Tools needed. Supplies Needed

Similar documents
CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. International Version

MONKEY BARS OVERHEAD RACK INSTALLATION

Mach Wall Installation Instructions

How to Install the QuickHang Installation Kit

Office Installation Guidelines

Chapter 1. Beam and Sill Plates

AXIOM Classic Trim Installation Instructions

Chapter 23. Garage Construction

Gambrel Barn with Overhang Manual

INSTALLATION INSTRUCTIONS

Panel Grille Suspended Ceiling Installation Guide

AXIOM Classic Trim. Assembly and Installation Instructions

METALWORKS Concealed. Installation Instructions

Trim (Aluminum Substrate)

Walk-in Configurations

Top Mount Ultra Modern Hanger

Hospital Grade Welded Ceiling System

METALWORKS Linear (Interior & Exterior Applications)

WG-4 Wall Guard Installation Instructions

AXIOM Classic Trim. Assembly and Installation Instructions 1. GENERAL

METALWORKS Linear (Interior & Exterior Applications)

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General

SAGIREV Installation Manual

Linear Open Style Suspended Ceiling Installation Guide

INSTALLATION INSTRUCTIONS

Tips for Professional Ceiling Installers

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501)

Assembly and Installation Guide

WOODWORKS Walls. Installation Instructions WALL

FlowBar Architectural Linear Diffusers F L- 1 0 / F L-15 / FL-2 0 F L- 2 5 / F L-30 I NSTA LL AT IO N & OPER AT I ON M AN UA L

Baby Grande with Crank, Housing, and Side Rails Installation Instructions

Chapter 3. Wall Layout

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Versatility at Work. Installation Instructions

INSTALLATION INSTRUCTIONS FIXTURE SERIES: SAE 202 MOUNTING TYPE: RECESSED WALL / SLOT PAGE: 1 OF 8

48 in. X 96 in. 500 Pound Capacity Motorized Overhead Storage Unit Installation Guide [OPTION B] MODEL # PRM4X8 Patent Pending

metalworks Plank Assembly and Installation Instructions 2.1 Read this entire document before proceeding with installation.

Chapter 3. Wall Layout

WoodWORKS Channeled Plank

Bionic 4 PERIMETER, CONTINUOUS RUN X3, X7

Box Track INSTALLATION INSTRUCTIONS

" BASE CABINET

Chapter 7 - Porch Framing

Chapter 18. Interior Doors

INSTALLATION GUIDE. TRANZFORM Sound TRANZFORM Space

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Dura-Lock Roof System

Chapter 6 - Walls & Stairs

TIP FOR GETTING STARTED

UNIT 12: INTERIOR DOORS AND TRIM

Octagon Greenhouse Manual

48 in. X 96 in. 500 Pound Capacity Motorized Overhead Storage Unit Option A

Building An Outdoor Playhouse

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

Metallaire Installation Instructions

Installation Instructions. Conventional Wainscot Wall Padding Panels MODEL # RWC25321 RWC26321 RWC253X1 RWC263X1 RWC25321 RWC25XXX RWC26XXX

WoodTrac Direct Mount Ceiling System

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

DECKING INSTALLATION GUIDE

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Original Gallery System

Install Guide. view our Install video guide online

Laminate Cabinet Installation Instructions

Installation Instructions

Classic Exposed Tee System (24" x 24", 24" x 48", and 24" x 72") Floating Clouds and Perimeter Wall Attachment

METALWORKS TARTAN PANELS General Installation Instructions

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

Q-Sox Installation Instructions

modular/panel-built sauna kit

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

48 in. X 96 in. 500 Pound Capacity Motorized Overhead Storage Unit Option B

Dave's Glossary of Construction Terms. by Dave Osborne (

Adjustable Countertop Installation

Installation Guide (888)

Cabinetry Installation

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

HONEYCOMB SHADES. Cordless INSIDE MOUNT. A few simple tools are required: STANDARD HARDWARE OPTIONAL HARDWARE

SERIES 9000 RAILING SYSTEMS INSTALLATION GUIDE

Precut Value Shed Manual Gambrel Barn

INSTALLATION INSTRUCTIONS

Kentucky 4H Wood Science Plans Notebook. Plans Level 2

DO NOT HESITATE TO CONTACT US TO BE GUIDE DURING THE INSTALLATION OF SQUAREDECKO PRODUCTS

Spoked GARRICK HANGER

Stag Hanger ASSEMBLY INSTRUCTIONS

Method of Build 1. General

Harmony 1/4 Glass Railing Installation Instructions - Deck Application

The Festival Assembly Instructions

Contour Hanger ASSEMBLY INSTRUCTIONS

Industrial Hanger ASSEMBLY INSTRUCTIONS

Chapter 17 - Porch Trim

Rafter Cutting Basics

Octagon Vinyl Gazebo Assembly Instructions

Chapter 11. Siding and Soffit

Revision Date: April 01, Paramount Enclosure

Double Beam Freestanding Pergola Installation Guide

Metro Series Sauna. installation instructions

Installation Instructions

12 x 12 Flat Top Pergola

Transcription:

Installation Guide

Key System Components Main beam Cross tee Tools needed Chalk line Drill (cordless) ¼" drill bit Hammer Miter saw Pencil String line(s) Stud finder Tape measure ½" to 1" wood chisel Calculator (optional) Finish nailer (optional) Wall molding and corner medallion Panel Supplies Needed Brad nails (½") for border tile fabrication Drywall screws Finish nails (2½") Hanger wire Lag-eye screws Main beam clip (suspension mount shown) Main beam clip (surface mount shown) PLEASE READ THIS INSTALLATION GUIDE IN ITS ENTIRETY BEFORE BEGINNING INSTALLATION

Installation Guide There are two methods for installing the Evoba Wood Ceiling System: surface mount (attaching directly to joists or existing ceiling surface using main beam clips) and suspension mount (attaching the system to joists using hanger wire). Be sure to follow the directions that correspond with your chosen method of installation. for technical support call 800.434.3750 Step 1) Determine the height of the ceiling If you are using the suspended mount method, in each corner of the room, measure and mark on the wall the desired finished ceiling height (Fig 1). If you are using the surface mount method, attaching directly to the ceiling joists or existing ceiling surface using the supplied main beam clip, measure down 2¼" from the ceiling joist or surface and mark on wall, in each corner of the room. (Fig 2). ceiling height minimum of 2¼ from existing ceiling Use a chalk line to connect the corner marks, snapping out the new ceiling height on each wall. This is the reference point for the top of the wall molding. Fig 1 Step 2) Install corner medallions 2 1 4" Place the corner medallion so the top of the medallion is level with the snapped chalk line. Use a 2½" finish nail to fasten the medallion to the wall (Fig 3). Repeat in all corners of the room. Fig 2 Step 3) Install wall molding Line up a piece of wall molding so the chalk line is just visible above the molding. Butt the wall molding to the corner medallion and nail the molding to the wall Fig 3

studs using a 2½" finish nail (Fig 4). Subsequent wall moldings can be installed by abutting the factory-cut square edges. Alternatively, the molding ends can be mitered for a more seamless joint. Repeat these steps until you complete the entire wall and meet at the opposite corner medallion. Repeat this process on all walls of the room. Step 4) Layout of main beams The following instructions are for a full ceiling application. For a tray or soffit application, please see page 7. Determine whether to install the first main beam in the room's center or to install two main beams on either side of the centerline. This will ensure your border tiles are as wide as possible to best utilize materials and aesthetics. There are two layout options. You will need to perform the calculations for both methods to determine the best layout option (Figs 5 & 6). Layout option 1 On one wall running parallel to the ceiling joists, measure the distance from wall to wall. Establish and mark on the wall the center point. Measure, in inches, the distance from the center point to opposite wall. Using a calculator if needed, divide this distance by 25.5. The resulting number is the number of rows of tiles required to span half the room. For example, let's assume we have a room that is 14'-7" (175") from wall to wall. 175 divided by 2 = 87.5 to center point. Divide this number by 25.5 (the distance from center to center of each row). 87.5 divided by 25.5 = 3.43. This means that each half of the room needs about 3½ rows of tiles (3 full tiles and 0.43 remainder). Layout option 2 To determine your best layout option, you must also consider whether materials and aesthetics are best utilized when two main beams are installed an equal distance from the center point (as opposed to option 1, where the main beam is installed directly on the center point). To do this, subtract 12.75 from the center point measurement (87.5 in our example). 87.5 12.75 = 74.75. Divide by 25.5 (74.75 divided by 25.5 = 2.93). This means that each half of the room will need almost 3 full rows of tile (two full tiles and 0.93 remainder). In our example, layout option 2 is the best use of materials and will achieve the best appearance. Whichever number is the larger remainder is the best option (.43 in option 1,.93 in option 2). Fig 4 OPTION 1 Fig 5 OPTION 2 Fig 6 centerline main beams centerline main beams

If using layout option 1, snap a line in the center of the ceiling (or on joists) perpendicular to the joists. Then measure over in 25½" intervals on both walls on each side of the centerline until you reach the opposite walls. Snap chalk lines to mark main beam layout (Fig 7, 8, 9). floor joists floor joists centerline Fig 7 Fig 8 first set of main beams Fig 9 subsequent main beams

If using layout option 2, measure over 12¾" from both sides of the centerline to determine the first two main beam locations. Then measure over in 25½" intervals on both walls on each side of the centerline until you reach the opposite walls. Snap chalk lines to mark main beam layout (Fig 10, 11, 12). floor joists 12 ¾ 12 ¾ centerline first set of main beams Fig 10 Fig 11 Fig 12 subsequent main beams

When building a soffit or tray ceiling and using only full-sized panels, follow these instructions. main beams first set of main beams To calculate the size of a tray or soffit ceiling where Evoba is used, add the distance from the wall (or other termination point) plus the distance from centerto-center between the main beams and cross tees. 25 25½ The distance from a wall or termination point to the center of the first main beam is 25". The distance from center-to-center between the main beams is 25 1 2". The distance from a wall or termination point to the center of the first cross tee is 25". The distance from center-to-center between the cross tees is 25 1 4". (Fig 13) 25¼ 25 cross tees For example, let's say you are going to install a tray ceiling that has 4 rows of mains (distance A) and 5 rows of cross tees (distance B). Distance A - 25" + 25 1 2" + 25 1 2" + 25" = 101" Distance B - 25" + 25 1 4" + 25 1 4" + 25 1 4" + 25" = 125 3 4" The installation itself will proceed according to normal instructions. Fig 13 starting point subsequent main beams floor joists Step 5) Install hanger wires (suspended system only) For surface mount installations, which do not require hanger wires, go directly to the surface mount installation instructions in Step 6. Hanger wires must be spaced no more than 48" apart and must be attached directly to the ceiling joists, or through the drywall ceiling into the joists above, on every-other joist. Starting at one end of the room, mark the center of the first joist nearest the wall. From this point, mark the center of every-other joist where the main beam chalk line intersects it (Fig 14). Repeat this process with each main beam chalk line. Screw in the lag eye screws at the locations specified above. Tie hanger wire to the lag eye screws by wrapping wire around the lag eye three times. Bend the tag end of the hanger wires 90º at the desired ceiling height so they are parallel with the ceiling above (Fig 15). = hanger wire placement points Fig 14 joist hanger wire 90º Fig 15 main beams

Step 6) Install main beams For both suspended and surface mount installations, follow these steps. 11/16" For the first main beam to be installed in each row, a tongue will need to be created on one end so that main beam can rest on the wall molding (Fig 16a). Follow these steps to create the tongue: (a) Measure 11 16" and make a pencil mark. Then, using a miter saw, cut the face of the main beam until the blade hits the spline (Fig 16b). a. b. (b) Using a wood chisel, chisel off the face of the main beam (Fig 16c), leaving the entire spline. This will create the tongue that will rest on the wall molding (Fig 17). Fig 16 c. Fig 17 spline tongue wall molding

For surface mount installation, follow these steps. Depending on your layout method from step 4, attach the first main beam(s) using the main beam clip, installing the clips a maximum of 48" apart. It is recommended that the clips be attached at the middle and the ends of each main beam. Attach clips to main beams first and then to the joists. Note: If you are attaching to drywall or other finished surface, make sure you attach the clip to the framing and not just the drywall. To establish the exact distance between main beams, use a 2' cross tee as a spacer (Fig 18). Push subsequent beams against the cross tee to make a tight joint and attach the main beam clip to the ceiling joist. Attach all the remaining main beams parallel to the first centerline beam until you are within 23" from the outside wall. Use cross tees as spacers between each main beam. Fig 18 For suspended systems, follow these steps. Span a string line perpendicular to the main beam layout lines on the opposing walls 2¼" above the top of the wall molding. This string line will establish a level ceiling height reference at the top of the ceiling system. Multiple string lines are recommended for spans longer than 12'. On the main beam, starting from the end that has the tongue, measure the distance from the wall to the first lag eye screw (see Step 5). Mark this point on the main beam. This will be the first hanger wire intersection point. Next, measure the distance between the centers of each lag eye screw, transferring each measurement to the main beam. These points designate subsequent hanger wire intersection marks. On the main beam spline, measure 1" down from the top of the spline at the hanger wire intersection marks (Fig 19a), and drill a ¼" hole through the spline (Fig 19b). Rest the tongue of the main beam on top of the wall molding and insert and adjust the hanger wire so the main beam is level with the string line (Fig 19c). Wrap the wire around itself three times. (Fig 19d) Repeat this process at each intersection point to suspend the entire main beam. a. b. c. Fig 19 d.

Step 7) Connecting main beams If the remaining distance to the wall is greater than 8', install the subsequent main beams as noted below. If the remaining distance to the wall is less than 8 feet, measure from the end of the first installed main beam to the wall opposite where the beam's tongue will rest. Cut the final main beam in the row to the length you just measured (Revisit Step 6 if necessary). Note: This next step is only necessary if the dimension spanned by the main beams is greater than 8'. In such cases, main beams must be connected to span the entire length of the room. For suspended systems Measure from the end of the installed main beam to the first lag eye screw where the connecting beam will be installed. Mark this point on the connecting main beam. This will be the first hanger wire intersection point of the connecting beam. Continue measuring the distance between the centers of each lag eye screw, transferring each measurement to the connecting main beam. These points will designate subsequent hanger wire intersection marks. Mark, drill, fabricate tongue, and hang remaining beams as noted previously in step 6. Use of main beam clips Slide the main beam clip over the spline of the two main beams you wish to connect, aligning the beams. Fasten the clip to the main beam splines with 5 8" minimum length screws or nails (Fig 20). Repeat Step 6 (and Step 7, if necessary) with each row of main beams until all are installed. For surface mount installation Measure the remaining distance from the main beam to the wall. Cut beam to this length. Fabricate tongue as described in step 6. Attach main beam clips to beam every 4' minimum. See Use of main beam clips above for details. Repeat Step 6 (and Step 7, if necessary) with each row of main beams until all are installed. Fig 20 joint

Step 8) Install the cross tees For both suspended and surface mount installations, follow these steps. Place the first row of cross tees in the center of the room and work toward the walls. Install the cross tees by inserting at an angle to the main beams and rotating them until they are perpendicular to the main beam. lip cross tee length wall You will need to cut the cross tees closest to the wall to fit. Measure the distance from the nearest main beam upper lip to the nearest parallel wall and cut the cross tee to this length (Fig. 21) Create a tongue on the cut side of the tee so that it will sit on the wall molding (Fig 22). Revisit Step 6 if necessary. Repeat this step for all of the border row cross tees. main beam wall molding Step 9) Install the panels Fig 21 Be aware that the grain pattern of each panel is distinct. Many prefer the grain pattern in each panel to be facing the same direction. Others prefer a checkerboard pattern. For both suspended and surface mount installations, follow these steps. Start by placing all full-size panels into the grid, starting in the center and working outward. If there are no outside border panels, complete the entire ceiling. If border tiles need to be used, these will have to be cut to size. See Step 10. For the surface mount installation, the tiles are fabricated with a back-cut relief that allows for low-clearance insertion. Slide the cross tees over far enough to tilt and insert each panel between the main beams (Fig 23). Place panel to its highest point and then adjust the panel position until it rests properly on the main beam and cross tee supports. Center panels between the main beams. Once each new panel is in place, slide the cross tee back to its proper location. Repeat until the row is complete. main beam connection point Fig 22 wall molding connection point Fig 23

Step 10) Fabricate and install border panels For both suspended and surface mount installations, follow these steps. If it has been determined that your project will require border panels, you will receive extra frame and flat panel stock components with your order. wall add 1 Determine the border panel dimension by measuring from the inside edge of the wall molding to the closest edge of the nearest main beam (or cross tee depending on the direction of the layout). Add 1" to this measurement (Fig 24). This distance will represent the finished outside width of the border panel. Example: if the distance from the last main beam to the nearest parallel wall molding is 9", the full width of the border panel will be 10". Miter-cut two of the panel frame components so that the longest dimension equals the calculation above (Fig 25). Fig 24 wall molding main beam Using 1½" finish nails, fasten the panel frame together as you would a picture frame (Fig 26). border panel dimension Cut the 22 1 4" by 22 1 4" flat panel stock to the size of the border panel and nail to the back flat section of the panel frame (Fig 27). Be careful that nails don't protrude past the frame or panel into the finished area. A ½" brad nail works well here. Repeat this step to create as many border panels as you need (Fig 28). Place the border panels into the grid to complete the ceiling. Fig 25 panel frame components panel Fig 26 Fig 27 Fig 28

2014 Acoustic Ceiling Products, L.L.C. PO Box 1581 Appleton, WI 54912-1581 800.434.3750 Fax 800.434.3751 acpideas.com Presentation in this brochure or any other ACP publication is correct to the best of our knowledge at the time of publication. We provide this information in an advisory capacity only. Any advisory recommendations given in our publication must be modified to conform with local codes, conditions and specifications. Acoustic Ceiling Products, L.L.C. is a member of C.I.S.C.A., C.S.I., and N.H.B.A. Evoba is a trademark of ACP. ACP #WIN-99 (03.21.14)