Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB. Job # BID-CDBG #16

Similar documents
Vinyl Windows Manufactured by VPI Quality Windows

Material List for Log Complete Packages

Vinyl Windows and Doors Manufactured by VPI Quality Windows

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

EXTRUTECH PLASTICS, INC. Custom Extruder of Close Tolerance Profiles

VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS

INSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

Your sauna can be placed on concrete, tile, linoleum, or any surface that does not absorb water. Do not install the sauna on carpeting.

8x8 Shed Plans and Building Guide

SPECIFICATIONS PROPOSAL & BID DOCUMENT

8/7/ HP SWING DOOR INSTALLATION INSTRUCTIONS

12x12 Shed Plans and Building Guide

Boxed Shed. QUAKER or A-FRAME SIZES: 6 x 8 6 x 10 T1-11Siding

Painting Hard Co. Inc.

Carpentry/Carpenter CIP Task Grid

10x10 Shed Plans and Building Guide

Sash Replacement Guide for Andersen Impact Resistant Casement Windows

Site Preparation Information for:

A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.

Quick Reference Guide For MoistureFree Certified Inspectors and Contractors

Sections & Details VOCABULARY

6x6 Shed Plans and Building Guide

Chapter 12 - Windows and Doors

Measuring & Ordering Guide

Unit 9. Wall and Ceiling Framing

LEAD DESIGN SPECIFICATIONS

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Strands & Standards CARPENTRY 2

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

Kitchen and Bath Design Planner

Chapter 12 - Windows and Doors

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

Entry Level Assessment Blueprint Carpentry

Chapter 19. Interior Finish Work

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

WALL TO FABRICATED FLOOR

Installation Instructions

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

Punch List Checklist EXTERIOR LANDSCAPING. COMMON LIVING SPACES and HALLS

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

BUILDING PLANS. BUILDING DEPARTMENT

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

Installation Instructions

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

Best Barns USA Assembly Book

St. John s United Methodist Church Facility Stewardship Plan Last update: 9 May 2011

Chapter 18. Interior Doors

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised April

the Greenbriar 12' x 16' Best Barns USA Assembly Book Revised June 4, 2013

T he Double-Hung Replacement System replaces the sash and balance system of an older double-hung window. The

Please read and understand all instructions before beginning. These instructions cover the non-impact aluminum sliding glass door.

E-Z BUILD SHED BUILDING GUIDE 10' 10' 10' 12' 10' 14' 10' 16' 10' 20'

Truman Heritage District Design Guidelines. Glossary

2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ

UNIT 12: INTERIOR DOORS AND TRIM

WINDOW INSTALLATION GUIDE

for Andersen Frenchwood Hinged and Outswing Patio Doors, Sidelights, and Transoms

GLOSSARY OF TERMS SECTION 8

Handcrafted Excellence TIMBER FRAME HOMES

KNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT CERTIFICATE OF APPROPRIATENESS APPLICATION

E-Z BUILD STEEL BARN 12' 12' 12' 16' 12' 20'

Common Safety Concerns

Best Barns USA Assembly Book

Best Barns USA Assembly Book

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised May 31, 2013

Best Barns USA Assembly Book Revised October 24, 2017

ForceField Air & Water Barrier System. installation instructions

Best Barns USA Assembly Book

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Country Cabin. Assembly Manual. HomePlace Structures

4. Components and Stairs

MANUFACTURING INC. Specifications

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Worthington Sauna Installation & Owner s Manual

Best Barns USA Assembly Book

DATE SENT: RESPONSE NEEDED: YES NO SUBJECT: Risk Assessment(s)

STACKING MULTI-SLIDE DOOR SYSTEM

Steel Reinforced Joining Guide (Horizontal / Vertical)

Chapter 6 - Walls & Stairs

How to install soffit VENTILATION. How to begin

Carpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%

Tools required by installer: Materials required by installer:

A Visual Field Guide. Village of Danforth Historic Resource Survey. Syracuse, New York. for the

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel

General Spec Sheet: 18 x 24 (457mm x 610mm) Vent

Assembly Instructions

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Metro Series Sauna. installation instructions

10. Vents, Baffle Guard and Blocking

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

Keystone Garage Assembly Manual

Entry Level Assessment Blueprint Carpentry

Transcription:

Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB Job # BID-CDBG #16 Bid is to be turn-key, including all applicable code requirements, materials, labor, City Business License permits, insurance, debris removal and other necessary items that may be required to complete the Scope of Work. Contractor must assume that measurements contained in this request are approximations; it is the contractor s responsibility to assure accurate measurements when quoting. As of January 1, 2010, contractors/maintenance workers performing renovation, repair and painting projects that disturb lead-based paint in homes, child care facilities, and schools, built before 1978 must be certified and must follow specific work practices to prevent lead contamination in most situations. Firms performing renovation, repair and painting projects for compensation that disturb lead-based paint in pre-1978 homes, child care facilities and schools must be certified by the EPA and must use certified renovators who are trained by EPAapproved training providers to follow lead-safe work practices. Contractor will be responsible for the cost of any retesting of failed Clearance test(s) and will be responsible for any additional labor and material costs until a passed Clearance test is obtained. Due to program funding restraints and requirements we reserve the right to remove less priority Item numbers to achieve the maximum allowable work to be performed. For more information or for general questions about the scope of work, and to gain entry please contact Ed Causebrook at ed.causebrook@cityofrockhill.com or (803) 329-5589 or 803-242- 2863 cell. This property is owner occupied. Project Location: 452 Locust Street Rock Hill SC 29730 Item 1: Kitchen: Kitchen floor size is approximately 7 x 9. Floor stabilization: The kitchen floor is bouncy. Not looking to level, minimal jacking as needed, to add additional support and stabilization. Insure existing 2x8 floor joist are properly fastened to center girder. Install 1 drop beam spanning approximately 6 floor joists with proper sized beam, placed approximately 3 from exterior wall. Install cement footers 18 x18 x12 deep, for each jack post spaced no wider then 6. Repair/replace up to 3 floor joist as needed. Repair floor at bedroom door. Install 5.0MM 4'x8' utility PR (luan). Fill all joints and fasteners divots to insure smooth continuous flooring. Install new linoleum (Vinyl Sheet Flooring:.125 mm). Install new transition strip at door locations. Install new base moulding and base shoe molding as needed painted to match existing. Remove and install new shelve under sink. 1

$ Item 2: Bathroom floor repair: Bathroom floor is approximately 5 x 6. Repair floor where it is weak around the toilet. Reuse commode. Do not remove tub Remove and dispose of ALL linoleum and ALL deteriorated wood flooring. Install floor joist blocking as needed (the same sized dimensional lumber as floor joist) to provide a fastening surface for sub floor patch. Insure patch is the same height as the surrounding floor. Install 5.0MM 4'x8' utility PR (luan). Fill all joints and fasteners divots to insure smooth continuous flooring. Install new linoleum (Vinyl Sheet Flooring: a minimum of 2MM thick). Insure water tight seal around tub. Install new transition strip under door. Install new base moulding and base shoe molding as needed painted to match existing. Item 3: Front door repair: Replace broken glass. $ $ Item 4: Front porch repair: Wrought iron column, guard rails and handrails are rusted trough giving no support. Replace with a 4.25-in minimum Colonial Porch post. o Install with a Quick-Mount, aluminum plinth, or other elevated bracket. Install wood guard rail with top plate. o Add a support to the bottom rail maximum span of 4. o 2 x 2 pickets o Rails, pickets, top plate will be joined with screws no nails. Install wood handrails o 2 x 2 pickets o Rails, pickets, top plate will be joined with screws no nails. Item 5: Window replacement: $ 2

Replace front porch metal casement window ¼ ½ ¼ approximant size is 54 ½ x 52 ½ and kitchen metal casement window approximant size is 24 x 41. Windows must be double hung, half screen, E-star rated, gas filled. Replace rotted exterior trim and sill on windows as needed. Replace interior window trim as needed. $ Item 6: Crawl Space doors: Build 2 new crawl space doors including jambs, headers, stops, hinges and hasps. $ Item 7: Storm doors: Install new storm doors on the front 36 x 80 and rear 32 x 80. $ Item 8: Rear entrance door: Adjust, re-work, trim, add door sweep, re-hinge, threshold to existing wooden door to insure proper working condition and air sealing. $ Item 9: Painting (peeling, chipping, alligatoring surfaces) The A-side of the house is the side facing the road and is typically the location of the main entrance door to the house. The remaining three sides of the house are denoted with letters B through D moving clockwise from the front of the house. Exterior; Side A through Side D OLDER, white wood corner boards, vertical trim boards, fascias, soffits, crown moldings and trim boards on main house. Clean, scrape and re-paint. ADDENDUM #1; Replace rotted wood as needed. 3

Side B through Side D ADDENDUM #1; Clean, scrape and re-paint replace rotted wood as needed and shingles on D side of utility storage. Side C White wood attic air vent and frame. Clean, scrape and re-paint. Side A Porch White wood ceiling, crown moldings, ceiling support beams and trim boards. Clean, scrape and re-paint. Door A1 White wood door threshold. Clean, scrape and re-paint. Interior; Room 6 Bedroom 3 Door B1 White and yellow wood door frame, jambs and stops. Make smooth and operable, clean, scrape and re-paint. $ PROJECT TOTAL: $ 4

5