Installation Instructions For TruLine 1.6A 24VDC

Similar documents
Installation Instructions for TruLine 1.6A 24VDC. Section One: Basic Configuration Options

Installation Instructions for TruLine 1A Center Feed Power Channel Connector

Installation Instructions For Reveal

Installation Instructions for DIY or Completed Light Channel.6 Millwork

SLOT INSTALLATION GUIDE Indoor IP20

Installation Instructions for DIY or Completed 45 Degree Light Channel

Inde-Pendants Family. 32L Ring Plaster Trim, Grid and Drywall Ceiling Types. Document No Installation instructions for 32L-Rxx-P

Installation Instructions For Reveal Light Channel

Installation Instructions for Zip Suspension Downlight with Remote Power and 4" Square or Round Canopy

Inde-Pendants Family. 32L Surface Mount Cylinder with Ring Plaster Trim, Grid and Drywall Ceiling Types. Document No

Connecting the Channel A

Inde-Pendants Family. 32L Surface Mount Cylinder Plaster Trim, Grid and Drywall Ceiling Types. Document No

C 0.05" ALLEN WRENCH. Installation Instructions for Cirrus Channel Suspension T1 with 4" Square or Round Canopy. Section One: Adjusting Cable Position

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

Installation Instructions For Aurora Dual MR16 Round & Square Edge 3.3" Fig.1 Complete Fixture ADJUSTABLE GEARS HIDDEN BEHIND THE LAMP PAN LOCK

INSTALLATION INSTRUCTION Indirect Recessed Channel

Installation Instructions for Cirrus Suspension Downlight with Power - End Feed. Section One: 4" Flush Canopy Version

SURFACE CLIP MOUNT. 1 Insert lens into channel, measure, and cut to length. Remove lens cover from channel. surface. Attach lens cover and end caps

Lightplane 3.5 Recessed

Installation Manual MODEL ANE-42

Assembly Instructions

Installation Instructions Standalone or continuous run configurations - 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS

Multiples EM_ 1.4. Install 1X1/1X2/1X3/1X4 Housings. Installation Instructions for. This product is suitable for indoor locations.

Install the Housing. Installation Instructions for Entra Round or Square Type IC, Air-tight New Construction Adjustable LED Housing EN3_-LH9_ 1.

Installation Manual MODEL NE-42

compile system INSTALLATION GUIDE Updated January 2019

Joiner Kit Joiner bracket (x1) Biscuit aligners (x2) Trim Flange

Dura-Lock Roof System

Installation Instructions For Aurora Halogen Accent Housing 3 Round & Square Trimless AH1-ARE, AH1-ARB, AH1-ASE, AH1-ASB. Fig.

Installation Instructions For Aurora Halogen Accent Housing 3 Round & Square Trimless AH2-ARE3 & AH2-ASE3. Fig.1 Complete Fixture

Installation Manual MODEL AE-46

INSTALLATION INSTRUCTIONS FIXTURE SERIES: SAE 202 MOUNTING TYPE: RECESSED WALL / SLOT PAGE: 1 OF 8

- 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS. Factory pre-installed mud flange TOOLS REQUIRED: Phillips screwdriver, 5/16 nut driver.

Installation Manual MODEL E-42

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Mount to the Wall INSTALLATION MANUAL

Low Headroom Rear Mount TorqueMaster

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

TrendWall Floor-To-Ceiling Panels Installation Instruction

RAIL 4 PERIMETER RP4D RECESSED T-BAR LED TELESCOPIC, INTEGRAL DRIVER

Instruction page index: Installation Instructions for Bosca Models BOS-XX-C-XX, & BOS-XX-S-XX. Page 1 of 5

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

Installing Fixture Using Remote Power Supply

All Terrain Flares 2014 Chevy Silverado

STYLE BAR & TONNEAU COVER INSTALLATION

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

LIGHT FIXTURES MUST BE COMPLETELY INSTALLED PRIOR TO CEILING CONSTRUCTION

BARN DOOR HARDWARE KIT

Figure A. Figure B. Figure C. Figure D

Stair Mounting Kit. Installing safety gates in modern homes can be very challenging, especially for stairs.

Assembly Instructions

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

WAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S

LINESSE LINEAR LUMINAIRE 3 RECESSED CV2424

Installation Instructions

AURORA HALOGEN ACCENT HOUSING 3 ROUND AND SQUARE TRIMLESS AH3-ARE3-RBG & AH3-ASE3-RGB INSTALLATION INSTRUCTIONS

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

INSTALLATION INSTRUCTIONS FOR FLUSH MOUNT FIXTURES

Installation Instructions For Aurora Halogen Accent Housing 3 Round & Square Trimless AH2-ARE3 & AH2-ASE3. Fig.1 Complete Fixture

HP-2 / HP-4 / HP-6 Ceiling to Wall Inside Corner Installation Instructions Overview

INSTALLATION INSTRUCTIONS FOR FLUSH MOUNT FIXTURES

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

SunTrackerTwo Preparation

JFI2089WTS Panel Dimension Guide 3/4 Overlay Panel Dimensions

MODELS: AE46, AE42, E46, E42, ANE46, ANE42, NE46, NE42

x2 1/4 (6mm) Floor Anchor

x2 1/4 (6mm) Floor Anchor

SAE of 7 "R" (REGRESSED) POSITION "S" (SHIELDING AT TOP) POSITION. Tools Required

Fortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

User Instructions Multiline Otter Scoreboard Caddy Assembly

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Ripple Hanger ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS - CEILING POWER TRAK, HANGER HOOKS AND RACKS I. CONTENTS CEILING POWER TRAK KIT

TRAILMATE METEOR ASSEMBLY MANUAL

INDIVIDUAL MOUNTING: T-Bar

INSTALLATION LOW HEADROOM EXTENSION. 1 Cutting Vertical Track. 2 Quick Install Jamb Brackets

The following instructions will guide you through the installation of your new vinyl railing.

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER R H

INSTALLATION AND CARE INSTRUCTIONS

FlowBar Architectural Linear Diffusers F L- 1 0 / F L-15 / FL-2 0 F L- 2 5 / F L-30 I NSTA LL AT IO N & OPER AT I ON M AN UA L

Assembly Instructions for model: VMPR1

Included in Hardware Kit. Jeep Cut-Out Fender Flare Set of 4 Set Part # Rev STEP 1 PRIOR TO INSTALLATION

Round or Square Type IC Wall Wash Housing with Lamp for Flangeless Trims

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

INSTALLATION INSTRUCTIONS

SINCE 1922 P UBLICATION N O

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

The following instructions will guide you through the installation of your new vinyl railing stair kit.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

QUANTUM 2 CIRCLE 24 Installation Instructions

Angled Side Flush with Panel Face

4 Position the Suntile to the x tile s position and mark the felt around the square box flange. Then remove the Suntile

Transcription:

2014 Pure Lighting. All Rights Reserved. Installation Instructions For TruLine 1.6A 24VDC INS# 902-TL1.6A-07 1718 W. Fullerton Ave Chicago, IL 60614 Tel: 773-770-1195 Fax: 773-935-5613 www.purelighting.com info@purelighting.com IMPORTANT INFORMATION - This fixture is wall or ceiling mount. - This instruction shows a typical installation. - Consult the configuration notes on Page 1 before beginning any installation. SAVE THESE INSTRUCTIONS! Section One: Basic Configuration Options Horizontal Configuration Horizontal installations are linear runs of channel beginning at a junction box and ending at a take-up box on a single surface. Runs can be up to 40' in length and the LED strip lays in the bottom of the channel. Horizontal installations are typically installed perpendicular to wall studs or ceiling joists. Where no stud/joist is present (or in a remodel installation) a mounting strap may be used to secure the channel to the drywall. Vertical Configuration Vertical installations are linear runs of channel beginning at a junction box and ending at a take-up box on a single surface. Runs can be up to 40' in length and the LED strip lays in the bottom of the channel. Vertical installations are typically installed between wall studs or ceiling joists. Cross-braced stud sections or mounting straps are suggested to provide additional support every 32". 1

Room-Wrapping Configuration STRAP TL1.6-RWM INSIDE CORNER Room-wrapping configurations are used for installations that join runs of TruLine 1.6 on multiple planes (like a ceiling and a wall) using miter-cut linear sections of channel. For room-wrapping installations, the LED strip will be installed in the bottom of the channel. STRAP LED (SHOWN IN RED) PLASTER LENS 2x4 LENS 2x4 DRYWALL DRYWALL SCREW Zig Zag Configuration 2x4 BRACE TAKE-UP LENS Zig Zag configurations are used for installations that join runs of TruLine 1.6 on a single plane (like a ceiling or a wall) using sections of channel joined by L connections or miter cut linear sections of channel. STRAP PLASTER 2x4 STRAP TL 1.6 For Zig Zag installations, the LED strip will be installed in the side of the channel, allowing the LED strip to follow the zig zag channel pattern. LENS LED (SHOWN IN RED) DRYWALL DRYWALL SCREW Section Two: Standard Horizontal Installation A B INSTALLATION PHILLIPS SCREW ADJUSTABLE BAR DIRECTION 1 BRACKET 1: Mount each adjustable mounting bar to one side of the junction box and secure them with the mounting brackets and two Phillips screws provided. ADJUSTABLE BAR 3 CONDUIT W/ LOW-VOLTAGE WIRES #8 SCREW NOTE: The adjustable mounting bars mount to studs that are spaced 13" to 24" apart. 2: Place the lips on the adjustable mounting bars against the studs. Secure the adjustable bars to the studs with the eight #8 screws. 2 2 3: Install conduit (if required by local electrial code) and run low-voltage power wires to the junction box.

C STARTER SECTION SECTION CUT LENS LENGTH TO TOTAL LENGTH NOTE: If cutting channel to length, ensure that the lens is also cut to match the total length of the installation. D 4: Cut a section of drywall where the junction box will be located using a 6" fixed jab saw or other appropriate tool. 6" FIXED JAB SAW 4 E 6 8 MARKING STRAP 6 5 2.25" WIDTH OF INSTALLATION 5: Mark the area where the channel will be located on the drywall using the junction box opening as a guide (MIN 2.25"). 6: Cut out the marked area using a "Dremel Multi-Max" or a 6" Fixed Jab Saw. 8: Mark the location of the studs to the drywall for future reference. NOTE: To install channel in a wall without standard-spaced studs, install perforated mounting straps every 32" behind drywall and secure using two drywall screws. Mark the location of any mounting straps to the drywall. F 9: Connect the red power supply (24VDC+) wires to each red power wire with a wire nut inside the junction box. 9 10 10: Connect the black power supply (24VDC-) wires to each black power wire with a wire nut inside the junction box. 11: Place the wire nut connections inside junction box. POWER WIRE 3

G FRAME 12 H JOINER BAR 13 12: Insert the joiner bars halfway into the channel trap door frame. Tighten the two #4-40 set screws on each joiner bar with a 0.05" Allen wrench. 13: Slide the other section of channel onto the joining bars and tighten the remaining #4-40 set screws with a 0.05" Allen wrench. END CAP 15 END CAP INSERT 14: Place both power connector into the end cap insert. 15: Slide the assembled end cap insert and power connectors into the end cap. 14 POWER CONNECTOR I FRAME 16: Insert the #4-40 Torx screws through the end cap holes and thread into the TruLine 1.6A channel. 17: Tighten the end cap to the channel using the provided T10 Torx screwdriver. END CAP 16 T10 TORX 17 J POWER FEED MARKING MARKING 18 ENDCAP 19 #6 SCREW #6 SCREW 18: Using the mark locations on the drywall, carefully make holes in the channel flange using the provided square drill with counter sink bit. 19: Secure the channel to the stud through the drywall with the #6 screws using the provided square recess bit. 4

K 20 ULTRA THIN DRYWALL TAPE 20: Apply ultra-thin drywall tape along edges of channel to prevent cracking of plaster after installation. L 12" COMPOUND KNIFE 21 PLASTER CONTRACTOR'S TAPE NOTE: Test the LED strip before any plaster work is done. NOTE: Cover the channel opening with blue contractor s tape before plastering. 21: Use a 12" compound knife for a smooth compound spread. Sand, paint, and finish the plaster and drywall before removing the blue contractor s tape. M 22: Remove the blue contractor s tape from the inside of the channel. Clean the channel surface with alcohol to remove any dust or debris before continuing. 23: Attach the trap door to the junction box using the #6-32 screw. #6-32 SCREW 22 23 N 24 SOFT TAKE UP EXCESS SOFT 26 POWER WIRE 25 PAPER BACKING 24: Line up the red wire side of the power connector with the +24VDC marking on the Soft Strip. Push the male connector of the Soft Strip into the female connector of the power cables. 25: Carefully remove the backing from the LED soft strip, making sure not to remove the tape from the soft strip. Firmly press down the adhesive portion of the soft strip onto the channel surface while removing the rest of the backing, making sure there are no air bubbles that can cause surface irregularities. 26: If required, trim the soft strip on the dashed cuttable section, place the excess soft strip inside the take up box (see inset). Ensure the entire length of the channel is covered with Soft Strip to avoid unlit areas. 5

O CORRECT 27 NOT INSTALLED CORRECTLY 27 27: Snap the lens back onto the channel. Ensure lens is fully seated. Section Three: Vertical Installation P VERTICAL ORIENTATION Q ADJUSTABLE BAR INSTALLATION DIRECTION 1 CONDUIT 3 PHILLIPS SCREW BRACKET 1: Mount each adjustable mounting bar to one side of the junction box and secure them with the mounting brackets and two Phillips screws provided. ADJUSTABLE BAR 2: Remove a knockout to install the power line conduit (if required by local electrical code. 3: Install the conduit and run the low voltage 24V DC power wires coming from the remote power supply to the junction box. 4: Refer to the instruction provided with the power supply along with the wiring diagram for proper wiring. R STARTER SECTION SECTION CUT LENS LENGTH TO TOTAL LENGTH NOTE: If cutting channel to length, ensure that the lens is also cut to match the total length of the installation. 6

S DREMEL MULTI-MAX DRYWALL T STRAP 5 INSTALLATION HEIGHT 9 10 10 DRYWALL SCREW 6 6" FIXED JAB SAW 2.25" 5: Mark the area where the channel will be located on the drywall. 6: Cut out the marked area using appropriate tools. 7: Install & finish drywall. 8: Install mounting straps behind the drywall (suggested spacing is every 32") by threading a drywall screw into the perforated material. 9: Place the mounting strap behind the cut drywall and rotate into place using the drywall screw as a handle. U SUPPORT BRACE 11 11 10: Secure the mounting strap to the drywall using two drywall screws. Mark the location on the drywall. Complete mounting, plastering, painting, and LED strip installation by following Steps 20 through 30 in Section One Section Four: Room-Wrapping Configuration V ASSEMBLED CUTAWAY VIEW OUTSIDE CORNER ALTERNATE VERTICAL INSTALLATION OPTION: 11: Install 2x4 support braces (suggested spacing is every 32") before installing and finishing drywall. INSIDE CORNER INSTALLATION NOTES Room-wrapping installations use LED strip bent 90 for inside or outside corner configurations. Channel sections will be miter cut on-site. 7

W CEILING X FRAME WALL END CAP INSTALLATION AREA T10 TORX 3 1 4 1: Install junction box and low-voltage power. 2: Measure and mark installation length. Cut out marked areas using appropriate tools. 3: Insert the #4-40 Torx screws through the end cap holes and thread into the TruLine 1.6A starter channel section. 4: Tighten the end cap to the channel using the provided T10 Torx screwdriver. Y Z CEILING INSTALLATION AREA WALL #6-32 SCREW 5 6 5: Install the assembled end cap and trap door frame to the junction box using the #6-32 screw.. 6: Measure installation length from inside edge of assembled trap door frame section to the ceiling. 7: Repeat measurement steps for additional sections to determine all required channel cut lengths. 8

Z1 Z2 LENS FRAME 9 11 JOINER BAR 10 8: Remove the trap door frame from the junction box. 9: Insert the joiner bars halfway into the channel trap door frame. Tighten the two #4-40 set screws on each joiner bar with a 0.05" Allen wrench. 11: Snap the lens into the assembled channel BEFORE marking and cutting. This ensures a good fit when installed. 10: Slide the other section of channel onto the joining bars and tighten the remaining set screws. Z3 MARK AT MEASURED LENGTH 12 12: Mark the assembled channel and lens lengths using the measurements taken in Steps 6 and 7. Z4 13 SIDE VIEW 13 45 45 13: Miter cut each section of assembled channel and lens to match the corner angle. In a 90 corner installation as shown, each channel section is cut at a 45 angle to form a complete corner. 9

Z5 STRAP Z6 15 DRYWALL 16 16 END CAP SCREW 19 END CAP INSERT 18 POWER CONNECTOR 17: Remove end cap from the cut channel section that will be mounted to the power junction box. 18: Place both power connectors into the end cap insert. 19: Slide the assembled end cap insert and power connectors into the end cap. 14: Install mounting straps behind the drywall (suggested spacing is every 32") by threading a drywall screw into the perforated material. 15: Place the mounting strap behind the cut drywall and rotate into place using the drywall screw as a handle. 16: Secure the mounting strap to the drywall using two drywall screws. Mark the location on the drywall. Z7 FRAME Z8 END CAP 20 T10 TORX #6 SCREWS 23 21 20: Insert the #4-40 Torx screws through the end cap holes and thread into the TruLine 1.6A channel. 21: Tighten the end cap to the channel using the provided T10 Torx screwdriver. 22: Using the marked locations on the drywall, carefully make holes in the channel flange using the provided square drill with counter sink bit. 23: Secure the channel to the studs/mounting straps through the drywall with the #6 screws using the provided square recess bit. 10

Z10 Z11 CONTRACTOR'S TAPE 12" COMPOUND KNIFE 25 PLASTER ULTRA THIN DRYWALL TAPE 24 25: Use a 12" compound knife for a smooth compound spread. Sand, paint, and finish the plaster and drywall before removing the blue contractor s tape. NOTE: Test the LED strip before any plaster work is done. NOTE: Cover the channel opening with blue contractor s tape before plastering. 24: Apply ultra-thin drywall tape along edges of channel to prevent cracking of plaster after installation. Z12 26: Line up the red wire side of the power connector with the +24VDC marking on the Soft Strip. Push the male connector of the Soft Strip into the female connector of the power cables. LED SOFT 28 27: Carefully remove the backing from the LED soft strip, making sure not to remove the tape from the soft strip. 28: Firmly press down the adhesive portion of the soft strip onto the channel surface while removing the rest of the backing, making sure there are no air bubbles that can cause surface irregularities. 27 26 POWER CONNECTOR 11

Z13 Z14 PAPER BACKING LED SOFT LED SOFT 30 31 TAKE-UP 29 31: If required, trim the soft strip on the dashed cutting lines. Place the excess soft strip inside the take-up box. 29: Continue removing the paper backing from the soft strip and installing along channel, pressing adhesive into place using ONLY a finger. 30: Bend the soft strip to match the installation corner. Ensure the entire length of the channel is covered with Soft Strip to avoid unlit areas. Z15 Z16 CORRECT 33 NOT INSTALLED CORRECTLY 33 32: Repeat Steps 26 through 31 to install the second LED soft strip to the channel. 33: Snap the lens back onto the channel sections. Ensure lens is fully seated. 12

Section Five: Zig Zag Installation Z17 INSTALLATION PHILLIPS SCREW ADJUSTABLE BAR DIRECTION 1 BRACKET 1: Mount each adjustable mounting bar to one side of the junction box and secure them with the mounting brackets and two Phillips screws provided. Z18 ADJUSTABLE BAR 3 CONDUIT W/ LOW-VOLTAGE WIRES #8 SCREW NOTE: The adjustable mounting bars mount to studs that are spaced 13" to 24" apart. 2: Place the lips on the adjustable mounting bars against the studs. Secure the adjustable bars to the studs with the eight #8 screws. 2 Z19 4 WALL 3: Install conduit (if required by local electrial code) and run low-voltage power wires to the junction box. Z20 6" FIXED JAB SAW 6 7 8 4: Mark the area where the junction box will be located on the drywall. 5: Install the drywall. 6: Cut out the marked areas to expose the junction box. 7: Insert the joiner bars halfway into the channel trap door frame. Tighten the two M4 set screws on each joiner bar with a 1.5MM Allen wrench. 8: Slide the other section of channel onto the joining bars and tighten the remaining M4 set screws with a 1.5MM Allen wrench. Z21 STARTER SECTION SECTION 9 LENS 9: Assemble the lens to the channel before cutting. Z22 LENGTH 10 45 FRAME LENS 11 10: Determine the channel length and cut channel and lens at a 45 angle from the outer corner. 11: Cut additional lens/channel assembly for the opposing 45 angle and any other corners as required for the installation. 13

Z23 12: Mark location of junction box. Cut out drywall to expose junction box using a 6" Fixed Jab Saw or equivalent tool. 12 6" FIXED JAB SAW Z24 STRAP 15 13 14 MARKING 13: Mark the area where the channel will be located on the drywall using the junction box opening as a guide (MIN 2.25" wide). 14: Cut out the marked area(s) using a Dremel Multi-Max or a 6" Fixed Jab Saw. 15: Mark the location of the studs to the drywall for future reference. 2.25" 2.25" NOTE: To install channel vertically or in a wall without standardspaced studs, install perforated mounting straps every 32" behind drywall and secure using two drywall screws. Mark the location of any mounting straps to the drywall. Z25 16: Connect the red power supply (24VDC+) wires to each red power wire with a wire nut inside the junction box. 16 17 17: Connect the black power supply (24VDC-) wires to each black power wire with a wire nut inside the junction box. 18: Place the wire nut connections inside junction box. POWER WIRE Z26 90 JOINER BRACKET 19: Insert the 90 joiner bracket halfway into the mitered channel corner. Tighten the two M4 set screws on each joiner bar with a 1.5MM Allen wrench. 19 14

Z27 Z28 90 JOINING BRACKET 21 TAKE-UP 20 20: Slide the other section of mitered channel onto the 90 joining brackets and tighten the remaining M4 set screws with a 1.5MM Allen wrench. 21: Slide the take-up box onto the non-power channel end and tighten the M4 set screws with a 1.5MM Allen wrench. Z29 POWER FEED END CAP Z30 POWER FEED END CAP TORX SCREW 22: Place both power connector into the power feed end cap by rotating them 90 to seat. 22 POWER CONNECTOR 24 23: Insert the #4-40 Torx screws through the end cap holes and thread into the power end of the TruLine 1.6A channel. 23 24: Tighten the end cap to the channel using the provided T10 Torx screwdriver. Z31 25: Using the mark locations on the drywall, carefully make a hole to channel using the provided square drill with counter sink bit. #6 SCREW 25 26: Secure the channel to the studs/mounting straps through the drywall with the #6 screws using the provided square recess bit. 27: Secure the Trap Door channel section to the junction box with the supplied screw. 26 15

Z32 Z33 12" COMPOUND KNIFE ULTRATHIN DRYWALL TAPE 28 PLASTER 29 CONTRACTORS TAPE 28: Apply ultra-thin drywall tape along edges of channel to prevent cracking of plaster after installation. DO NOT overlap strips of drywall tape. Z34 NOTE: Test the LED strip before any plaster work is done. NOTE: Cover the channel opening with blue contractor s tape before plastering. 29: Use a 12" compound knife for a smooth compound spread. Sand, paint, and finish the plaster and drywall before removing the blue contractors tape. 30: Remove the blue contractors tape from the inside of the channel. Clean the channel surface with alcohol to remove any dust or debris before continuing. 31: Attach the trap door to the junction box using the #6-32 screw. 31 #6-32 SCREW Z35 32: Line up the red wire side of the power connector with the +24VDC marking on the Soft Strip. Push the male connector of the Soft Strip into the female connector of the power cables. 33: Carefully remove the backing from the LED soft strip, making sure not to remove the tape from the soft strip. Firmly press down the adhesive portion of the soft strip onto the channel surface while removing the rest of the backing, making sure there are no air bubbles that can cause surface irregularities. 16 POWER CONNECTION 32 LED PAPER BACKING 33

Z36 Z37 35 34 LED SOFT 34: Continue applying LED soft strip in the side of channel. Carefully bend the LED soft strip 90 to match the channel corner. 35: Connect and install the second LED soft strip length for the opposite side of the channel by following the same steps as the first. Z38 LED SOFT Z39 LED SOFT TAKE-UP TAKE-UP LED SOFT 36 37 36: Continue applying soft strip in side of channel. Carefully bend the soft strip 90 to match the channel corner. 37: Trim excess soft strip along the dotted cutting lines ONLY. Place excess soft strip length into the channel take-up box. Z40 CORRECT 38 38 NOT INSTALLED CORRECTLY 38: Snap the lens back onto the channel. Ensure lens is fully seated. 16