Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Similar documents
Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

SECTION SITE SURVEYS

STATE UNIVERSITY CONSTRUCTION FUND

SURVEY GUIDANCE AND FORMS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

3. DESIGN SPECIFICATIONS

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

List of Figures. List of Forms

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS

CITY OF MUSKEGO DRAFTING STANDARDS

Porter County Plan Commission

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Subdivision Application Checklist

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

Legal Description & Site Plan Requirements and Layouts

Town of Westlake Construction Plans Review Checklist

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

PART XII: TOPOGRAPHIC SURVEYS

City of Massillon Site Plan Checklist

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

CHAPTER 11. Plan Standards

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

Charlotte County Utilities DESCRIPTION

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

DEVELOPMENT PLAN CHECKLIST

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

APPENDIX D: DRAWING SUBMISSION STANDARDS

Grease Interceptor Design Checklist

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS

1. Land survey Work. 2. Civil and Structural engineering services.

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

TOWN of LAKESHORE SITE PLAN CHECKLIST

Site Plan/Building Permit Review

Washington County Road Engineering Plan Submittal/Review Checklist

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

PRELIMINARY PLAT CHECK LIST

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

Section 101. Street Design

PLANNING AND DEVELOPMENT

Clarifications in italics added July 2018

Council Policy Engineering Drawing Submission Requirements

Plan Submittal and Review Checklist

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

Plan Preparation Checklist

CHAPTER 11 SURVEY CADD

Essential Skills: Reading and Interpreting Maps and Plans

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Conceptual, Preliminary and Final Site Plan Review in Holladay City

5.7 Plan Documentation and Supporting Information.

CHECKLIST 8-O. Highlands County Engineering Department Improvement Plan Checklist

MAJOR GRADING PLAN CHECKLIST

Project Name: County File No.: Checked by: For: Date:

MILL HILL ARTS VILLAGE

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

CONCEPT REVIEW GUIDELINES

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

B17. Sewer Site Plans BULLETIN

Minor Site Plan Application and Checklist Land Disturbing Activities

Sewer Line Extension Permit Design Checklist

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Alabama Standards of Practice for Surveying

Article 4.0 Measurements and Exceptions

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

Survey Control Point Observations

Application for Site Plan Review

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

Checklist for Tentative Subdivision Map

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Applying for a Site Development Review

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF MERCER ISLAND

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

Chapter 13 Plan Submittals

DRAFTING STANDARDS 9.00 DRAFTING STANDARDS

Construction Documents (CDs) Checklist

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

7000 Fifteen Mile Road Sterling Heights, Michigan

Transcription:

Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181

Table of Contents Survey Requirements SURVEY DRAWING REQUIREMENTS... 4 SURVEY CONTROL REQUIREMENTS... 4 Horizontal and Vertical Data... 4 Project Coordinates and Elevations... 4 Project Survey Control Points... 4 PROPERTY SURVEY REQUIREMENTS... 5 TOPOGRAPHIC SURVEY REQUIREMENTS... 6 COORDINATION... 8 ILLUSTRATIONS Figure 1, Monument Location Maps 1a 1b 1c 1d 1e 1f 1g 1h West Campus East Campus (not yet available) Clermont College (not yet available) Raymond Walters College (not yet available) College of Applied Science (not yet available) Warren County Property (not yet available) Genome Research Institute (not yet available) Center Hill (not yet available) Figure 2, Monument Data 2a 2b 2c 2d 2e 2f 2g 2h West Campus East Campus (not yet available) Clermont College (not yet available) Raymond Walters College (not yet available) College of Applied Science (not yet available) Warren County Property (not yet available) Genome Research Institute (not yet available) Center Hill (not yet available) DESIGN GUIDELINES AND STANDARDS 2

Acronyms and Abbreviations CAD GPS NAD NAVD NGVD OAC SPC Computer-aided design Global positioning system North American Datum North American Vertical Datum National Geodetic Vertical Datum Ohio Administrative Code State Plane Coordinates DESIGN GUIDELINES AND STANDARDS 3

SURVEY REQUIREMENTS SURVEY DRAWING REQUIREMENTS Drawings must comply with the University s CAD Standards. SURVEY CONTROL REQUIREMENTS Horizontal and Vertical Data The horizontal and vertical data for University of Cincinnati projects depend upon the standards of the county in which the survey is located, as follows: County Horizontal Vertical Hamilton NAD 83 NGVD 29 Clermont NAD 83 NAVD 88 Warren NAD 83 NAVD 88 The University has set permanent monuments using static global positioning system (GPS) surveying methods, meeting Second Order (Class I) horizontal and Second Order (Class II) vertical accuracy requirements. State Plane Coordinates (SPCs) and National Geodetic Vertical Datum (NGVD) 29 or North American Vertical Datum (NAVD) 88 elevations (depending on the county) were established for the monuments. Location maps and data for the monuments (Figures 1 and 2) are included at the end of this standard. Project Coordinates and Elevations Ground coordinates for the monuments have been generated from their SPCs; an average combined factor (sea level factor times scale factor) was used. The ground coordinates, along with the NGVD 29 or NAVD 88 elevations described above, define the University s survey control system, which shall be used for the project. Project Survey Control Points Set project survey control points from the University s permanent monuments. The control point material shall meet the requirements of Ohio Administrative Code (OAC) Section 4733-37-03(C) and (D). Set enough control points to ensure that every part of the site is visible from at least one control point. All control points shall be visible from at least one other control point. DESIGN GUIDELINES AND STANDARDS 4

Determine the ground coordinates of the control points and report them to the nearest 0.001 foot. The relative accuracy between any two of the control points shall be 1:20,000 or better. Elevations to the nearest 0.01 foot shall be established for each project control point. Establish the elevations by leveling loops that begin and end on the University s permanent monuments, using the project control points as turning points. The maximum vertical closure error for the level loop shall not exceed the following: Vertical closure error < 0.033 x SQRT (L x 0.0003), where L is the length of the level loop in feet, and SQRT is the square root. The survey drawing(s) shall include a list showing all the control points used for the survey. Show the north and east ground coordinates, elevation, and a description for each control point. PROPERTY SURVEY REQUIREMENTS Comply with the current Minimum Standards For Boundary Surveys of the State Board of Registration for Land Surveyors (OAC 4733-37), as well as local requirements of the county and/or municipality in which the project is located. In the case of conflicting requirements, the more stringent requirements shall apply. Provide a property survey drawing on Mylar, signed and sealed by a registered land surveyor. Provide a 3-D AutoCAD drawing on electronic media, showing the same information as the hard copy. Provide an ASCII file on electronic media of all survey points used to produce the AutoCAD drawing. For each survey point there shall be one line in this file, showing the point number, north and east coordinates, elevation, and description, in that order. Use a comma-delimited format. Show existing and proposed property boundary lines, Auditor s tax parcel lines, easement lines, and right-of-way lines. For each straight line, show the length and bearing. For each curved line, show interior angle, radius, arc length, and chord length and bearing. Show and describe all existing survey monumentation (iron pins, cross notches, railroad spikes, nails, concrete monuments, etc.) that was found, and new monumentation that was set. Furnish legal descriptions of all proposed parcel boundaries, even if they are the same as the existing parcel boundaries. DESIGN GUIDELINES AND STANDARDS 5

Show the area of each existing or proposed Auditor s tax parcel to the nearest 0.0001 acre. If less than 1 acre, also show the area in square feet. Comply with the Auditor s requirements for breaking out sub-areas due to county lines, municipality lines, section lines, zoning lines, etc., that cross the parcels. Show the owners names for all project and adjacent properties. Show easement grantee names, along with recording information. Show the width of all public and private street right-of-ways, the width and type of pavement, and street/alley names. Show existing structures on the project parcels and on adjacent parcels within 50 feet of the property lines. Show house and business numbers. For all structure corners less than 25 feet from property-related lines (property, easement, right-ofway, etc., lines), provide the dimensions from the structure corners to the lines. Describe the structure material type and number of stories. Note vacant parcels as VACANT. Dimension and describe encroachments and evidence of prescriptive rights. Show fences and walls, and their location relative to property-related lines. Show zoning of project property and adjacent property. Show the zoning building line setback requirements. TOPOGRAPHIC SURVEY REQUIREMENTS Provide a topographic survey on Mylar, signed and sealed by a registered land surveyor. Provide a 3-D AutoCAD drawing on electronic media, showing the same information as the hard copy. Provide an ASCII file on electronic media of all survey points used to produce the AutoCAD drawing. For each survey point there shall be one line in this file, showing the point number, north and east coordinates, elevation, and description, in that order. Use a comma-delimited format. The topographic survey shall extend 25 feet beyond the project limits. Provide contours at 1-foot intervals, except in areas where the slope is greater than 2:1, where the contour intervals can be shown at 5-foot intervals. Provide spot elevations on paving and other hard surfaces to the nearest 0.01 foot, and on other surfaces to the nearest 0.1 foot. Provide spot elevations at the following locations: Along all grade-break lines that were used to plot the contours. In areas where the slope is less than 12:1, at each intersection of a 25-foot square grid. DESIGN GUIDELINES AND STANDARDS 6

On the top (at back) and bottom (at face) of curbs, and on both sides of walks, at 25-foot intervals. On roadways and driveways at the crown and at other cross-slope grade breaks, at 25-foot intervals. Provide plotted locations of structures, including all corners. Provide elevations for each floor and at each entrance of the structures. Show mean elevation and extent of water in excavations, wells, and bodies of water. Show all miscellaneous features, including signs, lights, parking lot striping, benches, waste receptacles, bicycle racks, etc. Provide utility information. The following is to be shown based on record utility information and on survey measurements of accessible utility appurtenances: Location, description, elevation, size, and direction of flow of sanitary sewers, storm sewers, combination sewers, storm drains, and culverts, and their appurtenances. Provide rim elevations of each catch basin and manhole, and the invert elevation of each pipe. Location, description, elevation, size, and pressure of water, gas, steam, condensate, and chilled water lines, and their appurtenances. Provide rim and top of pipe elevations at valves, meter pits, and other appurtenances where these utilities are accessible. Location, description, elevation, and characteristics of power, communication, cable television, lighting, and traffic control, and their appurtenances. Name of the operating authority, including the contact person and telephone number, for each utility. Show test boring locations and the elevation at the top of the holes. Show plantings in yards, mowed open spaces, and landscaping: Regardless of size, show all trees and individual bushes, and indicate species name. For trees, indicate the diameter 3 feet above the ground on the upper slope side. Show perimeter outline of flower beds, groups of bushes, etc. Show woods and thickly vegetated natural areas: Show trees 12 inches and over in diameter, measured 3 feet above the ground on the upper slope side. Indicate the species name. Show the perimeter outline. Include the property-related lines (property, easement, right-of-way, etc.) on the topographic survey drawings. DESIGN GUIDELINES AND STANDARDS 7

COORDINATION This section describes requirements for coordinating a project with other project plans currently in design, other current construction, and existing records. Other projects that are currently in the design or construction phase may abut or overlap the project area. Also, numerous record documents for past projects in the vicinity may be on file in the University s plan room. The horizontal and vertical control system used for these current or past projects may not be the same as the University s survey control system described above. Therefore, when referring to plans from other projects, establish the correct horizontal and vertical relationships between those projects and the University s survey control system. Determine and apply the required adjustments to properly orient the information on those plans to the University s system. Make actual survey measurements to determine the proper relationship of the project to all adjoining existing features, including current construction. DESIGN GUIDELINES AND STANDARDS 8

Figure 1a: Monument Location Map, West Campus DESIGN GUIDELINES AND STANDARDS 9

Figure 1b: Monument Location Map, East Campus DESIGN GUIDELINES AND STANDARDS 10

Figure 1c: Monument Location Map, Clermont College DESIGN GUIDELINES AND STANDARDS 11

Figure 1d: Monument Location Map, Raymond Walters College DESIGN GUIDELINES AND STANDARDS 12

Figure 1e: Monument Location Map, College of Applied Science DESIGN GUIDELINES AND STANDARDS 13

Figure 1f: Monument Location Map, Warren County Property DESIGN GUIDELINES AND STANDARDS 14

Figure 1g: Monument Location Map, Genome Research Institute DESIGN GUIDELINES AND STANDARDS 15

Figure 1h: Monument Location Map, Center Hill DESIGN GUIDELINES AND STANDARDS 16

Monument Figure 2a: West Campus Monument Data State Plane Coordinates Ground Coordinates North East North East Elevation (NGVD 29) WC-01 419689.102 1398167.349 419689.102 1398167.349 799.83 WC-02 419839.063 1397608.246 419839.076 1397608.197 765.47 WC-03 418854.449 1397283.114 794.82 WC-04 418650.227 1396532.309 418650.136 1396532.165 793.53 WC-05 418750.546 1395904.250 418750.464 1395904.051 832.68 WC-06 418450.826 1395456.558 418450.717 1395456.320 814.56 WC-07 417475.993 1395529.417 417475.798 1395529.185 858.49 WC-08 417424.366 1396012.109 417424.167 1396011.919 858.13 WC-09 417234.753 1397916.821 417234.537 1397916.799 851.53 WC-10 418138.567 1397959.087 418138.431 1397959.069 796.50 WC-11 417895.284 1396533.201 417895.126 1396533.057 811.23 UC-01 419342.259 1395550.095 419342.228 1395549.865 798.67 Note: Average Combined Factor = 0.999912056 Monument Figure 2b: East Campus Monument Data State Plane Coordinates Ground Coordinates North East North East Elevation (NGVD 29) - - - - - Note: Average Combined Factor = DESIGN GUIDELINES AND STANDARDS 17

Monument Figure 2c: Clermont College Monument Data State Plane Coordinates Ground Coordinates North East North East Elevation (NAVD 88) Note: Average Combined Factor = Figure 2d: Raymond Walters College Monument Data Monument State Plane Coordinates Ground Coordinates Elevation North East North East (NGVD 29) Note: Average Combined Factor = DESIGN GUIDELINES AND STANDARDS 18

Monument Figure 2e: College Of Applied Science Monument Data State Plane Coordinates Ground Coordinates North East North East Elevation (NGVD 29) Note: Average Combined Factor = Figure 2f: Warren County Property Monument Data Monument State Plane Coordinates Ground Coordinates Elevation North East North East (NAVD 88) Note: Average Combined Factor = DESIGN GUIDELINES AND STANDARDS 19

Monument Figure 2g: Genome Research Institute Monument Data State Plane Coordinates Ground Coordinates North East North East Elevation (NGVD 29) Note: Average Combined Factor = Monument Figure 2h: Center Hill Monument Data State Plane Coordinates Ground Coordinates North East North East Elevation (NGVD 29) Note: Average Combined Factor = DESIGN GUIDELINES AND STANDARDS 20