XL MAX. Suspension System Data Center Ceiling Solutions. Assembly and Installation Instructions

Similar documents
Suspension System Technical Guide Data Center Ceiling Solutions

METALWORKS Concealed. Installation Instructions

FORMATIONS Curves Clouds with AXIOM VECTOR Trim and Suspension System

metalworks Plank Assembly and Installation Instructions 2.1 Read this entire document before proceeding with installation.

METALWORKS Linear (Interior & Exterior Applications)

AXIOM Classic Trim. Assembly and Installation Instructions

METALWORKS Linear (Interior & Exterior Applications)

WOODWORKS Concealed. Assembly and Installation Instructions

AXIOM Classic Trim. Assembly and Installation Instructions 1. GENERAL

Classic Exposed Tee System (24" x 24", 24" x 48", and 24" x 72") Floating Clouds and Perimeter Wall Attachment

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General

metalworks Vector Assembly and Installation Instructions

METALWORKS Linear (Interior & Exterior Applications)

Trim (Aluminum Substrate)

AXIOM Classic Trim Installation Instructions

WOODWORKS Access Hook-on System

DesignFlex Shapes Lyra, Calla, Optima, Ultima Panels

INFUSIONS and METALWORKS Wings Accent and Acoustical Clouds

METALWORKS TARTAN PANELS General Installation Instructions

WoodWORKS Channeled Plank

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. International Version

WOODWORKS Grille System

Soundscapes Shapes Acoustical Clouds

INTERIOR INSTALLATION

Face Mount to Through-the-Post Mount

AUXILIARY FRAMING AND ACCESSORIES

WOODWORKS Linear Solid Panels

WOODWORKS Linear Solid Panels

METALWORKS Wings Accent and Acoustical Clouds Installation Instructions

MPA-9000 Universal Ceiling Projector Mount Kit

Acoustical Infill Panels

CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual

INSTALLATION INSTRUCTIONS

The Festival Assembly Instructions

Heavy Duty I-Beam Trolley

2-PIECE STAIRWAY ASSEMBLY

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MSP-WRTIDSKY1 Light Weight Suspended Ceiling Kit for use with Island Display Skybox

Hang-TITE Rod Hanger Screws

Qwik-Fence Installation Instructions

Diva Acoustical Ceiling

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

INSTALLATION INSTRUCTIONS

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS

CARRIER OVERHANG 1'-0" MAX PANEL LENGTH 3'-0" MIN - 16'-0" MAX (RECOMMENDED) SPECIFICATIONS (unless noted otherwise)

SM-RAZOR-F-M/L/XL. Strong Low Profile Fixed Mount for Ultra-Thin Flat-Panel TVs INSTALLATION MANUAL

Horizontal Cable Systems

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01

MobileTrak5 Installation Instructions

Panel Grille Suspended Ceiling Installation Guide

e997 Articulating Wall Arm MANUAL IM004-03

southpaw enterprises, inc.

Light Structural Main Runner Light Structural Infill Tees. Straight Connector. Strut Structural Tee thread

INSTALLATION GUIDE. Version 2.0

Tel: +44 (0)

CMA-455 Suspended Ceiling-Tile Reinforcing Kit

INSTALLATION INSTRUCTIONS

By SP Partners, LLC. INSTALLATION GUIDE. ProTech

Installation Instructions

KS SERIES - VERTICAL INSTALLATION

March 1, Fax:

Desk/Wall-Mount Rack

48 in. X 96 in. 500 Pound Capacity Motorized Overhead Storage Unit Installation Guide [OPTION B] MODEL # PRM4X8 Patent Pending

Installation Guide 888-4WB TRAY

table of contents Sliding Door Accessories Page Latches & Snuggers Stay Rollers Brackets & Stops

KOLO SHELTER Installation Instructions Parts List

R/L, AND LXE TYPE CABLE

MM750 Installation Instructions

P /8 Ring Diameter 90. Trim Ring Mounting Holes P /8. 393/16 Ring Diameter. Stud Minimum

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

Steel Sound Enclosure

APPENDIX A, UMC STANDARD 6-5 STANDARD FOR INSTALLATION OF FACTORY-MADE AIR DUCTS

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15

INSTALLATION INSTRUCTIONS FOR HAND OPERATED SILENT STEEL ADC HEAVY DUTY CURTAIN TRACK MODELS: 280, 281, 282, 280-A, 283-N, 283-R

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

K.D. LOCKER ASSEMBLY INSTRUCTIONS

Tools needed. Supplies Needed

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

I-VICFLEX.VS1. Victaulic VicFlex Style VS1 Dry Sprinkler WARNING WARNING TECHNICAL DATA BEND CHARACTERISTICS INSTALLATION INSTRUCTIONS SIDEWALL

Top Mount Ultra Modern Hanger

Dura-Lock Roof System

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

FIRST TEAM SPORTS, INC.

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

Framework for Cable Railing

Cable Railing Kit Application Guide

CSS Central Mount System

For additional assistance call

OB1U INSTALLATION INSTRUCTIONS. Interactive Flat Panel Over White Board Mount

MANUAL e130. Wallstation

SECURITY DOORS - 2', 3', 4'

Instruction Sheet For: SCM-2

NX7 SERIES 5-1/2 HANDRAIL

Transcription:

PRELUDE Top Lock XL MAX (4) #8 x 1/" Long Main Beam Sharp Point Truss Head Screws Suspension System Data Center Ceiling Solutions Assembly and Installation Instructions SYSTEM OVERVIEW The Prelude XL Max Suspension Blind Steel Pop System Rivets is designed to 1/8" Dia. x.7" Long offer flexible and reconfigurable.16".186" support Grip Range of cable trays, bus bars, and other hanging elements via /8" threaded rod connections to structure. The diagram below provides an overview of the suspension system components, clips, and portion accessories. of the rivet IHC Intersection Used to increase main beam to cross tee connection strength and carry the ceiling system with /8" threaded rod from structure Main Beam on the IHC clip. Installation PMLC Prelude XL Max Load Connector Used to support bus bars, cable trays, and other components with /8" threaded rod along the suspension system face Installation Hardware That Needs to be Purchased Separately Screws are fine listed as shown: Min 1-1/4" or longer #8 Truss head self-tapping screws for attaching structural wall angle, lateral support bar 16" or 4" on center to structure #8 truss head self-tapping screw 1/" to secure XTAC clips to the structural wall angle #8 truss head sharp point screw 1/" long for the top lock clips, XTAC clips to tees connections, and for PMLC clips IMPORTANT NOTE: The Prelude XL Max Load Connector item PMLC is designed to be used with Prelude XL Max Suspension System only. They are designed for specific duty loads that are specified in the load charts provided on the last page of this document. When hanging heavy loads greater than those specified in the load charts, consultation by a local engineer is required. Also, please be sure to review the installation and securing recommendations for any load that will be supported by the suspension system. Armstrong is not liable for improper use or improper installation of the Prelude XL Max Suspension System or its components. Please refer to the load charts for specific information on the allowable loads for the suspension system. /8" threaded rod to structure (4' O.C. or as required) Main Beam Cross Tee 6" Max Prelude XL Max and Cross Tees 15/16" face double bulb suspension system provides maximum load carrying capacity and Seismic D, E, F performance IJC Intersection Joint Clip Used when supporting load from a cross tee that isn t supported on both sides with the Intersection Cable Tray (By others) SHC Supplemental Used to carry the ceiling system with /8" threaded rod from any route location along the main beam when plenum obstructions prevent use of the TLMBS Top Lock Main Beam Locks two main beams together for a secure connection. * Must be within 6" of an IHC or SHC

INSTALLATION CONSIDERATIONS The Prelude XL Max Suspension System is designed to be installed with /8" threaded rod from structure. However, you may find it easier to hang and level the suspension system first, using 1 gauge hanger wire before replacing all hanger wire with /8" threaded rod. 1. Lay out the space, marking the locations of the hanger rods, main beams, and cross tees, and note any mechanicals that will be supported overhead. Be sure to follow the locations and direction of the threaded rod, hangers, main beams, cross tees of the engineering drawing if working from a Reflected Ceiling Plan from a specifying architect/engineer. If plumb threaded rod drops are not possible, then a trapeze or sub framing may be required. This sub or trapeze framing must be engineered to support the designed loads.. Install the Structural Wall Angle item SWA9878HRC. Screw attach structural wall angle to studs or structure 16" or maximum 4" on center, with 1-1/4" truss head, self-tapping screws. All cross tees and main beams are to be connected to the structural wall angle with an XTAC Clip, using two steel pop rivets. IMPORTANT: Rivets are properly installed when the compressed rivet body protrudes a minimum of 1/8" past the XTAC surface.. Mark the locations of the main beams and cross tees on the wall angle. 4. Install /8" threaded rod hangers into the deck per the recommendations from the deck anchor manufacturer. Threaded hanger rods must be installed plumb with the Intersection (IHC) in all main beam-to-cross tee intersections 4' O.C., unless otherwise specified. 5. Slide the Intersection s (IHC) onto the main beam item 70145 where the threaded rods are located. IMPORTANT NOTE: s must be located prior to cross tee installation. All IHC clips need to be installed in the same direction, orientation. *Do Cross Tee Adapter Clip (XTAC) 5.a. Thread the nut on the threaded rod per the installation detail. Tighten the /8-16 nuts until metal to metal contact is made and then turn an additional 1/4 turn with a wrench. Use a thread locking compound at this connection. A locking compound is not required, if using a locknut per the illustration. Threaded Rod () Screws () Pop Rivets.a. In seismic installations requiring free-floating connections, Lateral Support Bars (LSB) shall be installed to support perimeter cross tees and main beams in place of connections to the structural wall angle with an XTAC clip. In addition to allowing free-floating connections, the Lateral Support Bar also serves as a stabilizer bar keeping perimeter components from spreading apart. The LSB eliminates the need for perimeter support wires and " wall angle molding. To install, slide the lower leg of the IHC Lateral Intersection Support Hanging Bar over Clip the top bulb of each cross tee and main beam that require the free-floating connection (as shown in the detail below). Screw attach the upper leg of the Lateral Support Bar to wall studs or structure at maximum 4" on center, with 1-1/4" truss head, self-tapping screws. The Lateral Support Bar must be screw attached to the wall before the placement of lay-in panels. Lateral Support Bar 8' Lg.16.75 Screw Attach Structural Wall Angle SWA9878 to Structure Every 16" or 4" on Center /8" nuts Nut 6. When a desired location for the threaded rod to structure cannot be achieved using the Intersection (IHC) (due to obstructions in the plenum), the Supplemental Hanging Clip (SHC) must be used to secure the main beam to the threaded rod. All SHC clips need to be installed in the same Top Lock direction, orientation. Main Beam Threaded Rod Imperial: /8" Flat Washer, (MSC Item 741505) Nut M5 x 6mm, 0.8mm Pan Head Machine Screws Adhesive Required Main Beam (4) #8 x 1/ Sharp Poi Head Scre SHC Clip Installation

Intended Location IHC /8" nuts HVAC Duct New Location Threaded Rod SHC Nut /8" nuts Nut NOTE: For rivet installation, installer must drill /16" holes through grid once the TLMBS is located. TLMBS Threaded Rod to Structure () #8 x 1/" long Sharp Point Truss Head Screws SHC Supplemental Imperial: /8" Flat Washer, (MSC Item 741505) Threaded Rod Nut Imperial: /8" Flat 1/8" Thickness, 7/8 Case Hardene Grade (MSC Item 74 M5 x 6mm, Pa Machine S * Thread Adhesive Re Blind Steel Pop Rivets M5 x 6mm, Max 0.8mm 6" /16" dia. x.450" long.15" Heavy.50" Hex Grip Range Pan Head Top Lock Shear Strength: (4) 540 #8 lbs. x 1/" Long Machine Screws Main Beam IFI 114 Grade 0, Sharp Size Point Code Truss 64 (MSC Item #67618009) SHC Clip Head Screws installation on two Adhesive Required Prelude XL Max SHC S Lock Main Beam e Clip Installation o Prelude XL Max SHC Supplemental Imperial: /8" Flat Washer, (MSC Item 741505) M5 x 6mm, 0.8mm Pan Head Machine Screws Adhesive Required Threaded Rod Nut Top Lock Main Beam Heavy Splice Hex Clip SHC Clip 8. Install the cross tees as they would be installed on any suspension SHC Supplemental system. Installation 9. Install two blind 1/8" steel pop rivets at each clip-main beam intersection (four total) as noted on the detail. Pop rivets must be inserted Main through Beam the Splice existing Clip holes Splice in the Clip XL Installation cross tee clip, then into the Intersection on (IHC) two Prelude as shown XL Max in the detail below. IMPORTANT: Connections for load-carrying grid form a structural element. Please take time to understand and follow (4) #8 x 1/" Long installation Sharp Point instructions Truss to ensure rated load performance. Head Screws Blind Steel Pop Rivets 1/8" Dia. x.7" Long.16".186" Grip Range SHC Supplemental TLMBS Hanging Top Clip Lock Installation Main Beam Installation 7. Install the Splice (TLMBS) onto each main beam coupling to secure the connection using two #8 on the IHC clip. truss head sharp point screws and two blind /16" steel pop rivets as shown in the detail below. Two holes must be drilled in the main beam to accomodate the two blind rivets. The Top Installation (4) Lock #8 x 1/" Main Long Beam Splice Blind is Steel required Pop Rivets at every main beam splice Sharp location Point in Truss the field 1/8" of the Dia. installation. x.7" Long 10. On every main beam-to-cross tee intersection and every Head Screws.16".186" Grip Range IMPORTANT: To ensure Shear Strength: rated load 60 capacity, lbs. the TLMBS must 4' cross tee-to-' cross tee intersection where an Intersection be installed within 6" of threaded rod to structure as shown (IHC) is not installed, you must install an in the image below. Intersection Joint Clip (IJC). The IJC is used when supporting a load from a cross tee that isn t supported on both sides with IMPORTANT: Rivets are rivet properly goes through installed when the the IHC. Attach the IJC to the main beam #8 x 1/" and long cross tees using compressed rivet body protrudes the XL a clip. minimum of 1/8" past the four M5 machine screws and thread locker Truss adhesive Head as shown TLMBS surface. below. All IJC clips need to be installed Sharp Point the Screw same direction, orientation. on the IHC clip. IJC Intersection Joint Clip

16".186" Grip Range Main Beam Blind Steel Pop Rivets 1/8" Dia. x.7" Long on the IHC clip..16".186" Grip Range Installation #8 x 1/" long Truss Head Sharp Point Screw IHC Intersection Make Hanging sure Clip that Installation 11. Once all the main beams and cross tees are installed, verify that all connections the IHC on clip. the Supplemental (SHC) and Intersection (IHC) are tight and a thread locking compound was used before proceeding with the installation. A locking IHC compound Intersection Hanging is not required, Clip Installation if using a locknut per the illustration. 1. Locate the positions of the mechanical equipment (cable trays, bus bars, etc.) that are to be supported and attach the Prelude XL Max Load Connector (PMLC) to the face of the suspension system. Slide the clip open and engage it on the face of the suspension system. Be sure the two halves of the clip fully engage the clip around the flange of the suspension system and are interlocked together. PMLC Load Connector Clip Threaded Rod 1 #8 x 1/" long Truss Head Sharp Point Screw Nuts 1 Load Connector Clip Installation Install the threaded rod that will be used to support the load using the provided hardware as shown in the detail above. Hand tighten nuts 1 & until metal to metal contact is made and then turn an additional 1/4 turn with a wrench. Then Nuts hand tighten nut to nut until metal to metal contact is made and then turn an additional 1/4 turn Threaded with a wrench. Rod A thread locking compound is required for this connection if you do not use a locknut as shown in the detail above. Do not use /8" nuts. Load Connector Clip Installation 14. Install the ceiling panels. SEISMIC DATA IBC categories D, E and F must also meet these additional requirements: PMLC Load Connector Clip 1. Screw the Prelude XL Max Load Connector (PMLC) clip to the suspension system using a #8 truss head sharp point screw as shown above. Be sure to screw from the larger hole (the pilot hole) into the smaller hole of the other clip. Only one screw is required to properly install the PMLC. Structural wall angle is to be used along the perimeter with a XTAC clip attaching the grid to the angle molding, as directed in section. Grid must be attached to two adjacent walls opposite walls must have a /4" clearance in accordance with ASTM E580. Ends of main beams and cross tees must be tied together to prevent their spreading. These should be locked into place using the lateral support bar. Ultra Heavy-duty grid system. See load data. Ceiling areas over 1,000 SF must have rigid bracing for the grid. Ceiling areas over,500 SF must have seismic separation joints or full height partitions. Ceilings without rigid bracing must have " oversized trim rings for sprinklers and other penetrations. Changes in ceiling plane must have positive bracing. Mechanicals (Cable trays, electrical, etc) may be attached and supported by the ceiling grid, per our instructions. However, mechanicals must be seismically braced by others. Suspended ceilings will be subject to special inspection. Perimeter support wires within 8". NOTE: Consult your local code professional for information specific to your region. California projects may be governed by DSA and OSHPD. 4

PRELUDE XL MAX LOAD CONNECTOR MAX SINGLE POINT LOADS Main Beam, 4' Span 48" 4" Max mid span load = 9 lbs Max point load within " of threaded rod = 00 lbs Cross Tee, 4' Span 48" 4" Max mid span load = 9 lbs Max point load within " of threaded rod = 50 lbs NOTES: These values are based on the spans being installed in a ' x ' module (using a ' tee). Unbraced or ' x 4' modules will have a lower mid span load value. or additional loading configurations, contact Techline for guidance and a qualified engineering professional. MORE INFORMATION For more information, or for an Armstrong Ceilings representative, call 1 877 ARMSTRONG. For complete technical information, detail drawings, CAD design assistance, installation information, and many other technical services, call TechLine customer support at 1 877 ARMSTRONG or FAX 1 800 57 TECH. For the latest product selection and specification data, visit armstrongceilings.com/datacenters. Inspiring Great Spaces is a registered trademark of AFI Licensing LLC All other trademarks used herein are the property of AWI Licensing Company and/or its affiliates 016 AWI Licensing Company Printed in the United States of America BPLA-9800-816 5