Electromagnetic Disturbances of the Secondary Circuits in Gas Insulated Substation due to Disconnector Switching

Similar documents
GIS Disconnector Switching Operation VFTO Study

Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

Sources of transient electromagnetic disturbance in medium voltage switchgear

A Simple Simulation Model for Analyzing Very Fast Transient Overvoltage in Gas Insulated Switchgear

Analysis of Electromagnetic Transients in Secondary Circuits due to Disconnector Switching in 400 kv Air-Insulated Substation

GIS Instrument Transformers: EMC Conformity Tests for a Reliable Operation in an Upgraded Substation

Revision of TRV Requirements for the Application of Generator Circuit-Breakers

Alternative Coupling Method for Immunity Testing of Power Grid Protection Equipment

Estimation of Re-striking Transient Overvoltages in a 3-Phase 132KV Gas insulated Substation

Estimation of Re-striking Transient Over voltages in a 132KV Gas insulated Substation

Ferroresonance Experience in UK: Simulations and Measurements

A Study on Ferroresonance Mitigation Techniques for Power Transformer

PREVENTING FLASHOVER NEAR A SUBSTATION BY INSTALLING LINE SURGE ARRESTERS

VFTO STUDIES DUO TO THE SWITCHING OPERATION IN GIS 132KV SUBSTATION AND EFFECTIVE FACTORS IN REDUCING THESE OVER VOLTAGES

Modelling of Sf6 Circuit Breaker Arc Quenching Phenomena In Pscad

Modeling insulation in high-voltage substations

Calculation of Transients at Different Distances in a Single Phase 220KV Gas insulated Substation

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS

Extensive LV cable network. Figure 1: Simplified SLD of the transformer and associated LV network

G. KOEPPL Koeppl Power Experts Switzerland

5. Black box arc modelling

Modeling and Analysis of a 3-Phase 132kv Gas Insulated Substation

Transient recovery voltage analysis for various current breaking mathematical models: shunt reactor and capacitor bank de-energization study

A MODEL TO SIMULATE EM SWITCHING TRANSIENTS IN ELECTRIC POWER DISTRIBUTION SUBSTATIONS

EMC Philosophy applied to Design the Grounding Systems for Gas Insulation Switchgear (GIS) Indoor Substation

Fatima Michael college of Engineering and Technology

Validation of a Power Transformer Model for Ferroresonance with System Tests on a 400 kv Circuit

The Influence of Atmospheric Overvoltages on High-Voltage SF 6. Substations

DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY

Modeling for the Calculation of Overvoltages Stressing the Electronic Equipment of High Voltage Substations due to Lightning

Switching Restrikes in HVAC Cable Lines and Hybrid HVAC Cable/OHL Lines

A Pyrotechnic Fault Current Limiter Model for Transient Calculations in Industrial Power Systems

SWITCHING OVERVOLTAGES IN A 400-KV CABLE SYSTEM

Tab 2 Voltage Stresses Switching Transients

Effect of High Frequency Cable Attenuation on Lightning-Induced Overvoltages at Transformers

DC current interruption tests with HV mechanical DC circuit breaker

Power Quality and Reliablity Centre

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

VI 3 - i TABLE OF CONTENTS

A3-308 HIGH SPEED GROUNDING SWITCH FOR EXTRA-HIGH VOLTAGE LINES

ELECTRICAL POWER TRANSMISSION TRAINER

Lumped Network Model of a Resistive Type High T c fault current limiter for transient investigations

Ferroresonance Conditions Associated With a 13 kv Voltage Regulator During Back-feed Conditions

The various factors influencing the VFTO levels in 500kV and. 750kV GIS have been discussed by developing the simulink models which

Research Article Survey of Induced Voltage and Current Phenomena in GIS Substation

I -limiter The world s fastest switching device

Fast Front Transients in Transformer Connected to Gas Insulated Substations: (White+Black) Box Models and TDSF Monitoring

Voltage Sag Mitigation by Neutral Grounding Resistance Application in Distribution System of Provincial Electricity Authority

ANALYSIS OF FAULTS INTERRUPTED BY GENERATOR

2. Current interruption transients

CONTENTS. 1. Introduction Generating Stations 9 40

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

EXPERIMENTAL INVESTIGATION OF A TRANSIENT INDUCED VOLTAGE TO AN OVERHEAD CONTROL CABLE FROM A GROUNDING CIRCUIT

2000 Mathematics Subject Classification: 68Uxx/Subject Classification for Computer Science. 281, 242.2

AORC Technical meeting 2014

Adi Mulawarman, P.E Xcel Energy Minneapolis, MN. Pratap G. Mysore, P.E Pratap Consulting Services, LLC Plymouth, MN

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering)

Voltage Sag Index Calculation Using an Electromagnetic Transients Program

Power Quality Basics. Presented by. Scott Peele PE

ABB AG - EPDS. I S -limiter The worldʼs fastest limiting and switching device

Coordination of protective relays in MV transformer stations using EasyPower Protector software

Prevention of transformers damage in HPP with double generating units connected to GIS via HV cables

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES

Harmonic control devices. ECE 528 Understanding Power Quality

Ferroresonance in MV Voltage Transformers: Pragmatic experimental approach towards investigation of risk and mitigating strategy

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Exercises. 6 Exercises

FGJTCFWP"KPUVKVWVG"QH"VGEJPQNQI[" FGRCTVOGPV"QH"GNGEVTKECN"GPIKPGGTKPI" VGG"246"JKIJ"XQNVCIG"GPIKPGGTKPI

Chapter 1. Overvoltage Surges and their Effects

URL:

Parameters Affecting the Back Flashover across the Overhead Transmission Line Insulator Caused by Lightning

PROTECTION APPLICATION HANDBOOK

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Relion 605 series Self-Powered Feeder Protection REJ603 Product Guide

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Abstract. 1 Introduction

DC Chopper Based Test Circuit for High Voltage DC Circuit Breakers

Research Article A Simplified High Frequency Model of Interleaved Transformer Winding

Application for A Sub-harmonic Protection Relay. ERLPhase Power Technologies

Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION. Course Content

Simulation of Short Circuit and Lightning Transients on 110 kv Overhead and Cable Transmission Lines Using ATP-EMTP

Specialists in HV and MV test and diagnostics. Testing in Substations

Lightning test in lab. Symmetrical fault and protection. Olof Samuelsson

High voltage engineering

NOVEL PROTECTION SYSTEMS FOR ARC FURNACE TRANSFORMERS

ANALITICAL ANALYSIS OF TRANSFORMER INRUSH CURRENT AND SOME NEW TECHNIQUES FOR ITS REDDUCTION

MEDIUM & HIGH VOLTAGE

Overcurrent Protection / 7SJ45

SUPPRESSION METHODS FOR VERY FAST TRANSIENT OVER- VOLTAGES ON EQUIPMENT OF GIS

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento

Fixed Series Compensation

Substation Preventive Maintenance

EI HIGH VOLTAGE INSULATION TESTING POLICY

Test Specification for Type Approval

Understanding and Optimizing Electromagnetic Compatibility in Switchmode Power Supplies

Investigation of Inter-turn Fault in Transformer Winding under Impulse Excitation

A Special Ferro-resonance Phenomena on 3-phase 66kV VT-generation of 20Hz zero sequence continuous voltage

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages

Transcription:

International Conference on Power Systems Transients IPST 3 in New Orleans, USA Electromagnetic Disturbances of the Secondary Circuits in Gas Insulated Substation due to Disconnector Switching Ivo Uglesic 1, Sandra Hutter 1, Viktor Milardic 1, Igor Ivankovic, Bozidar Filipovic-Grcic (1) Faculty of Electrical Engineering, University of Zagreb, Unska 3, 1 Zagreb, Croatia (e-mail: ivo.uglesic@fer.hr, sandra.hutter@fer.hr, viktor.milardic@fer.hr), () Croatian Electrical Company, Transsmision Division, Ul. grada Vukovara 37, 1 Zagreb, Croatia (e-mail: igor.ivankovic@hep.hr, bozidar.filipovic-grcic@hep.hr) Abstract The paper describes problems with electromagnetic compatibility (EMC) of the secondary equipment in the 13 kv gas insulated switchgear (GIS). The causes for malfunctioning of the busbar protection during disconnector switching have been studied. Thorough measurements and computer simulations were conducted in order to determine magnitudes and frequencies of the transient voltages and currents in the secondary circuits. Although measured secondary transients had lower magnitudes than allowed, they caused malfunctioning of the secondary equipment, e.g. busbar protection. Continuous monitoring of the HV equipment's influence on the secondary equipment and implementation of some precautionary protection measures are recommended. Keywords electromagnetic compatibility (EMC), transient enclosure voltage (TEV), busbar protection, gas insulated switchgear (GIS). I. INTRODUCTION Electromagnetic disturbances due to Very Fast Transient Overvoltages (VFTO) occurring in metal enclosed gasinsulated switchgear (GIS) are a well known problem. Today, secondary equipment in HV switchgear is processor oriented, entirely electronic and very sensitive to disturbances. Also, it is located near the HV switching devices, which can cause harsh operating environment. Cigre Working Group 3. stated in its Report on nd international GIS service experience survey that of the sample of 73 CB/bay/year, 16% reported problems with maloperation of control, protection or secondary circuits, although in general, improved reliability of GIS in service was confirmed [1]. The influence of EM disturbances on the operation of relay protection devices, as well as propagation of transients in the secondary circuits has been studied for 13 kv GIS. send a command to open the circuit breaker if all three criteria (1 - differential current criteria, - overcurrent criteria, 3 - direction criteria) are fulfilled during a certain time interval. Fig. 1 shows an example of proper busbar protection operation. All three required criteria have been fulfilled during a certain time period. In this example, a 5 Hz current was injected from the testing device. Channel 1 shows that negative logic was implemented, which means that the signal is active if differential current is not present. With the presence of differential current, the signal obtains zero value and enables tripping. At this time instant an overcurrent signal is already present on channel. Channel 3 registers if current flows in the specified direction. This signal is present at regular intervals. The protection system measures signals separately, during positive and negative current half-period. Testing on the busbar protection measuring system was repeated during disconnector switching operations. The module has tripped twice, when the disconnector was operated. Again, signals at the entrance to the protection system were recorded and all three criteria have been fulfilled during a certain time period (5 ms), although signals occurred at irregular intervals. The differential current criterion was fulfilled and saw-shaped overcurrent impulses are present during the entire interval. The processor is integrating the signal, if the frequency of the saw-shaped signal is high enough. The case in which all three criteria have been fulfilled during a certain time period (after approximately 5ms) is depicted in Fig.. Fig. 3 shows signals at the entrance to the measuring system, also recorded during disconnector switching operation. Channel 1 represents current from cable 11 kv, which is one of the inputs into the measuring system. II. RELAY PROTECTION TESTING After disconnector switching during normal substation operation, malfunctioning of busbar protection can occur which can result in disconnection of the whole substation. Testing was performed in order to determine causes that can lead to relay tripping. In order to send a tripping command, the measuring system has to detect whether the fault is experienced inside or outside the protection zone. The busbar protection will Fig. 1 Proper busbar protection operation initiated with testing device 1

International Conference on Power Systems Transients IPST 3 in New Orleans, USA Tripping Operated disconnector Fig. Busbar protection operation initiated during disconnector switching operation. Fig. One-line diagram of 13 kv GIS E6 E5 E E1 DC circuits Command kiosk Differential protection control circuits Cable protection circuits Busbar protection circuits Gas insulated switchgear Current tranformer measuring point GIS enclosure Cable sheaths Current tranformer Fig. 5 Location of measuring points Ch.1 - I 1 current from cable 11 kv, Ch. - U 1 secondary voltage from module RWT8, Ch.3 - I current from transformer secondary 11/1 kv, Ch. - U voltage from transformer secondary 11/1 kv. Fig. 3 Signals at the entrance in the measuring system (with superimposed HF interference). It can be observed that HF interference is superimposed on 5 Hz frequency signal. Channel represents voltage which the module sends as output signal in the measuring system. Channels 3 and represent current and voltage from the secondary side of the power transformer. On-site testing has demonstrated that disconnector switching operation can lead to the relay protection tripping. III. MEASUREMENTS Thorough measurements were conducted in order to determine magnitudes and frequencies of the transient voltages and currents in the secondary circuits []. Fig. shows a one-line diagram of the 13 kv GIS testing configurations. During on-site EMC testing, applied voltage or current interference should not damage or put at risk normal operation of the equipment. Transient enclosure voltage (TEV), induced impulse currents, transmitted voltages and currents in the secondary circuits were measured during disconnector switching operations located in the line feeder bay, at the following points (Fig. 5): enclosure at the point of GIS/cable junction and cable sheaths; ground straps; current transformer terminals; secondary circuits (differential protection control circuits, busbar and cable protection circuits, and DC circuits). A. External Transients at GIS/cable junction During switching operation in the GIS, restrikes between contacts generate surges that propagate inside and outside the enclosure. Transients that appear on the outer side of the GIS cause transient enclosure potential rise (TEVR). Whole series of restrike sequences were recorded during disconnector closing and opening. During measurements, more than a hundred repetitions of this phenomenon were recorded (Fig. 6). However, this number depends on the chosen trigger level, hence the actual number is even greater. It can be assumed that the duration of the whole process is more than 3 ms. B. Transmitted Voltages and Currents in Protection Control Circuits Impulse voltages and currents are transmitted in the measuring, protection and control circuits via conductive, inductive or capacitive coupling, and at the highest frequencies via radiative coupling (antenna effect) [3]. Fig. 7 shows typical a) voltage and b) current oscillograms recorded in current control circuits located in the busbar protection kiosk, caused by a single restrike (maximal measured voltage and current magnitudes at this location were 8 V and A, respectively). A wide band of frequencies can be observed in Fig. 7. However, the voltage oscillates with two dominant frequencies around 11 MHz and 8 MHz.

International Conference on Power Systems Transients IPST 3 in New Orleans, USA 5 3 a) Voltage U (V) 1-1 - -3 - -5,,,6,8 1 1, 1, 1,6 1,8 Time t (microsec) 7. U 5.6..8 1. a) 95 samples, t = 6 ms. 1 3 5 6 1 8 6 Current I (A) - - -6-8 b) -1 I (A) 1.,,,6,8 1 1, 1, 1,6 1,8 Time t (microsec).8.. b) 1 samples, t = 3 ms Fig. 6 External transient voltages at the GIS/cable junction (curve A) and on the cable sheaths (curves B, C and D) during disconnector a) closing b) opening Dominant frequencies observed on the current diagram are around 8 MHz and 86 MHz. The entire disconnector switching operation, lasts a few hundred milliseconds. More than a hundred impulses with a duration of a few microseconds, are repeated with pauses of differnet durations in a range of milliseconds. The overcurrent relay module takes into account RMS current value, so in some cases multiple repetition of the current impulses can be interpreted as a signal that led to busbar protection tripping. C. Overview of Measurement Results Measurement results have shown that in all cases high frequency voltages and currents appear, with a dominant -. 6 8 1 Fig. 7 a) Voltage and b) current during disconnector switching recorded in current control circuits located in busbar protection kiosks frequency of 5 MHz occurring at different locations and with different magnitudes. In some cases, currents had two dominant frequencies, one responding to the voltage frequency and the other twice as high. Table I gives an overview of maximal transient voltages' and currents' magnitudes, with their corresponding dominant frequencies, measured at different locations. According to standards IEC 81- [] and IEC 17C 1 [5], testing procedures carried out on the secondary equipment have an acceptable disturbance level up to kv. All measured transients in the secondary circuits had magnitudes within the boundaries specified by the above mentioned standards. 3

International Conference on Power Systems Transients IPST 3 in New Orleans, USA Table I Maximal transient voltage and current magnitudes with dominant frequency(s). U N - voltage in normal operation, Û - peak value of transient voltage, f U - voltage dominant frequency(s), I N - current in normal operation, Î - peak value of transient current, f I - current dominant frequency(s). Location Comment U N Û f U [MHz] I N [A] Î [A] f I [MHz] Enclosure 18 ; 7 - - - Cable sheath 138 ; 7 - - - Command current circuits - - - - kiosk diff. busbar protection 3; 7 1 9 3; 7 DC circuit V ± 11 ± 8 3 - - - Current bay E5 368 8 1 115 8; 9 transformer bay E1 8 5 1 15 5; 7 Busbar voltage circuits 1 3 76 3; 18 18 protection current circuits 8.5 8 1.5 8; 86 kiosk DC circuit V ± 1 ± 3 7; 5 - - - Cable protect. kiosk voltage circuits 1 3 56 16 - - - IV. COMPUTER SIMULATIONS Additionally, computer simulations were performed on the model, containing three phases in one encapsulation and taking into account mutual coupling between phases, with the help of the EMTP-ATP program. Inner VFTO and transmitted voltages in the secondary circuits were calculated during disconnector switching operations, for the same substation layouts on which measurements were carried out (Fig. ). A. Applied Models Bus ducts (Fig. 8) were represented as lossless distributed parameter transmission lines [6] with the following high-frequency surge impedance matrix, calculated with the support routine CABLE CONSTANTS in the EMTP- ATP program [7]: Z S 15.6 = 15.6 15.6 [ Ω] Electrical arc in the disconnector during sparking was simulated with its conductance-dependent parameters described with the Cassie and Mayr arc equation: dg dt 1 is = ( g) (1) Θ P( g) ( g) where g is the arc conductance, i s is the arc current, P is the arc cooling power and Θ is the arc thermal time constant. r v =. m, r s =.1 m R u =.3 m Fig. 8 Bus duct cross-section Parameters P(g) and Θ(g) are conductance dependent. P(g) is defined for two rates that correspond to the ignition and burning phase: a) Ignition:.87 g ( MW) P i = 1.15 () b) Burning:.5 g ( MW) P b = 15 (3) The time constant Θ determines the rate of change with which the arc conductance obtains its stationary value. In the calculations a constant value of Θ (g) = 1µs was assumed, because of its negligible influence on the very fast transients. Parameters P i, P b and Θ are selected as recommended in [8]. The power transformer was modeled, as proposed in [9] with the total equivalent capacitance: C = C + C = C C + C () T e b g s where C s represents equivalent series capacitance of the winding, C g is the shunt capacitance between winding to the grounded core and transformer tank, and C b is capacitance of the terminal bushing. C s and C g were computed from the transformer geometry according to [1]. For the considered transformer with the nominal power of MVA and with continuous disc winding, computed values were C s = 66 pf and C g = 37 pf. The leakage inductance of the winding was 17 mh. Inner transients are transmitted to the outer side of the GIS enclosure at the GIS/cable junction and at the gas to air bushings. The model of the gas to air bushing contains an ideal transformer that enables connection of three transmission lines: the bus duct inside enclosure, the enclosure outer side (surge impedance to ground) and an overhead wire, as shown in Fig.9. A similar approach was used for modeling of the GIS/cable junction. The enclosure, ground straps and simplified earthing grid are modeled for calculation of TEV from their surge impedance and corresponding length [6]. b

International Conference on Power Systems Transients IPST 3 in New Orleans, USA Overhead wire 1 : 1 SF insulated bus duct 6 enclosure outer side Fig. 9 Model of the gas to air bushings Surge impedance for each enclosure section was calculated from its medium height above the ground and its outer radius. B. Calculation Results Evaluation of calculated results for external transients has to take into account complexity of the model and unsymmetrical geometry of components outside the enclosure. Usually, for the substations that are already in operation it is difficult to obtain all necessary details for more accurate calculations. Measured and calculated results for the external transients were compared in the time and frequency domains (Fig.1 and Fig. 11). Results have shown that inner transients in this case do not place high dielectric stress on adjacent equipment and the transformers' insulation. However, due to their high frequency and multiple repetition in a short time period they are a source of disturbances to the secondary circuits. 3 U[kV] kv] 3 1 1-1 -1 - - -3 3 6 9 1 15 18 3 1-1 - -3 a) Measured U max = 3.8 kv -..3.6.9 1. 1.5 [us] 1.8 (file TR9_VARD5E.pl; x-var t) v:oklopc.7 [kv].5 b) Calculated U max = 3. kv t (ns) -3 3 6 9 1 15 18 t (ns) 3 1-1 - -3 a) Measured U max = 3.6 kv -..3.6.9 1. 1.5 [us] 1.8 (file TR9_VARD5E.pl; x-var t) v:plastb.9 [kv].6 b) Calculated U max = 3. kv.3.1.3 -.1 1 3 5 6 c) Frequency spectrum of measured voltage 8 6 1 3 5 6 d) Frequency spectrum of calculated voltage Fig. 1 Transient enclosure voltage. 1 3 5 6 c) Frequency spectrum of measured voltage 9 75 6 5 3 15 1 3 5 6 d) Frequency spectrum of calculated voltage Fig. 11 Transient voltage on cable sheat 5

International Conference on Power Systems Transients IPST 3 in New Orleans, USA Computer simulations can be used for assessment of the possible transient level and their frequency spectrum that can occur in the GIS. The frequency spectrum of calculated transient enclosure voltage differs somewhat from that measured, although a dominant frequency of around 5 MHz is often measured in other cases (Table I). Arrangement and modeling of the ground straps has a considerable influence on the calculation of the external transients, and especially on the frequency spectrum, due to the wave reflections at short distances. It can be observed that the transients are strongly damped in both cases. VI. CONCLUSIONS EMC problems due to disconnector switching have been analyzed on the existing 13 kv GIS. Measurements were conducted on some characteristic points in GIS, in order to determine the level of the EM disturbances. Measurement results have shown that in all case studies, high frequency voltages and currents occur, with a dominant frequency of 5 MHz, regardless of very different disturbance magnitudes occurring in different locations (ranging from 1. kv in one case to 3 V in another). Malfunctioning of the busbar protection during disconnector switching in the GIS has been thoroughly studied and measurements have established that all three necessary criteria for busbar protection operation are fulfilled in this case. Multiple repetition of the current impulses can cause busbar protection tripping due to integration of these input signals in the overcurrent relay module. Measured overvoltages and currents have lower magnitudes than allowed by the standards. In general, they should not place dielectric stress on the insulation or cause the secondary equipment to malfunction. However, busbar protection malfunction has occurred during on-site testing, which demonstrates a need for continuous monitoring of the transient overvoltages and current levels in the secondary circuits. In the GIS operation continuous monitoring of the HV equipment's influence on the secondary equipment and implementation of some precautionary protection measures are recommended. Attention should be focused on the implementation of protection measures, electromagnetic disturbance mitigation methods and on site EMC equipment testing. Comparison of the external transients computer simulations with field measurements showed that calculations could be used for assessment of the overvoltage level that may occur in the GIS. REFERENCES [1] T.M. Chan, F. Heil, D. Kopejtkova, P.O' Connell, J.-P. Taillebois, I. Welch, "Report on Second International Survey on High Voltage Gas Inslated Substations (GIS) Service Experience", Paper 3-1, CIGRE Paris, 1998. [] I. Uglesic, V. Milardic, S. Hutter, I. Ivankovic, " Electromagnetic compatibility in secondary circuits in Substation Trpimirova 11/ kv ", Zagreb, March. [3] WG 36., "Guide on EMC in power plants and substations", Paris, December 1997. [] IEC 81- : "Electromagnetic compatibility for industrial-process measurement and control equipment. Part. Electrical fast transients/burst requirements", 1988. [5] IEC 17C 1: Committee Draft 17C (Secretariat)1, "Electromagnetic compatibility (EMC) for secondary systems in gasinsulated metal enclosed switchgear for rated voltages of 7.5 kv and above", 1991. [6] J.A. Martinez, D.Povh, P. Chowdhuri, R. Iravani, A.J.F. Keri, "Modeling Guidelines for Very Fast Transients in Gas Insulated Substations", IEEE PES Special Publication Modeling and Analysis of System Transients, 1998. [7] ATP Rule Book, Canadian/American EMTP User Group, 199. [8] R.Sun, Transiente Überspannungen in SF 6 -isolirter metallgekapselten Schaltanlagen ( Transient Overvoltages in the SF 6 - isolated Metal Enclosed Switchgear ), Ph.D. thesis, University of Stuttgart, Juni 1991. [9] P. Chowdhuri, "Electromagnetic Transients in Power Systems", RSP-John Wiley, 1996. [1] B. Cucic, "Distribution of Surge Wave through the Transformer Continuous Disc Winding", Master thesis, Zagreb, 1. 6