Lange Crank Hoist-a-top Assembly Instructions

Similar documents
MONKEY BARS OVERHEAD RACK INSTALLATION

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

HOIST A TOP. 6b TJ/YJ/CJ only. 6a JK only. Page 1


RESIDENTIAL MOTORIZED STORAGE UNIT

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY




In the box: Figure 1: Instructions, 1-channel, 2 retainers, 2 adjustable tubes, 1 chrome ring, and hardware. Channel

Low Headroom Rear Mount TorqueMaster

Installation Manual. SKU# TracVan Double SKU# TracVan Double SKU# TracVan Triple

Installation Instructions/Hoist-a-TopTM

RESIDENTIAL MOTORIZED STORAGE UNIT

43107 Rhino Jerry Can Holder Rhino Jerry Can Holder - Horizontal

Heavy-Duty Bypass Track System

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

Welded screw eye HCP1443. D Pulleys. Webbing straps with buckles HCP1459.SET DO NOT UNTIE. Single black/red hoisting rope HCP1483**

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

Required Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

48 in. X 96 in. 500 Pound Capacity Motorized Overhead Storage Unit Installation Guide [OPTION B] MODEL # PRM4X8 Patent Pending

ABM International, Inc. Navigator Assembly Manual

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

Medium HoneyBadger Chase Rack Installation Instructions

Barricade Trail Force HD Rear Bumper w/ Tire Carrier installation (07-16 Wrangler JK)

Save time! Read the entire manual before beginning Hoister installation.

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

INSTALLATION GUIDE NS Double Clamp Ladder Rack NV200 / City Express ( Aluminum )

WAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S

Top Mount Ultra Modern Hanger

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER R H

INSTALLATION INSTRUCTIONS - CEILING POWER TRAK, HANGER HOOKS AND RACKS I. CONTENTS CEILING POWER TRAK KIT

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK

INSTRUCTION BOOKLET #C20

RESIDENTIAL MOTORIZED PLATFORM LIFT SYSTEM

This Folding Shelf Kit will work in conjunction with our Swing Away Carrier Kit allowing you add additional exterior storage space to your Vanagon.

Assembly and installation help

40670 Transit Connect/NV200/City Express/ProMaster City Partition

Save time! Read the entire manual before beginning Hoister installation.

BY ALIEN TECHNOLOGIES CORP

Triple Bypass System

Welded screw eye HCP1443. (G1) Cleat 7757ASSY. (G1) Cleat 7753ASSY. Webbing straps with buckles HCP1459.SET (G1) Cleat 7754ASSY DO NOT UNTIE

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

Spoked GARRICK HANGER

FOLDING TONNEAU RACK. 1. Rack Rail Assembly

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions

Save time! Read the entire manual before beginning Hoister installation.

Intercooler Shroud and Belt Cover for WRX

SB-WM-ART2-L-BL SB-WM-ART2-XL-BL

IMPORTANT SAFETY INFORMATION. KIT INCLUDES A 1 welded screw eye B 4 pigtail lag screws C 1 shackle

Assembly Instructions

DOCK WEDGE - STANDARD

8' x 22' Cash Hut INSTALLATION INSTRUCTIONS

WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount

Installation Guide. Tel: (519) Railway St. P.O Box 668 Seaforth, ON Canada N0K 1W0

Assembly Instructions 10 X 10 Aluminum Frame Building

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

Serial Number Location

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

Box Track INSTALLATION INSTRUCTIONS

Installation Guide for Rough Country 1.25 inch Body Lift Kit w/o Shocks (07-15 Wrangler JK 4 Door) Item # J10048 Option B; Manual

======================================================================================== ( DR / DR) JK WRANGLER MOD RACK

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

VACUSEAL MODEL 200. HOT TUB PRODUCTS 233 Carrington Road Bethany CT

Geiger Rhythm. Right ON SITE. Installation Principles

ULTRA SPACE SAVER SQUARED Installation Instructions

SCHACHT STANDARD FLOOR LOOMTM

USSC LLC - GSS LLC FIELD MODIFICATION INSTRUCTIONS

INVIS-A-RACK INSTALLATION INSTRUCTION DZ , DZ , DZ IR-HOUSING-ASSEML X2 IR-HOUSING-ASSEMR X2 BUNGEE BOX D 8 FT.

JEEP JK ( 5 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT

MOTORIZED STANDARD SHADE WITH CABLES Installation Instructions

Industrial Hanger ASSEMBLY INSTRUCTIONS

48 in. X 96 in. 500 Pound Capacity Motorized Overhead Storage Unit Option B

Rockwell 4-in-1 Sliding Door

Stag Hanger ASSEMBLY INSTRUCTIONS

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

By SP Partners, LLC. INSTALLATION GUIDE. ProTech-12

STEP 1 : DESTROYER FRONT BUMPER INSTALL GATHER YOUR TOOLS AND LAY OUT YOUR PARTS... *shorty bumper to show hardware* Tools Required:

PFW 6875 Installation Guide Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d Installation, Installatie gids

Assembly Instructions for model: VMPR1

INSTALLATION INSTRUCTIONS

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Polaris XP Doors (P144202) Installation Instructions

SINGLE TRACK BYPASS (patent pending) barn door hardware

AX1001. Smith/Functional training Combo-free weight ASSEMBLY INSTRUCTIONS

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

Oxford Stalls Installation Instructions

Installation Guide 40670

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

TorqueMaster Replacement Spring

Cellar Hanger ASSEMBLY INSTRUCTIONS

48 in. X 96 in. 500 Pound Capacity Motorized Overhead Storage Unit Option A

Transcription:

Lange Crank Hoist-a-top Assembly Instructions Installation Time: 1-4 Hours depending on skill level Tools Required: Cordless Drill Level Stud Finder Ratcheting wrench 9/16 socket or wrench 11/16 socket or wrench 5/16 socket or wrench 2x6 standard lumber (length depending on stud spacing) 3 construction screws Tape measure Ladder Electrical tape To speed installation first determine the direction of your ceiling joists in reference to your garage door opening (Parallel or Perpendicular). Next take a measurement to determine if you have 16 OC or 24 OC spacing between ceiling joists. For joists running parallel cut (4) pieces of 2x6 lumber to an appropriate length in order to span the distance between joists. For perpendicular ceiling joists you will need to cut (1) piece of 2x6 lumber to a length long enough to span at least 3 ceiling joists. An additional (2) pieces of 2x6 lumber will need to be cut to length depending on your stud spacing (16 OC or 24 OC). Installation Instructions: Assembling the Frame 1. Slide two round foam bumpers onto each of the two supplied arms and space them evenly. These will be adjusted at a later time to support the Freedom top panels. 2. Depress the spring loaded button and insert each of the two arms into the main frame assembly to form a T shape. Next insert the remaining arm into the remaining opening and adjust each arm to the proper hole layout depending on the model of jeep. All hole settings may need to be adjusted based on your model of jeep and/or any modifications to your top (roof racks, etc.) that may affect the balance of your top when lifted.

3. Slide smaller square foam piece down the main shaft of the T assembly with the slots facing up with the smaller slot on the left hand side. The proper orientation of this is crucial to making sure the Freedom panels fit securely. 4. Now assemble the remaining larger form pieces with the fingers oriented upwards and the smaller slot on the left hand side like the previous foam piece. Be sure to leave the assembled foam piece behind the tab with multiple mounting holes to ensure it does not interfere with cable operation. 5. Locate the hooks and insert them through the holes at the ends of the left and right arms with the black straps with the grommets and secure with nylon nut as shown. Do not over tighten, hooks should remain loose with at least 3-5 threads extending beyond the nylon portion of the nut. 6. Attach the rear hook assembly as shown using the supplied nylon nut. Be sure not to overtighten as adjustment will be necessary during hard top removal. Insert square plugs into the exposed ends of the tubes.

7. Attach elastic straps to the grommets then to the main frame for now. These will be used later to secure the Freedom Panels to the frame prior to lifting off the top. Mounting the Crank 1. Start by securing one of the 2x6 pieces of lumber that was already measured and sourced. Measure 50 up from the floor and mark. This measurement can be moved up or down to adjust to obstacles on the wall or for varying heights of the end user. Using 3 construction screws (not supplied) attach the 2x6 to the wall studs making sure it is level and attached to at least 2 separate studs using 4-6 of the 3 construction screws. 2. You will need to remove the spool to gain access to the mounting holes for the crank assembly. Locate the crank unit and remove the center spool using the 11/16 & 9/16 wrenches or sockets.

3. Mount the crank assembly using the (2) supplied 3 lag screws and washers. Once mounted reinsert the spool and attach the supplied handle as shown. Mounting the pulleys (Perpendicular) ceiling joists pictured. 1. Mount (1) of the sourced 2x6 pieces of lumber to the wall directly above the crank assembly where the ceiling meets the wall. Fasten using 3 construction screws (not included). Using the remaining (2) pcs of 2x6 mount one on the mark that was identified as the center point of the hardtop from the preinstallation instructions. The last piece should be mounted approx. 32 OC from the center board. 2. Mount the dual pulley in the center of the 2x6 (number 1 in the photo above) using the supplied screws (4). Next mount a single pulley in the center of the 2x6 (number 2 in the photo above) using supplied screws (4). 3. The final single pulley will be mounted ½ left of center on the 2x6 (number 3 in photo above) using the supplied screws (4). The final pulley mounting locations should look like the photo below.

4. For Parallel ceiling joist configuration the mounting locations will be the same for all 3 of the pulleys, but pulleys 1, 2 & 3 referenced above will be attached to a single longer 2x6 mounted to the ceiling joists. Make sure to select a length that is at least long enough to span several ceiling joists while still allowing for a spacing of 32 between pulleys 2 & 3 and making sure that pulley 3 is ½ left of center. See diagram below. Installing the Cable 1. Mark one end of the cable with electrical tape then measure 20 down the cable and mark with another piece of electrical tape. This will leave the cable with 20 on one side of the tape with the marked end and 23 on the other side.

2. Starting with the marked end of the tape (20 side) insert the cable into one of the larger holes on the spool of the crank assembly from left to right. Pull until you reach the tape at the 20 mark. 3. Locate the same end of the cable and pull it back through another hole in the spool from right to left. 4. Take the opposite end of the cable (non-marked 23 side) and insert it into the spool from left to right through the remaining hole. This will result in the longer side being on the right (gear side) and the shorter end (marked end) being on the left side of the spool. 5. Loop the longer cable (side closest to gear) over the right side of the dual pulley and continue to pull the cable skipping the first single pulley (½ off center) and loop over the last single pulley. This cable will be attached to the front of the frame that was previously assembled.

6. Loop the cable through the front mounting tab on the assembled frame and tighten using the supplied hardware as shown. 7. Loop the shorter end of the cable over the left side of the dual pulley on the wall and pull remaining slack through. This cable will then loop over the first of the single pulleys (½ off center). 8. Using the supplied hardware connect to one of the rear mounting holes on the frame assembly and tighten as you did on the front. Note: You may need to move this connection point to find the proper balance for your top based on an initial test. 9. Use the crank to begin coiling up excess cable making sure that the cable is winding evenly onto the corresponding side of the spool. As the slack is wound up make sure that the empty frame is being lifted evenly. Adjustment may be necessary to ensure even lifting between the front and back of the frame.

Testing the Assembled Unit It is recommended to check all bolts and fasteners prior to hard top removal or testing with any load. Finished Assembly Installation Instructions Written by ExtremeTerrain Customer Jerry Birdsong 06/01/2018