Health and Safety at Work (Hazardous Substances Markings for Pipework Connected to Above Ground Stationary Tanks) Safe Work Instrument 2017

Similar documents
Health and Safety at Work (Hazardous Substances Markings for Pipework Connected to Above Ground Stationary Tanks) Safe Work Instrument 2017

Industrial Pipe Marking

SECTION MECHANICAL IDENTIFICATION

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

SECTION MECHANICAL IDENTIFICATION

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION MECHANICAL IDENTIFICATION

SECTION IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

SECTION MECHANICAL IDENTIFICATION

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Piping & Equipment Identification

Trade of Plumbing. Module 1: Thermal Process and Mild Steel Pipework Unit 5: Drawing Phase 2

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

ACCESS TO HIGH VOLTAGE APPARATUS

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

STANDARD AND EXAMPLE DRAWINGS

Pre-printed PVC Cable Markers O-Type, K-type, Z-type, V-Type

A. Product Data: For each electrical identification product indicated.

SECTION COMMON WORK RESULTS FOR HVAC

1. ASME A Scheme for the Identification of Piping Systems.

SECTION ELECTRICAL IDENTIFICATION

CITY OF MUSKEGO DRAFTING STANDARDS

CRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Bollards, Column Guards, Corner Guards, Wheel Stops, Speed Humps & Fixings. Lockinex. ea i, ea u i

VICINITY MAP LOCATION MAP GRAPHIC SCALES

Accessories and workbenches

British Standard Pipe Markers (BS1710-BS4800)

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14

Brady B-595 Indoor/Outdoor Vinyl Tape for the GlobalMark Printer

NZQA Expiring unit standard version 3 Page 1 of 8. Operate bitumen handbar sprayer equipment, and handspray bitumen for chipseal surfacing

NZQA registered unit standard version 2 Page 1 of 5. Demonstrate knowledge of bitumen handbar sprayers and operations

Plan Submittal and Review Checklist

Forming and assembling pipework systems

Policy Sponsor: Assistant Vice President Facilities Management. Responsible Unit: Trade Services

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Threadlocking Adhesives

COIN PACKAGING SPECIFICATIONS Number of coins in roll 0,01 0, , ,05 2, , , ,

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

Subject Document no. Page Drafting of P&IDs TBA 1 / 6. Group Issued (by / date) Revised (by / date) Rev. Instruction TSN 15.5.

SECTION ELECTRICAL IDENTIFICATION

UNSIGNED HARDCOPY NOT CONTROLLED. Reference Designation Marking and Miscellaneous Coding

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

JED Specification

Learning Legacy Document. London Fire Brigade Incident Management Requirements. 1) Communications Equipment. Version 3 20/08/15 1 of 5. a.

Insulator (Heat and Frost) Level 2

NEW FIXED WIRING COLOURS. A practical guide

ER 87 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes. (1 mark) ESR 27(2) (2 marks) ESR 74A(1AA)

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY

Marking and engraving Solutions for OIL & GAS industry

Make props using mixed media

Name Class Date. Brightness of Light

Georgia Underground Marking Standards

FSS020-ADVANCED DIPLOMA IN FIRE & INDUSTRIAL SAFETY MANAGEMENT ONE YEAR EXAMINATION NOVEMBER TIME: 3 Hours Marks: 100

PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS. Date: January 26, 2001

Brady B-595 Indoor/Outdoor Vinyl Tape for the GlobalMark Printer

The Aquascaper /evolutionaqua evolutionaqua

Guidelines for Laying Targets for Ground Control Points

BANKNOTE PACKAGING SPECIFICATIONS. The packet straps must be made of either paper or plasticized paper

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Panel Riser Kit Option 1. Installation Instructions 226BEE 0117CH

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

BUILDING DESIGN STANDARDS FACILITIES MANAGEMENT AND ANCILLARY SERVICES EXTERIOR IMPROVEMENTS DIVISION 32 Exterior Site Furnishings

BP Brine Pro Brine Maker. Parts List. This Parts List is for BP-2000 brine makers with serial numbers beginning with and higher.

SPECIFICATION FOR STEP UP TRANSFORMER 0.415/11Kv and (630KVA & 1000KVA)

DEPARTMENT OF TRANSPORTATION BEFORE THE PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

Fire Safety During Construction, Tar Kettles, and Bituminous Melters

NATIONAL CERTIFICATES (VOCATIONAL) SUBJECT GUIDELINES WORKSHOP PRACTICE NQF LEVEL 2

SAQCC FIRE D&GS TRAINING SUB COMMITTEE TYPICAL COURSE CURRICULUM LAYOUT

Paint Cleanup Paint Equipment Generalities Paint supply Materials of Construction

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

NATIONAL RULES FOR ELECTRICAL INSTALLATIONS. Fourth Edition. Extracts from Amendment No.1: June 2011

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5

SECTION SITE SURVEYS

Lineside Signs. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Three Date July 1996

For crossing under a railroad, contact the specific railroad company's engineering department.

TRAV-L-CUTTER Pipe Cutter

REGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE

Level 4 End of year Test Revision

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

TABLE OF CONTENTS. SI No Contents Page No.

Form-IV. Form of Inspection/Test Report. (Under Regulation 43)

Network Standard NS

Forming and Assembling Pipework Systems F/508/4663

SEMPEO2-23 (SQA Unit Code - FP2Y 04) Producing platework components and assemblies

TABLE OF CONTENTS. Product Listing Index. Look for this symbol. It let s you know which products are available in 4-Color Process. BLUE FROG PRINTING

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

H O O P RAC K. Simple Security

Construction Manual for High Altitude Test Chamber

Transcription:

Health and Safety at Work (Hazardous Substances Markings for Pipework Connected to Above Ground Stationary Tanks) Safe Work Instrument 2017 This safe work instrument is approved under section 227 of the Health and Safety at Work Act 2015 by the Minister for Workplace Relations and Safety, after being satisfied that appropriate consultation has been carried out under section 227(3) of that Act. Contents Page 1 Title 2 2 Commencement 2 3 Overview 2 4 Interpretation 2 5 Application 3 6 Pipework to be marked 3 7 Positioning of pipework markers 3 8 Pipework used for fire-fighting water or foam 4 9 Specifications for markers 5 7 Schedule 1 Product identification marker colour codes Schedule 2 8 Forms of product identification marker Schedule 3 9 Form of product identification tag Schedule 4 Form of pipework function marker 10 1

1 Title Safe Work Instrument This is the Health and Safety at Work (Hazardous Substances Markings for Pipework Connected to Above Ground Stationary Tanks) Safe Work Instrument 2017. 2 Commencement This safe work instrument comes into force on 1 December 2017. 3 Overview This safe work instrument specifies requirements relating to the form, position, and colour-coding of markings for pipework connected to certain above ground stationary tanks, for the purpose of regulation 17.78(2)(b) of the Regulations. 4 Interpretation (1) In this safe work instrument, unless the context otherwise requires, Act means the Health and Safety at Work Act 2015 additive piping means piping used to mix an additive with fuel elevated pipe rack means an elevated structure designed and built specifically to support multiple pipes fuel storage depot boundary means the boundary of a place that is used for the storage of fuel pipework function marker means a marker that (a) indicates the function of a pipe; and (b) meets the specifications prescribed in clause 9(3) product identification marker means a marker that (a) identifies the product transferred by a pipe; and (b) subject to clause 9(2), meets the specifications prescribed in clause 9(1) product identification tag means a product identification marker that meets the specifications prescribed in clause 9(2) Regulations means the Health and Safety at Work (Hazardous Substances) Regulations 2017 (2) Any term or expression that is defined in the Act or the Regulations and used, but not defined, in this safe work instrument has the same meaning as in the Act or the Regulations. 2

5 Application (1) This safe work instrument applies to pipework connected to an above ground stationary tank that (a) (b) (c) forms part of a stationary container system; and has a water capacity of 60 000 L or more; and is used or intended to be used to contain a Class 3.1 substance. (2) Despite subclause (1), this safe work instrument does not apply to pipework that is a pipe outside a fuel storage depot boundary. (3) To avoid doubt, this safe work instrument does not apply to a pipeline that is subject to the Health and Safety in Employment (Pipelines) Regulations 1999. 6 Pipework to be marked In order to comply with this safe work instrument, a relevant PCBU must ensure that pipework is marked in accordance with clauses 7 to 9 for the purpose of identifying (a) the product in the pipework; and (b) the function of the pipework. 7 Positioning of pipework markers (1) For a pipe of not more than 50 m in length, a product identification marker must be applied at each of the following positions on the pipe: (a) a point on each side of every manifold system that the pipe leads into and away from: (b) a point on each side of every wall, bund wall, boundary fence, or other barrier that the pipe passes through, that is within 1 m of the wall, bund wall, boundary fence, or other barrier: (c) if the pipe enters the ground, a point within 1 m of the ground: (d) if the pipe is used in a loading gantry, adjacent to the main control valve or flow meter for the pipe; within 1 m of each hose connection point for the pipe on either the loading arm or the hose: (e) if the pipe forms part of any suction and discharge pipework, adjacent to every pump: (f) adjacent to every tee connection and valve: (g) if the pipe enters or exits a tank, adjacent to the point of entry or exit (as the case requires): (h) at every point where the product in the pipe needs to be 3

readily identifiable in an emergency; or identified for the purpose of indicating a hazard: at every point in the pipework where it is necessary for the purpose of preventing a serious risk to health and safety to avoid confusing pipes that have the same base identification colour but that contain different products. (2) For a pipe of more than 50 m in length, product identification markers must be applied (a) in accordance with subclause (1); and (b) at each of the following positions on the pipe: (iii) (iv) at intervals not exceeding 50 m, if the pipe is visible along its length: at intervals not exceeding 8 m, if the pipe is not visible along its length: at the point where the pipe enters any elevated pipe-rack: at the point where the pipe exits any elevated pipe-rack. (3) In addition to the requirements of subclauses (1) and (2), a pipework function marker must be applied to every pipe that is a wharfline, bunker line, or transfer line. 8 Pipework used for fire-fighting water or foam Despite clause 7, a pipe used for fire-fighting water or foam (a firefighting product) must, for the purpose of identifying the product in the pipe, (a) be painted along its entire length in accordance with the colourcoding specified in columns 4 and 5 of Schedule 1 for Fire water or Foam (as the case requires); or (b) have a product identification marker applied at every point on the pipe where the pipe needs to be readily identifiable in an emergency; and at a point on the pipe that is within 1 m of a fire-fighting connection point, if (A) (B) 9 Specifications for markers the pipe is in close proximity to a pipe used for a different fire-fighting product; and both pipes are within 1 m of the fire-fighting connection point. (1) Subject to subclause (2), a product identification marker (a) must 4

(b) may (iii) (iv) be in one of the forms prescribed in Schedule 2; and be coloured-coded in accordance with Schedule 1; and have a minimum text height of 24 mm; and have a single arrow (A) at one end to indicate flow direction; or (B) if the product in the pipe may be conveyed in either direction, at each end; and be applied as a self-adhesive pre-printed label; or be painted onto the pipe. (2) If a pipe is too small in diameter or too short in length to be marked with a product identification marker in accordance with subclause (1) (for example, additive piping), product identification tags may be affixed to the pipe with cable ties, provided that the tags are (a) in the form prescribed in Schedule 3; and (b) made of permanent material such as laminated plastic; and (c) if the pipe contains a product listed in Schedule 1, colour-coded in accordance with Schedule 1; and (d) if the pipe does not contain a product listed in Schedule 1, (iii) coloured using black text on a white background; and marked with the product name (but not the proprietary name of the product); and in the case of a pipe that contains an additive, (A) marked after the product name with the word additive ; and (B) marked before the product name with the relevant oil company name, where this is necessary to distinguish between specific additives. Example ABC Oil Limited MS additive (3) A pipework function marker (a) must be in the form prescribed in Schedule 4; and 5

(b) may be coloured using black text on a white background; and applied as a self-adhesive pre-printed label; or painted onto the pipe; and (c) may contain additional wording to reflect local terminology, such as a company name or product description. Examples DEF Limited Bunker Line GHI Limited Transfer Line Black Oil Wharfline 6

Schedule 1 Product identification marker colour codes Cls 8(a), 9(1)(a), 9(2)(c), 9(2)(d) Product name Text colour Arrow colour Background colour Colour specification 98 MOTOR SPIRIT White White Bronze PMS 161 95 MOTOR SPIRIT White White Red PMS 187 91 MOTOR SPIRIT Black Black White - VAPOUR Black Black White - RECOVERY JET A1 White White Black - DIESEL White White Jade Green AS2700 G21 PMS 3295 AVGAS 100 White White Colour 1 Jade Green Colour 2 Red AS2700 G21 PMS 3295 BS 5252 04 E 53 PMS 186 - Stripe colour - white SLOPS White White Black - HEAVY FUEL OIL White White Brown AS2700 X54 PMS 4635 LIGHT FUEL OIL White White Brown AS2700 X54 PMS 4635 WASTE OIL White White Black - WATER White White Forest Green BS 5252 12 C 39 PMS 357 FIRE WATER White White Red BS 5252 04 E 53 PMS 186 STEAM Black Black Silver-grey BS 5252 00 A 01 PMS 877 WHITE SPIRITS White White Orange BS 5252 06 E 55 PMS 151 KEROSINE White White Powder Blue BS 5252 18 E 51 PMS 298 FOAM White White Red BS 5252 04 E 53 PMS 186 7

Schedule 2 Forms of product identification marker Cl 9(1)(a) 8

Schedule 3 Form of product identification tag Cl 9(2)(a) 9

Schedule 4 Form of pipework function marker Cl 9(3)(a) Dated at Wellington this [date] day of [month] [2017]. [Name], Minister for Workplace Relations and Safety Date of notification in Gazette: This safe work instrument is administered by WorkSafe New Zealand. 10