Modular Locomotive System Instruction Manual for HBK22 Fowler Body Kit

Similar documents
Billy Body Kit HBK5 CHECKLIST. Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit. Checked

Ruby 0-4-0T Kit Assembly Instructions

Shay Cab - Floor & Roof

MIDLAND RAILWAY JOHNSON 6-WHEEL 3,250g TENDER

FINNEY7 SR 5500G TENDER IN ORIGINAL CONDITION

G. Building the Cab, Cab Roof and Cab Boiler Extension Page 14 and Backhead.

FINNEY7 4500G May17 SR 4500G TENDER. Fig 1. Original Appearance. Side raves Sanding gear Front water fillers TIA Water treatment system

The Virgo/Libra Steam Engine

NSWGR Z12 CLASS LOCOMOTIVE AND TENDER KIT

Brassmasters

Build the. Steam Locomotive. Pack 06

SE5a Instrument Board part 2 - rev 1.1

Build the. Steam Locomotive. Pack 05

Aspinall locomotive and tender

7mm/0Gauge BRF 025 ZUV SHARK Plough Brake. Building Instructions

BRF-022 YGH SEALION. Building Instructions

Tips on Assembly If you are new to etched kits these tips will help you with general assembly of not just this kit but also other etched kits.

NGLK005 4mm scale, 009 gauge Statfold Barn Rly Peckett 0-6-0ST

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B

Building Rudy Kouhoupt s Walking-Beam Engine

Scratch Built: Live Steam Garratt

1. Underframe/Tank Bottom

woodworkersjournal.com MATERIAL LIST

INFINITE RANGE - CENTRE FOLDING DOOR

BRF-020 Type YCV Turbot Spoil Wagon. Building Instructions

40 & 50 Foot PS-1 Box Car Assembly Instructions

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

Instructions: PS-2CD 4000 Model Kit Revised 7/2008

Brassmasters Scale models

Reversing Gear. Shay Reversing Gear

M4 Foot Operated Underpinner Instruction Manual

The Useless Machine. DIY Soldering Edition. Instruction Guide v0004

WARNING! ETCHED PARTS CONTAINED IN THIS KIT HAVE SHARP POINTS, EDGES AND CORNERS.

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Hydraulic Clamp Carrier. Installation & Operation Manual

Scratchbuild A Backwoods Water Tank Part V - Making the Frost Box and Hanging the Water Spout

BRF-012 Type OTA Timber Wagon. Building Instructions

Deauville Installation Guide

Peter Krause ABN

PS 5077 cu. ft. Boxcar with EOC device. 1:29 scale resin craftsman kit. by Burl Rice

HOW TO TUNE A QB SERIES CO2 AIRGUN FOR NOOBS.

Portofino Case2 Installation Guide

Clock 35 - Toyland. Construction instructions for Clock 35

SINCE 1922 P UBLICATION N O

Pre-Paint>Fuselage>Empennage>Fit elevator. Objectives of this task: Materials required: Prepare the horizontal stabiliser and the elevator

Assembly Instructions 10 X 10 Aluminum Frame Building

INFINITE RANGE - CENTRE FOLDING DOOR

Installation Instructions. Walk-in Shower Screen. with 180 Return Panel

Tool Wagon Assembly Instructions

Kawasaki Mule Pro Upper Doors #06020 Installation & Operations Manual

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Detailing kit for Bachmann LNWR/LMS G and Tender. Instructions. Additional components available separately:

Portofino Installation Guide

Captain Baxter, 3D Print instructions

Gardman Lean-to Greenhouse Assembly Instructions

Corvus Racer CC

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward.

Southern Pacific C-30-4/6 Bay Window Caboose N-Scale & HO-Scale

TITGEMEYER Tf1673GB(0517)1. GETO City Body Kit with a self-supporting base and without a base Assembly Instructions

150 MM FREE STANDING WOOD FIRE FLUE KIT INSTALLATION INSTRUCTIONS


Installation for Full Size Polaris Ranger Crew Doors

F i t t i n g t h e N e w L a n d i n g G e a r t o Y o u r S k y J i b V 1

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

THE PODIUM MUSIC STAND

Elimination of Elevator Bounce

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

3/8-16 x 3/4 cap screw. 3/8-16 hex nut for above screws. 1/4-20 x 3/4 socket cap screw. 3/16 short arm hex key (not to scale)

Curium 19.4H Installation Instructions & Parts List

INFINITE RANGE - HINGE DOOR

V4 Premium Kit. Prusa i3 Build Guide

Swift assembly guide

STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE

Assembly Instructions 10 X 10 Aluminum Roof Support

EasiChas. Chassis and Detailing Kit for Bachmann MR/LMS 3F Locomotive and Tender. For EM and P4 Gauges only. Instructions

Hardware and Components:

Palatine Models. The Palatine Models Alex Jackson Turner Bending Jig. Introduction

Plans. Easy-to-Build Full-size Deluxe Murphy Bed Plan. For more plans, tools and hardware visit rockler.com

Installation Instructions for FC2 & FC15 Forward Controls for the Super Magna

Shed Assembly Instructions

caroma marc newson shower mixer

3Insert the second rod no. 4

10' Building Instructions for kit CC25 Caledonian Railway 20 Ton Brake Van

Edge 540 V3 35CC. Scheme A. Item No:L G Specifications. Flying Weight

Installation Instructions Kit, Base Rail Bracket Part # 31413

Installation instructions, accessories - Electric engine block heater

GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

INSTALLATION GUIDE. 5" Balustrade System

4 Position the Suntile to the x tile s position and mark the felt around the square box flange. Then remove the Suntile

The GAK using Ziv s GAK in the box

End tipping and runner wagons

3.2.3 Rear Door Window and Quarter Window Carrier Assembly

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

FUSELAGE CONSTRUCTION

Tools and Tips: ( 1 )

EXTRA 330SC 60CC. Item No:H G Specifications cc gas DA50,DA60, DLE55, DLE60(twin), 3W55. Description

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Deauville Installation Guide

Specifications: Hole Sizes: Selector Pin Hole: 3/8 (0.375 ) Trigger Pin Hole: 5/32 (0.156 ) Hammer Pin Holes: 5/32 (0.156 )

Transcription:

Modular Locomotive System Instruction Manual for HBK22 Fowler Body Kit Roundhouse Engineering Co. Ltd. Units 6-10 Churchill Business Park. Churchill Road, Wheatley. Doncaster. DN1 2TF. England. Tel. 01302 328035 Fax. 01302 761312 Email. mail@roundhouse-eng.com www.roundhouse-eng.com 1

HBK22 FOWLER BODY KIT. INTRODUCTION These instructions cover the construction of the body kit intended to fit the Fowler chassis and boiler kits. All parts are included to build the locomotive as a manual controlled Fowler, without a tender. The tender is available as an optional kit if required. The brass panels are photo etched to shape and all fold lines and holes are etched into the parts where necessary. Only a minimum of cleaning up is required and will normally simply mean running around the edges with a small file or emery cloth to remove any sharp edges or pips that may be left due to the photo etching process. As a general rule, all folds should be 90 degrees with the etched lines on the inside of the angle except if specifically stated otherwise. The kit is designed for either manual or radio control operation and all fixing holes are provided for both versions. The panels have been designed for assembly with soft solder, however, if preferred holes can be drilled at the joints and small rivets or screws used. If soldering, a small to medium butane blowtorch is ideal, as the large areas of brass work will dissipate the heat of a soldering iron too quickly unless a very powerful one is used. Use a suitable flux with the solder, Bakers fluid being particularly good, though extreme care must be taken during use. Follow the manufacturers instructions on the packaging of any solder, fluids or glues at all times. Glue of any kind is not suitable for the main structure, but is required for the headlamp lens. Refer to diagrams where necessary and hold parts together with 2

small clamps such as toolmakers clamps or miniature G or C clamps, during soldering or drilling of joints. It is advisable to run through the full instructions identifying all parts and mountings and have a dry run before soldering anything in place. All painting is left to the builder and Acrylic paint is readily available in spray cans for a good finish. A good primer is essential and if available an etch primer should be used on brass parts. A good model shop will stock more specialised paints and should include etch primer in the range. Read carefully and follow the maker s instructions that appear on the can before using any paint. All parts must be thoroughly cleaned and rubbed down with fine wet and dry paper prior to painting. At Roundhouse, we paint all the domes the same colour as the bodywork. 3

4 CAB LAYOUT This diagram below shows the layout of the cab fittings on the finished model, having previously constructed the Fowler Chassis and Boiler kits. The version shown is manual controlled.

When folding long brass sections such as the side flanges of the cab floor, it is better to hold the flanges between two pieces of angle iron in a vice or clamps, as illustrated below. In this way, the entire flange is bent over in one movement and results in a much neater finish. FOLDING LONG SECTIONS OF BRASS CONSTRUCTION. If you have already constructed the Fowler Chassis and Boiler kits, one boiler band holding the boiler mounting foot, and the boiler wrapper will already be fitted to the boiler. If the chassis/ boiler is complete, it will be necessary to remove the lubricator, gas tank and gas burner. Unscrew the two union nuts that connect the lubricator to the regulator and superheater. The lubricator can now be put to one side. Support the gas tank and then unscrew the union nut that connects the gas pipe to the gas burner. The gas tank can then be put to one side. If the cab floor has already been fitted, unscrew the M3 fixing screw that attaches the rear of the boiler to the rear frame spacer and remove this screw and the spacer underneath. Remove the cab floor. 5

CAB FLOOR The Cab Floor needs to be folded before it is soldered to the other bodywork parts. When folded into shape, the cab floor should appear as shown in these diagrams. Ensure that the ROUNDHOUSE logo that is etched into the brass remains to the top when finished. Fold the rear of the cab floor up 90º so the two parts of the cab back point upwards at a right angle. The flanges running along either side of the cab floor can now be folded down at 90º. On the cab back uprights, the inner and top e d g e s a r e f o l d e d backwards and t h e o u t e r e d g e s a r e folded towards the front These two holes are used when fitting the reversing lever 6

CAB FLOOR & SIDES With the cab floor now folded, the cab sides need to be soft soldered to it. The cab sides are already folded into a U shape. Fit the floor and the sides together as shown in the drawings below, and use some small tool makers clamps or equivalent to hold them together whilst soldering. Underneath View Solder along here where the cab sides and floor meet. 7

SERVO BRACKET Following the general rule that all folds should be 90 degrees with the etched lines on the inside of the angle, you can now fold up the Servo Bracket. The two pictures below show the folded servo bracket from different angles. If you are intending the finished Fowler kit to be Manual Controlled, then fitting of this Servo Bracket is optional. However, at Roundhouse we fit the Servo Bracket to both Manual and Radio Controlled versions of this model. This enables a Manual Controlled model to be easily fitted with R/C at a later date. The right hand cab side has some guide lines etched on the inside face. Lay the Cab assembly down as shown below, line up the Servo Bracket in guide lines and soft solder into place. You don t need to clamp the bracket into place before soldering. 8

ROOF SUPPORT POSTS Lay the Cab Assembly so it is sitting on the left hand side. Two Roof Support Posts can then be placed into the bottom corners The front post should line up with the etched guide line. Ensure that this post lines up with the etched guide line on the inside of the cab. Make sure that underneath, where the posts push through the floor, that they are flush with the edges of the bodywork Check that the bottom of the posts are level with the cab sides. Again it is not necessary to clamp these into place. Gently soft solder the posts to the cab panels. Do not solder right to the bottom of the post - leave about ½ at the bottom corner unsoldered so as not to disturb the previously soldered joints. Rotate the assembly and solder the remaining two Roof Support Posts into place. As before don't solder right to the bottom corner. Make sure that the Roof Support Posts are positioned so that the mounting holes are facing outwards. 9

HANDRAILS & CAB STEPS A one foot length of brass rod is supplied which should be cut into four 74mm lengths. These four lengths of rod will be the handrails and cab step supports. The four tags at the top of the cab doorway should be curved in slightly - just enough to hold the handrails in place. Solder the Handrails to the tags. Curve these tags slightly so that they hold the top end of the handrail. The cab steps can now be folded and soldered to the bottom of the Handrails. Make sure that the cab steps are level - any excess handrail protruding through the bottom of the cab step can be removed. 10

FITTING THE CAB ASSEMBLEY The Cab Assembly can now be fitted to the chassis. The lubricator, reversing lever and gas tank need be removed to enable the Cab Assembly to be fitted. Remove the countersunk screw that holds the boiler mounting foot to the rear frame spacer. Slide the Cab Assembly under the boiler (it may be easier to completely remove the boiler). The hole towards the front of the cab floor should line up with the hole in the rear s p a c e r. T h e countersunk screw can now be replaced through the frame spacer to hold the boiler and cab assembly in place. The reversing lever and lubricator now can be fitted in the cab. The lubricator connected to the steam regulator and superheater pipe as before. The pipes may need a little bending s o t h a t t h e lubricator and its drain are sitting in the left hand cab d o o r w a y. T h e manual reversing lever is fitted as shown below, using two m3 screws from beneath the cab floor - see the drawing at the bottom of Page 6. 11

BOILER BANDS AND PIPEWORK The four Boiler Bands can be fitted to the boiler using the M2 Long Steel Screws & Nuts. First, make sure that the boiler wrapper is pushed forward so that it is flush with the smokebox. Check that the Boiler Wrapper is level - if not, loosen the clamp screws and adjust the position of the wrapper. The first Boiler Band should be over the boiler wrapper and touching the rear of the smokebox. The next two Boiler Bands should be equidistant between the sanding domes and the central dome. The fourth Band is placed against the cab front. Fit the Four Boiler Bands here Take the pipework and place it over the top of the boiler so that the two brass support rings are central over the vertical screws. A hole needs to be drilled in the smokebox which will allow the shorter rod at the front to fit in. Carefully mark the smokebox, remove the pipework and drill a small in the smokebox using a 1.8mm drill. Please Note - The cylinder covers shown in some drawings and photo s are available separately and are not supplied as part of the Fowler Kit. 12

Mark here, and then drill 1.8mm Once the hole in the smokebox has been drilled, the pipework can be fitted. Again, place the pipework centrally over the boiler. The front most rod fits into the hole in the right hand side of the smokebox footplate whilst the two outer pipes tuck between the frames and the valve chests. Remember to fit the shortest rod into the hole that you drilled in the smokebox. Front Left Hand side of the smokebox Front Right Hand side of the smokebox 13

CAB FRONT PANEL Bend the Cab Front Panel as shown in these drawings. Make sure that the sanding lever slot will be on the right when fitted to the body. Front Front Rear Sanding Lever Slot Rear The Cab Front panel can now be fixed to the body using the 2 of the M2 brass screws and nuts. Again, make sure that the Sanding Lever Slot is to the right. Leave the screws loose until we have fitted the boiler pipework. The four rods at the cab side of the pipework fit into their respective holes in the cab front plate. Cab front panel showing where the pipework fits. 14

SANDING DOMES The Sanding Domes consist of three parts - a brass top, a white metal bottom and the dummy sanding pipes. First, place the dummy sanding pipes over the front screw so that the pipes are angled towards the front. The white metal part of the sand dome can now be placed over the top. Both white metal castings are identical, but they are asymmetrical - make sure that the deep cut outs sit over the sanding pipe and the shallow cut out fits over the pipework strap. The Brass top can now be screwed onto the boiler wrapper screw. It should tighten up and hold the bottom part of the dome and the sanding pipes firmly to the boiler. If it doesn't tighten up, then the screw may need a few threads removing. Repeat for the rear sanding dome. The last part of the boiler decoration to be fitted is the Sanding Lever. First, carefully bend the Sanding Lever brackets as shown below. We now need to drill a small hole in the side of the Sanding Dome. Use a 1.8mm drill and fix the lever with the steel self tapping screws. Sanding Dome Brass Top Sanding Lever Sanding Dome white metal bottom Sanding Pipe 15

FITTING THE GAS TANK AND ROOF The roof is in two parts, an upper and a lower part. The gas tank is fixed to the lower part of the roof using two M3 screws. Fit the Dummy Whistle to the upper part of the roof using the screw supplied. Then fit the upper roof to the lower roof using the four 10BA screws and nuts. Use 10BA screws here 16

The complete roof with gas tank and dummy whistle can now be fitted to the cab. Make sure that the safety valve cover is fitted over the safety valve and that it is aligned correctly. When fitting the roof, guide the cab front panel into the slot in the lower roof. Now refit the lower part of the gas pipe to the gas jet holder. Ensure that this is fully tightened up. The complete roof may now be attached to the roof mounting posts using four of the M2 x6 Brass CH screws. Use M2 x 6 Brass CH screws here. 17

18 DUMMY HEADLAMP All that remains now is to fit the Dummy Headlamp to the front of the smokebox. The headlamp lens needs to be glued into the recess at the front of the headlamp. Check that the lens fits snugly into the recess - if not you may have to remove a little of the metal will a knife or small file. Push one of the M3 x 6 brass CH screw through the hole at the rear of the headlamp and screw into the tapped hole at the front of the smokebox.

Include with this kit is the Rear Cab Plate. If you decide to build and fit the optional tender, the rear cab plate can be fitted. At the rear of the cab floor are two tags. These can be bent upward and inwards to clasp the edges of the plate. 19

Fowler Body Kit HBK22 CHECKLIST Roof - Upper Roof - Lower Cab Floor Cab Sides 4 x Boiler bands with M2 Long Steel Screws & Nuts fitted. Cab Front Panel 1 ft of Brass Handrail Rod Boiler Pipework Assembly 2 x Brass Dummy Sanding Pipes 1 x Safety Valve Cover with grub screw fitted. 1 x Filler Dome 2 x Brass Sanding Dome Tops 2 x White Metal Sanding Dome Bottoms 1 x Headlamp Casting 1 x Lens 1 x Sanding lever 1 x Rear Cab Plate 4 x Roof Support Posts 1 x Servo Bracket 2 x Cab Steps (etched brass) 1 x Brass Dummy Whistle with screw 4 x 10BA Screws & Nuts 3 x M3 x 6 Brass CH Screws 2 x Steel Self Tapping Screws 6 x M2 x 6 Brass CH Screws & Nuts 20 Checked