Red Rocks Noise Monitoring, db1 (25 80 Hz) Levels 5/16/14: Global DubFest

Similar documents
STRLodgingPerformanceSnapshotAugust2017CYTD

Climate Update. Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University.

Recreation Facility Hours

MONTHLY OPERATING REPORT

Model 356P/L Advanced PLL LVPECL or LVDS VCXO

TEST (a) Write these numbers in order of increasing size. 12, 7, 15, 4, 1, 10, Circle all the odd numbers.

Demonstration of PFR Improvement September ERCOT Operations Planning

Practice Test Chapter 8 Sinusoidal Functions

Sinusoidal Applications

The Influence of Quieter Pavement & Absorptive Barriers on US 101 in Marin County

Climate Update. Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University Presented by Reagan Waskom

TS79L00 Series 3-Terminal 100mA Negative Voltage Regulator

AMMA Conference (6-10 November 2006) UHF-VHF Wind Profiler Radars Network. Sodars Network

Model 653 Very Low Jitter LVPECL or LVDS Clock

TEST 6. 12, 7, 15, 4, 1, 10, Circle all the odd numbers.

TT7000R4. DS Instruments. D text. RF Power Meter, Signal Generator, Frequency Counter. -Key Features-

KIODO 2009: Trials and Analysis Florian Moll Institute of Communications and Navigation German Aerospace Center (DLR)

SINGAPORE HOTEL RATES VALID FROM NOW - 31MARCH 2016

Total Marks : 100 READ THE FOLLOWING DIRECTIONS CAREFULLY:

Climate Update. Wendy Ryan Research Associate For Nolan Doesken, State Climatologist.

TS79M00 Series 3-Terminal 500mA Negative Voltage Regulator

National Radio Channels. PPM measurement October 2017

Climate Update. Nolan Doesken State Climatologist Atmospheric Science Department Colorado State University.

Start Date. Census Date Delivery Mode EFTSL Unit Fee. End Date

Ultra Low Quiescent Current 5V/150mA Fixed-Voltage Ultra Low LDO

VAN BUREN COUNTY TENNESSEE

A 2014 Survey of Butterflies at the Confluence *

Critical Evaluation of the Motorola M12+ GPS Timing Receiver vs. the Master Clock at the United States Naval Observatory, Washington DC.

CQ-206A High-Speed Small-Sized Current Sensor

Description. Table 1. Device summary. Order code Package Packing. TDA7851F Flexiwatt25 (vertical) Tube TDA7851FH-QIX Flexiwatt25 (horizontal) Tube

Ultra Low Quiescent Current 5V/150mA Fixed-Voltage Ultra Low LDO

Oyster Monitoring ( ) Nikki Dix, Pam Marcum, Matt Monroe

DISCONTINUED PC3240TB BIPOLAR ANALOG INTEGRATED CIRCUIT 3.3 V, SILICON MMIC WIDE BAND AMPLIFIER DESCRIPTION FEATURES APPLICATIONS ORDERING INFORMATION

3-Termal 500mA Negative Voltage Regulator

Date 7pm 8:30pm. 3-Jul. Coed Recreational. No Game.

Week I AUDL Signals & Systems for Speech & Hearing. Sound is a SIGNAL. You may find this course demanding! How to get through it: What is sound?

S TAT E O F THE MEDIA: HOW AMERICA LISTENS MARCH 2015

The Big Train Project Status Report (Part 94)

3-Terminal 500mA Positive Voltage Regulator

CRYSTAL RESONATOR. DSX321G MHz

CRYSTAL RESONATORS (JAPAN) 1B326000AB0AR (INDONESIA) 1C326000AB0AR RECEIPT. Serial No. : DATE : 2008/12/08 ITEM : C.ENG. ENG.

BusinessHaldimand.ca. Haldimand County 2018 Community Profile

Drought Update for March 2006

TS34119 Low Power Audio Amplifier

parents & leaders 10-Aug-17 Unit Commisioner Meeting 7:00pm-8:00pm Goldsmith Building 1950 West 3rd Street Unit Commissioners NA NA NA

WHAT TO EXPECT IN 20I8

Family Group Record. 1 M John H. Eisenhower Born F Mary Ann Eisenhower. 3 F Catharine Ann Eisenhower. Jacob F. Eisenhower

BusinessHaldimand.ca. Haldimand County 2019 Community Profile

DAISHINKU CORP. QUARTZ CRYSTAL DSX321G MHz 1B224000BC0E 1C224000BC0E. Techfaith Wireless Communication Technology (Shanghai) Ltd.

60% 100% 100% Performance Report YTD YTD YTD. June Development Services Division. In this Edition. target: 100% target: 100% target: 100%

Decoding Galileo and Compass

Model 633 Very Low Jitter LVPECL or LVDS Clock

M70LL Laser Distance Sensor

MEASURING HUM MODULATION USING MATRIX MODEL HD-500 HUM DEMODULATOR

NEWSPAPERS and MAGAZINES. Cakebread, Robey & Co Ltd Trade Catalogue (July 1938) (Builders Materials: with diagrams and illustrations)

5 V, SILICON GERMANIUM MMIC MEDIUM OUTPUT POWER AMPLIFIER. Part Number Order Number Package Marking Supplying Form

Assessing the Feasibility of Wind Power Production for the University of Rhode Island s Bay Campus

SEQUATCHIE COUNTY TENNESSEE

EXAMINATION TIMETABLE SUMMER 2017 (Year 11)

Homogenisation of Maximum and Minimum Air Temperatures in Ireland. Mary Curley * and Seamus Walsh

The DC Machine Laboration 3

Long-term changes in the magnetosheath: Solar wind drivers and magnetospheric effects

Switched-mode power supply control circuit

DISCONTINUED PC3232TB BIPOLAR ANALOG INTEGRATED CIRCUIT 5 V, SILICON GERMANIUM MMIC MEDIUM OUTPUT POWER AMPLIFIER DESCRIPTION FEATURES APPLICATIONS

LIST OF MOVIES FROM PAST SFFR MOVIE NIGHTS (Ordered from recent to old) *See editing Instructions at bottom of document

Paper 2. Calculator allowed. Mathematics test. First name. Last name. School. Remember KEY STAGE 3 TIER 3 5

Climate Update March 2006 Meeting

80mA Low Noise Ultra Low Dropout Voltage Regulator

University of California, San Diego Department of Electrical and Computer Engineering

Organised by: Science Buskers Festival 2017

TSL channel buffers for TFT-LCD panels. Features. Application. Description

Climate Update September 24, 2003 WATF meeting

by the numbers distribution: locations in Southeast Michigan, delivered every Wednesday

RECOMMENDATION ITU-R S.733-1* (Question ITU-R 42/4 (1990))**

For ultra-high precision measurement of current: DC, AC, pulsed..., with galvanic separation between primary and secondary. Applications.

SPRING. FALL There will be no classes Wyndham Championship Week (August 13-19) CAMPS. Visit us online at: Summer. Winter

Mercury Minimization Plan City of Otsego

Drought Update January 18, 2005 WATF Meeting

Cable Testing TELECOMMUNICATIONS AND NETWORKING

RECOMMENDATION ITU-R SA Protection criteria for deep-space research

Description The RA-FX1D offers 8 Mono and 8 Dual Mono selectable delays to cover a range of popular applications.

All in all, a very interesting project; the PQube appears to be a handy tool in the power quality kit!

MSS Gateway AAP COLLECTION

Keywords. DECCA, OMEGA, VOR, INS, Integrated systems

Description. Order code Package Packing

Formals. We got you. Spinner Music Productions

Phase 2 Silver Line Update

Feed back element in high performance gradient amplifiers Feed back element in precision current regulated power supplies

Certification Cover Sheet Accredited Calibration Order Number:

August Sun Mon Tue Wed Thu Fri Sat. 3 Summer Check-In 7th Grade. 1 2 Summer Check-In 8th Grade C Day School Starts 12 A1 13

Tom's Sewing Centre. Countryfolk Fabric. Summer Special Events

Singapore Hotels - Tariff ( FIT Room Rates) ( Market : Asian Market)

Monitoring Based Commissioning using Visualization Techniques. Ben Burgoyne, CCP, LEED AP Session Number R1.47 3/6/2014 9:00 am Room 347

sound is a longitudinal, mechanical wave that travels as a series of high and low pressure variations

Austin. July 2010 PPM Pre-Currency Data. Carrie Stein, Senior Account Manager Jenny Griffith, Senior Training Service Consultant Arbitron Inc.

Diagnostic Assessment

For ultra-high precision measurement of current: DC, AC, pulsed..., with galvanic separation between primary and secondary. Applications.

4GHz / 6GHz Radiation Measurement System

Climate Update May 2006 Meeting

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA

Transcription:

1 Red Rocks Noise Monitoring, db1 (25 Hz) Levels 5/16/14: Global DubFest

Red Rocks Noise Monitoring, db1 (25 Hz) Levels 5/17/14: Gramatik

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 5//14: Bassnectar jet overhead and people talking nearby parked car idling

1 Red Rocks Noise Monitoring, db1 (25- Hz) Levels 5/31/14: Bassnectar

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 6/19/2014 Feed the Rocks

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 6/20/2014 Skrillex

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 6/20/2014 Skrillex

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 7/03/2014 Dead Rocks 18:00 18:15 18: 18: 19:00 19:15 19: 19: 20:00 20:15 20: 20: 21:00 21:15 21: 21: 22:00 22:15 22: 22: 23:00 23:15 23: 23: 00:00 00:15 00: 00: 1:00

17:00 17:15 17: 17: 18:00 18:15 18: 18: 19:00 19:15 19: 19: 20:00 20:15 20: 20: 21:00 21:15 21: 21: 22:00 22:15 22: 22: 23:00 23:15 23: 23: 00:00 00:15 00: 00: 1:00 Red Rocks Noise Monitoring, db1 (25- Hz) Levels 7/18/2014 Global Dance

17:00 17:15 17: 17: 18:00 18:15 18: 18: 19:00 19:15 19: 19: 20:00 20:15 20: 20: 21:00 21:15 21: 21: 22:00 22:15 22: 22: 23:00 23:15 23: 23: 00:00 00:15 00: 00: 1:00 Red Rocks Noise Monitoring, db1 (25- Hz) Levels 7/19/2014 Global Dance

17:00 17:15 17: 17: 18:00 18:15 18: 18: Red Rocks Noise Monitoring, db1 (25- Hz) Levels 7/20/2014 Global Dance 19:00 19:15 19: 19: 20:00 20:15 20: 20: 21:00 21:15 21: 21: 22:00 22:15 22: 22: 23:00 23:15 23: 23: 00:00

16: 16: 17:00 17:15 17: 17: 18:00 18:15 18: 18: 19:00 19:15 19: 19: 20:00 20:15 20: 20: 21:00 21:15 21: 21: 22:00 22:15 22: 22: 23:00 23:15 23: 23: 00:00 Red Rocks Noise Monitoring, db1 (25- Hz) Levels 7/31/2014 Hard Red Rocks

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 7/18/2014 Global Dance

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 7/18/2014 Global Dance

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 8/13/2014 Dirty Heads 19:00 19:15 19: 19: 20:00 20:15 20: 20: 21:00 21:15 21: 21: 22:00 22:15 22: 22: 23:00 23:15 23:

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 8/129/2014 Atmosphere db1 1min Morrison db1 15min Morrison 18:19:0019:1519:19:20:0020:1520:20:21:0021:1521:21:22:0022:1522:22:23:0023:1523:23::00

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 9/12/2014 Flux Pavilion

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 9/26/2014 Big Gigantic

Red Rocks Noise Monitoring, db1 (25- Hz) Levels 9/27/2014 Big Gigantic

Red Rocks Amphitheatre Monitoring of Sound Levels Summer 2014 Addendum: Missing Data Date Sat, Jun 21, 2014 Sat, Jul 19, 2014 Fri, Aug 08, 2014 Fri, Aug 29, 2014 Fri, Sep 12, 2014 Fri, Sep 26, 2014 Sat, Sep 27, 2014 Name of Event 1 Skrillex 2 Global Dance Festival 2 Pretty Lights 1 Atmosphere 1 Flux Pavilion 3 Big Gigantic 3 Big Gigantic 1 Indicates dates when Jefferson County Open Space data was not recorded for part or all of the concert 2 Indicates dates when Morrison (Wood Lane) data could not be reported 3 Indicates dates when Red Rocks Front of House data was time offset the graphs show an attempt to sync the data