Cyclic tests 1 of engineered shearwalls considering different plate washer sizes

Similar documents
Cyclic tests of engineered shear walls with different bottom plate and anchor bolt washer sizes (Phase II)

APA Report T Shear Wall Lumber Framing: Double 2x s vs. Single 3x s at Adjoining Panel Edges APA - The Engineered Wood Association

Pilot Research on Cold-formed Steel Framed Shear Wall Assemblies with Corrugated Sheet Steel Sheathing

APA Report T Wood Structural Panel Lateral and Shear Wall Connections with Common, Galvanized Box, and Box Nails

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?

Moment resistance of bolted timber connections with perpendicular to grain reinforcements

3.1 General Provisions

Test Report on Cold-Formed Steel Shear Walls

ESR-2648 Reissued May 1, 2012 This report is subject to renewal June 1, 2013.

Connection Design Examples

Chapter 1: Introduction

Investigation of Shear Capacity for Light-Frame Wood Walls Constructed with Insulated Oriented Strand Board Panels

Lawrence A. Soltis, M. and Robert J. Ross, M. 1

TAS 201, TAS 202, TAS 203 and ASTM E330 PERFORMANCE TEST REPORT. Rendered to: DIAMOND DOOR PRODUCTS

Changes in the 2001 NDS for Wood Construction

ICC-ES Evaluation Report Reissued June 1, 2010 This report is subject to re-examination in one year.

Classic Connection Conundrums

Cast-in Ferrule Connections Load/Displacement Characteristics in Shear

STRUCTURAL DESIGN AND PERFORMANCE OF COMPOSITE WALL-FOUNDATION CONNECTOR ELEMENTS KRISTIN ANNE DUCHATEAU

MSP-WRTIDSKY1 Light Weight Suspended Ceiling Kit for use with Island Display Skybox

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

Steel Strong-Wall Shearwall Installations

10x12 FOUNDATION GUIDE 10x12 TRICO AND FLORA SHEDS

Effect of Vertical Load under Cyclic Lateral Load Test for Evaluating Sugi CLT Wall Panel

FT DIX ELEMENTARY SCHOOL PHASE VII, CLASSROOM ADDITION PEMBERTON TOWNSHIP REGAN YOUNG ENGLAND BUTERA, PC PROJECT #5349A

calculated with factor of safety of 2.5 for bending stress, 3.0 for shear stresses and deflection limitation of L/180.

4Post Server Rack-111 Assembly For Floor Anchored Models

Title. CitationJournal of Wood Science, 58(4): Issue Date Doc URL. Rights. Type. File Information.

INSTALLING YOUR NEW SPRING LIFT ARM KIT

TEST PROCEDURE FOR DYNAMIC PULL-THROUGH PERFORMANCE OF ROOFING MEMBRANES OVER FASTENER HEADS OR FASTENERS WITH METAL BEARING PLATES

Dimensions Mechanical and Performance Requirements. Drop-In Anchors Hollow Wall, Steel Regular Style Drive Style...

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY

PRACTICAL ENGINEERING. Strong Rail-Post Connections for Wooden Decks

GLOSSARY OF TERMS SECTION 8

SECTION ROUGH CARPENTRY

Tools: Sharpie, Square, Vise, Hack saw, Ruler, Punch, Hammer, File. 2. Cut the stock Place stock in vise and cut with hack saw

Drywall, Wood and Truss Uplift

THE ROGUE TM FUNSLIDE TM

T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY

UPPER DOOR KIT P/N APPLICATION BEFORE YOU BEGIN ITEMS MARKED (*) ARE INCLUDED IN HARDWARE KIT PN P/N Rev 01 07/14 Page 1 of 6

4' x 12' Walk-In Chicken Coop Plan. Designed for 3-5 chickens

LOAD DURATION AND SEASONING EFFECTS ON MORTISE AND TENON JOINTS

HALFPIPE PLANS. Includes plans for a 4' Inline Skate Halfpipe, 3' Skateboard Halfpipe and a Grinding Rail

Tex-452-A, Rotational Capacity Testing of Fasteners Using a Tension Measuring Device

Featuring TJ Rim Board and TimberStrand LSL

Connection Philosophy. p NDS Chapter-by-chapter description Changes from previous editions Examples. Part 1: Member Design Webinar.

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

Square Shear Beam Mounting Guidelines

DTFACT 16 C IN PAVEMENT LIGHT FIXTURE TESTING AND ANALYSIS FINAL SUMMARY PRESENTATION

UPPER DOOR KIT P/N

Moment-Resisting Connections In Laminated Veneer Lumber (LVL) Frames

Independent Containment System (ICS)

Hiniker Company th St. P.O. Box 3407 Mankato, MN VEHICLE INSTALLATION INSTRUCTIONS FOR: CHEV/GMC 4x4: K1500 SILVERADO/SIERRA

POWER-Skru Large Diameter Concrete Screw

Mounting Instructions Item No.: xxx

Nail, Wood Screw, and Staple Fastener Connections

The Base Shear Formula

Mounting Plate User s Guide. Includes Mounting, Installation, and Product Registration

Capacity of Oriented Strand Board Shear Walls with Overdriven Sheathing Nails

TORSIONAL FATIGUE OF TAPER BUSHINGS

2002 ADDENDUM to the 1997 NDS and PRIOR EDITIONS

(1) Method to fix Mechanically with BOLT or NUT

CHARACTERISTICS OF LUMBER-TO-LUMBER FRAMING CONNECTIONS IN LIGHT-FRAME WOOD STRUCTURES

Load Tables, Technical Data and Installation Instructions

City of Los Angeles RR Values for Connectors in Shear Walls and Wall Anchorage Assemblies

UR20/UR28 Ouro Site/Area Luminaire Installation Instructions

Ductility of large-scale dowelled CLT connections under monotonic and cyclic loading

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

Umbrella Inserts and Stubby Screens

INSTALLATION INSTRUCTIONS

Oxford Stalls Installation Instructions

Experimental investigation of the behaviour of pinned beam to column connections to pure shear monotonic and cyclic excitation

Hardware Pkg

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

HowtoPlans. 24'x8' Walk In Chicken Coop Plan. Designed for up to 50 chickens. .org

INSTALLATION INSTRUCTIONS ATV Winch Mounting Kit Part Number: Applications: Honda Rancher. Before You Begin.

Building Science. Design Issues. Design Issues. Advanced Framing. Stack Framing Concept. Advanced Framing. Use Less Stuff Better

Connection and Tension Member Design

TRUS JOIST RIM BOARD. Featuring TJ Rim Board and TimberStrand LSL. Multiple thicknesses, grades, and products to cover all your rim board needs

2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ

TECH SHEET PEM - REF / TESTING CLINCH PERFORMANCE. SUBJECT: Testing clinch performance of self-clinching fasteners.

INSTRUCTIONS INSTRUCCIONES CONSIGNES

SDWH TIMBER-HEX Screw

THE ROGUE TM GRAND RAPIDS TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

CIC 200 PLASTIC SCREW ANCHOR ASSORTMENT WITH PHILLIPS BINDING HEAD METAL SCREWS. 6 x 3/4 P/N x 1 METAL SCREW P/N x 3/4 METAL SCREW

LATERAL RESISTANCE OF TRADITIONAL JAPANESE POST-AND-BEAM FRAMES UNDER MONOTONIC AND CYCLIC LOADING CONDITIONS MARIA STEFANESCU

INSTALLATION INSTRUCTIONS - NSF WALK-IN COOLER/FREEZER Wall-Mounted Shelving System - No Blocking

5 kn Flexure Fixture. The difference is measurable

BSM, GSM & GSS. Joint Kit Instruction. (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers

UNIFIED FACILITIES GUIDE SPECIFICATIONS

B Connectors. Automation. Structural Framing System Connectors & Fasteners

Volunteer Guide - FLASH Cards Mitigation for High Wind Events Wood Construction Connectors Card Reference

Pressure Vessel Assembly Instructions

Nails, Fasteners, Connectors, and Framing

Metl-Span CF-42 Santa Fe Wall Panels 24 Ga. Exterior / 26 ga. Interior Facings Allowable Connection Load 1,7,8,9,10 (psf) Two or More Equal Spans

HowtoPlans..org. 8'x10' Storage Shed Plan

DIVISION: CONCRETE SECTION: CONCRETE ANCHORS REPORT HOLDER: HILTI, INC. EVALUATION SUBJECT:

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

January 8, 2016 Revised March 19, UNIRAC 1411 Broadway Blvd. NE Albuquerque, NM Flat Tile Mount (#KS-RH-AT1) Laboratory Load Testing

Small Above Fireplace Pull-Down Full-Motion TV Wall Mount

Transcription:

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 1 Cyclic tests 1 of engineered shearwalls considering different plate washer sizes Prepared for: American Forest & Paper Association (AF&PA) Prepared by: David Rosowsky, Lori Elkins, and Cameron Carroll Oregon State University Rev. 5/19/2004 Summary Table Wall designation P max (lbs) @ P max (in.) load @ 0.8P max (lbs) Energy (1) (in.-lbs) A1 10428 3.44 9500 84370 A2 11334 3.07 10487 76433 A3 11815 2.96 10895 78042 Avg. A 11192 3.16 10294 79615 Avg. A (excl. A1) 11575 3.02 10691 77238 B1 11156 2.81 10084 79779 B2 12053 2.98 11229 90002 B3 11682 2.84 10652 80577 Avg. B 11630 2.88 10655 83453 C1 11774 2.58 10062 58339 C2 11421 2.69 10593 64979 C3 11943 2.83 11219 67161 Avg. C 11713 2.70 10625 63493 D1 11600 2.81 10863 77540 D2 11407 2.81 10611 76369 D3 10148 2.85 9150 71434 Avg. D 11052 2.82 10208 75114 A: 2.5 in. square 1/4 in. plate washer (1) Area under hysteresis loops up to the first complete loop beyond P max B: 3 in. square 3/8 in. plate washer C: standard round washer (1.75 in. diam. 1/8 in.) D: 2 in. square 3/16 in. plate washer (tested March 2004) Note: washers tightened to approximately 40 ft-lbs torque Summary Conclusion This study examined the effect of washer size (used at the anchorage) on the performance of engineered wood shearwalls built with a treated sole plate (bottom plate). Complete framing details of the wall specimens are shown on the following pages. No statistically significant differences in performance, as measured by peak capacity and deflection capacity, were observed 2. 1 The test setup was in accordance with methods in ASTM E2126 Standard Test Methods for Cyclic (Reversed) Load Test for Shear Resistance of Framed Walls for Buildings. The cyclic loading protocol is shown in Appendix A. 2 Analysis of variance (ANOVA) was performed. The mean peak capacities were found to have no statistical differences at the 5% significance level. The means of the corresponding deflections (at P max ) were found to have no statistical differences at the 2% significance level.

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 2 Summary Notes/Observations: Wall designation Washer type Notes/observations: Dominant failure mode A1 Sheathing separated from studs at center of wall. Fastener failure A2 2.5 in. square plate washer Interior studs separated from sole plate. Sheathing separated from studs at center of the wall. Fastener failure A3 Same as A2 (with some splitting of sole plate). Fastener failure B1 Sole plate split at hold-downs. One hold-down completely ripped from end studs (bent screws). Separation at middle double stud. Fewer failures of edge sheathing fasteners. Fastener failure B2 3 in. square plate washer Sheathing separated from studs at outside and bottom edges of wall, however middle seam intact. End studs started to split at hold-down. Sole plate had little damage. Fastener failure B3 Fastener failure at sheathing edges at ends of wall. Bottom edge of sheathing pulled away from sole plate along interior studs. (Some superficial splitting of sole plates.) Bottom of end studs (near sole plate) split. Fastener failure C1 Sole plate failed (split) along ¾ of length. Bottom of sheathing pulled away from sole plate. Little damage on other edges. End stud split along hold-down screws. Interior studs separated from sole plate. Sole plate failure (splitting) C2 standard round washer Sole plate failed along ½ of length. One of the middle studs split from bottom plate (up about 12 ) and from top plate (down about 30 ). One sheathing panel pulled away from studs along edge and bottom of wall, with less damage along middle seam. The other panel had complete failure along middle seam, some failure along bottom, and little failure at end. Sole plate failure (splitting) C3 Sole plate failed. Similar to C2. Middle double stud split at end near sole plate. One end stud split along (one line of) hold-down screws. Sheathing pulled away from bottom half of end studs, and along sole plate. Middle seam intact. Sole plate failure (splitting)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 3 Summary Notes/Observations (continued): (continued on next page) Wall designation Washer type Notes/observations: Dominant failure mode D1 Edges of sheathing separated from studs. Small split in sole plate from sheathing nail pulling out. Little/no sole plate damage. Fastener failure D2 2 in. square plate washer End stud separated from top plate. One edge of sheathing separated from stud. Little/no sole plate damage. Fastener failure D3 Middle stud had some splitting near sole plate. One edge of sheathing separated from stud. Little/no sole plate damage. Fastener failure

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 4 Drawing A-1: Specifications for shearwall test specimen

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 5 Drawing A-2: Specifications (cont d.) for shearwall test specimen

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 6 Drawing A-3: Calculations for shearwall test specimen

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 7 15000 10000 Wall A1 (2.5 in. plate washer) ref = 2.4 in. 5000 Force (Lb-F) 0-5 -3-1 1 3 5 Monotonic pushover at end of cyclic test -5000-10000 Backbone curve -15000 Deflection (In) 15000 10000 Wall A2 (2.5 in. plate washer) ref = 3.3 in. Wall A1 backbone shown for comparison 5000 Force (Lb-F) 0-5 -3-1 1 3 5-5000 A1-10000 A2-15000 Deflection (In) 15000 10000 Wall A3 (2.5 in. plate washer) ref = 3.3 in. Wall A1 backbone shown for comparison 5000 Force (Lb-F) 0-5 -3-1 1 3 5-5000 A1-10000 A3-15000 Deflection (In) Figure 1. Hysteresis results for Walls A1-A3 (2.5 in. plate washer)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 8 15000 10000 Wall B1 (3 in. plate washer) ref = 3.3 in. Wall A1 and A3 backbones shown for comparison Force (Lb-F) 5000-5 -3 0-1 1 3 5-5000 A1-10000 A3-15000 Deflection (In) 15000 10000 Wall B2 (3 in. plate washer) ref = 3.3 in. Wall A1, A3, B1 and B2 backbones shown for comparison Force (Lb-F) 5000-5 -3 0-1 1 3 5 B1-5000 A1-10000 B2 A3-15000 Deflection (In) 15000 10000 Wall B3 (3 in. plate washer) ref = 3.3 in. Wall A1, A3, B1, and B2 backbones shown for comparison Force (Lb-F) 5000-5 -3 0-1 1 3 5 B1-5000 A1-10000 B2 B3 A3-15000 Deflection (In) Figure 2. Hysteresis results for Walls B1-B3 (3 in. plate washer)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 9 15000 10000 Wall C1 (standard round washer) ref = 3.3 in. Wall A1, A3, B1, B2, and B3 backbones shown for comparison 5000 Force (Lb-F) 0-5 -3-1 1 3 5 B1-5000 A1-10000 B2 B3 A3-15000 Deflection (In) 15000 10000 Wall C2 (standard round washer) ref = 3.3 in. Wall A1, A3, B1, B2, and B3 backbones shown for comparison 5000 Force (Lb-F) 0-5 -3-1 1 3 5 B1-5000 A1 C2 B2-10000 B3 A3-15000 Deflection (In) 15000 10000 Wall C3 (standard round washer) ref = 3.3 in. Wall A1, A3, B1, B2, and B3 backbones shown for comparison 5000 Force (Lb-F) 0-5 -3-1 1 3 5 B1-5000 A1 C2 B2-10000 B3 A3-15000 Deflection (In) Figure 3. Hysteresis results for Walls C1-C3 (standard round washer)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 10 15000 10000 Wall D1 (2 in. plate washer) ref = 3.3 in. A1, A3, B1, B2, B3, and C2 backbones shown for comparison 5000 Force (lb-f) 0-5 -3-1 1 3 5-5000 -10000 B1 A1 C2 B2 B3 A3-15000 Deflection (in) 15000 10000 Wall D2 (2 in. plate washer) ref = 3.3 in. A1, A3, B1, B2, B3, and C2 backbones shown for comparison 5000 Force (Lb-F) 0-5 -3-1 1 3 5 B1-5000 A1 C2 B2-10000 B3 A3-15000 Deflection (In) 15000 10000 Wall D3 (2 in. plate washer) ref = 3.3 in. A1, A3, B1, B2, B3, and C2 backbones shown for comparison 5000 Force (Lb-F) 0-5 -3-1 1 3 5 B1-5000 A1 C2 B2-10000 B3 A3-15000 Deflection (In) Figure 4. Hysteresis results for Walls D1-D3 (2 in. plate washer)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 11 Figure 1. Hydraulic actuator located at top of wall Figure 2. Shearwall assembly in test fixture

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 12 Figure 3. Shearwall assembly showing top loading beam and coupling to actuator Figure 4. Hold-down in corner of shearwall

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 13 Figure 5. Fastener pull-out at panel edges along center stud (Specimen A1)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 14 Figure 6. Uplift of sole plate at hold-down (Specimen A1) Figure 7. Sheathing pull-away at corner (Specimen A1)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 15 Figure 8. Sheathing edge pull-out (Specimen A2) Figure 9. Sole plate after failure, no splitting (Specimen A2)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 16 Figure 10. Fastener failure at sole plate, nail bending/ripping through sheathing (Specimen A3) Figure 11. Failure at bottom of wall, some splitting of sole plate (Specimen A3)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 17 Figure 12. Close-up of sole plate splitting (Specimen A3) Figure 13. End stud failure at hold-down (Specimen B1)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 18 Figure 14. Failure showing split at end of sole plate (Specimen B1) Figure 15. End stud failure (Specimen B1)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 19 Figure 16. Multiple failures, but no splitting of sole plate (Specimen B1) Figure 17. Start of a split in sole plate (Specimen C1)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 20 Figure 18. Sole plate splitting at hold-down (Specimen C1) Figure 19. Sole plate splitting from hold-down to first washer location; no bending of washer (Specimen C1)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 21 Figure 20. Top view of sole plate splitting from hold-down to first washer (Specimen C1) Figure 21. End stud and sole plate failures (Specimen C1)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 22 Figure 22. Sole plate split along its length (Specimen C1) Figure 23. Multiple slits at sole plate (Specimen C1)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 23 Figure 24. Sole plate split between interior studs (Specimen C1) Figure 25. Sole plate split through interior bolt location (Specimen C1)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 24 Figure 26. Failure at end of wall showing sole plate splitting (Specimen C2) Figure 27. Anchor bolt showing slight embedment (but no bending) of washer (Specimen C3)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 25 Figure 28. Sole plate (post-test) showing washer embedment (Specimen C2) Figure 29. Sole plate (post-test) showing slight washer embedment (Specimen D2)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 26 Figure 30. Sheathing separation from framing (Specimen D2) Figure 31. Sheathing separation from bottom plate, showing bolted anchor and hold-down (Specimen D3)

OSU Shearwall Testing Report for AF&PA, May 2004 [FINAL] page 27 APPENDIX A: CUREE Cyclic Loading Protocol Slip (mm Slip 40 30 20 10 0-10 -20 Initiatio n cycles Second primary cycle, used for yield point 0 50 100 150 200 First primary cycle, used f or initial s tif f nes s Examples of primary cycles Examples of trailing cycles 1.0 ref Time -30-40 Time (seconds) Technical Reference: Krawinkler, H., Parisi, F., Ibarra, L., Ayoub, A. and Medina, R. (2000), Development of a Testing Protocol for Wood Frame Structures, CUREE Publication No. W-02, Consortium of Universities for Research in Earthquake Engineering, Richmond, CA.