BELCHER RD 66TH ST N DRAFT 09-18-14 GULF BLVD Dunedin Causeway 16 Gulf of Mexico WEST BAY DR WALSINGHAM RD Beckett Bridge 102ND AVE N 26 27 S MYRTLE AVE 113TH ST N EDGEWATER DR BAYSHORE BLVD S MISSOURI AVE SEMINOLE BLVD SUNSET PT 10 28 q Other Management/ Operations Projects: CR 1?ò 17 18 20 25 1 2 3 6 7 8 50 p NURSERY RD 13 14 15 BELLEAIR RD 12 24 CR 296 4 5 CURLEW RD MAIN ST 30 11 EAST BAY DR 16TH AVE SE 29 N PINELLAS AVE N BELCHER RD 21 1ND AVE N GULF BLVD 33 SR 580 31 TAMPA RD MCMULLEN BOOTH RD 47 22 US HIGHWAY N See Inset Map 35 23 PARK BLVD N TH ST N 40 45 32 38TH AVE N PASADENA AVE S 62ND AVE N EAST LAKE RD 22ND AVE N 1ST AVE S 9 5TH AVE N PINELLAS BAYWAY ULMERTON RD KEYSTONE RD COURTNEY CAMPBELL CSWY 22ND AVE S 41 p %&g( 34TH ST S 46 I-5 54TH AVE S Tampa Bay -US -Alt US -East Bay Drive -54th Ave S -22nd -East Lake SR 679 Bayway Rd/McMullen Booth Rd Bridge -Park Blvd µ 0 2.5 5 10 Miles 4TH ST N Pinellas Transportation Plan Preliminary Cost Feasible Roadway Projects 2020-2040 Including Policy Plan (Unfunded Projects 38 Legend 34 GANDY BLVD San Martin Bridge Funded Projects Unfunded Projects US Interchanges HILLSBOROUGH COUNTY Inset Map 126TH AVE N 23 118TH AVE N Tampa Bay US HIGHWAY N PARK BLVD N 62ND AVE N 40 I-275 PD&E Study Bridge Projects Committed: Northbound 4F bridge replacement Unfunded: Addition of Transit to new 4F bridge Gandy Bridge Replacement 34TH ST N 41 54TH AVE N 45 44 46TH AVE N 38TH AVE N ULMERTON RD 43 %&g( MANATEE COUNTY 35 GANDY BLVD DR MARTIN LUTHER KING JR ST N 4TH ST N
1 2 US (SR 55 from Pinellas Trail to Pasco Line US (SR 55 from South of Lake Street to Pinellas Trail Design: $10,317,2 2020 2025 CST: $52,660,000 Design: $12,641,000 CST: $169,0,700 3 US (SR 55 from S of Timberlane Rd to South of Lake Street Design: $15,741,000 CST: $207,677,400 4 5 6 7 8 9 10 11 12 Meres Blvd from Alt US (SR 55 to US Disston Avenue Ext from Woodhill Drive to Meres Blvd US (SR 55 from N of Nebraska Ave to S of Timberlane Rd US (SR 55 from North of CR 95 to N of Nebraska Ave US (SR 55 (Curlew Road Interchange from Northside Drive to N of CR 95 Forest Lakes Blvd. from SR 580 to SR 584 Sunset Point Rd. from Alt US to Keene Rd Belcher Rd. from NE Coachman to Druid Rd Highland Ave from East Bay Dr to Belleair Rd Tarpon Springs and 2 lane / $5,824,900 Tarpon Springs $13,388,809 ROW: $43,770,873 CST: $125,9,593 CST: $112,455,830 2020 2025 $202,400,000 $223,532 2020 2025 $7,474,467 + + + $16,6,772 $33,884,000 $22,232,3 *s may include any or all of the following: adding sidewalks; adding bike lanes; the provision of turning lanes at U: Un, D: Divided, P: Partially Controlled, F: Freeway, O: One way, Aux: Auxiliary Lanes
13 14 Nursery Rd. from Highland Ave to Belcher Rd Nursery Rd. from Belcher Rd to US 15 Belleair Rd. from US to Keene Rd 16 17 18 20 21 Indian Rocks Rd. from Walsingham Rd to West Bay Dr 16th Ave. SE from Seminole Blvd to Donegan Rd 16th Ave. SE from Donegan Rd to Lake Ave Starkey Rd. from East Bay Dr to Ulmerton Rd 1nd Ave. N. from Belcher Rd to Starkey Rd 1nd Ave. N. from 66th St N to Belcher Rd + + + + + + $10,596,781 5/6 lane $21,665,582 + + 22 SR 686 at th Street bridge $64,888,000 23 126th Ave. N. 34th ST to US 24 25 26 27 Starkey Rd. from Ulmerton Rd to Bryan Dairy Rd Starkey Rd. from Flamevine Ave to Bryan Dairy Rd 102nd Ave. N. from 1th St N to 125th St N 102nd Ave. N. from 125th St to 113th St /4 lane + $10,829,5 2020 2025 6 lane $16,1,352 2020 2025 + + $13,523,996 $13,430,5 $9,932,9 $4,556,821 $26,992,404 $3,128,974 $2,703,0 $16,099,467 $4,254,685 $35,884,681 *s may include any or all of the following: adding sidewalks; adding bike lanes; the provision of turning lanes at U: Un, D: Divided, P: Partially Controlled, F: Freeway, O: One way, Aux: Auxiliary Lanes
28 29 102nd Ave. from 113th St to Seminole Blvd 16th Ave. SE from Lake Ave to Starkey Rd + + $2,704,155 $3,630,526 30 31 32 33 34 35 Starkey Rd. from 54th to 84th 62nd Ave. N. from th St to 66th St Belcher Rd. from 38th to 54th Tyrone Boulevard Overpass Removal/Trail Overpass Construction Howard Frankland Bridge from 4th Street to Pinellas Line 1 I 275 Ramp, Northbound 275 to Westbound Ulmerton I 275 Express Lanes from 118th St to 4th St/West end of Howard Frankland Bridge 4D Grade Separated 8 lane freeway 6 and 8 lane freeway 6 lane $13,766,922 + $15,563,092 4D at Grade + Trail Overpass 8F + 2Aux + Transit freeway ramp 6/8F + 2Aux $80,705,938 2025 2030 $9,764,663 $18,934,080 $567,875,878 $107,181,992 SR 686 (Roosevelt Boulevard Stage 3 of 6, W of I 275 Interchange to SR 686 (Roosevelt Blvd W of 9th St partially $1,315,045 2025 2030 38 SR 694 (Gandy Blvd. from East end of 4th St North to West end of Gandy Bridge SR 694 (GANDY BLVD FROM US (SR 55 TO E OF I 275 (SR 93 s 6 lanes partially 6 lanes + enhancements CST: $57,750,000 CST: $24,625,000 $25,740,000 2020 2025 *s may include any or all of the following: adding sidewalks; adding bike lanes; the provision of turning lanes at U: Un, D: Divided, P: Partially Controlled, F: Freeway, O: One way, Aux: Auxiliary Lanes
40 62nd Ave. N. from US to th St $21,960,840 2020 2025 + 41 Haines Rd. 60th Way to US $5,8,472 28th St. from 58th to 62nd + 43 Haines Rd. from 51st Ave to I 275 $8,097,320 + 28th St. from 38th to 54th + 44 + 45 46th Ave. N. from th St to th St 2F (modify 46 I 275 at 31st Street Interchange Interchange interchange 47 22nd Ave. S. from 58th St to 34th St $44,552,985 I 275 study, from 54th Ave S to Study $13,992,000 North of 4th St North NE Coachman from McMullen + Booth Rd to Drew St US from 118th to 70th 6 lane Interchange/ 50 Corridor study + $2,899,292 $8,735,728 $9,664,306 $17,811,000 TBD TBD *s may include any or all of the following: adding sidewalks; adding bike lanes; the provision of turning lanes at intersections; bringing the existing facility to urban section standards by providing the required lane widths, set backs, drainage, U: Un, D: Divided, P: Partially Controlled, F: Freeway, O: One way, Aux: Auxiliary Lanes Note: It is anticipated that the cost estimates for the Pinellas projects will be revisited as the scope of the work is further defined. This will occur through the development of the Pinellas Capital Improvement Program and update of the Transportation and Capital Improvement Elements of the Comprehensive Plan.