After- LIFE Conservation Plan for Oroklini Lake as part of the project LIFE10NATCY716 - Oroklini

Similar documents
Protecting an important wetland for birds and people: The LIFE Oroklini project

ACTION PLAN FOR OROKLINI LAKE, CYPRUS

Wildlife monitoring in Cyprus. Nicolaos Kassinis Game and Fauna Service (GFS)

AGRAS WETLAND - Implementation of management measures at the Agras wetland LIFE03 NAT/GR/000092

Axios Delta Wetland complex overall ha 44 river estuaries (Gallikos, Axios, Loudias, Aliakmonas) 33 coastal lagoons: Kalohori N. Agathoupoli Al

Danube Delta SITE INFORMATION. IUCN Conservation Outlook Assessment 2014 (archived) Finalised on 17 November 2015

SoN 2015: Landmark report shows European biodiversity going lost at unacceptable rates: intensive agriculture main culprit

Project description Environmental issues Beneficiaries Administrative data Read more

Aythya nyroca Eastern Europe/E Mediterranean & Sahelian Africa

Acrocephalus melanopogon

saline lagoons - Conserving saline lagoons & their birds on ten Natura 2000 sites in England LIFE99 NAT/UK/006086

THE MERSEY GATEWAY PROJECT (MERSEY GATEWAY BRIDGE) AVIAN ECOLOGY SUMMARY PROOF OF EVIDENCE OF. Paul Oldfield

Habitat Use by Wildlife in Agricultural and Ranching Areas in the Pantanal and Everglades. Dr. Júlio Cesar de Souza and Dr. Elise V.

Site Improvement Plan. Ouse Washes SPA. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future

FORTH CROSSING BILL OBJECTION 88 RSPB SCOTLAND FORTH REPLACEMENT CROSSING: ENVIRONMENTAL STATEMENT

Project description Environmental issues Beneficiaries Administrative data Read more

Black-crowned Night-heron Minnesota Conservation Summary

LIFE Project Number LIFE03 NAT/SLO/ LIFE PROJECT NAME Conservation of endangered species and habitats in the Sečovlje salt-pans

Coastal wetland at risk

BYRON BIRD BUDDIES. ANNUAL REPORT September 2015 September 2016

Alca torda. Report under the Article 12 of the Birds Directive Period Annex I International action plan. No No

Issued with the support of the European Union through the Life Natura programme. LIFE05 NAT/RO/ Project

Natura 2000 Biogeographical Process Mediterranean Kick-off Seminar FIELDTRIP IN THE AXIOS DELTA NATIONAL PARK

Botaurus stellaris stellaris C & E Europe, Black Sea & E Mediterranean (bre)

BirdLife International Marine Programme Marine Important Bird & Biodiversity Areas (Marine IBAs)

Natura 2000 in the Po Delta - Conservation of habitats and species in the Natura 2000 sites in the Po Delta LIFE09 NAT/IT/000110

Jackson Bottom Wetlands Preserve BCS Number: 47-14

Dougall - Conservation of the Roseate Tern in Brittany LIFE05 NAT/F/000137

Protecting biodiversity at Great Salt Lake. On the ground at Kennecott Utah Copper

Ladd Marsh Wildlife Area BCS number: 49-3

Calidris alpina schinzii Britain & Ireland/SW Europe & NW Africa

The implementation of Ramsar Convention in Lebanon

Avian Project Guidance

Calidris alpina schinzii Baltic/SW Europe & NW Africa

Humber Management Scheme. Fact sheet: Wintering and passage birds

The Rufford Foundation Final Report

Cat Island Chain Restoration Project Brown County Port & Resource Recovery Department

CHAPTER. Coastal Birds CONTENTS. Introduction Coastal Birds Action Plan. 108 cbbep.org

Migratory Shorebird Conservation Action Plan

American Bittern Minnesota Conservation Summary

Laymans report LIFE10/NAT/IT/000256

Northampton Washlands: Frequently Asked Questions

Luscinia svecica svecica

Oxyura leucocephala East Mediterranean, Turkey & South-west Asia

Gallinago media Western Siberia & NE Europe/South-east Africa

Stone Curlew (Burhinus oedicnemus)

Tualatin River NWR and Wapato Lake BCS number: 47-37

The Aigues-Mortes saltmarshes

Kokemäenjoki-LIFE. From Ancient to the Present Estuary, Kokemäenjoki Wetland Chain. LIFE Nature project (LIFE06NAT/FIN/000129)

Grus grus grus Eastern Europe/Turkey, Middle East & NE Africa

Podiceps nigricollis nigricollis Europe/South & West Europe & North Africa

Recurvirostra avosetta South-east Europe, Black Sea & Turkey (bre)

Oxyura leucocephala West Mediterranean (Spain & Morocco)

Platalea leucorodia leucorodia West Europe/West Mediterranean & West Africa

Vanellus vanellus Europe, W Asia/Europe, N Africa & SW Asia

Impact of wind farms on birds and bats

CLIMATE CHANGE IMPACT ON MIGRATORY BIRDS IN POLAND

ECOLOGICAL RESTORATION

Branta leucopsis East Greenland/Scotland & Ireland

Lymnocryptes minimus Northern Europe/S & W Europe & West Africa

Bittern (Botaurus stellaris)

Sauvie Island Wildlife Area BCS number: 47-28

R. Griswold Snowy Plover/Least Tern Monitoring Project 2009

State of nature in the EU: results from the reporting under the nature directives

Irrigation tanks becoming Important Bird Areas Study of three tanks in Mysore city : Kukkarahalli, Ligambudhi, Karanji lakes

Habitat Selection of Nesting and Migrating Birds in the Hortobágy. Ph.D Thesis. Zsolt Végvári

Development of the Saker Falcon (Falco cherrug) Global Action Plan (SakerGAP)

National Fish and Wildlife Foundation Executive Summary for the American Oystercatcher Business Plan

Site Improvement Plan. Upper Nene Valley Gravel Pits SPA. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future

Red-breasted Goose Monitoring Strategy for the Main Wintering Sites from Dobrogea, Romania

18 July Keith Greer SANDAG 401 B Street, Suite 800 San Diego, CA Subject: Mission Bay Park Project Quarterly Report

Introduction of The Iraqi Marshlands

WISCONSIN BIRD CONSERVATION INITIATIVE IMPORTANT BIRD AREAS PROGRAM

Recurvirostra avosetta Western Europe & North-west Africa (bre)

Least Tern (Sterna antillarum)

Maryland Coastal Bays Colonial Waterbird and Islands Report 2018

BP Conservation Programme. Final Report

PonDerat Restoring the Ponziane Archipelago ecosystem through management of rats and other invasive alien species

Site Improvement Plan. Bowland Fells SPA. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future

Photo: Timo Seppäläinen. LIFE Saimaa Seal. Platform meeting Punkaharju Raisa Tiilikainen, project manager

Території особливої охорони (SPAs): методологія моніторингу птахів та менеджменту. В.Костюшин)

STANDARD DATA FORM FOR SPECIAL PROTECTION AREAS (SPA) FOR SITES ELIGIBLE FOR IDENTIFICATION AS SITES OF COMMUNITY IMPORTANCE (SCI) AND

Anser fabalis fabalis North-east Europe/North-west Europe

SPECIES ACTION PLAN. Rhinolophus ferrumequinum 1 INTRODUCTION 2 CURRENT STATUS 3 CURRENT FACTORS AFFECTING 4 CURRENT ACTION

Brief report to Ramsar Convention Secretariat. Azerbaijan Republic

ANNEX Following the discussions at the National Environmental Protection Agency in Bucharest on to clarify some aspects regarding the

Branta leucopsis Russia/Germany & Netherlands

Oregon Dunes National Recreation Area BCS Number: 47-5

Feldale Internal Drainage Board Biodiversity Action Plan Report Drainage Ditch Action Plan

Otus scops. Report under the Article 12 of the Birds Directive Period Annex I International action plan. No No

Managing wetlands and rice to improve habitat for shorebirds and other waterbirds

National Governments. US Fish and Wildlife Service, 1011 East Tudor Road, Anchorage AK 99503

LIFE Nature Projects for the Rewetting of Lake Dümmer Lowlands Niedersachsen

Restoration & Management of the Murrough Wetlands for Annex 1 Habitats and Birds

American White Pelican Minnesota Conservation Summary

Environmental Designations in Dorset. Dr Annabel King, Senior Ecologist, DCC

INFORMATION MANUAL ON MIGRATORY BIRD CONSERVATION

Migration of Birds MARC

Falco vespertinus. Report under the Article 12 of the Birds Directive Period Annex I International action plan. Yes SAP

5 th SESSION OF THE MEETING OF THE PARTIES May 2012, La Rochelle, France

Transcription:

After- LIFE Conservation Plan for Oroklini Lake as part of the project LIFE10NATCY716 - Oroklini Game & Fauna Service 2015

2 After- LIFE Conservation Plan for Oroklini Lake as part of the project LIFE10NATCY716 Oroklini This After- LIFE Conservation Plan has been produced by the Game & Fauna Service as part of the project Restoration and Management of Oroklini Lake SPA (CY6000010) in Larnaca, which is co-funded by the LIFE financial instrument of the European Union www.orokliniproject.org Photographs: Game & Fauna Service, Ministry of Interior, 1453, Nicosia,

3 Contents page(s) 1. Introduction 4-5 I. LIFE Oroklini project.4-5 II. Conservation objectives 5 2. Prospects and needs of an After LIFE Conservation Plan.. 6-9 I.Management of the wetland ecosystem.6-7 II. Priorities of application of After-LIFE Conservation actions and measures....8 III. Climate change adaptation strategy in relation to wetland habitats..8-9 IV. Evaluation of WFD objectives for Oroklini lake...9 V. Oroklini project contribution to Natura 2000 network of.9 3. ANNEX 1- Financial outlook 10-12

4 1. INTRODUCTION The present document is the last deliverable (Action E.5) of the LIFE project Restoration and Management of Oroklini Lake SPA (CY6000010) in Larnaca, (LIFE10NATCY716), prepared as foreseen by European Commission and the project s proposal. This AfterLife report is largely based on actions drawn from the Action Plan produced during the LIFE Oroklini project. The main reason for the preparation of this plan was to set out how the conservation actions taken during the LIFE Oroklini project will continue to be implemented (and estimate their cost) in order to safeguard the long-term management of the site under a Favorable Conservation Status. Also this deliverable defines who is responsible for overseeing the implementation of each action. The abovementioned project was implemented within the framework of the LIFE program of the European Union. I. LIFE Oroklini project The LIFE Oroklini project (LIFE10NATCY716) for the restoration, conservation and management of the Oroklini wetland was implemented between 2012 and 2014, to address restoration and conservation issues, pressures and threats such as lack of water management and hydrological balance for the needs of the ecosystems and species, disturbance, restoration of an area where an illegal flea market (bazaar) used to operate, eradication ofinvasive alien species (IAS) of flora and lack of public awareness through a combination of research, direct conservation work and public awareness initiatives. Oroklini lake (area of 57 ha) has been classified as a Special Protection Area (SPA: CY6000010) under the Birds Directive (2009/147/EC; Fig. 2) for two Annex I bird species that nest in significant numbers: the Black-winged Stilt, Himantopus himantopus, (for which Oroklini Lake is usually the most important nesting site in ) and Spur-winged Lapwing, Vanellus spinosus, (for which has more than 50% of the EU breeding population).

5 Figure 1. The areas included within the Special Protection Area (red) and Site of Community Importance (blue) at Oroklini Lake. The Annex I species Stone curlew (Burhinusoedicnemus), Kentish plover (Charadriusalexandrinus), Common tern (Sterna hirundo) and Little tern (Sternula albifrons) also breed, or have bred at the site. In addition to these, 58 Annex I species visit during migration (in spring or autumn) or overwinter at the site, and there are also a 36 regularly occurring migratory species not on Annex I, especially waterbirds. In total, about 190 species have been recorded at the site. Red-crested Pochard Netta rufina nested successfully between 2009 and 2013; these were the first nesting records for the species on the island. Cattle egret nested successfully for the first time in 2014, with a colony of around 45 nests present in spring 2014.A slightly smaller area (53 ha) is also designated as a Special Area of Conservation (SAC: CY6000011) under the Habitats Directive for its halophytic marsh vegetation (Fig1. adopted from Action Plan for Oroklini SPA) and especially the protection of 5 different habitats types as well as the rare halophytic flora species Suaeda aegyptiaca and other species that depend on the wetland ecosystems. II. Conservation objectives(adopted from Action Plan for Oroklini Lake, 2014) 1. Maintain Special Protection Area (SPA) in favourable conservation status through maintenance of suitable breeding habitat for qualifying species and other key breeding species 2. Maintain presence of migratory and wintering populations of Annex I and non- Annex I species and maintain 53ha SCI halophytic marsh communities in favourable condition 3. Maintain presence of European eel (Anguilla anguilla) in open water areas 4. Build and maintain support for Oroklini Lake within the local community and with visitors

6 2. PROSPECTS AND NEEDS OF AFTER LIFE CONSERVATION PLAN I. Management of the wetland ecosystem will assure the future conservation of the ecosystem as a whole and their targeted species / habitat types. The objective of the After-LIFE Conservation Plan is to describe the way in which the partners of the LIFE Oroklini project are planning to continue to develop the actions that have been initiated throughout the project s duration. Hence, the ultimate purpose of the implementation of the plan presented here is the management of the wetland, the maintenance of its ecological function and structure and also the assurance of the long-term conservation of the targeted species / habitat types. The After-LIFE Conservation Plan illustrates: The foreseen After LIFE actions. The beneficiary who is responsible for the implementation of each After LIFE action. All efforts and actions implemented following the project s completion should be solid and responsible, as were all activities during the project s implementation. For the conservation and management of Oroklini Lake, the After LIFE Conservation Plan consists of three parts: A. Administrative part. B. Monitoring and management part. C. Dissemination and public awareness part. A. Administrative part The implementation of critical administration activities regarding Decrees of the SPA and SAC. Hence, the administration needs are the following: Enforce the legal status of SAC and SPA: Based on the Decree, designation of the area as Special Area of Conservation (SAC) and implementation of management plans for the conservation of biodiversity of the wetland. The Department of (DE) and Game & FaunaService (GFS) are the responsible authorities for implementing Nature Directives. Responsible Beneficiary: DE& GFS Timeline: Implementation within five. Management of the wetland s infrastructure: The establishment of actions was carried out in different phases during the project s implementation. These elements (fencing, signs, pathway, bird hides and notice boards) which define the site need to

7 be maintained after the end of the project. For this, the maintenance of the pathways, notice boards and signs must be carried out once every year. Responsible Beneficiary: DE and GFS Timeline: Implementation for five. B. Monitoring and management part The implementation of specific monitoring and management measures will ensure and further improve the conservation status of the targeted species and habitat types. The long-term monitoring and management measures are due to contribute towards conservation in the long term, after the end of the project. All monitoring and management activities will be carried within SPA and SAC sites (all management/conservation/monitoring actions are shown in table in Annex I). C. Dissemination and public awareness part The promotion of greater public awareness on the importance of the conservation of targeted species and habitats and on the EU conservation policies. Besides, one of the most important aspects of the role of protected area is to show the necessary conservation work itself, the information and the results produced from this work should be communicated to large parts of the society. The LIFE Oroklini project adopted this approach through numerous activities in this direction, such as: printing of information materialand distributing this to several target groups, organized workshops and participating in scientific conferences. In addition, the project encouraged the participation of local people and other stakeholders in the design and implementation of conservation activities. Both dissemination and public awareness activities are implemented during the After-LIFE period, through: Public information: Dissemination of project s objectives and their results will continue to be presented in the project s website which will be active for at least five after the project s end date (http://www.orokliniproject.org/en/home). The website has been operating since the beginning of the project (July 2012) and has been constantly updated. This website will keep operating for up to five (following the LIFE+ program completion) and it will be a significant dissemination tool for the project s results and deliverables. In this way, these results and deliverables will be available for future research related to the wetland ecosystem concept and for the conservation issues of target species and habitat types. Public awareness and environmental education: An important achievement of the project is its link with the academic and education system of the island. Thus, an Educational Kid-was developed. A visitor information flier was produced and was promoted through Tourist Organization (CTO) to tourists and visitors.

8 Visitations form schools increased significantly since the beginning but also after the completion of the LIFE project. Activities will be continuous, in order to increase the public awareness on nature conservation and issues on biodiversity in. Responsible Beneficiary: DE Timeline: Implementation for five. II. Priorities of application of After-LIFE Conservation actions and measures For an SPA site to be considered to be in a favourable conservation status, the bird species of Annex I of the Birds Directive, or regularly occurring migratory species in that site, must achieve a predetermined favourable reference value (FRV).In order to achieve FRVs for the target species at Oroklini Lake SPA, the following conservation measures and monitoring actions must be carried out and utilized: 1. Bird monitoring that includes monthly countsandnesting waders monitoring where annual productivity will be estimated; 2. Predator control on fox and hooded crow numbers (for 2015-2016), combined with monitoring of nest success with wildlife cameras; 3. Monitoring of water control features in order to ensure their proper function; 4.Monitoring water levels for the benefit of birds, and the whole ecosystem s hydrological balance for the favourable conservation status of the habitats and the species; and 5.Monitoring the Ichthyofauna of Oroklini with special attention on eel population. In addition to the above, infrastructure monitoring and regular maintenance will be carried out(for the birdwatching hide and Information kiosk, fence and gates, water control structures - signs of illegal entry and vandalism, poaching, keep record of visitors). The wetland ecosystem will be maintained for its habitats types and will be monitored every 2, thus restored habitats(islets features) will be maintained in such a way to ensure that the target species favorable conservation status will be achieved. Potential threats such as bird collisions with electricity wires, dumping of refuse, regeneration of IAS will also be monitored and controlled. III. Climate change adaptation strategy in relation to wetland habitats climate, the extreme Mediterranean type with long dry periods and unpredictable rainfall with a downward trend, necessitates the planning of a water management strategy regarding the conservation of the very few, existing wetland habitats and the species they support. Prior to 2012, Oroklini wetland faced a number of threats especially related to water management and hydrological balance of the ecosystems structure and function. Through the LIFE Oroklini project the S3 compartment (north) of the wetland is able to hold water for a longer period and

9 especially throughout the most important for breeding waders season: spring-to early summer. Water management allows control of extreme events, especially with regards to spring flooding. Proper operation of water control structures allows drawing down water levels to avoid destruction of nests, as it was well documented in the past. These flooding threats have been dealt with through water management actions implemented during the LIFE Oroklini project. The relevant works carried out during the project s duration (mainly the restoration of the weir, part of the embankment, installation of 2 water control structures, creation of islets and ditches to increase safe nesting sites and feeding areas for waders) will safeguard the existence of the optimum quantity of water at such level in order to meet the conservation objectives for improved nesting of the target species at the highest degree possible (in order to achieve FRVs). In case of extreme drought the action plan prepared as part of OROKLINI LIFE project, provides for a study to investigate the feasibility of using treated or other water as currently the inflow cannot be controlled, i.e. cannot be increased in case of drought. IV. Monitoring under the objectives of the Water Framework Directive (WFD) Compartment S3 of Oroklini Lake has been included in the water bodies monitored by the Water Development Department (WDD), under WFD. This will be carried out once a month by the WDD. The other compartments (S6 and S7) have not been included because they are seasonal. V. Project Contribution to NATURA 2000 Network Orokliniproject, mostly through its conservation actions can be a Model project for other important wetlands. The project, through its many actions has raised awareness for the NATURA 2000 Network in the active community of Oroklini, which actively participated in project actions. The project contributed significantly in the conservation of 2 important wader species, Oroklinibeing one of the most important breeding sites of V.spinosus and H.himantopus. Estimated budget 115.550 for the next 5-year period (Annex I for detail breakdown)

10 ANNEX I - Financial Outlook Action Time frame estimated annual cost estimated cost for a 5- year period Beneficiary Action 1: Vegetation management 1.1 control of reeds from expanding to the detriment of native vegetation and breeding waders nesting habitat once 800 4.000 Εnvironment Department/ BirdLife 1.2 Preservation of embankment through rotational removal and trimming of Tamarisk once 500 2.500 Εnvironment Department / BirdLife 1.3 Conservation of small dam and removal of blocking vegetation Once every 2 500 every 2 1.000 Εnvironment Department / BirdLife 1.4 Removal of vegetation from islets, canals and ditches once every 5-1000 Εnvironment Department / BirdLife 1.5 Reed management and control in catchment area 1.6 Removal and control of IAS of flora 1.7 Conservation and management of native vegetation planted along the fenced perimeter of the lake once once every 2 once every 2 800 4.000 1000 every 2 1000 every 2 Εnvironment Department / BirdLife 2.000 Forestry Department 2.000 Forestry Department

11 2.1 Maintenance and operation of water control infrastructure Action 2: Water management twice and when needed 500 2.500 beneficiary Department / Game & Fauna Service / BirdLife Action 3: Conservation and protection of avifauna beneficiary 3.1 preservation of small ponds, ditches with water Once 500 2.500 Department / Game & Fauna Service / BirdLife 3.3 Removal of garbage from the lake area once 1.200 6.000 VCC 3.4 a. Production of pollution prevention protocol b. Staff training in dealing with hazardous situations such as reaction and containment of oil spills in the lake c. community awareness for minimizing risks of potential chemical/oil pollution and fertilizer run-off in the lake Action 4: Monitoring 5.000 Department beneficiary 4.1 Monitoringofavifauna 4.2 Productivity estimation of key waterbird species breeding at the site and predation impact 4.3 Monthly waterbird counts, monitoring of conservation actions(including bird collisions on electricity cables crossing the wetland) monitoring once Once monthly for 5 770 3.850 GFS &BirdLife 5.000 5.000 GFS &BirdLife 6500 32.500 GFS &BirdLife

12 4.4 Monthly monitoring of predators (nocturnal and diurnal) 4.5 Water level and salinity monitoring monthly for 5 2.640 5 500 2.500 13.200 GFS Department &WDD 4.6 waterqualitymonitoring 4.7 Mapping/updating habitat map and vegetation monitoring 5.1 Feasibility study for the possibility of using treated or other water in extended drought periods and in with extreme drought 4 times for 5 once every 2 Action 5: Research 600 3000 Department and WDD 1.000 2.000 Department 5.000 5.000 5.2 Study of the possibility of releasing the native fish species Aphanius fasciatus in Oroklini wetland 4.000 4.000 5.3 Study on the impact of potential agrochemical flow from 3000 nearby agricultural areas 5.4 Study on the potential impact of mosquito spraying in the wetland 4.000 Action 6: Public awareness 6.1 Infrastructure maintenance (fence, birdhides) 6.2 Public awareness campaigns (bird watching events, volunteer wetland area cleanup, etc) beneficiary Department and Water Development Department WDD Department Department Department Once a year 1.000 5.000 VCC variable - - All project partners