'s CABLE LIST 2. Center Box "A" Between Studs 3. All Saddles to be 3-point Saddles 4. Box Height "H" to be determined by pipe feed from box "S" RX - Nonmetallic Sheeted Cable 5. Box "H" To be mounted on face of stud between wall "B" and "C" UF-Underground Feeder and Branch Circuit Cable 6. Box "K" to be mounted Long Side parallel to the ground as shown. MC - Metal Clad Cable 7. "K" to be Right Half Switched and Left Half Hot controlled by Device "E" 8. All wire to be R/X unless otherwise noted on the Prints 9. All Ciruits in the same conduit shall share a common grounding conductor 10. Fittings are not of grounding type 11. Use box offsets for all pipe terminations where possiable 12. Ground all metal boxes 13. Use Low voltage staples for telephone wire 14. Devices "I" to control Device "C" 15. Devices "D", "M" and "F" to control Device "B" 16. Write your Contestant Number on all paper work on the line provided 17. Device "G" to protect Devices "A","E","L", and "K" 18. Device "P" to control Device "J" 19. Telephone Jacks to be interconnected with Blue Pairs as Primary Line 20. Panel is a Main Panel 21. Do Not stab ANY Devices 22. Do Not Mount ANY devices to boxes 23. All heights to be measured off of finished floor. 24. Any measurements on plywood to be off edge of plywood. 25. Use Proper wire nuts for all locations 26. Device "E" to control Device "A" 26. Device "S" To be only GFCI Protected Device on circuit 27. Box "K", "Q" to be center between studs, Heights per Notes above 28. Circuits "2 and 3" shall share a grounded conductor 29. Use 1/2" K.O. in Box "M" nearest to the stud 30. Smoke Detector To be Hot all the time( Wiring Harness Only) 30. Wire between Box "E" and "K" to be 14/3 31. Do NOT Drill holes in studs with out asking first. 32. Use Orange Pair as the secondary line on the phone jack 33. Use Romex staples for Romex only 34 Keep your area clean at all times 35. Device "L" to be hot all the time 36. Draw a Smiley Face Next to Contestant Number 37. Have a Wonderful Day and GOOD LUCK