POST FRAME CONSTRUCTION MANUAL

Similar documents
Chapter 51: Sidewall Overhang(s) Only - Enclosed

GLOSSARY OF TERMS SECTION 8

VENTED GABLE DETAIL ROOF PANEL GABLE FLASHING 24" C/C MAX. BUTYL SEALANT TAPE ROOF PURLIN FLASH AB-1, AB-2, AB-3, OR AB-4

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Chapter 9: Truss Preparation

24 X32 3 CAR GARAGE POLE BARN STYLE FRAME

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

VENTED GABLE DETAIL ROOF PANEL GABLE FLASHING 24" C/C MAX. BUTYL SEALANT TAPE ROOF PURLIN FLASH AB-1, AB-2, AB-3, OR AB-4

8x8 Shed Plans and Building Guide

E-Z BUILD STEEL BARN 12' 12' 12' 16' 12' 20'

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Belmont with pocket doors. Building Size 12'x16' or 12'x20' Revised January 10, 2012

Best Barns USA Assembly Book

Five Star Panel Installation Instructions

eco-shake INSTALLATION INSTRUCTION

Best Barns USA Assembly Book

Garage Design Guide. October 2018

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

5 5 8 " 60" 53 8 " " 7" 5 1 2" 7" " FIVE MODELS TO MEET YOUR DESIGN REQUIREMENTS.

10x10 Shed Plans and Building Guide

12x12 Shed Plans and Building Guide

Viva Synthetic Thatch Installation Instructions

Chapter 16: Roof Steel

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the North Dakota with pocket doors. Building Size 12'x12' or 12'x16' Revised August 30, 2011

Best Barns USA Assembly Book

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

6x6 Shed Plans and Building Guide

Best Barns USA Assembly Book

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

Assembly Book. the Brandon Building Size 12' x 20' Revised September 13, 2017

Best Barns USA Assembly Book

Shapes Siding. Perfection Shingles. Chalk Line

Best Barns USA Assembly Book

Assembly Book. the Fairview. Building Size 12'x12' Revised July 25, 2012

GIRTS ON BACK OF BUILDING

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised April

HOW TO BUILD A 12X8 SHED

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

3.1 General Provisions

Chapter 23. Garage Construction

MUELLER

Storing, Handling, and Cutting Steel Panels

Best Barns USA Assembly Book

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

Best Barns USA Assembly Book

8 x 10 Timber-frame Garden Shed

Best Barns USA Assembly Book

Best Barns USA Assembly Book

the Greenbriar 12' x 16' Best Barns USA Assembly Book Revised June 4, 2013

Chapter 17 - Porch Trim

Best Barns USA Assembly Book

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Best Barns USA Assembly Book

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised May 31, 2013

Best Barns USA Assembly Book

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Best Barns USA Assembly Book

Description. Lesson Outcomes. Assumptions. Build a Floor. Carpenter

Best Barns USA Assembly Book

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Assembly Book. the Brandon. Building Size 12'x12' or 12'x16' Revised September 13, 2017

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Chapter 7 - Porch Framing

Chapter 22. Shed Construction

Sections & Details VOCABULARY

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

Appendix A Door and Window Framing Last updated 5/21/2013

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

Best Barns USA. Assembly Book. 12'x 16' the Millcreek. Revised September 19, 2017

Best Barns USA Assembly Book

Best Barns USA Assembly Book

DUTCH GABLE FREESTANDING CARPORT

RIDGE-JOIST CONNECTION 12/12 maximum slope

12' Octagon Wood Gazebo

Tuff-Rib Install Guide

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

RED DIAMOND SHINGLES Roof Installation Introduction:

Vinyl Gazebo Instructions

Ultimate. garden. Two sheds in one, this rustic cedar shed will keep everyone. happy.

General Layout. Eng. Maha Moddather

Best Barns USA Assembly Book

ROOF-CEILING CONSTRUCTION

Appendix B Framing Component Installation Last updated 5/27/2013

Best Barns USA. Regency Deluxe. 8' x 12' Assembly Book. revised February 15, 2017

How to make a Wendy house Part One: The Floor and the Frame

TABLE OF CONTENTS A. PBR

900 SERIES PANEL SHEET INDEX STAGGERED ENDLAP STAGGERED MALE LEG AT ENDLAP CONTINUOUS FEMALE ENDLAP INSTALLATION SEQUENCE CI-WR

Best Barns USA Assembly Book

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

Ekoroof LiteTile Dimensions

Gambrel Barn with Overhang Manual

The Complete Guide to Building with Green Mountain Panels

Gable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Keystone Garage Assembly Manual

Transcription:

POST FRAME CONSTRUCTION MANUAL www.pole-barn.info www.apbbuildings.com

TABLE OF CONTENTS 3. Jobsite Preparation 4. Setting Foundation Posts 5. Setting Corner Posts 6. Sidewall & Endwall Posts 7. Grade Board 8. Wall Girts 9. Truss Supports 10. Setting Trusses 11. Truss Bracing - Purlin & Lateral 12. Truss Bracing - Sway & Wind 13. Steel Trims - Overhang 14. Steel Trims - No Overhang 15. Steel Roofing 16. Steel Trim Profiles

JOBSITE PREPARATION Leveling Get your pad level and elevated (see Drainage below) before you begin construction. It is important that fill material is compacted with each 6-8 inches of material added. Drainage Raise your building pad at least 6" above the surrounding terrain. Extend the pad a minimum 3' wider and longer than the building on all sides. Staking Use batter boards to lay out your building dimensions. Make the batter boards long enough (4'-6') to allow adjustment of string line to get dimensions precise. Post Plan Measurements Note on your plan that the corner bays measure 1 1/2" less than those in between. Setting the posts 1 1/2" inset from the actual building measurement leaves room for the girts that are nailed to the outside of the posts. The combination of girt and post spacing below will result in a 24' wide x 32' long building including the girts and steel. Squaring Your Post Plan To confirm a square post plan, measure the same length diagonally as shown below. Adjust the string line until both measurements are the same. Note: Diagonal measurement for string line is post to post So circumference on this post plan is 23' 9" wide by 31' 9" long

POST ORIENTATION JOBSITE SETTING PREPARATION POSTS LAMINATED POSTS 4 EMBEDMENT DEPTH & METHOD 1) 29 GA STEEL ROOFING Concrete Footer Each post stands on concrete. A pre-cast concrete footer, sakrete, or pre-mixed concrete may be used, minimum compressive strength of 2500 psi. 2) 2x4 #2 SPF PURLINS 24" OC 3) FASCIA & TRIM 4) SOFFIT 5) (2) 2x10 #1 SYP TRUSS SUPPORTS Uplift Protection Your plans will define the uplift protection used for your site location. 6) 29 GA STEEL SIDING 7) 4x6 UC4B TRT SAWN FOUNDATION POST 8) 2x4 #2 SPF WALL GIRT 24" OC Wall height is measured from bottom of skirt board to top of truss support 12' 4" Treated uplift cleats are used in low wind areas 9) (1) 2x8 TRT #1 SYP PRESSURE TREATED SKIRT 10) 2x6 PRESSURE TREATED UPLIFT CLEATS #4 rebar encased in a concrete collar is typical in high wind regions Embedment Depth Your plans will define embedment depth based upon your engineering requirements. This measurement is shown on the Wall Section drawing. 11) 18" Ø X 6" THICK CONCRETE FOOTER 12) SLOPE GRADE AWAY FROM BUILDING 13) WOOD TRUSS DESIGNED BY OTHERS 14) OPTIONAL CONCRETE SLAB GRADE 48" TYPICAL HIGH WIND POST Sand / gravel backfill 20d ring shank nails Treated wood cleat CONCRETE COLLAR STEEL REBAR REFER TO YOUR PLANS FOR EMBEDMENT DETAILS

JOBSITE PREPARATION SETTING CORNER POSTS Make certain that your hole is the proper depth including the thickness of the concrete footer. Remove any loose soil from bottom of hole prior to pouring or dropping footer in hole. This will eliminate the possibility of settling when the weight of the building and snow load is applied to the structure. Pre-cast footers should be laid on a level surface to ensure post stability. Some packages will replace precast concrete footers with 80# sakcrete due to the amount of concrete required under the post. With your uplift protection on the post and the footer in place the next step is to set the corner posts. When placing the corner posts ensure that post is plumb on two sides, then backfill the hole compacting the material as required every 6"-8" with a 2x4 or spud bar. Make sure the post is plumb until the hole is completely backfilled. POST LEVEL HOME DEPOT TIP Foundation posts and other treated lumber will warp badly if left in the sun unbanded, even for short periods of time. = Leave posts and lumber banded until needed. = Cover lumber to prevent direct sunlight warpage in horizontal position

SIDEWALL POSTS Find the post plan drawing included in your structural building plans. Note the measurements are from center of post to center of post except for door openings and corner posts. Door openings and corner posts are measured from the edge of the post. Measure as indicated and lay a nail to mark the location required for each sidewall post. Embed each post and plumb using the technique described for corner posts above. Temporary bracing may be used to maintain plumb while construction is in progress. ENDWALL POSTS Locate the gable endwall posts which are longer than eave and corner posts. These posts extend to the top of the truss. Use the same measurement, plumb, and embedment techniques discussed earlier.

INSTALL SKIRT BOARD Locate the 2x8 treated lumber in your package. Find the corner post with the highest grade Place a nail in the post establishing grade, or ground level for your building. Establish a level line around the perimeter of the building and place a nail in each post. Install treated skirt board with (3) 0.177 x 4" 20d galvanized ring shank nails. The structural drawings include wall drawings that identify the lengths of dimensional lumber to be used for treated skirt board, untreated 2x4 wall girts, and truss supports (2x10 or 2x12). Your building package may include two, three, or four truss supports on each eave side. See your Wall Section drawing in the structural plans for your specific supports. FASTENER SCHEDULE PAGE 1 OF PLANS SKIRT or GRADE BOARD Skirt board, girts, and truss supports will extend beyond corner posts 1 1/2" on the eave sides. For expansion and contraction issues you can place a nail between lumber lengths to leave a small gap

INSTALL WALL GIRTS Install girts to post using (3) 16d 0.131x3 galvanized ring shank nails. Girts on the eave (gutter sides) will extend 1 1/2" beyond the corner posts for a boxed fit with gable girts. Dimensional lumber may be cut and staggered to improve wall fastening strength in high wind areas. To stagger girts simply move the fastening post over one bay. For instance in this drawing move row 2 fastening point B to the post between A and B by cutting a 16' 2x4 in two 8' lengths for the ends. We recommend staggering the skirt board and truss supports to fasten adjacent to the girts if girt rows are not staggered. Wainscot (two tone walls) includes a 2x6 nailer and Z trim positioned at 40" from grade to work with 36" long wainscot plus 4" since the siding starts 4" up from grade. A B 2 2' -2x4 SPF Wall Girts 2' on center 1 2' -Refer to Wall Section drawing for girt spacing for your design

TRUSS SUPPORTS Truss supports are sized based upon your specific needs. Supports may be 2 ply, 3 ply or 4 ply 2x10 or 2x12 dimensional lumber. Placement of the truss support is simple. Measure from the bottom of the grade board up the post the height of your wall as shown on the wall section in the structural plans. Mark the post and nail the truss supports to the post based upon the fastening specifications included in your plans. ONLY USE GALVANIZED RING SHANK NAILS AS REQUIRED BY OUR PLANS. TRUSS SUPPORTS MUST EXTEND 1 1/2" BEYOND CORNER POSTS TO SUPPORT GABLE ENDFRAME TRUSSES NOTCH POST FOR MULTI-PLY TRUSS SUPPORTS STACK MULTI-PLY TRUSS SUPPORTS 2-Ply 3-Ply 4-Ply............ 68 TRUSS SUPPORT FASTENING............

SETTING TRUSSES Endframe Truss To Corner & Gable Post Connection Truss Handling & Unloading The endframe trusses with horizontal nailers are nailed to all gable posts on the bottom and top chord of the truss. See page 1 fastener schedule for end truss nail size and quantity. Truss Installation & Bracing Endframes should rest on truss supports. If you didn't extend the truss support beyond the post to support end truss then cut a 2x6 bearing block 18" long and nail with (6) 20d 0.177x4 ring shank nails Make sure truss is centered by measuring overhang on both sides. Place both endframes trusses first. Then confirm squareness using the diagonal method discussed on page 3. Nail a hurricane tie to each truss and the inside truss support using 1 1/2" nails provided. Common Truss to Stub Post Connection The next truss will be placed between posts. A 2x6 stub post is inserted between truss supports to secure the truss in place. Ensure truss is square using a jig fashioned to your truss spacing. Truss Spacing Measure overhang on both sides and adjust until both measurements are the same. Common Truss to Eave Post Connection The next truss will sit full bearing on the post. Cut a 1 1/2" notch in the corner of the post and nail using fastener schedule on page 1 of structural plans. Measure overhang on both sides and adjust until both measurements are the same. LAMINATED POST SAWN 4x6 or 6x6

Truss Bracing - Purlin & Lateral After setting the gable end truss, bracing must be installed to support the intermediate trusses as they are placed. 2x4 purlins are used at 24" on center typically along the top chord of each truss. If your snow load dictates, the spacing may be less in the drift area. Your structural plans will include the drift area if needed. Full height gable posts should be cut even with the top chord of the truss. Eave posts are cut along the pitch of the roof. TRIMMING POSTS Prior to unbanding your trusses consult your structural plans to determine purlin spacing. Measure 24" (or your purlin spacing) from the ridge and mark the trusses for purlin placement. Trusses with no overhang require a purlin at the end of the truss. Trusses with overhang use the 2x6 fascia board for the eave purlin. See Wall Section drawing on structural plans. MARKING PURLIN LOCATIONS Similar to girts, purlin runs can be staggered to prevent connection points from residing on the same truss thus making a stronger roof system. 2x4 PURLINS NAILED TO TOP CHORD OF TRUSSES Purlins 2x6 Fascia board used as edge purlin Lateral Bracing

TRUSS BRACING - SWAY & WIND For 2' on center trusses with no gable overhangosb or plywood sheathing replaces purlins on the top chord. The need for sway bracing is determined by the spacing of the trusses and the overall height of the truss that is determined by the building span and roof pitch. The taller the truss the more sway bracing you will need. An example where sway bracing is required for most any design is shown below. This 20' wide building has a 16' overhead door on the left endwall. As you can see sway bracing is included near the opening to further support that area. Wind bracing is commonly used so it is included here. Our designs do not use wind bracing. Wind bracing certainly doesn't hurt anything so feel free to liberally brace your trusses. Wind bracing

STEEL TRIMS & OVERHANG Trims may be fastened with wood binder screws or color matched nails Both are included in your building package. INSTALL EAVE TRIM BEFORE ROOFING EAVE TRIM TUCKS UNDER ROOFING EAVE TRIM SOFFIT 2x6 FASCIA BOARD F&J OVERHANG TRIM ANGLE TRIM ELEMENTS NOT SHOWN IN CONTACT FOR CLARITY CORNER TRIM ANGLE TRIM INSTALL GABLE TRIM AFTER ROOFING GABLE TRIM LAYS OVER ROOFING 2x6 FASCIA BOARD SOFFIT PURLIN F&J OVERHANG TRIM RAKE FILLER ANGLE TRIM

STEEL TRIMS NO OVERHANG

FASTEN STEEL ROOFING WOOD BINDER SCREWS - HOW TO TIGHTEN OVERLAP SIDE UNDERLAP SIDE Foam closure seals rib where roofing meets siding Foam closure seals rib on roofing to ridge cap Starting at one end of the building, fasten the first roof panel at the top and bottom of the panel ensuring that the panel is square and that the roofing extends past the eave trim 2". This will leave a gap at the top where the foam closures and ridge cap go. The top and bottom of the panel require a screw on both sides of the rib. The screws between the top and bottom only require one screw next to the rib. DO NOT SCREW ON TOP OF THE RIB IN BETWEEN TOP AND BOTTOM TOP AND BOTTOM OF PANEL

Steel Trims RIDGE CAP 2" screws on the rib

#1 SYP Rafters to site specific snow load Pre-manufactured truss 4' oc typical Heel height to match rafter height