Parts Included: Tools Required: Canvas Office Landscape Interiors Off Module 90 Connector Kit Installation and Disassembly for Recycling Instructions

Similar documents
Important Loading Information. Tools Required. Meridian Lateral Files Instructions

Passenger/Right Center and Rear Support Brackets. Driver/Left Center and

RBP-1215B-RX DODGE RAM QUAD CAB RX3

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required

Assembly Instructions

Workbench Instructions for Assembly

INSTALLATION INSTRUCTIONS

(6) Plastic Retainers. Passenger/Right. Passenger/Right Support Brackets

Pickup Box Utility Rack Package Installation (Instruction ID: )

Box Track INSTALLATION INSTRUCTIONS

Tools Required: Materials Identification and Segregation: Disassembly Steps: Aeron Disassembly for Recycling

Support. (3)Passenger Support. Brackets. (2) Running Board (example only)

INSTALLATION INSTRUCTIONS 6 OVAL BENT END SIDEBARS DODGE RAM 1500, CREW CAB PART#: /241533B

ASSEMBLY INSTRUCTIONS MANUAL

IDR assembly instructions:

Continuous Handrail Kit Installation Instructions

Franklin Mills Stackable Movable Lateral Instructions

Yardistry. External Display YP *Time required for assembly approximately 1.5-2hrs

INSTALLING INVISIRAIL GLASS PANELS POST INFORMATION... 2 PRE-INSTALLATION... 2

INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,

Installation Instructions

Cable Tray Kit: - Cable Tray - Cable Tray Cover - Power Block Support (x2) Top Support Kit: (x2) - 2 Top Supports. Quantities are per bench

Trak-Slider Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Lab Style Table Frame Part No Assembly Guide Automation Technology

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

This procedure will cover the steps to properly pack up the ARES for shipment.

ATLANTIS RAIL Contact Information

MODULAR BUMPER INSTALLATION MANUAL

Small Projection port, Small View port Installation procedure

Installation Instructions - Model V4JSD 1

XHD Bull Bar w/ Dual Row LED Light Bar (10-17 Jeep JK)

RUN-IN SHED INSTRUCTIONS

Table of Content. Sayl Disassembly for Recycling

V nyl Gazebo truct c it Assembly Instr ons

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

OWNER S MANUAL. Safety. Please read this owner s manual before use and keep it at hand for reference. Warranty

Workbench Instructions for Assembly

IN-30000_F. Installation Instructions

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.

RIPPER PEDAL. Bearing / Axle Replacement. ( Disassembly )

**MOUNTING YOUR MONITOR

Installation Instructions

INSTALLATION INSTRUCTIONS

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

Installation for Full Size Polaris Ranger Crew Doors

Footprint Worksurface Assembly Instructions

Big Block Installation Manual For Systems without A/C

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Kai Installation Instructions

HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1

Video Wall Installation Instructions 2W X 3H, 3W X 3H

Installation Manual. SKU# TracVan Double SKU# TracVan Double SKU# TracVan Triple

INSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER

TechBench Installation Manual

Parts Included: T-Feet Assembly

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

RAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED

(2) 25mm x 20mm x 5mm Adhesive Backed Foam Pads. 100mm x 50mm x 1.0mm Adhesive Backed Foam. (2) Spacer Plates. Passenger/Right Side Frame Mounting

On-Roof Mounting Sets for Flat-Plate Collectors

ESA-100 Fixed Sidelite/Non Breakout

INSTALL LOAD BED TRACKS

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

Rockwell 4-in-1 Sliding Door

Shetland Stalls Installation Instructions

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

Office Partitions WARNING. Assembly Instructions. Customer Service A S S E M B LY HARDWARE H1 H2 H3 H4 H5 H8 H9 H10 H11 H12

Required Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench

Series 4 HV Single Monitor Lift Assembly Instructions

Range height adjustable assembly

Installing the Profile Privacy Panel. Assemble top mounting bracket. Prerequisites. Tools

ICU TRACKLESS SLIDING DOOR

User Instructions Multiline Otter Scoreboard Caddy Assembly

Frameless Fixed Panel Slider

irunning Board Installation Instruction

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030

O-Sullivan King 4 Poster Bed O-Sullivan Queen 4 Poster Bed Parts and Hardware List

Topo Freestanding Applications - Private Office

EUROLINE CLASSIC SOLID SURFACE Installation Instructions

MITCHELL WREATH RINGS NO-HAMMER ASSEMBLY INSTRUCTIONS

For additional assistance call

INOVO 2-LITE SLIDING PATIO DOOR

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

MAG-CONV Basic, 48, 48R & Midline Front Mount

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2


L.L.Bean. Wooden Slat Bed

4" Oval Nerf Bar. Part No. A1007S/B. PARTS LIST: Qty Part Description Qty Part Description

Modular Bi-File Lateral

INSTALLATION INSTRUCTIONS

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

RangerWare Fiberglass Door System Installation Instructions P/N

Transcription:

Y Parts Included: Canvas Office Landscape Interiors Off Module 90 Connector Kit Installation and Disassembly for Recycling Instructions FT127.A N Shim A Light Seal B Foam Light Seal C G H Double-Face Tape Weld Nut (5) Flat Washer(2) D J Lower Mounting Bracket Hex Socket Cap Screw (5) Hardware Pack FT127.B E Upper Mounting Bracket F Mounting Bar (2) Tapping Machine Screw (4) Screw (1) Shelf Drilling K L M Screw (4) Hardware Pack C Double-Face Tape Lower Mounting D Bracket Support Upper Mounting Upper Mounting N S Support A Light Seal B Foam Light Seal Tools Required: Hex Head P Bolt (5) R Hardware Pack Flat Washer (5) L M Screw (4) Screw Machine (1) Shelf Drilling Hardware Pack Power Driver #2 Phillips Bit Level 1/4 Allen Wrench Rachet Wrench 9/16 Hex Socket 7/16 Hex Socket 1/4 Drill Bit 3/6 Drill Bit Safety Glass 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. 1

Assembly Instructions: Note: Install Base Covers on Spine Frame before starting Return Wall installation. M 1 FT127.A 2 Wall Tiles 1. Determine where wall will be installed on Spine Wall. 2. Position Lower Mounting Bracket (D) onto bottom rail on spine wall frame. 3. Secure to frame with 4 Self Drilling Screws (M). F Center across width of rail D 3 1. Install all Wall Tiles onto Spine Wall Frame. 3/16 Holes Base Cover 1/4 Holes 1. Position Mounting Bar (F) on Top Rail of Frame centered directly above where Lower Mounting Bracket was installed. Bar should be centered on the width of the frame. 2. Drill two 3/16 holes thru Mounting Bar and top rail of frame. 3. Remove Mounting Bar from to rail. 4. Drill out holes in Mounting Bar with 1/4 Drill. 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. 2

K 4 5 F N F 1. Position Mounting Bar (F) and Shim (N) on top rail as shown. 2. Install 2 Tapping Screws (K). 3/16 Holes 1/4 Holes 6 K 1. Position Mounting Bar (F) on plastic Wire Channel flush to end of channel on Return Frame. 2. Drill two 3/16 holes thru Mounting Bar, Wire Channel and top rail of frame. 3. Remove Mounting Bar from to rail. 4. Drill out holes in Mounting Bar with 1/4 Drill. 1. Position Mounting Bar (F) in Wire Channel as shown. 2. Install 2 Tapping Screws (K). 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. 3

C A 7 Wire Channel B 1/4 1. Apply Double Face Tape (C) onto Frame. 2. Make sure notched end of Light Seal (A) is up and 1/4 from top Channel. Press onto Double Face Tape. Cut Light Seal even with bottom of Frame. 3. Press and center Foam Light Seal (B) onto Light Seal (A). 8 1. Set Return Frame onto Lower Mounting Bracket. 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. 4

9 10 J J L E G G 1. Adjust Glides on Return Frame to match Spine Wall Frame. 2. Install Machine Screw (L). 11 1. Slide Weld Nuts (G) into Mounting Bars. 2. Set Top Mounting Bracket (E) onto Mounting Bars. 3. Install 5 Hex Socket Cap Screws (J) loosely. Plumb Return Wall. Tighten 5 Hex Socket Cap Screws. 12 R 1. When installing off module walls back to back, place 2 Washers (R) under Mounting Bracket before installing Screws. 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. 1. Install Base Covers and Wall Tiles onto Return Frame. 5

1 FT127.B 2 N Top Support Rail 1. Install Top Support Rail from off Modular Tile FT188 onto Spine Wall Frame. L 3 R P 1. Insert Upper Mounting Support (N) into Return Wall Frame. Secure to frame with 3 Hex Head Bolts (P) and 3 Flat Washers (R). M B 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. 1. Insert Lower Mounting Bracket (B) into Bottom of Frame. Loosely attach to frame with Machine Screw (M). 6

Note: Install Base Covers on Spine Frame before starting Step 4. Mark Holes 4 P R S Upper Mounting Support Top Support Rail 1. Set Return Frame into desired location on Spine Frame. Loosely install Upper Mounting Bracket (S) onto Upper Mounting Support with 2 Screws (P) and Flat Washers (R). Make sure Bracket engages into slots on Top Support Rail. 2. Plumber Frame and mark Lower Mounting Bracket holes on Spine Frame. 3. Remove Upper Mounting Bracket. M 5 D 1. Remove Lower Mounting Bracket from Return Frame. 2. Position Lower Mounting Bracket (D) onto bottom rail on spine wall frame. 3. Secure to frame with 4 self Drilling Screws (M). 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. 7

C A B 6 Wire Channel 1/4 1. Apply Double Face Tape (C) onto Frame. 2. Make sure notched end of Light Seal (A) is up and 1/4 from top of Channel. Press onto Double Face Tape. Cut Light Seal even with bottom of Frame. Upper 3. Press and center Foam Light Seal (B) onto Light Seal (A). Mounting Bracket Off Modular Tile 7 R P S N Lower Tile 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. Lower Mounting Bracket Top Support Rail 1. Install Lower Tiles and finish installing off Modular Tile on Spine Frame. 2. Set Return Frame onto Lower Mounting Bracket and engage Upper Mounting Bracket (S) onto Top Support Rail. Fasten to Upper Mounting Support (N) with 2 Screws (P) and 2 Washers (R). 3. Adjust Glides on Return Frame to match height of Spine Wall. 8

8 9 L Top Tile Rail B 1. Secure Lower Mounting Bracket (B) to frame with Machine Screw (L). 1. Install Top Tile Rail above off Modular Tile. 10 1. Complete Tiling Spine. Install tiles on Return Frame. 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. 9

Every wall run requires support. To ensure safe, supported and stable configurations Vivo Interiors partial height walls must be supported properly and at appropriate intervals. All support requirements for the Vivo System should be used carefully: When designing and specifying When installing components and equipment When reconfiguring workstations during the life of the facility Support consideration for wall-height support The following consideration are critical for determining proper support when using support walls, wall starts, open return frames and support pedestals: Height of wall run (highest frame or highest combination of regular and stacking frames) Length of wall run and frequency of support Number and type of load-bearing components being supported Height of support Placement and width of support While they are listed here in the sequence in which support decisions are usually made. All of these support considerations are interdependent: Changing one of them to meet certain needs may affect the requirements for the others. For example, while a 10 run of 57 -high frames allows a maximum of two load bearing components per frame if the length of the wall run is reduced. This ability to adjust one factor to compensate for another allows designers and specifiers to meet users specific needs for privacy, space and amount of storage. The first four considerations (the height of the wall run, the length of the wall run and frequency of support, the number and types of load bearing components being supported, and the height of support) are covered in the Vivo planning guide. The considerations related to the placement and width of support are summarized later in this section. Exceptions or additional details are contained in the sections covering each consideration. 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. 10

Proper Support for Non-load Bearing 90 Degree Wall Runs Type of Support Wall runs must be supported at both ends by an architectural wall or a support wall. Spine Wall Height of Support Wall Must be no more than 22 lower than the height of the wall run. Support Wall Height of Run Frames and Stacking Frames can be up to 90 high, with no more than 22 difference in height between adjacent frames. Width of Support Wall Wall runs up to 4 long require 42 return walls. Wall runs greater than 4 and up to 14 require 48 return walls. Wall runs up to 14 can also be supported by two support walls (one on each side of the connector) with a minimum width of 24. Support Wall Length of Run Maximum length of run is 14 between supports. Proper Support for Load Bearing 90 Degree Off Module Connection Spine Wall Height of Run Off Module Wall Frames and Stacking Frames can be up to 90 high, with no more than 33 difference in height between adjacent frames. up to 33 Height off Module Wall Off Module Wall must be no more than 33 lower than the height of the spine wall run. up to 90 Width of Support Width must match or exceed the depth of the deepest component on the Off Module wall run on both ends of the off module wall. Note: Off module connections cannot be used at both ends of an off module wall run. 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. Support Wall Length of Run Maximum length of run is 8 between end supports, unless you use mid-run support. Load bearing wall runs support load bearing and non-load bearing components. 11

Disassembly for Recycling: Materials Identification and Segregation: Where possible, plastic components are marked with ASTM recycling codes. Use these codes to identify material type for recycling. Non marked components should be treated as mixed plastic. Ferrous metals can be identified using a small magnet for recycling. Non-ferrous metals should be separated and recycled separately. To disassemble product, reverse the above installation steps. 2013 Herman Miller, Inc. eeland, Michigan. Printed in the U.S.A. Y, and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc. 12