Commercial Infill Project Guide

Similar documents
APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

PLAN SUBMITTAL REQUIREMENTS

ADDENDUM #2 September 12, 2018

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

Residential Construction Checklist Single and Two Family Construction

TO WHOM IT MAY CONCERN:

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DESIGN REVIEW PROCESS AND APPLICATION

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

Residential Room Addition / Remodel Submittal Requirement Checklist

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

PROJECT ADDRESS: PERMIT #

Tri-County Commercial Application Checklist

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Non-Residential and Multi-Family Plan Check Submittal Requirements

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

City of Thousand Oaks

Residential Room Additions

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

APPLICATION FOR SITE PLAN REVIEW

BUILDING PLAN REVIEW REQUIREMENTS

Single-Family Dwelling Submittal Requirements

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

SPARTAN DAY CAMP 4814 FREEDOM RING RD

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS

NORTHWEST FIRE DISTRICT OUT OF DISTRICT FIRE CODE PERMIT FEE SCHEDULE JULY 1, 2014

FIT-OUT PERMIT REQUEST (GENERAL WORKS)

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

A/E REVIEW CHECKLIST HVAC

COMMERCIAL PERMIT APPLICATION GENERAL REQUIREMENTS

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

VILLAGE OF ALGONQUIN COMMUNITY DEVELOPMENT 2200 Harnish Drive Algonquin, IL Phone (847) Fax (847)

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

APPLICATION FOR SITE PREPARATION PERMIT

Architectural Design Process

Tenant Improvement. Training in the fundamentals of Commercial Construction

NEW SINGLE FAMILY HOMES

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

Town of Rotterdam Office of the Planning Commission

City of Santa Paula Planning Department

Commercial Building Permit Process

CITY OF CAPE CANAVERAL COMMUNITY APPEARANCE BOARD APPLICATION PACKET

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

Site Plan/Building Permit Review

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

CLARK COUNTY FIRE CODE AMENDMENTS

SUBDIVISION PLAT APPLICATION

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

INSPECTIONS & PERMITS DEPARTMENT

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

BERKELEY COUNTY ENGINEERING AND

Conceptual, Preliminary and Final Site Plan Review in Holladay City

SECTION 2 GENERAL REQUIREMENTS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

Operating Standards Attachment to Development Application

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

EXECUTIVE SUMMARY of DESIGN REVIEW

Permit Application. General Information

CHAPTER 5 ARCHITECTURE

Minor Site Plan Review Process

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

Checklist for Minor Plan Modification

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only*

City of Aspen Water Review for Pitkin County Permits Submission Packet

Signs, Canopies & Awnings City of Oshkosh Department of Community Development

ADMINISTRATIVE DESIGN REVIEW Information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

SITE PLAN APPLICATION

C I T Y O F M c K I N N E Y PLANNING

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

Transcription:

Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750

If you are moving your business into an existing building that is considered an infill and a permit is required. The City of Nixa building permit system exists to safeguard the life, health, property and welfare of the public through building project plan review, licensing of contractors, issuance of building permits, and completion of building construction/remodeling inspections. This guide is an effort to help you understand the four major steps in the commercial infill project plan review and building permitting process. All commercial remodel projects will require plans. If you are making structural changes, i.e. adding/tearing down walls, electrical upgrades, outlets, new fixtures, then you will need to provide plans. Both the Infill permit and the new Business License application will include an inspection by the City to inspect the establishment for compliance with current codes and requirements. Asbestos Survey Certification is required where existing construction materials are to be disturbed through remodeling or demolition activities. The survey must be done by a licensed asbestos inspector prior to City acceptance of a permit application. The United States Environmental Protection Agency has published new regulations aimed at protecting children from lead poisoning. Effective now, renovators that disturb paint in child-occupied facilities and housing built before 1978 must provide lead hazard information to owners, children s families, and residents prior to beginning work. The EPA pamphlet Renovate Right must be provided or made available. Signed receipts or mailing receipts must be maintained for three years to demonstrate compliance. Effective April 2010, anyone performing renovations/repairs for compensation must be trained and certified in the removal of lead based paint and all safe work practices must be followed. The EPA may be contacted at 1-800-223-0425 for additional information or to request copies of the pamphlets. Step 1: Preliminary Remodel Plan Review Preliminary remodel project plan reviews benefit everyone by minimizing problems in the review process and by expediting plan review and building permit approvals. Preliminary reviews can be completed at the Planning and Development office with conceptual or preliminary drawings, or through an on-site inspection at the proposed project location. Step 1A: Scheduling of a preliminary remodel plan review 1. There is no charge to the applicant, unless an on-site preliminary project review is conducted. 2. Preliminary reviews must be scheduled. Please contact the Planning and Development office for scheduling. (Note: If you have a disability that may require special assistance, please indicate such so that appropriate arrangements can be made )

1. Preliminary remodel project reviews will generally be scheduled between the hours of 8 a.m. to 11:30 a.m. and 12:30 p.m. to 3:30 p.m. during the business week. 2. At a minimum, conceptual plans and/or drawings are required. Planning and Development will keep one copy for future reference. 3. Any or all of the following people may attend the review: a. Owner or Owner s representative(s) b. Contractor c. Architect d. Plans Examiner e. Fire Prevention f. Relevant Personnel from other departments Step 1B: Preliminary On-Site Reviews 1. When plans are not available for the existing building, an on-site review can be performed. Step 2: Project Plan Submittal Plan submittal is a crucial step in the plan review process. Good plans with complete information help to expedite the plan review process by avoiding delays caused by lack of required information. 1. When is an Architect or Engineer required? Missouri law requires that virtually all project plans and drawings be sealed by a design professional licensed in the State of Missouri. In most instances, architects and engineers will not be allowed to seal drawings outside of their professional discipline. 2. Commercial Remodel Checklist The form provides a general checklist for the review process and is attached at the end of this document. A completed checklist is required with all project plans submitted for review. 3. Project Valuation and Building Permit Fees The building permit fee shall be based on the square footage of the finished project and includes everything under roof. 4. Plans Three (3) sets of construction plans will be required to be submitted for review. Plans and specifications shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and to show in sufficient detail that all work will conform to the adopted City of Nixa codes

Step 3: Project and Plan Review The Planning and Development Department has primary responsibility for coordinating the project review process. The Planning and Development Department will review all project plans for code compliance. All of the project plans will be reviewed by The City of Nixa s Planning and Development Department. 1. The project plans will be reviewed for compliance with the following codes: A. 2012 International Building Code B. 2012 International Fire Code C. 2012 International Plumbing Code D. 2012 International Mechanical Coe E. 2011 International Electric Code F. ICC-ANSI-2003 Accessibility Requirements G. Code of the City of Nixa Missouri H. City of Nixa Zoning 2. Projected Project Review Time: The time to review plans can vary greatly. Factors that will have a direct impact on the review time include completeness of drawings, the number of plans in Planning and Development for review, size of the remodel to be reviewed, type of work involved, etc. Planning and Development has established a ten (10) business day review period for each submittal. 3. Completion of Plan Review: When the project plan review is complete, the plans will either be stamped approved and ready for a building permit, or will require changes prior to plan approval and permit issuance. When submitted plans require changes or revisions, the Planning and Development department will issue a Project Review Comment Letter, which will detail the required changes. When the Project Review Comment Letter has been issued, the project is placed on hold, and no further work will be done until the requested revised information or drawings are received. Once revisions are received, a ten (10) business day review period will be initiated. 4. Project Plan Revisions All project plan revisions that are required by the Project Review Comment Letter to be made before issuance of a building permit must be submitted by the original project plan designers (architect and/or engineers of record). All comments in the Project Review Comment Letter shall be addressed either in the form of addendum(s) or revised drawings. When the revised plans are submitted for re-review, they will be reviewed within ten (10) business days and a response letter will be forwarded to the applicant. The Planning and Development Department will review the submitted changes and plan revisions. If the changes and revisions are approved, the plans will then be released for issuance of a building permit.

5. Code Appeals All applicants for building permits have the right to an appeal. The City of Nixa can have the appeal reviewed by an outside engineer or architect, with such fees being paid for by the applicant, to determine the suitability of alternate materials and methods of construction and to provide reasonable interpretations of the International Building Code. The City of Nixa does not have the authority to waive any requirements of the Code. 6. Expiration of Project Plan Review Plan reviews are only valid for 180 days from the day the initial plans were submitted. Three extensions of 90 days can be granted upon receipt of a written request. If the original plan submittal and review expires, a new plan review fee will be charged to initiate another or further plan review. Step 4: Building Permit Issuance 1. Approved plans made ready for permit: Planning and Development will notify the project owner, the project architect and/or contractor by phone or email when the plans have been approved and the permit is ready to be picked up. 2. Picking up the building permit: Any person identified in item 1 above may obtain the project building permit, along with the stamped and approved set of drawings, at the Planning and Development office, after all required plan review and building permit fees have been paid. 3. Revision to project plans after permit issuance: If during project construction, certain design or installation changes are made that affect existing wall configurations, structural elements, or mechanical, plumbing electrical and/or fire protection systems, revised project plans must be submitted to the Planning and Development Department for review and approval. If the original plans were sealed by a licensed architect and/or engineer, then the revised plans must also be sealed with the revised plan/ drawing date noted. Review fees may apply to the revised plans.

Commercial Remodel Project Checklist Please indicate compliance with a check mark or N/A if the item does not apply to your project. Project Name and Location: Zoning 1. The use of the existing building and indicate the zoning district. 2. If the property is being rezoned to allow the proposed use, show approval by indicating Ordinance. Site Plans 1. Each drawing must be signed, dated and sealed by a professional architect or engineer, registered in the State of Missouri. 2. The site plan contains a legal description. 3. The site plan shows the correct location and number of drive approaches. 4. The site plan shows the correct number of parking spaces and ADA spaces. 5. The site plan shows all existing structures and other features. 6. The site plan shows the proposed location of new signs and the location of existing signs. 7. The site plan shows all required landscaping and buffer yard requirements. 8 If re-addressing is required, does it conform to the City s addressing standard. Architectural Plans 1. The building plans show the existing floor plans and all proposed changes. 2. The building plans show all proposed demolition and removal.

3. The building plans show all new structural walls and design loads. 4. The building plans show all egress requirements, including corridors, occupancy loads, stairs, guards and handrails, and window and door schedules. 5. The building plans show all accessibility and special use requirements. 6. The building plans show all portable fire extinguishers, fire alarm, and fire suppression systems. 7. The building plans show all exit and emergency lighting. 8. The building plans show, if required, all Knox Box locations for emergency responder access. Mechanical, Electrical and Plumbing Plans 1. The MEP plans show all proposed demolition and removal. 2. The MEP plans show all gas lines including sizes, materials, connections, and valves. 3. The MEP plans show all combustion air requirements and appliance type and locations. 4. The MEP plans show all kitchen equipment including hood and duct systems. 5. The MEP plans show all air handling equipment and ductwork systems. 6. The MEP plans show all panel locations, riser diagrams including voltage, amperage, and phase. 7. The MEP plans show the proposed panel schedule(s). 8. The MEP plans show the electrical site plan including all lighting, fire alarm, and fixture schedule. 9. The MEP plans show all existing and proposed fixtures. 10. The MEP plans show all accessibility requirements. 11. The MEP plans show all traps, interceptors, and valves. 12. The MEP plans show all backflow and backwater devices.

Fee Schedule Business Remodel/Commercial Infill with changes Building Permit $ 0.17 per sq. foot Plan Review 1/2 of permit fee w/mechanical add $ 60.00 w/plumbing add $ 60.00 w/electric add $ 60.00 Commercial Infill with no changes Building Permit $ 60.00