ILC Status. Time line SCRF status Test Facilities Design Improvement Summary Kaoru Yokoya IPAC2010 May , Kyoto. K.Yokoya, IPAC2010, Kyoto

Similar documents
ILC Status K.Yokoya, SRF2009, Berlin

The ILC Accelerator Complex

X-Band Linear Collider Report*

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration

Message from the Americas

International Technology Recommendation Panel. X-Band Linear Collider Path to the Future. RF System Overview. Chris Adolphsen

CHALLENGES IN ILC SCRF TECHNOLOGY *

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL *

SRF Technical Status and Future R&D

Short report on the First ILC Workshop

ILC Reference Design Report Accelerator Executive Summary

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

LC Technology Hans Weise / DESY

3 General layout of the XFEL Facility

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

THE CRYOGENIC SYSTEM OF TESLA

FAST RF KICKER DESIGN

Advance on High Power Couplers for SC Accelerators

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Status of Warm-Cold Linear Collider Competition

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY

Plans for the ESS Linac. Steve Peggs, ESS for the ESS collaboration

ILC SRF Cavity High Gradient R&D at Jefferson Lab

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW*

Superstructures; First Cold Test and Future Applications

FLASH Operation at DESY From a Test Accelerator to a User Facility

Project X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

The Art and Science of Making a Major Technical Decision Choosing the Technology for the International Linear Collider

ILC Damping Rings: Engineering Model and Vacuum System Design

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

ELECTRON CLOUD MITIGATION INVESTIGATIONS AT CESR-TA

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

NLC - The Next Linear Collider Project. NLC Update. CLIC Group. CERN September D. L. Burke SLAC

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

Crab Cavity Systems for Future Colliders. Silvia Verdú-Andrés, Ilan Ben-Zvi, Qiong Wu (Brookhaven National Lab), Rama Calaga (CERN)

The European Spallation Source. Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

Introduction to the PAC07 International Industrial Forum for the ILC. Ken Olsen President Linear Collider Forum of America

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK

Supporting Planning and Engineering Processes at XFEL Examples, Benefits and Experience

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

Strategy for the engineering integration of the ESS accelerator

Superconducting RF System. Heung-Sik Kang

TESLA Progress on R1 & R2 issues

High acceleration gradient. Critical applications: Linear colliders e.g. ILC X-ray FELs e.g. DESY XFEL

TESLA TeV Collider Project Overview

Status, perspectives, and lessons from FLASH and European XFEL

OVERVIEW OF REGIONAL INFRASTRUCTURES FOR SCRF DEVELOPMENT

To produce more powerful and high-efficiency particle accelerator, efforts have

RF Design of Normal Conducting Deflecting Cavity

EXPERIMENTAL RESULT OF LORENTZ DETUNING IN STF PHASE-1 AT KEK-STF

Performance of Superconducting Cavities for the European XFEL. Detlef Reschke DESY for the EU-XFEL Accelerator Consortium

Motivation: ERL based e linac for LHeC

ILC GDE. Barry Barish Caltech. Global Design Effort July-06 HEPAP - Wash DC

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

CLIC Compact Linear Collider

SIMULATION CODES. Proceedings of IBIC2014, Monterey, CA, USA

Fabrication Techniques for the X-band Accelerator Structures. Juwen Wang WORKSHOP ON X-BAND RF TECHNOLOGY FOR FELs March 5, 2010

Electromagnetic characterization of materials for the CLIC Damping Rings and high frequency issues

FLASH: Status and upgrade

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES

ESS RF Development at Uppsala University. Roger Ruber for the FREIA team Uppsala University

Superconducting Cavity Fabrication for ILC in Japan

Crab Cavities for FCC

FAST KICKERS LNF-INFN

PROJECT X: A MULTI-MW PROTON SOURCE AT FERMILAB *

Construction Status of SuperKEKB Vacuum System

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors

BPM requirements for energy spectrometry

Status and Future Perspective of the HIE-ISOLDE Project

Proposal of test setup

Status of the ESS Accelerator Workpackage

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii

Current Industrial SRF Capabilities and Future Plans

SRF Cavities A HIGHLY PRIZED TECHNOLOGY FOR ACCELERATORS. An Energetic Kick. Having a Worldwide Impact

5.5 SNS Superconducting Linac

Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator

STATUS OF THE TTF FEL

Thermionic Bunched Electron Sources for High-Energy Electron Cooling

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

DESY Project. Introduction. E Elsen

LLRF Plans for SMTF. Ruben Carcagno (Fermilab) Nigel Lockyer (University of Pennsylvania) Thanks to DESY, PISA, KEK, Fermilab, SLAC Colleagues

Electron Cloud Mitigation Investigations at CesrTA

3.9 GHz System (AH1) XFEL WP46

SwissFEL Design and Status

KEK ERL CRYOMODULE DEVELOPMENT

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II*

DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX

Chapter 9. Magnet System. 9.1 Magnets in the Arc and Straight Sections

Superconducting 1.3 GHz Cavities for European XFEL

200 MHz 350 MHz 750 MHz Linac2 RFQ2 202 MHz 0.5 MeV /m Weight : 1000 kg/m Ext. diameter : 45 cm

Transcription:

ILC Status Time line SCRF status Test Facilities Design Improvement Summary Kaoru Yokoya IPAC2010 May.26.2009, Kyoto Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 1

RDR (Reference Design Report) RDR published in summer 2007 First cost estimation Accelerator 4.79BILCU(=US$2007) Civil engineering 1.83 Explicit labor 14.2 kperson-year Exec Summary Physics Accelerator Detectors GDE re-structured since then for the next milestone 3 Project Managers Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 2

ILC/GDE Timeline RDR Baseline TDP Baseline Technical Design TDR TDP-1 TDP-2 Change Request MM studies New baseline inputs RDR ACD concepts R&D Demonstrations 2009 2010 2011 2012 2013 Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 3

Technical Design Phase Technical Design Report It will be a detailed technical report Sufficient to give reliable estimate of the total cost Ready for construction proposal to governments But will not be a complete engineering document Planned to be completed by the end of 2012 Technical Design Phase TDP1 till Jul.2010 (ICHEP at Paris) Critical R&D Risk mitigation Cost reduction New baseline TDP2 till end of 2012 Technical design Project implementation plan Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 4

GDE SCRF Plan SC(Superconducting)RF technology is the key to ILC SCRF issues S0: cavity S1: Cryomodule S2: Module string Industrialization Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 5

S0: Cavity Gradient Cavity gradient is a big, single cost-driver RDR assumes >35MV/m (Q 0 >1x10 10 ) in vertical test Target of cavity yield during TDP Yield > 50% in TDP1 Yield > 90% in TDP2 Should be revisited in Rebaseline Cavity Global Database Team established last summer Uniform, well-controlled database Definition of the standard cavity processing `Production Yield = (# of )/(# of produced cavities) Up to 2 nd pass Cavities to be included in the statistics `Established vendor No R&D cavities such as Large Grain Condition of X-ray should be added soon Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 6

Present Production Yield Simple criterion >35MV/m 44% yield Improved HLRF system can accept cavity gradient spread ~20% 64% yield (27.9-41.8MV/m, average 36.5MV/m) TDP1 target satisfied yield [%] Electropolished 9-cell cavities JLab/DESY (combined) up-to-second successful test of cavities from qualified vendors - ACCEL+ZANON+AES (25 cavities) 100 90 80 70 60 50 40 30 20 10 0 >10 >15 >20 >25 >30 >35 >40 100 90 80 70 60 50 40 max gradient [MV/m] Electropolished 9-cell cavities JLab/DESY (combined) up-to-second successful test of cavities from qualified vendors - ACCEL+ZANON+AES (25 cavities) yield [%] 27.9-41.8MV/m 30 20 Only `established vendors included 10 0 >10 >15 >20 >25 >30 >35 >40 max gradient [MV/m] Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 7

Locating the Defects Techniques to locate the defects inside cavities are by now common in the world Pass-band mode measurement Temperature map Optical inspection Try&error science Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 8

Make a replica Detailed Surface Analysis Accurate measurement of the shape Computer simulation of the field enhancement β=1.5 Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 9

Cause of Gradient Limitation Electropolished 9-cell cavities JLab/DESY (combined) up-to-second successful test of cavities from qualified vendors - ACCEL+ZANON+AES (25 cavities) 100 90 80 70 yield [%] 60 50 40 30 Thermal quench by field emission 20 10 0 >10 >15 >20 >25 >30 >35 >40 max gradient [MV/m] Likely to be large surface defect > O(100mm) Hayano 2010.Jan Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 10 10

Grinder for equator Local Repair: Grinding Grinder for slope surface Labs Method Cavity name Results DESY Local Grinding (KEK) AC71 26MV/m (string???) -> 30 MV/m FNAL Local Grinding (KEK) AES-03 20 MV/m (Bump, scratch) -> 34 MV/m JLAB Local Grinding (KEK) JLAB LG-01 30 MV/m (Pit) -> will be tested. KEK Local Grinding(KEK) MHI-08 16 MV/m (Pit) -> 27 MV/m Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 11

S1-Global Goals Try average gradient > 31.5 MV/m Demonstrate plug-compatibility Assemble cavities from DESY-FNAL-KEK in KEK-STF All cavities and cryostat (1 from INFN) sent to KEK. Now assembling. Operation to finish by the end of 2010 Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 12

8 Cavities for S1-Global Module C MV/m AES002 32.8 ACCEL8 30.6 Zanon108 31.3 Zanon109 30.7 Module A MHI005 27.1 MHI006 27.7 MHI007 33.6 MHI009 30.6 Average 30.5 STF1 KEK cavities S1G Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 13

S1-Global Module C (DESY, FNAL cavities) INFN Module C vacuum vessel 2010 年 1 月 15 22 日 4 連化作業 (DESY:2 人 FNAL:3 人来所 ) FNAL Cavity Now in STF tunnel DESY Cavities Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 14

S1-Global Test Plan Month Subjects Participation 5 Assembly to be complete 6 Cool-down,Low Power Test IHEP 7 Low Power Test & Tuner Function Test Preliminary Cryog. Performance test 8 Input coupler conditioning 9 Re-cool-down High Power Test for Cryomodule C 10 High Power test for Cryomodule A Cryogenic Performance Test 11 Control, LLRF, total-system dynamic loss Cryomodule heat loads at 2K DRFS preparation, 12 DRFS test using S1-Global setup INFN, FNAL FNAL, SLAC, FNAL, Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 15

S2: String Test System test with high-gradient, fully beam-loaded, full LLRF control, high rep rate Necessary in each region (Asia, Europe, Americas) Europe FLASH XFEL US FNAL-NML Japan KEK-STF2 Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 16

FLASH 9mA Experiment Fully beam-loaded, high gradient, LLRFcontrolled experiment Successful long-time (>10hr) operation at 3mA Short time at >6mA Almost satisfies S2 Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 17

Energy Stability (examples) Pulse-pulse 2100 bunches, 3MHz, ~2.5nC/bunch (7.5mA) Along pulse 30 MeV Along pulse: 0.5% p-p Pulse-pulse: 0.13% RMS 700us Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 18

FNAL-NML (New Muon Lab) Synergy with Project-X First module Fabricated at DESY (TTF type III+) Assembled in FNAL Cooling test is going to start 2 nd module US cavities To be built in 2010 CM3-CM6 Ion source, RFQ SSR0 SSR1 SSR2 β=0.6 β=0.9 ILC MEBT 325 MHz, 2.5-160 MeV 650 MHz, 0.16-2 GeV 1.3 GHz 2-3 GeV Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 19

Cryomodule activities at FNAL Kephart, Kyoto 2010 CM1 String Assembly MP9 Clean Room Final Assembly CM1 Move to NML FNAL S1 global CM1 installed Dressing cavities for CM2 Cavities @ KEK Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 20

KEK-STF2 First module test (STF1) completed in 2008 Half size (4 cavities) Max gradient ~30MV/m (1 cavity) Measurement successful STF2 Injector 2011 to early 2012 (with beam) 1 st 9 cavity module to be completed by end of 2012 Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 21

Industrialization Success of S2 does not mean ready for production Scale of projects # of cavs period production rate Euro-XFEL 800 2yr 1 cav/day Project-X 400 ~3yr 2 cavs/week ILC 16000 ~4yr 7 cavs/day (3 regions) Exceeds the present capacity of any company Multiple vendors in each region desired Must consider: quality control, mass-production, cost reduction Industry session last Sunday at Kyoto Europe Americas Asia vendors RI (ACCEL) Zanon AES, Niowave, PAVAC MHI (HITACHI, Toshiba) laboratories DESY, LAL(Orsay), CEA(Saclay), INFN FNAL, ANL, Cornell, JLAB KEK, IHEP, PKU, RRCAT, IUAC Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 22

Cavity Pilot Plant at KEK Prototype for the future production line Main part is EBW facility Cost reduction Need more companies to join EBW to be delivered Mar.2011 CP press EBW Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 23

Critical issues Emittance tuning KEK-ATF, CESR-TA Damping Rings Fast injection/extraction kickers Bunch-by-bunch extraction needed Rise/fall time < 6ns required test at KEK-ATF Electron cloud CESR-TA Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 24

Multibunch Extraction from ATF by Fast Kicker T.Naito, WEOBMH02 in DR: 3 Trains, 9(max 10) bunches/train with 5.6 ns spacing Extracted: 27(max 30) bunches with 308 ns spacing bunch-by-bunch profile follows that in the DR. bunches were extracted from the last bunch to the first bunch. 25 Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 25

Kick angle jitter Kicker Stability ~4x10-4 satisfies ILC requirement Remaining problem Pulse-to-pulse timing jitter Next study in June 1ns/div Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 26

CESR-TA Electron cloud is one of the highest risk factor for ILC Study at CESR started in 2008 Evolution of electron clouds under various cloudmitigation techniques chamber coatings (TiN, alpha carbon) clearing electrodes grooved chambers can be monitored in various magnetic fields: drift, dipole, quadrupole, wiggler Reconfiguration of CESR needed Beam parameters are not identical to ILC Extrapolation with computer simulation is needed Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 27

CESR Reconfiguration L3 EC experimental region PEP-II EC Hardware: Chicane, upgraded SEY station (coming on line in May) Drift and Quadrupole diagnostic chambers New EC experimental regions in arcs (wigglers L0 straight) Locations for collaborator experimental chambers CHESS C-line & D-line Upgrades Windowless (all vacuum) x-ray line upgrade Dedicated optics box at start of each line Detectors share space in CHESS user hutches L0 region reconfigured as a wiggler straight CLEO detector sub-systems removed CESR Ring 6 wigglers moved from CESR arcs to zero dispersion straight Region instrumented with EC diagnostics and mitigation Wiggler chambers with retarding field analyzers and various EC mitigation methods (fabricated at LBNL in CU/SLAC/KEK/LBNL collaboration) Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 28

CESR-TA Status Reconfiguration complete BPM upgrade, xbsm, 4ns feedback new EC chambers (electrodes, grooves, a-c coating, RFA detectors, Solenoid windings Status Emittance ε y ~20pm EC mitigation comparisons progress EC simulations Future plans From M.Palmer, PAC, May2010 ~70 machine development days scheduled in 2010 May, July, September and December experimental periods. Will focus on: LET effort to reach a target emittance of ey 20pm Continued EC mitigation studies Detailed characterization of instabilities and sources of emittance dilution in the ultra low emittance regime Application of our results to the damping rings design effort An extension to the R&D program has been proposed ILC DR Electron Cloud Working Group in Oct.2010 Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 29

ATF2 Miniature of ILC Final Focus Same optics system as ILC Tolerances similar to ILC International project Funding manpower Goals 1 st step: Beam size < 35nm IP BSM (beamsize monitor) needed 2 nd step: Stability of the beam centroid < 2nm IP BPM (beam position monitor) (<2nm) needed IP feedback system ILC format beam from ATF Beam line construction started in 2005 and completed in December 2008 Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 30

ATF2 Status Goal 1 Beam size reached ~300nm Target: 37nm by end of 2010 Goal 2 IPBPM being tested upstream Laser wire tested in Apr. FONT5 showing progress As of Apr.10 Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 31

Design Improvement Revisit the baseline design Cost optimization Balance of cost and risk/performance Cost is an important issue for big projects Should not exceed the cost estimation in RDR Should prepare for the possible cost increase, e.g., cryomodule, cavity gradient, etc. (waiting for info of XFEL cavity cost) Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 32

SB2009 Single tunnel with new RF distribution system: KCS (Klystron Cluster System) DRFS (Distributed RF System) Half number of bunches (1312) with same pulse length (1ms) reduce RF system to half Half circumference of DR (same bunch interval in DR) Single-stage bunch compressor (minimum bunch length 300μm) Positron undulator at linac end Use QWT (Quarter Wave transformer) in capture section Traveling focus Layout of central region with shorter tunnel length Expected total cost reduction ~13% Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 33

Single Tunnel Packing all component in RDR in single tunnel will cause significant increase of machine down time (XFEL adopts single tunnel but modulators are on the surface) Revision of RF distribution system is needed KCS (Klystron Cluster System) DRFS (Distributed RF system) RF Waveguide Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 34

Klystron Cluster System Feeds +/- 1 km of linac Power station on surface every 2km ~30 klystrons (10MW MBK) in a station Output microwave combined (~300MW) and sent to underground by overmoded wave guide (~48cm) Distributed to modules by coaxial tap-offs. Need R&D of high power system Developed at SLAC Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 35

Feed 2 (or 4) cavities by a klystron (~750kW) Present scenario 1 klystron for 4 cavities (SB2009) 1 modulator for 26 cavities with back up Flexible distribution Issues are maintenance and cost Being developed at KEK First test planned at the end of S1-Global Capture cavities for STF2 STF2 will be driven by DRFS DRFS Scheme A Permanent magnet focusing Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 36

Reduced Number of Bunches Number of bunches 2600 1300 with same pulse length (~1ms) half current in linac RF system half Allows half size damping rings (same bunch interval in the ring) ~6km ~3km Electron-cloud : almost the same Update to ~2600 bunches is harder Experience of e-cloud needed Fast kicker Need to squeeze more the beam at IP for the same luminosity Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 37

New Design of Positron Source Replace flux concentrator with Quarter Wave Transformer (less efficient but safer) longer undulator (=230m), higher target load target R&D Continue R&D of flux concentrator Place undulator at linac end (250GeV point) Simpler machine protection system Complex systems concentrated in the central region Allows low acceleration gradient of linac at low energies No deceleration Higher positron yield at high energy (>300GeV CM) But poor yield below 300GeV CM (~half at 250GeV) Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 38

Luminosity Bunch number reduction would cause factor 2 reduction of luminosity squeeze more tightly Further reduction at low energies due to the new location of undulator (factor 2 at 250GeV CM) Can be cured in principle by `traveling focus (at the expense of higher sensitivity on collision offset), but it does not work at low energies due to larger geometric emittance factor of 3-4 reduction from RDR value at 250GeV CM. Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 39

Recovery of Luminosity at Low Energies At low energies the machine repetition rate (5Hz) can be raised owing to the low site power consumption Requires stronger wigglers in damping rings but this seems to be feasible Must revisit entire system The final focus quadrupoles can be modified for low energy collision to make traveling focus effective Shorter magnet can focus the beam Detailed design needed Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 40

Towards Re-baseline New baseline must be decided by early 2011 to be in time for TDR Four major issues A) Accelerating gradient B) Single tunnel (with new RF distribution) C) Half number of bunches D) Undulator BAW (Baseline Assessment Workshop) BAW1 Sep.2010 @KEK A&B BWA2 Jan.2011 @??? C&D Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 41

Collaboration with CLIC Collaboration of the two linear colliders groups, ILC and CLIC, is desirable with respect to synergies and saving resources Collaboration is going on in several fields General Issues CFS (Conventional Facility & Siting) Positron Source Damping Ring BDS (Beam Delivery System) Cost Estimation Detectors Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 42

Governance Discussion launched among the management levels of ICFA, ILCSC, and GDE. What sort of organization needed for ILC Lab Models (CERN, ITER, XFEL,..) Budget model In-kind contribution Common fund Site selection procedure Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 43

Technical issues Beyond TDR Possible remaining R&D issues RF distribution, positron System tests (most important: S2) Industrialization Cost reduction Mass-production Engineering design Project implementation plan Governance Siting Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 44

Summary GDE is on the track to TDR in 2012 Progress in SCRF technology and evaluation of cavity yield Efforts for industrialization growing Test facilities, CESR-TA, ATF/ATF2, FLASH, etc, contributing to risk mitigation Re-baseline is being planned through BAW (Baseline Assessment Workshops) by early 2011. Jun 26, 2010 K.Yokoya, IPAC2010, Kyoto 45