TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project

Similar documents
Maldives: Strengthening Capacity for Operations Management

Mongolia: Intelligent Transport Systems Development for Mongolia

TERMS OF REFERENCE FOR CONSULTANTS

Kingdom of Cambodia: Institutional Strengthening of the Cambodian National Petroleum Authority

LAW ON TECHNOLOGY TRANSFER 1998

People s Republic of China: Improving Energy Efficiency, Emission Control, and Compliance Management of the Manufacturing Industry

Supporting Regional Project Development for Association of Southeast Asian Nations Connectivity

(Cofinanced by the Global Road Safety Partnership)

Technical Assistance Report

Sri Lanka: Technical Assistance for Water Supply and Sanitation

Fielding of Consultants 04 September November February July 2004

Asia-Pacific Region Automotive Industry Sustainable Development Declaration

HUMAN RESOURCE DEVELOPMENT STRATEGY NATIONAL NUCLEAR ENERGY AGENCY INDONESIA For FNCA Human Resource Development 2003 Guritno Lokollo

Islamic Republic of Pakistan: Enabling Economic Corridors through Sustainable Transport Sector Development

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Appendix-1. Project Design Matrix (PDM)

National Innovation System of Mongolia

Bhutan: Adapting to Climate Change through Integrated Water Resources Management

Rules of Usage for the BESSY II Electron Storage Ring and the BER II Neutron Source at the Helmholtz-Zentrum Berlin für Materialien and Energie GmbH

Informal document WP.5 (2016) No. 9

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

Terms of Reference of Aircraft Noise at IGI Airport, New Delhi

European Charter for Access to Research Infrastructures - DRAFT

Operational Objectives Outcomes Indicators

European Union - New Zealand SCIENCE AND TECHNOLOGY COOPERATION ROADMAP Research and Innovation Priorities

10 th APEC TRANSPORTATION MINISTERIAL MEETING 7 th October 2017 Port Moresby, Papua New Guinea Ministerial Statement

Mainstreaming Air Quality in Urban Development through South South Twinning

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE

United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses

Technical Assistance Reforms Improving the Speed, Relevance, and Quality of Technical Assistance Operations

Metrological Telecommunication System Development Project

Implementation of Sustainable Transport for All (Cofinanced by the Government of Austria)

Mongolia: Enhancing the Use of Multiple Data Resources to Monitor Progress Towards the Sustainable Development Goals (SDGs)

EXPERT GROUP MEETING ON CONTEMPORARY PRACTICES IN CENSUS MAPPING AND USE OF GEOGRAPHICAL INFORMATION SYSTEMS New York, 29 May - 1 June 2007

4 Briefing. Responsible investor

Nasir, Dao PKM Abdul Partner PwC Legal (Vietnam) Co., Ltd

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or

Quality assurance in the supply chain for pharmaceuticals from the WHO perspective

WIPO Development Agenda

The 45 Adopted Recommendations under the WIPO Development Agenda

Facilitating Technology Transfer and Management of IP Assets:

Assessing and Monitoring Social Protection Programs in Asia and the Pacific

Preparing for an Uncertain Future:

8 th Annual Meeting of OECD-CESEE Senior Budget Officials

Public Art Network Best Practice Goals and Guidelines

Enforcement of Intellectual Property Rights Frequently Asked Questions

GUIDELINES FOR THE APPLICATION FOR A SPACE STATION CARRIER LICENCE. Section 1 - Introduction

ASIAN DEVELOPMENT BANK

Survey of Institutional Readiness

I-5 Bridge Replacement Project

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013

SINGAPORE TO PARTNER THE GOVERNMENT OF SRI LANKA TO DEVELOP CAPABILITY IN URBAN PLANNING AND GOVERNANCE

Trade facilitation in the context of the SPS Agreement

Highways, ring road, expressways of tomorrow in the Greater Paris

New Development Bank Technical Assistance Policy

MARITIME MANAGEMENT MASTER S DEGREE (ONLINE) Train for a leading role in maritime-based organizations.

BOARD OF DIRECTORS MEETING Port Authority of the Cayman Islands 45A Harbour Drive April 28,

Mongolia: Strengthening Systems for Promoting Science, Technology, and Innovation

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

SMEs Development: Vietnamese Experience

EXECUTIVE SUMMARY. St. Louis Region Emerging Transportation Technology Strategic Plan. June East-West Gateway Council of Governments ICF

TERMS OF REFERENCE Supporting Implementation of HPNSDP. Technical Assistance for Improving TA Mechanism for the next Health Sector Programme

Fujitsu, SMU, and A*STAR collaborate on traffic management technologies with the Maritime and Port Authority of Singapore

the relevant needs of the existing power stations remains the mainstay of the Cooperation.

What does the revision of the OECD Privacy Guidelines mean for businesses?

KIMST. Create Dreams and the Future of the Oceans. KIMST takes the initiative in Marine R&D Innovation

THE LABORATORY ANIMAL BREEDERS ASSOCIATION OF GREAT BRITAIN

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

PROGRAMMING AND MODALITIES

Circular letter No. 16

TERMS OF REFERENCE. Preparation of a Policymakers Handbook on E-Commerce and Digital Trade for LDCs, small states and Sub-Saharan Africa

This Call for Qualifications does not require the preparation of a design proposal.

Rosatom Approach to IPR Management in Collaborative Projects on Innovations

S 0342 S T A T E O F R H O D E I S L A N D

Ex-Ante Evaluation (for Japanese ODA Loan)

Chapter 11 Cooperation, Promotion and Enhancement of Trade Relations

Green Energy Finance Workshop Monday, 5 June 2017, 9:00 a.m. - 12:30 p.m. 6 ADB Avenue, Mandaluyong City 1550, Metro Manila, Philippines

Technical Assistance Report. Assessment of Power Sector Reform in Asia and the Pacific

Leapfrogging of Clean Technology in Central Asia Regional Economic Cooperation Countries through Market Transformation

CLIENT ALERT. SBA Issues Several New Rulemakings, Including Proposed Increases to the Size Standards for NAICS Sectors 51 and 56.

Information Technology Policy

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS TENTH MEETING

MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY

CURRICULUM VITAE. Alastair David Maclean. Senior leader with considerable commercial and change management experience

Is Texas Ready for Mileage Fees? Results from Exploratory Study Presentation to the Texas Transportation Commission December 15, 2010.

Pan-Canadian Trust Framework Overview

WFEO STANDING COMMITTEE ON ENGINEERING FOR INNOVATIVE TECHNOLOGY (WFEO-CEIT) STRATEGIC PLAN ( )

Project NEON Announcement of Apparent Best Value Design-Build Proposer Transportation Board of Directors Meeting

EGS-CC. System Engineering Team. Commonality of Ground Systems. Executive Summary

Project Administration Instructions

TERMS OF REFERENCE. 30 Calendar-days = 1 person month (Average 50% in Egypt) Deputy Team Leader of Industrial Business Services at GIZ PSME Project

"Workshops on key economic issues regarding the. enforcement of IPR in the European Union"

ANNEXES FOLLOW-UP OF RECOMMENDATIONS BY ORDER OF PRIORITY

Initial draft of the technology framework. Contents. Informal document by the Chair

Opportunities and Challenges for Open Innovation

Science, Research and Information Technology

The Strategy of Promoting Born - Global and High- Growth SMEs

Transportation. Growth Management Policy Board April 4, 2019

Computing Requirements of Sri Lankan Scientific Community

National Economic Census 2018: A New Initiative in National Statistical System of Nepal

Transcription:

Expressway Operations Improvement Project (TRTA SRI 50299) I. Background TERMS OF REFERENCE FOR CONSULTANTS Attached Technical Assistance on Sri Lanka: Expressway Operations Improvement Project 1. The Government of Sri Lanka has applied for a loan from the Asian Development Bank (ADB) for the South Asia Subregional Economic Cooperation (SASEC) Port Access Elevated Highway Project. The project aims to alleviate traffic congestion in the densely populated areas and to improve connectivity between potential economic hinterland along the expressway network and both the commercial center and international gateway in Colombo. The Ministry of Higher Education and Highways (MOHEH) is the executing agency, and the Road Development Authority (RDA) is the implementing agency of the project. The proposed technical assistance will be attached to the loan project to further improve operations of expressways. 2. The RDA has expanded its expressway network since the Southern Expressway, Sri Lanka s first expressway, was opened to traffic in 2011. The Colombo Katunayake Expressway (CKE) has been in operation since 2013, and a part of the Outer Circular Highway (OCH) since 2014. The current toll rate policy and toll collection system have been historically developed on a project-by-project basis so toll rates and collection systems differ among expressways. However, once the rest of the OCH is completed, the three expressways will be connected with each other. The planned new Central Expressway leading to the OCH will also join the network. Furthermore, the New Kelani Bridge, funded and implemented by the Japan International Cooperation Agency, links the Colombo Katunayake Expressway to the proposed toll elevated highway; the proposed project will become a part of the expressway network. The expansion of the expressway network will require a comprehensive, modern, and consistent toll policy and collection system. 3. Toll rate. The current toll rates consist of fixed fee and variable fee based on project-specific parameters such as recovery period, construction cost, and traffic volume. These parameters are, in principle, kept constant; thus, there is no in-built mechanism to regularly review and update the rates. The current rates and toll policy may be neither reasonable nor sustainable in the emerging landscape because the application of different rates to each expressway would be unfair and even confusing to road users under the network; the expanding expressway network has yet to be incorporated in the toll rate policy; parameters used for the calculation do not include augmentation of expressway capacity, vehicle volume, and operation and maintenance costs; (iv) no inflation factor is considered; and (v) the impact of new toll collection technology needs to be fully incorporated. The technical assistance (TA) will assist in developing a new accountable toll rate tool to address long-term operational sustainability for the expanding expressway network. 4. Toll collection system. The toll collection system also varies among the expressways. The CKE uses both manual toll collection (MTC) and electronic toll collection (ETC) with a simple open tolling system but the OCH and the Southern Expressway use only MTC with a closed system. The ETC system adopted in the CKE is very limited with radio-frequency identification (RFID) passive technology, compared with the more advanced system currently in operation in other countries. The RDA thus decided to adopt a new ETC system of multi-lane free flow for the proposed SASEC Port Access Elevated Highway Project, which will be expanded to other expressways as a national ETC system architecture. Although the operation and maintenance of the system are basically outsourced through a service agreement, this would still require policylevel initiatives and institution-level human resource development. The TA will thus support preparation of an action plan to create an enabling environment for the ETC system,

2 preparation of an information technology (IT)-related organizational structure and identification of required human resources in the RDA, and training of staff of the new IT section to efficiently manage the system. The TA will also assist in enhancing expressway capacity by obtaining key operational parameters to be secured by the newly introduced electronic toll collection system. II. Scope of Services 5. The TA will have two components: improvement of toll rate, and capacity enhancement for the implementation of ETC. A. Component 1 (improvement of toll rate ) 6. A firm (or a joint venture) will be recruited to carry out component 1 (TA Output 1). 7. The consultants under the firm shall provide the following services for TA Output 1 in consultation with RDA officials: review existing toll policies and best practices of the toll rate policy in other countries; prepare a fair and sustainable toll policy model with due consideration of cost recovery, sustainability, and accountability; and prepare a toll rate policy to be applied to the expressway network with a toll rate review framework. All parameters to be considered for the toll rate settings and its regular review shall be clearly identified. B. Component 2 (capacity enhancement for the implementation of ETC) 8. Individual consultants shall provide the following services for TA Output 2 (action plan to create enabling policy environment) in consultation with RDA officials: identify remaining policy bottlenecks to implement and enforce the new toll collection system; based on the bottlenecks identified in the above, prepare prerequisite and midterm action plans to create an enabling policy environment; and advise contingency and/or transition plans toward full implementation and enforcement of the toll collection system. 9. Individual consultants shall provide the following services for TA Output 3 (preparation of the organization structure and human resources plan for the IT division) in consultation with the RDA officials: assess the current IT capacity of the RDA to manage and operate the new toll collection system and leverage the system for effective expressway ; propose an appropriate structure of IT division in due consideration of effective operation and capacity of the toll collection system as well as utilization of the collected data from the toll collection system for expressway ; and prepare staffing and qualification requirements for the proposed IT division.

3 10. Individual consultants shall provide the following services for TA Output 4 (provision of training for IT division staff) in consultation with RDA officials: assess the capacity of the IT division staff, and prepare the training program required; and provide IT training to the IT division staff to operate, manage, and fully utilize the toll collection system. 11. Individual consultants shall provide the following services for TA Output 5 (enhancement of expressway capacity) in consultation with RDA officials: identify necessary financial and operational parameters to be obtained from the new toll collection system; propose the parameters to be used for design specifications for procurement of the toll collection system; and provide the RDA with support to prepare an expressway operation and plan including toll rate revision; a traffic plan; road safety; and (iv) safeguards, by leveraging data and information obtained by the toll collection system. III. Deliverables 12. The consultants shall prepare reports for TA Output 1 as follows: Interim report. The consultants shall analyze the existing toll rate policy and identify critical issues of the current toll rate when applying it to the expressway network. The consultants shall also present several good practices of toll rate policy in other countries. Fair and sustainable toll policy models in due consideration of cost recovery, sustainability, and accountability need to be included in the interim report. Final report. The consultants shall consolidate all activities for TA Output 1, its assessment and findings, and recommendations. The consultants shall prepare a toll rate policy to be applied to the expressway network with a toll rate review framework. All parameters to be considered for the toll rate settings and its regular review shall be clearly identified and incorporated into the guidelines. IV. Input Requirements 13. TA Output 1. The assignment for TA Output 1 will be for 6 months and is expected to commence in April 2019 and end in October 2019. A total of 4 person-month inputs of international s and 4.5 person-month inputs of a national will need to be provided as in the table. 14. Quality- and cost-based selection method with a quality:cost ratio of 90:10 and biodata technical proposals shall be used for this recruitment. Output-based contracts with reimbursable items based on actual expenses will be used. 15. TA Outputs 2 5. The assignments for TA Outputs 2 5 will be carried out by individual consultants. A total of 6 person-month inputs of international s and 36 person-month inputs of the national will need to be provided as in the table.

4 Staffing Requirements, Responsibilities, and Qualifications Experts PM Responsibilities Qualification Requirements TA Output 1 Toll rate /team leader Financial Expressway TA Output 2 ETC policy TA Output 3 ETC institutional 2 - Manage overall team work quality - Assess the existing toll policy, and collect good practices of toll policies in other countries - Identify parameters to be used for a new toll rate policy - Prepare and finalize toll rate policy guidelines and propose a reasonable review framework 2 - Prepare fair, sustainable, and accountable toll policy models, and compare the models to use for the Sri Lanka expressway network - Prepare and analyze long-term sustainability of the toll policy model with reasonable assumptions to review toll rates 4.5 - Support international s to prepare the toll policy models and guidelines - Collect necessary information, data, and institutional and policy constraints as important inputs - Coordinate with the RDA all activities concerned 2 - Identify remaining policy bottlenecks to implement and enforce the new ETC - Prepare prerequisite and midterm action plans to create an enabling policy environment - Advise a contingency or transition plan toward full implementation and enforcement of ETC 2 - Assess IT capacity of the RDA to operate and manage ETC - Propose an appropriate structure of IT division in consideration of the effective operation and capacity of the ETC system as well as utilization of the collected data from the ETC for expressway - Postgraduate degree in public policy, economics, transport, engineering or equivalent - Minimum 5 years experience in toll settings, and/or expressway operation and - Familiarity with expressway toll structure and policy - Postgraduate degree in business, finance, accounting, public policy or equivalent - Minimum 5 years experience in toll or fare settings, and/or revenue generating infrastructure operation and - Familiarity with expressway toll structure and financing model - Bachelor s degree in engineering, transport economics, finance, or equivalent Postgraduate degree in these fields is - Minimum 10 years professional experience - Minimum 5 years experience in expressway operation and and/or revenuegenerating infrastructure operation and - Familiarity with expressway toll structure, toll financing model, or SOE is an advantage - Minimum 5 years experience in ETC system development, installation, and/or operation - Familiarity with enabling policy environment to introduce the ETC system - Minimum 5 years experience in ETC operation and - Familiarity with institutional settings and requirements for IT-related organization - Working experience in information system is an advantage

5 Experts PM Responsibilities Qualification Requirements - Prepare staffing and qualification requirements for the proposed IT division TA Output 4 IT IT specialist TA Output 5 Expressway Transport planner, road specialist, and road safety specialist 1 - Assess the capacity of the IT division staff - Prepare the training program required for operation and of the ETC system 12 - Provide IT training to the IT division staff to operate, manage, and fully utilize the toll collection system 1 - Identify necessary financial and operational parameters for effective expressway to be obtained from the new toll collection system - Propose the parameters to be used for design specifications for procurement of the toll collection system 15 (12, 6 and 6) - Provide the RDA with support to prepare expressway operation and plan including toll rate revision; traffic plan; and road safety, by leveraging data and information obtained by the toll collection system - Minimum 5 years experience in IT training and capacity development - Familiarity with ETC system and/or infrastructure would be - Bachelor degree in information technology, or equivalent - Minimum 6 years professional experience - Minimum 3 years experience in IT training and capacity development - Familiarity with ETC system and/or infrastructure would be - Working experience in/with the public sector is an advantage - Postgraduate degree in public policy, business, economics, transport, engineering, or equivalent - Minimum 5 years experience in toll settings, and/or expressway operation and - Familiarity with organization and/or information system - Bachelor degree in relevant fields (economics, public policy, civil engineering, environment, etc.) - Minimum 10 years professional experience - Minimum 5 years experience in the relevant fields - Familiarity with transport would be - Working experience in/with the public sector is an advantage ETC = electronic toll collection, IT = information technology, PM = person-months, RDA = Road Development Authority. Source: Asian Development Bank. V. Counterpart Services and Facilities 16. The RDA shall provide all the necessary data/reports as available within the RDA. The RDA shall also provide the consultants with office space with office furniture, and the necessary counterpart officials.