TRISO-SUPER 10 Installation Guidelines

Similar documents
SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

Multi-layer Insulation Blanket for

Multi-layer Insulation Blanket for use in Roofs

June Non - Residential Refurbishment Pitched roofs - rafter level

June Residential Refurbishment Pitched roofs - rafter level

August 2008: Issue 1. Non - Residential New Build Pitched Roofs - Rafter Level

Multi-layer Insulation Blanket for Roofs

Multi-layer Insulation Blanket for Roofs, Walls & Floors The Highest Performing Certificated MultiFoil on the Market

To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call From outside the UK Call

Pitched roofs rafter level

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

Multi-layer Insulation Blanket for

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

Installation. Openings: Valley: Installation on timber roofs (new buildings) 1. Fit a support (noggins) around the opening.

GV Standard PitchVent

GV Standard Pitchglaze

Roll-Fix Kit The complete dry hip kit RFIG

Installation guide for 20/20

NEW equinox INSTALLATION GUIDE Issue

TECHNICAL BULLETIN 28

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

NEW equinox INSTALLATION GUIDE Issue

video 10 YEAR GUARANTEE Durable and lightweight Guaranteed waterproof for 10 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

15 YEAR GUARANTEE. Tough and long lasting Guaranteed waterproof for 15 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

SUPER-UNDERLAY SHEET

Guardian warm roof conversion system. Installation Guide

SANERI 3 º. Self-adhesive SBS-elastomer bitumen cap sheet

Standard Details. Glosford Timber Solutions Ltd. Homer Road Hereford HR4 9BP

Installation guide. Step-by-step instructions

PROFESSIONAL PITCHED ROOFING ANCILLARIES

Shingle Installation Guide

Acceptable Standards of Domestic Construction

Special Roofs and Vertical Slating

manthorpe Roll-Out Dry Fix Ridge System building products Fixing Instructions MBP 8265e

Three layer Felt Roofing using cold applied adhesive

INSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

Dry Verge System. For more information on CEMEX visit

BRACING BRACING SECTION 7 SECTION 7

ROOFING DESIGN AND FIXING GUIDE

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Polytegola N. Bitumen Roof shingles. Application guide

Installation Guide GRP Dormer

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

Installer s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS

Installation Manual. Future Roof Shingle / Slate Products

Glidevale eaves ventilation

Basic Fitting Details No. 1

FOREWORD HARMONY TECHNICAL SPECIFICATIONS

equinox INSTALLATION GUIDE Issue CONTENTS If in doubt at any stage BE SAFE WHEN WORKING AT HEIGHT

The stylish light weight bitumen shingle tile strip roofing system Design and installation manual

How-To-build guide Garden shed

INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4

8x8 Shed Plans and Building Guide

TYPICAL BARGE DETAIL - CROSS SECTION

AS TESTED TBA FIREFLY TBA FIREFLY BAL-FZ BUSHFIRE ROOF SYSTEM INSTALLATION GUIDE EASY TO INSTALL EASY TO CARRY EASY TO TRANSPORT

50948-RHN Putney. 06 January This document includes: Aluminium strip/ sheet coverings/ flashings 1. Code Section Revision Dated

BUILDERS RESPONSIBILITY

Certificate No: EW560

CSR ROOFING ARCHITECTURAL MANUAL INTRODUCTION

BBA BRITISH BOARD OF AGREMENT CERTIFICATE NO. 87 / 1823 / C

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details

HOW TO Fix Onduline Corrugated Bitumen Sheets

technical datasheet Eaves Protector Stainless Steel Polytop Fixings 2 x 600mm Centres Eaves Protector

Sandtoft installation guides

GLOSSARY OF TERMS SECTION 8

10x10 Shed Plans and Building Guide

Installation Instructions

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

2 Fibre cement slates fixing guide

COLORBOND steel clad. Details for bushfire-prone AS BAL-FZ sites

ISSUE Erection Manual

Inspire Aledora Slate Application Guidelines

Insuvent Designed to ensure ventilation in existing roofs when insulation quilts are installed

installation guide Villa

Brava Old World Slate Installation Guide

HILAND TRAY FORM AND FUNCTION MATERIAL SPECIFICATIONS DESIGN GUIDE ROOFING I WALLING

12x12 Shed Plans and Building Guide

Cladding. Quick Installation Guide. HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable.

6x6 Shed Plans and Building Guide

Egger Roofing Board Fast, Easy, Safe: With this board you can reach the top.

Stone coated steel roof tile INSTALLATION GUIDE

Installation Instructions

Recommended Slating Tools

Posi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system

Instructions for Installation on a Pitched Roof LIGHTWAY optical tube LW 260, LW 320, LW 520, LW 760

Glidevale eaves ventilation

Roofs SECTION. Contents for this section: Components and Elements of Roofs

ALPINE TRAY. To get the best from this product please follow these recommendations.

The Leka System Installation Guide

Unless otherwise directed, traditionally cast lead sheet is required.

Roofs. Installation instructions Models Monterrey and Elite

BARDOLINE INSTALLATION INSTRUCTIONS

HipMaster Installation Instructions

Transcription:

V 2007 ACTIS THIN MULTIFOIL INSULATION Installation Guidelines ROOFS ATTICS

2 Contents Technical characteristics 2 Essential rules of installation 3 Over rafter installation 4 Under rafter installation 6 Boarded roof and sarking board roof installation 8 Wall installation 10 Appendix 1 - Installation around roof window - under rafter installation 12 Appendix 2 - Installation around roof window - over rafter installation 13 Appendix 3 - Installation around a chimney 14 Appendix 4 - Installation at a dormer wall detail 15 Technical Characteristics THERMAL EFFICIENCY: U-value* = 0.19W/m 2.K *Thermal effi ciency measured under real conditions by TRADA Technology Ltd. and equivalent to 210mm of mineral wool as certifi ed by BM TRADA Certifi cation Ltd. For more information on testing under real conditions and the equivalence of performance of this product with 210mm of mineral wool please see the Special Notice on page 16 of this brochure PRODUCT DESCRIPTION 19 components: Number of refl ective fi lms: 8-2 external refl ective fi lms with reinforcing mesh Surface weight: 600g/m 2-3 wadding layers Thickness: 30mm approx. - 8 foam layers - 6 internal refl ective fi lms MECHANICAL PROPERTIES VALUE REFERENCE STANDARD Breaking strength Warp >500N ISO 13934-1 Weft >400N Tear strength Warp >60N ISO 13937-2 Weft >60N PACKAGING 10m 2 20m 2 Width 1.60m 1.60m Length 6.25m 12.50m Weight (per roll approx.) 7kg 14kg Building Insulation Products Certifi cate Number 0102

ESSENTIAL RULES OF INSTALLATION 3 Tile batten 1 2 Battens - 25mm min. Roof board Rafter Air void maintained Air void of 25mm or 50mm depending on membrane 1. Ensure an air gap of 25mm minimum on either side of the insulation. 2. Ventilation: Vapour permeable underlay: ensure an air gap of 25mm minimum between the insulation and membrane. The membrane should have a vapour resistance less than 0.25MNs/g. Felted Roof: Ensure an air gap of 50mm minimum between the insulation and the felt, with ventilation from eaves to ridge according to British Standards. 3. 4. 5. 6. Pull the insulation taut and staple every 50mm to the rafters or timber support using galvanised staples, 14mm minimum. 20mm stainless steel staples are recommended. Overlap the insulation 50-100mm at each joint and staple every 50mm onto the rafter or timber support batten. Cover all joints with ACTIS ISODHESIF tape to give an air tight fi nish. Fold all fi nishing edges under by 50mm minimum, staple every 50mm, and secure with a fi nal batten Rafter 5 ACTIS ISODHESIF tape 6 50mm return Staple - 14mm galvanised ACTIS ACCESSORIES: ACTIS ISODHESIF tape ACTIS CUTTER

4 is suitable for use in an over rafter application giving a continuous layer of insulation across the roof creating a more air tight section. 1. 2. 3. 4. 5. 6. 7. Measure 1500mm from the eaves (A), to (B), and fi x timber support (as noggin) between the rafters. Continue to fi x timber supports every 1 500mm as appropriate. Lay insulation horizontally starting at the eaves. Fold exposed edge over and staple to timber support every 50mm. Fix next layer of insulation overlapping edges 50 100mm. Staple to timber support every 50mm and seal with 100mm ACTIS ISODHESIF tape. At verges or gable, fold over insulation and staple to prevent air ingress. Visually inspect installed insulation to ensure the fi nish is as air tight as possible. Fix counter batten (38x25mm) with nails or screws. Install vapour permeable underlay to manufacturer s specifi cations. 8. Fix tile batten to suit. timber support (as noggin) 1 2 3 Appendices 1-4 show further installation instructions for specifi c details. insulation can be used for walls around pitched roof installations such as dwarf walls, dormer walls and gable ends, as long as these constitute less than 40% of the overall insulated area. Building Insulation Products Certifi cate Number 0102

OVER RAFTER INSTALLATION 5 Masonary cavity wall construction Roof covering 38x25mm counter timber batten Vapour permeable underlay Eaves profile Halfround gutter insulation sandwiched between 38x25mm horizontal batten and 38x25mm noggin to provide air seal at base of rafter Mineral wool or friction fit polystyrene insulation to reduce cold bridging Fascia & soffit board 12.5mm vapour controlled plasterboard with taped and filled joints Prefabricated or made up roof trusses Universal ridge or dry ridge system (other ridge systems are compatible) Roof covering Vapour permeable underlay Tiling battens insulation with lap over ridge and taped joint to finish 38x25mm counter timber batten in line with rafters

6 Under rafter installation is suitable for under rafter application. 1. 2. 3. Fix timber supports (as noggin) (A) and (B) between the rafters at collar/roof junctions. Continue to fi x timber supports every 1500mm as appropriate. Install secondary insulation, for example mineral wool or PIR foam between roof collars, to achieve Part L compliance, aligning a 25mm air gap to the underside. Lay across the face of the rafters, fi xing in a continuous layer from timber support (A), through (B), to (C). Staple in place every 50mm keeping insulation as taught as possible. 4. Fix next layer overlapping insulation by 50 100mm. 5. Staple the insulation to timber support and seal with 100mm ACTIS ISODHESIF tape. 6. Ensure all exposed ends of insulation are folded to stop air ingress. 7. Visually inspect installed insulation to ensure the fi nish is as air tight as possible. 8. Prepare for plasterboard by fi xing horizontal or vertical battens (38x25mm) using nails or screws, through the ACTIS insulation to the rafter. 9. Fixing vapour controlled plasterboard is recommended. Base of collar Secondary insulation timber support Appendices 1-4 show further installation instructions for specifi c details. insulation can be used for walls around pitched roof installations such as dwarf walls, dormer walls and gable ends, as long as these constitute less than 40% of the overall insulated area. Building Insulation Products Certifi cate Number 0102

UNDER RAFTER INSTALLATION 7 Roof covering Rafters Vapour permeable underlay Tiling battens insulation pulled taut to maintain air gap to plasterboard 12.5mm vapour controlled plasterboard 38x25mm timber batten fixed in line with rafters Roof covering Tiling battens Vapour permeable underlay Rafter insulation pulled taut to maintain 19mm air gap to plasterboard 12.5mm vapour controlled plasterboard 38x25mm timber batten fixed in line with rafter Ventilation at eaves and ridge

8 Over rafter installation - boarded roof 1. Fix counter battens (38x45mm) in-line with rafters. 2. Fix horizontal batten (38x45mm) at eaves. 3. Measure 1500mm from eaves batten and fi x timber support (as noggin) between cross battens. Continue to fi x timber supports every 1500mm, as appropriate. 4. Install insulation horizontally starting at the eaves. Fold exposed edge over and staple to timber support. 5. Visually inspect installed insulation to ensure the finish is as air tight as possible. 6. Fix counter batten (38x25mm) with nails or screws in line with rafters. 7. Fix vapour permeable underlay to manufacturer s specifi cation. 8. Fix tile battens to suit. Roof covering Tile batten VPU Counter batten Staple- 14mm galv min. Boarded roof Rafter Over rafter installation - Sarking board 1. Fix horizontal batten (38x45mm) at eaves. 2. Measure 1500mm from eaves batten and fi x timber supports (as noggin) between cross battens. Continue to fi x timber supports every 1500mm, as appropriate. 3. Install insulation horizontally starting at the eaves. Fold exposed edge over and staple to timber support. 4. 5. Visually inspect installed insulation is as air tight as possible. Fix counter batten (38x45mm) with nails or screws in line with rafters. 6. Fix sarking board as required. 7. Fix vapour permeable underlay to manufacturer s specifi cation. 8. Fix slate tiles. Roof covering VPU Sarking board Counter batten Staple- 14mm galv min. Rafter Building Insulation Products Certifi cate Number 0102

BOARDED AND SARKING BOARD ROOF INSTALLATION 9 Boarded roof Universal ridge or dry ridge system (other ridge systems are compatible) Roof covering Vapour permeable underlay Tiling battens insulation with lap over ridge and taped joint to finish 38x25mm counter timber batten @ 600mm crs 38x45mm counter timber batten @ 600mm crs 22mm T&G boarding Sarking board roof Fireclay or zinc ridge Slated roof finish Vapour permeable underlay insulation with lap over ridge and taped joint to finish 22mm softwood sarking boards 38x45mm timber batten in line with rafters

10 insulation can be used for walls around pitched roof installations such as dwarf walls, dormer walls and gable ends, as long as these constitute less than 40% of the overall insulated area. (Please contact Local Building Control for guidance on a project specific basis). Masonary walls 1. Fix horizontal or vertical batten (38x25mm min.) to wall at 500mm centres, inserting felt packers to ensure air circulation. 2. Fix horizontal batten (38x25mm min.) at ceiling and fl oor junction. 3. Lay insulation vertically stapling every 50mm with 14mm (min.) galvanised steel staples. Cut insulation 100mm longer at ceiling and fl oor allowing insulation to be clamped by second batten. 4. Overlap 50 100mm on batten and tape joints with 100mm ACTIS ISODHESIF tape. 5. Fix horizontal batten (38x25mm) at ceiling and fl oor clamping insulation to fl oor and ceiling and creating air tight seal. 6. Fix vertical batten (38x45mm min.) at 600mm (max.) centres. 7. Fix vapour controlled plasterboard. Timber batten - horizontal Packers - felt Timber batten - vertical Timber batten - horizontal Staple - 14mm galvanised Plasterboard Masonary wall Timber frame walls 1. Fix vertical or horizontal support batten to timber frame at joint positions of insulation. 2. Fit insulation horizontally stapling every 50mm. Cut insulation oversized at fl oor and ceiling allowing insulation to be clamped by the second batten. 3. Overlap 50 100mm on batten, staple using 14mm galvanised staples, and tape with ACTIS ISODHESIF tape. 4. Fix horizontal batten (38x25mm) at ceiling and fl oor clamping insulation to fl oor and ceiling creating an air tight seal. 5. Fix vertical batten (38x25mm). 6. Fix vapour controlled plasterboard. Plasterboard Timber batten - vertical Staple - 14mm galvanised Timber frame panel Masonary wall

WALL INSTALLATION 11 38x45mm vertical rails at 600mm c/c with 50mm oval nails nailed through TS10* and horizontal rails Block inner leaf 12.5mm vapour controlled plasterboard 50mm air cavity screwed to verticals with 30mm dry wall screws 1500mm 50mm air cavity Brick outer leaf taken down to meet TS10 in floor & taped joint with 100mm foil tape over 50mm overlap Cavity tray & 10mm weepholes 25x45mm horizontal rails with DPC 22mm T&G V313 chipboard flooring DPC 150mm minimum above ground 33x45mm cross battens TS10 (lapped up wall to vertical TS10) 33x45 cross battens with DPC 150mm thick concrete floor slab with 10mm fibreboard perimeter expansion Lean mix cavity fill DPM lapped under wall DPC 50mm sand blinding on layers of compacted hardcore * TS10 -

APPENDIX 1 12 Installation around a roof window - under rafter installation Roof window head Vapour permeable underlay lapped over tilting fillet and roof window flashing Vapour permeable underlay lapped over tilting fillet and roof window flashing 38x25mm counter timber batten Roof window cill Roof window flashing as approved by window manufacturer Roof window flashing as approved by window manufacturer Double glazed roof window insulation with 38x25mm horizontal timber batten to provide air seal and pulled taut to maintain air gap to plasterboard Vapour permeable underlay Tiling battens Cavity filled with mineral wool or friction fit polystyrene insulation to reduce cold bridge Roof window jamb Trimmer for roof window insulation with 38x25mm horizontal timber batten to provide air seal and pulled taut to maintain air gap to plasterboard 12.5mm vapour controlled plasterboard Building Insulation Products Certifi cate Number 0102

APPENDIX 2 13 Installation around a roof window - over rafter installation Roof window head Roof window head vapour permeable underlay lapped over tilting fillet and roof window flashing 38x25mm counter timber batten Cavity filled with mineral wool or friction fit polystyrene insulation to reduce cold bridge Roof window flashing as approved by window manufacturer Roof window cill Roof window flashing as approved by window manufacturer Double glazed roof window insulation sandwiched between 38x25mm horizontal batten and 38x25mm noggin to provide air seal at roof window Vapour permeable underlay Tiling battens Cavity filled with mineral wool or friction fit polystyrene insulation to reduce cold bridge Roof window jamb Trimmer for roof window insulation sandwiched between 38x25mm horizontal batten and 38x25 noggin to provide air seal at roof window 12.5mm vapour controlled plasterboard

APPENDIX 3 14 Installation around a chimney Code 5 lead flashing stepped around chimney and dressed into raggles and dressed over 150mm plywood plate shot fired to blockwork Bold roll interlocking roof tiles Vapour permeable underlay insulation sandwiched between 38x25mm horizontal batten and 38x25mm noggin to provide air seal at chimney Timber rafter with trimmer around chimney Tilting fillet & flashing Tiling battens 12.5mm vapour controlled plasterboard Rigid friction fit non combustable insulation to reduce cold bridging 38x25mm counter timber batten Building Insulation Products Certifi cate Number 0102

APPENDIX 4 15 Installation around a dormer window detail Vapour permeable underlay 38x25mm in-line timber batten Eaves profile Halfround gutter insulation sandwiched between 38x25mm horizontal batten and 38x25mm noggin to provide air seal at base of rafter Fascia & soffit board Fascia & soffit board mineral wool or friction fit polystyrene insulation to reduce cold bridging 25x45mm timber batten External finish (linings or composite board) Breather membrane 100x50mm dormer frame Insulation as required - see wall detail for fixing of in this application 9mm plywood skin 12.5mm vapour controlled plasterboard with taped and filled joints For any application not shown in this document please contact our technical support team on 01249 446 123 or visit www.insulation-actis.com

INSTALLATION TIPS Fire precautions Never expose to a direct heat source, sparks or a naked fl ame. Chimneys inserts and heat exchangers Never use to insulate a chimney fl ue, an insert or heat exchanger. Use a Euroclass A2 s1 d0 non-combustible insulation in accordance with British Standards. Finishes As recommended by current regulations do not leave insulation exposed in habitable rooms. Cover with a fi reproof fi nish such as plasterboard. Soldering Keep blow torch well away from, even when using a fl ame guard, and make sure that hot debris and sparks do not make contact with the insulation. Direction of laying ACTIS insulation materials It is recommended that strips are laid horizontally but they can also be laid vertically, depending on the characteristics of the area to be insulated. may be laid either side up without affecting the effi ciency of the insulation. Staples We recommend using galvanized or stainless steel staples, 14mm minimum. Contact between materials Avoid all contact between the insulation and lead, copper and its alloys. Please contact ACTIS for more specifi c advice. Television aerials It is advisable to have an external television aerial when using. Storage should be stored under cover and protected from the elements. Beware of the sun Once installed should not be left exposed to weathering for more than 3 days. When laying ACTIS insulation materials outside, protect eyes by wearing sunglasses, and protect against sunburn. SPECIAL NOTICE Thermal effi ciency is carefully measured in-situ under real weather conditions by the independent testing body TRADA Technology Ltd. The performance of the is compared to that of traditional mineral wool insulation materials tested concurrently and in identical conditions. This testing is strictly supervised and certifi ed by BM TRADA Certifi cation Limited (Certifi cate no. 0102 dated 3 April 2006). There are currently no ISO and BS EN testing standards which are appropriate for innovative multifoil insulation products. Under the current legislative framework in England and Wales, Local Authority Building Control Bodies have the discretion to accept independent certifi cation for insulation products, such as that provided for this product by BM TRADA. We strongly advise that you seek confi rmation of this approval from your local Building Control Body before installing the. In situ testing gives a more accurate measurement of the actual performance of multifoil products than the guarded hot-box test method, which is designed to test bulk insulation products, and is conducted in a controlled static laboratory environment. A hot-box measures heat transfer primarily by conduction, and does not take correctly into account heat transfer by radiation, which is the function of multifoil products. The European Directive of Building Products includes a procedure which allows for the creation of new standards for innovative products, the Request for European Technical Approval (ETA). ACTIS have made an ETA request for thin multifoil insulation products to the European Organisation for Technical Approvals (EOTA, the European body responsible for conducting this process). The aim of this request is to establish a new standard for assessing the thermal performance of thin multifoil insulation, based on the in situ test methodology defi ned by BM TRADA, with a view to achieving CE marking for these products. Copyright ACTIS Insulation Ltd 2007. All rights reserved. Distributor details ACTIS INSULATION LTD. Unit 1 Cornbrash Park - Bumpers Way Bumpers Farm Industrial Estate - Chippenham Wilts - SN14 6RA Tel. 01249 446 123 / Fax. 01249 446 345 Email: solutions@actis-isolation.com www.insulation-actis.com Ref: PZ182 (09/2007) - RCS Carcassonne 333 296 887 -