%&g( %&g( ) Bridge Projects DRAFT

Similar documents
Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

APPENDIX E: CIP Maps

PINELLAS COUNTY MPO FY 2013/ /18 TRANSPORTATION ALTERNATIVES (TA) PROGRAM PRIORITY LIST STATUS REPORT

CONSTRUCTION PLANS FOR: MUNICIPAL BUILDING REHABILITATION SECTION 26, TOWNSHIP 31 SOUTH, RANGE 15 EAST PINELLAS COUNTY, FLORIDA TAMPA ROAD C1

City of St. Petersburg Planning & Visioning Commission October 11, 2011

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida

Store # Address2 City State Zip County Phone NW US HIGHWAY 441 ALACHUA FL ALACHUA W.

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Updated: April 7, 2016

ACEC OC February 22, 2017

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER

State Road A1A North Bridge over ICWW Bridge

THE PLANNING COUNCIL AND METROPOLITAN PLANNING ORGANIZATION FOR PINELLAS COUNTY

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C.

SYSTEM SUMMARY Pinellas County has a type 4, E system consisting of one Primary PSAP, one Back-up PSAP and 10 Secondary PSAPs as follows:

THE PLANNING COUNCIL AND METROPOLITAN PLANNING ORGANIZATION FOR PINELLAS COUNTY

Appendix G. Visual Simulations and Illustrations

Study Description. November 29, Overpass Road Alternatives Public Workshop

Exit 61 I-90 Interchange Modification Justification Study

Attachment #2 PPW133-07

Subsidized Apartments in Pinellas County 1

Pinellas County Metropolitan Planning Organization 310 Court Street, 2 nd Floor, Clearwater, Florida (727) (727)

Draft Natural Resources Evaluation

Diversion Analysis. Appendix K

COASTAL MANAGEMENT ELEMENT

Retail Availabilities

TEXAS SENATE MILES DESCRIPTION: WIDEN NB AND SB MAINLANES TO 3 LANES EACH DIRECTION TO: 0.25 MILES N. OF LOOP 20/FM 3464 IN

Pinellas County Today - Cities, Small Towns and Suburbs

Directions to GMC Middle School Game Sites (updated 8/20/13)

Your NAMI State Organization

This page is intentionally left blank

Planarization & Routing Guide

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Appendix A. Planning to Stay Element A-1

BAY MEADOWS SPECIFIC PLAN

Medicine Bow. National Forest. Columbine. Routt. National Forest. Steamboat. Springs. Eagle. White River. Glenwood. National Forest. Springs.

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:

Public School Facilities Element

PLANNING TO STAY ELEMENT

X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS

Creating & Connecting Opportunities

2040 Long Range Transportation Plan - Needs Assessment: Congestion Management Costs and Benefits Prepared For:

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

Directions to Away Schools

Metro - Let me know about major weekend traffic impacts

3.62 ACRES VACANT LAND

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

PLANNING TO STAY. An Element. of the PINELLAS COUNTY COMPREHENSIVE PLAN. Prepared By: THE PINELLAS COUNTY PLANNING DEPARTMENT.

Crossroads Business Center Office / Flex Condo Units

Money Bayou Outfall Relocation Project

Directions to Shore Conference Fields

TCAG Annual Intersection Monitoring Program

TABLE OF CONTENTS 1200 PLAN PREPARATION

THE PLANNING COUNCIL AND METROPOLITAN PLANNING ORGANIZATION FOR PINELLAS COUNTY

Driving directions during the closure of Business 40 for the following downtown Winston-Salem facilities in Innovation Quarter:

TCAG Annual Intersection Monitoring Program

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Locate Request Information

Pinellas Community Traffic Safety Team Meeting Minutes for November 6, 2003

Welcome Public Open House

CHIPPEWA FALLS. Chippewa Falls High School 735 Terrill Street Chippewa Falls WI 54729

King Mill Lambert DRI# 2035 Henry County, Georgia

CTA Blue Line Forest Park Branch Feasibility/Vision Study

AMES INDUSTRIAL PARK AND OFFICE PLAZA

Noise Study Report. Addendum. Interstate 10 Corridor Project. In the Counties of San Bernardino and Los Angeles

Maintenance of Traffic sequence of operations including any phasing and detour maps;

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Future Projects. District 3 Central Minnesota. mndot.gov/d3

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

NRE DESIGN PARK SITE DEVELOPMENT PLANS SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY OF NAPLES, COLLIER COUNTY, FLORIDA

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

MIAMI, FL CO-WORKING LOCATIONS. cushwakesouthfl.com

Noise Impact Analysis. NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road. November Washington County.

FOR SALE :: Office/Warehouse Facility on ±3.94 Acres 240 Sunpac Avenue & 2031 Pabco Road

Little League District 19 New York District Administrator George Serrano. Directions to Little League Fields

Ray Allen Executive Director (361)

Appendix B: Transportation B-10 Toll Plaza Analysis

hauger bunch REALTOR 47+ Gross Acres / 33 Upland Acres Mixed Use / Office Sites US Highway 98 South Lakeland, Florida Polk State College

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS

1050 Page Mill Road Office Development

Discussions have been held with staff from the Regional Works Department on their proposed Road Program.

RETAIL PADS AT THE PLANNED HIGHWAY 65 INTERCHANGE. SWC Whitney Ranch Parkway and Wildcat Boulevard, Rocklin California

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

Update on Traffic Results and Findings

Directions for Soccer

MVLL 2018 FALL BALL WEEK SIX SCHEDULE BASEBALL

Winter Athletic Directions

2017 Income Limits and Rent Limits Florida Housing Finance Corporation SHIP Program

Exploring Our Wonderful Wetlands

Charlton/Oxford Route 20 Reconstruction Project

PORT SUSAN MIDDLE SCHOOL SPORTS SEASONS DIRECTIONS

6.5+ Acres: Commercial Zoning Auto Dealership Entitled US 98 North - South of I-4

IRIS External Interfaces

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

SECTION EDITION - REVISION 2. Large Guide

Transcription:

BELCHER RD 66TH ST N DRAFT 09-18-14 GULF BLVD Dunedin Causeway 16 Gulf of Mexico WEST BAY DR WALSINGHAM RD Beckett Bridge 102ND AVE N 26 27 S MYRTLE AVE 113TH ST N EDGEWATER DR BAYSHORE BLVD S MISSOURI AVE SEMINOLE BLVD SUNSET PT 10 28 q Other Management/ Operations Projects: CR 1?ò 17 18 20 25 1 2 3 6 7 8 50 p NURSERY RD 13 14 15 BELLEAIR RD 12 24 CR 296 4 5 CURLEW RD MAIN ST 30 11 EAST BAY DR 16TH AVE SE 29 N PINELLAS AVE N BELCHER RD 21 1ND AVE N GULF BLVD 33 SR 580 31 TAMPA RD MCMULLEN BOOTH RD 47 22 US HIGHWAY N See Inset Map 35 23 PARK BLVD N TH ST N 40 45 32 38TH AVE N PASADENA AVE S 62ND AVE N EAST LAKE RD 22ND AVE N 1ST AVE S 9 5TH AVE N PINELLAS BAYWAY ULMERTON RD KEYSTONE RD COURTNEY CAMPBELL CSWY 22ND AVE S 41 p %&g( 34TH ST S 46 I-5 54TH AVE S Tampa Bay -US -Alt US -East Bay Drive -54th Ave S -22nd -East Lake SR 679 Bayway Rd/McMullen Booth Rd Bridge -Park Blvd µ 0 2.5 5 10 Miles 4TH ST N Pinellas Transportation Plan Preliminary Cost Feasible Roadway Projects 2020-2040 Including Policy Plan (Unfunded Projects 38 Legend 34 GANDY BLVD San Martin Bridge Funded Projects Unfunded Projects US Interchanges HILLSBOROUGH COUNTY Inset Map 126TH AVE N 23 118TH AVE N Tampa Bay US HIGHWAY N PARK BLVD N 62ND AVE N 40 I-275 PD&E Study Bridge Projects Committed: Northbound 4F bridge replacement Unfunded: Addition of Transit to new 4F bridge Gandy Bridge Replacement 34TH ST N 41 54TH AVE N 45 44 46TH AVE N 38TH AVE N ULMERTON RD 43 %&g( MANATEE COUNTY 35 GANDY BLVD DR MARTIN LUTHER KING JR ST N 4TH ST N

1 2 US (SR 55 from Pinellas Trail to Pasco Line US (SR 55 from South of Lake Street to Pinellas Trail Design: $10,317,2 2020 2025 CST: $52,660,000 Design: $12,641,000 CST: $169,0,700 3 US (SR 55 from S of Timberlane Rd to South of Lake Street Design: $15,741,000 CST: $207,677,400 4 5 6 7 8 9 10 11 12 Meres Blvd from Alt US (SR 55 to US Disston Avenue Ext from Woodhill Drive to Meres Blvd US (SR 55 from N of Nebraska Ave to S of Timberlane Rd US (SR 55 from North of CR 95 to N of Nebraska Ave US (SR 55 (Curlew Road Interchange from Northside Drive to N of CR 95 Forest Lakes Blvd. from SR 580 to SR 584 Sunset Point Rd. from Alt US to Keene Rd Belcher Rd. from NE Coachman to Druid Rd Highland Ave from East Bay Dr to Belleair Rd Tarpon Springs and 2 lane / $5,824,900 Tarpon Springs $13,388,809 ROW: $43,770,873 CST: $125,9,593 CST: $112,455,830 2020 2025 $202,400,000 $223,532 2020 2025 $7,474,467 + + + $16,6,772 $33,884,000 $22,232,3 *s may include any or all of the following: adding sidewalks; adding bike lanes; the provision of turning lanes at U: Un, D: Divided, P: Partially Controlled, F: Freeway, O: One way, Aux: Auxiliary Lanes

13 14 Nursery Rd. from Highland Ave to Belcher Rd Nursery Rd. from Belcher Rd to US 15 Belleair Rd. from US to Keene Rd 16 17 18 20 21 Indian Rocks Rd. from Walsingham Rd to West Bay Dr 16th Ave. SE from Seminole Blvd to Donegan Rd 16th Ave. SE from Donegan Rd to Lake Ave Starkey Rd. from East Bay Dr to Ulmerton Rd 1nd Ave. N. from Belcher Rd to Starkey Rd 1nd Ave. N. from 66th St N to Belcher Rd + + + + + + $10,596,781 5/6 lane $21,665,582 + + 22 SR 686 at th Street bridge $64,888,000 23 126th Ave. N. 34th ST to US 24 25 26 27 Starkey Rd. from Ulmerton Rd to Bryan Dairy Rd Starkey Rd. from Flamevine Ave to Bryan Dairy Rd 102nd Ave. N. from 1th St N to 125th St N 102nd Ave. N. from 125th St to 113th St /4 lane + $10,829,5 2020 2025 6 lane $16,1,352 2020 2025 + + $13,523,996 $13,430,5 $9,932,9 $4,556,821 $26,992,404 $3,128,974 $2,703,0 $16,099,467 $4,254,685 $35,884,681 *s may include any or all of the following: adding sidewalks; adding bike lanes; the provision of turning lanes at U: Un, D: Divided, P: Partially Controlled, F: Freeway, O: One way, Aux: Auxiliary Lanes

28 29 102nd Ave. from 113th St to Seminole Blvd 16th Ave. SE from Lake Ave to Starkey Rd + + $2,704,155 $3,630,526 30 31 32 33 34 35 Starkey Rd. from 54th to 84th 62nd Ave. N. from th St to 66th St Belcher Rd. from 38th to 54th Tyrone Boulevard Overpass Removal/Trail Overpass Construction Howard Frankland Bridge from 4th Street to Pinellas Line 1 I 275 Ramp, Northbound 275 to Westbound Ulmerton I 275 Express Lanes from 118th St to 4th St/West end of Howard Frankland Bridge 4D Grade Separated 8 lane freeway 6 and 8 lane freeway 6 lane $13,766,922 + $15,563,092 4D at Grade + Trail Overpass 8F + 2Aux + Transit freeway ramp 6/8F + 2Aux $80,705,938 2025 2030 $9,764,663 $18,934,080 $567,875,878 $107,181,992 SR 686 (Roosevelt Boulevard Stage 3 of 6, W of I 275 Interchange to SR 686 (Roosevelt Blvd W of 9th St partially $1,315,045 2025 2030 38 SR 694 (Gandy Blvd. from East end of 4th St North to West end of Gandy Bridge SR 694 (GANDY BLVD FROM US (SR 55 TO E OF I 275 (SR 93 s 6 lanes partially 6 lanes + enhancements CST: $57,750,000 CST: $24,625,000 $25,740,000 2020 2025 *s may include any or all of the following: adding sidewalks; adding bike lanes; the provision of turning lanes at U: Un, D: Divided, P: Partially Controlled, F: Freeway, O: One way, Aux: Auxiliary Lanes

40 62nd Ave. N. from US to th St $21,960,840 2020 2025 + 41 Haines Rd. 60th Way to US $5,8,472 28th St. from 58th to 62nd + 43 Haines Rd. from 51st Ave to I 275 $8,097,320 + 28th St. from 38th to 54th + 44 + 45 46th Ave. N. from th St to th St 2F (modify 46 I 275 at 31st Street Interchange Interchange interchange 47 22nd Ave. S. from 58th St to 34th St $44,552,985 I 275 study, from 54th Ave S to Study $13,992,000 North of 4th St North NE Coachman from McMullen + Booth Rd to Drew St US from 118th to 70th 6 lane Interchange/ 50 Corridor study + $2,899,292 $8,735,728 $9,664,306 $17,811,000 TBD TBD *s may include any or all of the following: adding sidewalks; adding bike lanes; the provision of turning lanes at intersections; bringing the existing facility to urban section standards by providing the required lane widths, set backs, drainage, U: Un, D: Divided, P: Partially Controlled, F: Freeway, O: One way, Aux: Auxiliary Lanes Note: It is anticipated that the cost estimates for the Pinellas projects will be revisited as the scope of the work is further defined. This will occur through the development of the Pinellas Capital Improvement Program and update of the Transportation and Capital Improvement Elements of the Comprehensive Plan.