Build Instructions for Towers of Doom

Similar documents
BUILDING A TREE BENCH

DIY RUSTIC HALL TREE

Section # /2" x 1 1/2" x 20" /4" x 15 3/4" x 82 1/2" /4" x 1 5/8" x 82 1/2"

Eco Office File Base. Materials and Tools: Free Plans to build an office file cabinet base

Chili Pepper Routed Bowl

Project 17884EZ: Shaker End Table

Materials and Tools: Printer s Triple Console Cabinet. Free Plans to build a Triple Console Cabinet

Contest Field Border Construction Manual

How to Mitre Mouldings

Making Simple Bookbinding Equipment

Ask your DIY store or carpenter to cut the required boards to size. Instructions. 1. Cut out the opening for the bottles

DIY CHILD S STOOL. Instructions

(28) 2 x 4 x 8 Ft. Boards Tape Measure (9) 2 x 6 x 8 Ft. Boards Pencil (6) 2 x 2 x 8 Ft. Boards Carpenter s Square (9) 1 x 3 x 8 Ft.

Copyrighted Material Page 1

CCC Project Manual WEDGE RAMPS

Robert Bosch GmbH. Minimalist washstand

Cedar 2-Drawer Desktop Storage Cube

Dresser. Materials & Tools FEATURING FORMALDEHYDE-FREE TECHNOLOGY. Free Plans to build a Dresser

Cactus Routed Bowl. MLCS Items Needed:

PLANS BY TOM BURY MURPHY WORKTABLE TOTAL DIMENSIONS: FOLDED UP 30 X 48 X 0 FOLDED DOWN 30 X 58 X 84

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

129 KITCHEN BASE CABINET 480

OUTDOOR STOOL. ProWood Project Plan

Entrance Cabinet Plans

MyOutdoorPlans.com. By Julian King [2X4 GARDEN BENCH]

Installation Manual Using Existing Handrail Version 4.0 Oct 2017

PROJECT PLANS OUTDOOR SERVING CART

Copyright 2010 Springbok Publishing All Rights Reserved- Page 1

Castle Bed. Page 1 of 24

Easy Five Cube Tower Bookshelf. Copyrighted Material. Page 1

PROJECT PLANS ROLLING LAUNDRY SORTER

Project 11355EZ: Wall Cabinet with Louvered Doors and Shelf

ADULT. Adirondack / Muskoka Chair Plans

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

the wire, less is better. And make sure the bends on each truss wire are in line with the other. See the next photo.

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

PILOT SEAT AND HARNESS

PULLOUT SHELF ROCKLER BUILD IT WITH BUILD CUSTOMIZE

CO 2 DRAGSTER DESIGN AND CONSTRUCTION Notes for Students

Media Console Table 38"

JUNIOR CERTIFICATE 2005 MATERIALS TECHNOLOGY (WOOD) MARKING SCHEME ORDINARY LEVEL SECTION A

DIY X Panel Side Table

Rustic Console Table

Nanton Grain Mill Assembly

Patrol Box Plans by David J. Yarusso Troop 609

Robert Bosch GmbH. Wall organiser

How to Build A Porch Swing

Model #SH & CH SH Pine CH Naturaline

BUILDING A GOAL WALL DO IT YOURSELF! INSTRUCTIONS FOR A GOAL WALL

CA to each one. You may have to hold the end down while to glue sets or use an accelerator like I did.

woodworkersjournal.com MATERIAL LIST

Light Up the Room with a Light Bulb Illusion. By Laura Zinszer

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

Harriet Chair with Modifications

PROJECT PLAN TRAVEL CRIBBAGE BOARD

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

TM TM DOG HOUSE Age 9+

FLOW HIVE ASSEMBLY GUIDE. If we look after the bees they will look after us, and the honey really is an amazing bonus. Flow Hive Hybrid 3 Frame

WOOD COUNTERTOP INSTALLATION INSTRUCTIONS


CUSTOM SHUTTERS IN-A-BOX

Chest of Drawers Plans

How to Build a Structure Tester

Wall Panel Installation Instructions

What we ll be learning today

MLCS Instructions for Bowl and Tray Template Kit #9176/#9179

Kreg Tool Co. All Rights Reserved.

Building dimensions supplied by the #1 supplier of cornhole bags and boards on the internet.

Computer Desk. Project designed by April Wilkerson

Kitchen Step Stool. Premium Plan. In this plan you ll find: America s leading woodworking authority

WOOD TOY NEWS. July 23, 2013 Tuesday

Robert Bosch GmbH. Lounge light fixture

The Gothic Chess Set

Scratch Build a Water Tower

1. Position the legs on the plywood, mark the angle on the plywood, and also mark the cut at the top of the leg. Cut points "A" at a 10 degree angle u

Using the star template provided, trace out half the star shape on the pegboard sheet. Flip template over and trace out other side of star.

The frame sections of the china hutch are assembled with the aid of glue and spiral dowels. Dowel centers are recommended to

Project 12231EZ: Country Curio Clock

How to build a Ram for Challenge E: Twist-O-Rama

Super 2.5-EZ. Sheetrock Wall. Sheetrock Wall 10'-10" 2.5V-EZ 2.5V-EZ 2.5A-EZ

Prefabricated curves for drywall installations

Building a 30 Turntable

Safety First! Use eye protection, always! Use ear protection with loud power tools. Stay with children while they work!

Project Skill Level: INTERMEDIATE Plywood Used: CANPLY EXTERIOR Good Two Sides (G2S) or precision sanded Aspen

PROJECT PLANS WOODEN GIFT BOX

Chest of Drawers Plans

COMPLIMENTARY WOODWORKING PLAN

After the canopy hinge is square with the firewall and the nut plates are installed you can set up the hinge mounts. Start by clamping a 1/16 tongue

Chief s Shop: Simple Woodworking Bench

INST. A2. Great Lakes Aero Products, Inc. 915 Kearsley Park Blvd. Flint, MI (810) INSTRUCTIONS FOR INSTALLING ONE PIECE BONANZA WINDOW

Woodline USA Woodline Spacer Fence System

Triple Bunk Staggered Beds [1]

Bear-Resistant Trash Can Caddy: Enclosed Design Designed by Eagle Scout Michael Mezich

1 ¼-inch Pocket Screws Brad Nailer or Hammer 1 ¼-inch Brad Nails Clamps

PLANS BY KELLEY FARMHOUSE DESIGNS LOFTED DORM ROOM BED

How to Build a DIY Extra Long Wood Bench

This photo more clearly shows how locating pins are used to transfer the dowel holes from the edge to front of frame. Use bar clamps till glue dries.

Project: Trebuchet Overview: This medieval launcher would reek. Materials: 3/4 plywood, 2 of 5/8 threaded. Minimum Cutting Area: 2 sheets of plywood

This indicates a diagram detailing the dimensions of a project part and/or the placement for pocket holes, screws, nails, etc.

Master Closet System. Master Closet System Published on Ana White ( posted by Ana White [1]

Transcription:

Build Instructions for Towers of Doom 1. Measure and cut 4 x 8 sheet of plywood in half (or ask Home Depot to do it!). You will use one 4 x 4 sheet for the course base. 2. Attach a support frame to the underside of the course base. Cut down TWO of the 1 x 2 x 8 Furring Strip boards to build a frame to support the bottom base of the course. Each strip should be approximately 4 to fit along the edge of the underside of base. Attach the 4 x 4 plywood to the frame using four 1¼ screws around each edge of the 4 x 4 plywood. The frame boards were also attached to one another at the corners using a single 1¼ screw. For extra support, add a board down the middle of the course base (this board was only screwed to the frame, not to the 4 x 4 plywood). 3. Spray paint top side of 4 x 4 course base with Flat Black paint. 4. Cut 2 x 2 x 8 strip board into EIGHT 8 towers. Spray paint each tower with Flat Black paint. 5. Using dimensions given in main course drawing, mark off the 8 x 7 red box with painters tape and scrap paper to prevent overspray. Paint box with Gloss Apple Red paint two or more coats may be necessary. 6. Next build the ramp using part of the remaining 4 x 4 plywood sheet (other scrap wood can be used for the ramp as long as the surface is similar to the plywood): a. Cut the ramp s top platform first making it 6 long and 7 wide. b. Cut the incline surfaces of the ramp. The horizontal span of the incline boards is 5 but the board itself must be cut longer, for example, 5.5 long and 7 wide. As indicated on the ramp drawing, the top and bottom edges of the incline were tapered such that the top side of incline is longer than the bottom to make for a smooth transition. The tapers were made by first cutting the bottom edge of the ramp incline at a 45 degree angle with a table saw (45 degrees was the largest angle our table saw could cut but a sharper angle would be better). The angle on that edge was then sanded with a belt sander to make the angle sharper. Trial and error was used to achieve the correct angle (see Figure 1). Just be sure not to sand the leading edge of the ramp incline or the top of the board becomes shorter! Once this angle was complete, the incline board was cut with a table saw to approximately 5-5/16 at a 15 degree angle (but still 7 wide!). c. Cut ramp supports and attach ramp top platform. Using 1 x 2 x 8 Furring strip boards, make two 7 long and 1½ tall supports for the ramp. Attach the ramp s 6 x 7 top platform to these supports using ½" screws. The screws were pre-drilled and countersunk to slightly below the surface of the ramp platform (see Figure 2). This is not shown in the drawings but, in the actual build, the two 7 furring strip supports were positioned to protrude about 1/8 from the edge of the top platform this was to provide support for the ramp inclines (see Figure 2 and Figure 3). d. Attach the ramp base to the course base using 1¼ screws, screwed in from the bottom of the course base. The ramp base is centered on the back line of the course, which puts the top platform at exactly 21 from each edge of the course base (see Figure 4). The ramp was then centered on the back line by first marking the back line on the course base and then putting a

mark on the supports on both sides of the ramp base at 3-1/8 from the outside edge of the ramp supports (see Figure 5). e. The ramp inclines were attached with glue on both the top and bottom of the ramp incline. A ¼ screw was used on the bottom of the ramp and a 1-1/4 screw was used on the top (screwed into the ramp supports). These screws were centered on the ramp and countersunk so that the screws will be covered by the ¾ tapeline (see Figure 6). 7. After attaching the ramp, spray it Flat Black being careful not to overspray the red block painted in Step 5. 8. After paint all black paint is dry, make measurements and marks for the tape line. Then apply the ¾ white electrical tape to the pre-marked pathway. TIP: Do not immediately apply stretched tape to the course base as it will shrink and pull off the course base! Instead, allow the tape to shrink back to its natural length for a few seconds, prior to applying it to the course base. 9. Finally, measure and mark the position of the 8 towers using the measurements from the main course drawing. Note that the towers on the right side of the course match measurements for those on the left side including the position of the bottom-left tower. The towers are attached to the course base with a dab of glue and one 2½ screw. TIP: Drill a pilot hole through the top of the course base at the center of each tower location so that positioning the screw from the bottom side is not a guessing game! A small flat washer was used in the official course build but this is optional.

Figure 1 Tapered Bottom Edge of Ramp Incline Figure 2 Countersunk Screws and Ramp Supports Protruding from Ramp Top Platform

Figure 3 Top Platform Protruding to Support Incline Platform Figure 4 Center Ramp Base on Course Base

Figure 5 Center Ramp Base on "Back Line" Figure 6 Ramp Incline Countersunk Screws Centered on Board