METHOD STATEMENT. Sika FloorJoint S

Similar documents
Gluing windows with SABA Glasstack 760

SlipGrip Data Sheet & Installation Guide

Loose Lay Luxury Vinyl Plank

IMPORTANT: This product cannot perform its intended function if not properly installed.

Roll Out Vinyl Installation Guide

Installation Instructions

Esthec. Terrace. Manual for Assembly and Installation

EZYSTONE WORKSURFACES

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

COMPOSITES LAB MANUAL

TOOLS & SUPPLIES (Included in ProTops Tool Kit)

PBWWinc. GEN-U-LINE 4000 Series Application Guide. Technical Data Sheet. General Guidelines:

INSTALLATION INSTRUCTIONS

Tapecoat. Application Guideline

LuxCore Installation Instructions

Laying and maintenance of cement tiles

How to operate (folding)

Premium quality tools are important; not only will high quality rollers, brushes, and products create a better result, they ll make your job easier.

PBWWinc. Technical Data Sheet. GERLINE Gameline Paint Instructions for Sport Flooring. General Guidelines:

HOW TO CREATE AN OPENING IN BRICKWORK.

Sketchpaint. Ideal for turning any smooth surface into a whiteboard. Ready to use in 5 days

ARMA-CHEK SILVER APPLICATION MANUAL. T. +49 (0)

Step by Step Wing Bagging

Installation Instructions Stainless Steel Wall Panels

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS

WORK METHODS FOR THE RENOVAID WOOD RENOVATION SYSTEM

1. INTRODUCTION 2. REFERENCE SPECIFICATIONS. Page -1- Bonding and Grouting

How to repair a wall or ceiling FREE

Section 914. JOINT AND WATERPROOFING MATERIALS

Zip Block MODEL ZB INSTALLATION INSTRUCTIONS

Conversion, Application and Maintenance of the Avery Dennison Floor Marking System Instructional Bulletin #6.30

UNCONTROLLED 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES

380 Swimming Pool Paint

DULUX UNIVERSAL UNDERCOAT

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15

*Before starting, please read entire manual *Changes can be made in order for this manual to work for you. 3 x 6 I-Beam

Heavy Wall Applied Stop Tube Frame and Door Installation

KITCHEN INSTALLATION GUIDE

A. Provide a comprehensive guide to the products that are used when flashing, what they are used for, and the proper way to use them.

KITCHEN INSTALLATION GUIDE

Life* Installation Instructions & User Care Instructions. (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone)

3M No Polish SC/APC Angle Splice Connector Jacket for 2 x 3 mm FRP and 1.6 to 3.0 mm Cable 8802-T/APC/AS/1.6-3

Assembly instructions

CUPRON NEXT TECHNICAL DATA SHEET

Sash may be heavy. Use a reasonable number of people with sufficient strength to lift, carry, remove and install. Tape broken glass with duct tape bef

3M Impact Protection Profile Installation System Instructions

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

application instructions

Shower Screen and Door Kit Instructions

The Process. Features & Benefits PAINT REMOVAL SYSTEM APPLY COVER REMOVE WAIT WASH

ELiTE ProPanel Installation Guide

Curium 19.4H Installation Instructions & Parts List

Technical Data February, 2016

Balustrade Systems / Installation Instructions

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

VALENCIA RONDO DOOR WITH RETURN

Installation Instructions Recommended Tools

VALENCIA CORNER DOOR WITH RETURN

Retrofit Apron Front Farm Sink With Dual Mount Capability Installation Instructions

Contents. Study Plans. 2 Introduction. 4 List of Materials. 5 Glue, Resin and Fixings. 6 Tools. 7 Construction Sequence

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

Low V.O.C. 2-Component Polyurethane Game Line Paint System

Curtain Wall Installation Guide

Application Notes! RIGID MATERIALS. Rigid material standards. Printing on Rigid Materials with the Gerber Solara ion & Gerber CAT UV

Installation Instructions and Details

Nanoman Anti-Graffiti (Porous Surfaces)

Magnetpaint & Sketchpaint

WETFLOR INSTALLATION GUIDE

1. TOOLS + MATERIALS REQUIRED

ENGINEERED WOOD INSTALLATION GUIDE: The Cardinal Collection

Wave Profile Installation Guide

R2C Performance Products 7550 Industrial Drive Forest Park, IL Ph: (708)

WELDING. Section nine 9.1 CORRECT TOOLS

This section describes those structural components which make up the main frame including bulkheads, spar cover, and roll cage.

Curium 19H Installation Instructions & Parts List

Solutions. Installation Instructions. Ref Description Illustration Qty. A Shower Tray* mm Radius Curved Panel* Universal. Curved Quad Panel*

Repairs. Chapter 10 Repairs 10. 1

8 x 10 Sandwich Panel

SECTION COUNTERTOPS ecox PART 1 GENERAL

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Wallgard 1,3 product

USG Structural Solutions USG STRUCTURAL PANEL CONCRETE SUBFLOOR REPAIR MANUAL. usg.com

Manufacturer 12mm Laminate Flooring Installation Guidelines

MATERIAL SAFETY DATA SHEET Utrecht Acrylic Mediums & Varnish. Section 2 Hazard Identification (composition / information on ingredients)

Step-by-Step Installation Instructions for

Installation Guide. Aspect Stone Peel & Stick Tile. proper surface preparation is essential for a successful project. Installations Methods

MANUFACTURING INC. Specifications

PolyCarb has good resistance to many chemicals. Some chemicals may harm the PolyCarb sheets. Contact us when in doubt about any chemical.

Technical Bulletin SSG 5.1

SEWERI SAFETY MANUAL WARNING!

SECTION METAL FABRICATIONS

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

September 10, 2009 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES

SAFETY DATA SHEET Utrecht Artists Acrylic Mediums. Section 2 Hazard Identification (composition / information on ingredients)

Landscape Collection

CHEMSET Reo 502 EF TECHNICAL DATA SHEET. Extra Heavy Duty Pure Epoxy Anchoring Adhesive

3400 Tectura Designs Precast Concrete

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

Fitted Furniture Installation and Aftercare Guide

Transcription:

METHOD STATEMENT

Table of Contents 1 SCOPE 3 2 PRODUCT 3 2.1 3 3 SUBSTRATE REQUIREMENTS 3 4 Preparation of the Substrate 3 4.1 Mapping of the joint panels on the floor for the saw cuts 3 4.2 Execution of the saw cuts 4 4.3 To chisel out 5 4.4 Removing of possibly built-in metal profiles 5 4.5 Cleaning and preparation of the cut-out / Substrate 5 5 APPLICATION 6 5.1 Pre-assembling of the joint panels 6 5.2 Placing of a edge strip in the construction joint 7 5.3 Application of the adhesive Sikadur -31 High-Mod Gel in the cut-out 8 5.4 Application of the Adhesive Sikadur -31 High-Mod Gel in on the panel 9 5.5 Installation of 9 5.6 Plastering of the edges 10 5.7 Grinding of the joint panel 10 5.8 Coating of the joint panel 11 6 HEALTH & SAFETY RECOMMENDATIONS 12 6.1 Personal protection 12 7 LIMITATIONS 12 8 ENVIRONMENT 12 8.1 Cleaning of tools / Mixing equipment 12 8.2 Waste disposal 13 9 LEGAL NOTES 13 2/13

1 SCOPE This method statement describes the step by step procedure of the installation of the floor joint panels Sika FloorJoint S in order to provide all needed information for a proper installation. 2 PRODUCT 2.1 SIKA FLOORJOINT S is a prefabricated, carbon-fiber-reinforced polymer composite panel with high physical properties. Because of the waved joint design an improved load distribution is achieved. is the standard panel for new build and refurbishment of joints for concrete screeds with normal up to medium heavy wear; e.g. warehouses etc. 3 SUBSTRATE REQUIREMENTS Please refer to the Evaluation and Preparation of Surfaces for Flooring Systems 4 PREPARATION OF THE SUBSTRATE 4.1 MAPPING OF THE JOINT PANELS ON THE FLOOR FOR THE SAW CUTS - Set the position of the panel. - Marking of the length: Please add a surplus of 1/8 inches at the beginning and the end of the panel. 1/4 inches in total. - Marking of the width: Please add a surplus of 1/8 inches at the left and the right side of the panel. Mark 5 1/8 inches on each side of the joint, from the center. 10 1/4 inches in total. - Please mark the saw cuts all 1-1 1/2 inches using a chalk line or a permanent marker. Length of the joint panel +2 x 1/8 inches 48" 1" - 1 1/2" 5 1/8" 5 1/8" 10 1/4" Width of the joint panel + 2 x 1/8" Dimensions of the joint panels: 48 inches x 10 inches 3/13

4.2 EXECUTION OF THE SAW CUTS To cut the joints Diamond Cutting Equipment has to be used in combination with an appropriate vacuum cleaner in order to avoid too much dust and dirt. Examples of suitable equipment to cut the joint are: 1 in Hilti: DC-SE 20 Slitting tool Vacuum cleaner Depth of incision: The joint cutter must be adjusted to a depth of 1 in. At the corners (short side edge), it is recommended that the saw cut runs past the finished edge about 1-1 1/2 inches, to ensure that the incision is cut to the correct depth. (See picture below, marked with ) When dry cutting use a vacuum to control dust. When wet cutting, vacuum the water out of the saw cuts as soon as possible. Please note: Please control the abrasion of the diamond cutting disk continuously. If required adjust the diamond cutting disk, in order to ensure that the depth of incision remains unchanged. 4/13

4.3 TO CHISEL OUT When the saw cuts are completed the concrete should be removed using a powerful demolition hammer, e.g. Hilti TE 70-AVR. All of the cuts must be about 1 in depth. Please make sure that the outer edges of adjacent / existing concrete are not damaged during the removal process. 4.4 REMOVING OF POSSIBLY BUILT-IN METAL PROFILES The metal profile can be removed by using an angle grinder or a cutting torch. The metal profiles must be about 1 in depth. Use caution when cutting metal profiles as sparks may occur. 4.5 CLEANING AND PREPARATION OF THE CUT-OUT / SUBSTRATE All dust, loose and friable material must be completely removed from all surfaces before application of the adhesive, preferably by brush and/or vacuum. The concrete substrate must be sound and of sufficient compressive strength (minimum 3,625 psi (25 Mpa)) with a minimum pull off strength of 217 psi (1.5 Mpa). The substrate must be clean, dry and free of all contaminants such as dirt, oil, grease, coatings and surface treatments, etc. 5/13

5 APPLICATION 5.1 PRE-ASSEMBLING OF THE JOINT PANELS Place the panels into the opening provided. Leave panel about 1/8 inches from the short sided edge. Also leave a space of 1/8 inches between panels. The last panel should be placed (about 1/8 inches) from the short sided edge. Mark the place of the panel. If required, cut the panel to the correct size, leaving 1/8 inches from the edge, using an angle grinder. Place all parts in the cut out area and check that they fit well. Remove any high spots. Number the panels in sequence and then remove all panels, and place them in correct order to receive adhesive. 6/13

5.2 PLACING OF AN EDGE STRIP IN THE CONSTRUCTION JOINT In the construction joint, a screed edge stripping (out of a foam profile) must be placed as it is displayed below. This is an essential measure in order to allow movement between the two plates of the joint panel. Duct tape as a release point Adhesive: Sikadur -31 Hi-Mod Gel Screed edge stripping Axial position of the edge stripping in the joint. Adjusting the height of the stripping using adjustable trowel Screed edge stripping supplied in rolls of 55 yards. Height: 3-4 in, thickness 1/4 in. Adjustable trowel for even distribution of the adhesive or to adjust the heights. 7/13

5.3 APPLICATION OF THE ADHESIVE SIKADUR -31 Hi-Mod Gel IN THE CUT-OUT The adhesive Sikadur -31 Hi-Mod Gel has to be mixed according to the product data sheet The adhesive has to be applied in the cut-out evenly so that the installed edge stripping will not be covered by the adhesive. In order to allow for movement of the joint after the installation, it is mandatory that both sides of the panel are separated. For a proper separation, tape is fixed at the bottom side of the panel. Don t remove it! For an even distribution of the adhesive use an adjustable trowel Axial position of the foam strip in contact with the masking tape which has the function of a release agent. Distribution of Sikadur -31 Hi-Mod Gel in the cut-out by using the adjustable trowel in order to distribute the adhesive. The trowel hast to be adjusted to 3/4 in 8/13

5.4 APPLICATION OF THE ADHESIVE SIKADUR -31 Hi-Mod Gel ON THE PANEL In order to avoid entrapped air, the adhesive has to be applied on the bottom of the panel using a toothed trowel. 5.5 INSTALLATION OF SIKA FLOORJOINT S Install the joint panel into the wet adhesive bed. Press or pound on the panel in order to ensure that the profile is in contact with all the adhesives! Please ensured that no voids occur under the joint panel! Depending on the floor unevenness, the joint panel should be slightly lower or equal to the adjacent areas in order to grind the profile after the adhesive cures. Grind the cured adhesive to the level of the adjacent floor. 9/13

5.6 PLASTERING OF THE EDGES Using a spatula or margin trowel, seal the edges so that no voids remain. The joints must be free of cavities. Remove excess adhesive, in order to reduce grinding after it cures. 5.7 GRINDING OF THE JOINT PANEL The adhesive must be fully cured before the grinding can be completed. With the help of a diamond disk grinder a seamless transition between the two bottom plates has to completed. Grind using large circular movements, in order to avoid grinding marks or holes. Maximum 1/16 inch grind! Important: The evenness has to be controlled regularly using a level or straight edge. 10/13

5.8 COATING OF THE JOINT PANEL After grinding of the panel is complete and residual dust is vacuumed; the surface has to be coated. Use a clear or pigmented coating such as; Sikafloor -304 W or Sikafloor -264. Clean the coating from the "S" curve joint ensuring not to damage the joint sealant. 11/13

6 HEALTH & SAFETY RECOMMENDATIONS 6.1 PERSONAL PROTECTION Handling or processing resin based materials might cause irritation to the eyes, skin, nose and throat. Therefore an appropriate eye protection shall be worn at all times while handling and resin based materials. Safety shoes, gloves (butyl rubber/nitrile rubber gloves) and other appropriate skin protection shall be worn at all times. Always wear eye protection (safety glasses), hard hat, ear protection safety boots with steel toes. Always wash hands with suitable soap after handling products and before food consumption. Please make sure that drinking water, also for eye flushing and a first aid kit is always available. Ventilation is recommended, do not eat and drink at the workspace. For information and advice on the safe handling, storage and disposal of chemical products, users shall refer to the most recent Material Safety Data Sheet containing physical, ecological, toxicological and other safety-related data. 7 LIMITATIONS These products may only be used by experienced professionals. Always refer to the manufacturer s instructions before using the tools and mixing equipment. Products shall only be applied in accordance with their intended use. Beware of condensation! The substrate must be at least +5 F above dew point. 8 ENVIRONMENT 8.1 CLEANING OF TOOLS / MIXING EQUIPMENT Clean all tools and application equipment with solvent immediately after use, hardened and / or cured material can only be removed mechanically. 12/13

8.2 WASTE DISPOSAL Do not empty surplus material into drains; dispose responsibly through licensed waste disposal contractor in accordance with legislation and local / regional authority requirements. Avoid runoff onto soil or into waterways, drains or sewers. FOR DETAILED INFORMATION REFER TO THE MATERIAL SAFETY DATA SHEET 9 LEGAL NOTES The information, and, in particular, the recommendations relating to the application and end-use of Sika products, are given in good faith based on Sika s current knowledge and experience of the products when properly stored, handled and applied under normal conditions in accordance with Sika s recommendations. in practice, the differences in materials, substrates and actual site conditions are such that no warranty in respect of merchantability or of fitness for a particular purpose, nor any liability arising out of any legal relationship whatsoever, can be inferred either from this information, or from any written recommendations, or from any other advice offered. The user of the product must test the products suitability for the intended application and purpose. Sika reserves the right to change the properties of its products. The proprietary rights of third parties must be observed. All orders are accepted subject to our current terms of sale and delivery. Users must always refer to the most recent issue of the local Product Data Sheet for the product concerned, copies of which will be supplied on request. 13/13