A EUROCONTROL View on the Research Needs & the Network of Centres of Excellence

Similar documents
SESAR Single European Sky ATM Research

SESAR EXPLORATORY RESEARCH. Dr. Stella Tkatchova 21/07/2015

Preparatory paper: food for thought

Future Aeronautical Communication System - FCI

Final Project Report. Abstract. Document information

ICAO AFI/MID ASBU IMPLEMENTATION WORKSHOP. Cairo, November 2015

Propagation of airborne spacing errors in merging traffic streams

Cockpit Visualization of Curved Approaches based on GBAS

Final Project Report. Abstract. Document information

Systems for Green Operations ITD

Air Traffic Soft. Management. Ultimate System. Call Identifier : FP TREN-3 Thematic Priority 1.4 Aeronautics and Space

A standardized Interoperability Platform for collaborative ATM Validation and Training

An Interoperability Assessment Model for CNS/ATM Systems

Preliminary Safety Case for Enhanced Air Traffic Services in Non-Radar Areas using ADS-B surveillance PSC ADS-B-NRA

Technology and Manufacturing Readiness Levels [Draft]

MAXIMISING THE ATM POSITIVE CONTRIBUTION TO SAFETY - A

Radar/Lidar Sensors SESAR XP1 Trials at CDG airport WakeNet-USA October 2012 Boeing, Seattle, USA

Performance Based Surveillance & New Sensors technology

Centralised Services 7-2 Network Infrastructure Performance Monitoring and Analysis Service

ABSTRACT. Keywords: information and communication technologies, energy efficiency, research and developments, RTD, categorization, gap analysis.

ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System

USE OF DISTRIBUTED REAL-TIME SIMULATIONS IN ATM VALIDATION: EXAMPLES BASED ON THE ANALYSIS OF CONTROLLER PILOT INTERACTION

Introduction to PBN and RNP

Action Line Cyber-Physical Systems Addressing the challenges and fostering innovation in Cyber-Physical Systems

Applying the ADQ Implementing Rule Engaging the Originators

Informal paper. An Overview of ADS. - Principles, Drivers, Activities, Technology and Standards - 1 June 1999, v1.0 EUROCONTROL

Final Project Report. Abstract. Document information

Performance objectives and functional requirements for the use of improved hybrid surveillance in European environment

Contextual note SESAR Solution description form for deployment planning

ARTES 10 Phase 1 workplan of activities.

A-SMGCS WORKSHOP EUROCONTROL IANS, NOVEMBER 2015

IMPLEMENTATION OF GNSS BASED SERVICES

Second Iteration Baseline Report/Matrix

INTERNATIONAL CIVIL AVIATION ORGANIZATION

HALA! : Achievements"

EC UA Aviation Conference, Windhoek, Namibia, April 2 & 3, 2009

ED-137C Radio theory plus Practical Lab using ED-137B Radio Emulators & ED-138 Performance Monitoring Tool Course Background

Funding Perspectives for Cyber- Physical Systems in Horizon 2020

EUROCONTROL Guidelines on 8.33 khz Channel Spacing for Military Operators

Generic Experimental Cockpit (GECO)

How to build large European projects. Lessons learned from the Arrowhead project Professor Jerker Delsing

Security Assessment for Prototype First Iteration

SESAR S ATM TARGET CONCEPT: KEYS TO SUCCESS

The function is assumed by technology management, usually the Technological Development Committee.

Safety of advanced airborne self separation under very high en-route traffic demand

ESA Iris Programme Analysis & definition of the Satellite System Operations. Briefing 28 July

The LVCx Framework. The LVCx Framework An Advanced Framework for Live, Virtual and Constructive Experimentation

TOICA Pierre Arbez Airbus Operations SAS

AE4-393: Avionics Exam Solutions

Identification of critical scenarios of risk: An operational approach

CS7-2 NIPS/SUR-RF. Edition Number : 2.10 Edition Date : 18 November 2014 Status : Released Issue Intended for : EUROCONTROL Stakeholders

ASSEMBLY 37TH SESSION

Shift2Rail and Beyond: A Perspective from Industry

A NEW METHODOLOGY FOR SOFTWARE RELIABILITY AND SAFETY ASSURANCE IN ATM SYSTEMS

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

Development of the Strategic Research Agenda of the Implementing Geological Disposal of Radioactive Waste Technology Platform

REMOTE TOWERS UK CAA PERSPECTIVE. Executive Digital Tower Symposium November 2018 Dave Drake UK CAA

ASSEMBLY 39TH SESSION

SMART CITIES. Prof. Dr. Eric DUBOIS Director, IT for Innovative Services Department (ITIS) ICT Spring Luxembourg City, May 16, 2018

ACAS Xu UAS Detect and Avoid Solution

ASSEMBLY 39TH SESSION

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October Agenda Item 7: Aeronautical air-ground and air-to-air communications

ELSA Study and Recommendations. November 2016

PACAS: A Gamified Platform for Participatory Change Management in ATM Systems

ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG)

WIDE AREA MULTILATERATION system

GALILEO Research and Development Activities. Second Call. Area 3. Statement of Work

Simulated SWIM services in ATM

Hands across the ocean: UK and Canada ANSPs deepen their relationship

EUROCONTROL Specification

ANASTASIA. Presentation at Aeronautics Days 2006, Vienna June

BEYOND RADAR ERA ATM SOLUTIONS

EUROCONTROL Specification for ATM Surveillance System Performance (Volume 2 Appendices)

)XWXUH FKDOOHQJHV IRU WKH WRXULVP VHFWRU

Methodology for Agent-Oriented Software

Factories of the Future 2020 Roadmap. PPP Info Days 9 July 2012 Rikardo Bueno Anirban Majumdar

IMPLEMENTATION OF AN SBAS-SACCSA TEST BED IN THE CAR/SAM REGIONS. (Presented by the Secretariat) SUMMARY

The Army s Future Tactical UAS Technology Demonstrator Program

Horizon 2020 ICT Robotics Work Programme (draft - Publication: 20 October 2015)

SESAR Wake vortex measurements by radar. First results of the campaign

Human Integration in the Life-cycle of Aviation Systems HILAS

ARTEMIS The Embedded Systems European Technology Platform

Robotics in Horizon 2020 ICT Work Programme

Instrumentation, Controls, and Automation - Program 68

Role of Public funding in Enhancing Innovation

: Frequencies for new aeronautical Communication systems

Research Infrastructures: Towards FP7

ICAO SARPS AND GUIDANCE DOCUMENTS ON SURVEILLANCE SYSTEMS

ADS-B Introduction / Tutorial

Evaluation of ATC Working practice from a Safety and Human Factor perspective

Field Operational Tests In FP7

Proposal for ACP requirements

Work Package Final Report

DFMC SBAS Receiver Development. Please note that this presentation is also published on the GSA website

AIRBUS, FINMECCANICA AIRCRAFT, HONEYWELL, FINMECCANICA AIRBORNE & SPACE SYSTEMS

Surveillance Strategy

Scoping Paper for. Horizon 2020 work programme Societal Challenge 4: Smart, Green and Integrated Transport

As is well known, Galileo will. Airborne Applications. Issues and Perspectives

Final Project Report. Abstract. Document information

MARGARET: A PERSONAL TRANSPORTATION AIRCRAFT OF TOMORROW USED TODAY FOR COLLABORATION AMONG UNIVERSITIES

Transcription:

A EUROCONTROL View on the Research Needs & the Network of Centres of Excellence ANDRIBET Pierre 31 st January 2007 European Organisation for the Safety of Air Navigation 1

SESAR Definition Phase will identify Research needs WP 2.3.2: Validation needs WP 3.4.2: R&D Master Plan WP 4.3.2 &4.3.3: Research Work Programme 07/06 12/06 06/07 11/07 02/08 03/08 Air Air Transport ATM Framework: ATM Performance The The Targets Current Targets Current Situation ATM ATM Target Target Concept Concept ATM ATM Deployment Sequence ATM ATM Master Master Plan Plan of of Action Action Work Work Programme for for 2008-2012 D 3 D 5 D 6 2

One view of the potential Research for SESAR What do we mean by Research for SESAR? Some ideas on the main potential Research activities. A paradigm shift in the organisation of Research in Europe. 3

From a vision to implementation: Research - a mandatory step Concept selection R & D Technology development and Validation Systems and Equipments development Deployment D 3 06/2007 2013 2020 4

Concept selection R & D Technology development and Validation Systems and Equipments development Deployment D 3 06/2007 2013 2020 5

The main objective of is to Provide evidence, or otherwise, that the SESAR 2020 Concept of Operation: is safe in principle can attain the proposed level of performance is environmentally efficient and is operationally viable 6

Operational viability assessment New concept will impact operators Performance and Environment & organisation: impact assessment CDM for 4D trajectory management from strategic planning Safety to assessment pre-tactical deconfliction New repartition of roles for Separation Management, => Validation of working procedures: HIL simulations Prototyping HF experimentations Validation of collaborative processes: Modelisation of actors behaviours Trials with real data Validation of optimisation algorithms: Optimisation of trajectories Controllers Tools AOC/Mil Pilots The Human at the centre of the concept LANDSIDE AIRSIDE ATC Civ/Mil Operational viability assessment 7

Operational viability assessment Performance and Environment impact assessment Provide the evidence that the Safety assessment system can attain the required level of performances: Capacity X3 Environmental impact - 10% Predictability -1mn/+3mn Using 2020 traffic forecast: Analytical modelling, F/T simulation, Noise and emission modelling, ATFM modelling Performance and Environment impact Assessment 8

SARPS ICAO Operational viability assessment Performance and Environment impact assessment Safety assessment Provide evidence that the system can maintain today's level of safety with tomorrows traffic: Safety level X10 Apportioning TLS: Using a holistic top-down modelling (Integrated Risk Picture-IRP) As a first cycle of certification process: Following EUROCAE / RTCA process OSED & OHA Operational Operational Performance Hazard Analysis Analysis Allocate Safety Objectives & Requirements European ETSO European Technical Equipment Standards Specification Order ED 78A IRP SPR Safety & Performance INTEROP Interoperability Requirement Requirement Specification Specification Aircraft ANSP User Ground System Implementing Air System Rules Community Implementing Specification Rules Guidance Community Material Specification MOPS Guidance Material Minimum Operational Performance MOPS Specification Minimum Operational Performance Specification Environmental Conditions Specifications Development Methodology Specifications Platform Customisation Suppliers Options & Add-Ons CFIT Taxiway collision Mid-air collision Runway collision WV Risk Classification Fault Tree Model Influence Model Safety Assessment 9

Approach Two or three Cycles: Cycle 1: Generic Validation; Cycle 2: Refinement (Local Specific). Potentially a 3rd cycle for final refinement SESAR Definition phase SESAR Definition Phase Macro & System Model Analytical Fast Time Results Trade-Off and Results consolidation and conclusions and Trade-off Macro & System Model Analytical Fast Time Results Final Trade-Off and Results consolidation and conclusions and Trade-off EUROCAE / RTCA formalism Human In Loop Cycle 1 Generic Assessment Human in Loop Cycle 2 Local Specific Assessment 10

Concept selection R & D Technology development and Validation Systems and Equipments development Deployment D 3 06/2007 2013 2020 11

Technology development and Validation The main objective of Technology development and validation is: To identify the impact of the future concept on the ATM system architecture, To assess the technological feasibility of the required evolution, To provide the evidence that the ATM system can deliver the required performances. 12

Technology development and Validation System Architecture studies Design of Architecture Technology feasibility evolution Design and prototyping of Network centric backbone: Exchange Mechanism Middleware, System Performance assessment System Architecture studies 13

Technology development and Validation System Architecture studies Technology feasibility Identification and feasibility System Performance assessment studies (prototyping) of critical elements: A/G trajectory exchanges, FMS / TP accuracy, CDM mechanisms, Controller tools, Cockpit evolutions, Technology feasibility 14

Technology development and Validation System Architecture studies Technology feasibility System Performance assessment System performance modelling (System Capacity, Response times, Reliability ) Large scale trials System performance assessment 15

A tight time scale YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 Cycle 1 Cycle 2 Architecture studies Cycle 3 Feasibility studies component 1 Feasibility studies component n Large scale trials 16

Research Infrastructure : Modelling tools for performance assessments: Network models, F/T simulators Experimental Real Time simulators: ATC, TMA, TWR, CDM Human Factors evaluation tools Technology validation: Prototypes, Architecture modelling Huge gaps exist in current environment, Need to: Fill the gaps Federate European infrastructure EATRADA initiative to assess existing tools, identify gaps, and recommend solutions SESAR definition phase WP2.3.2 and WP 4.2 to complement the analysis 17

How to organise All European R&D actors (ANSPs, R&D centres, EUROCONTROL, Industry) need to federate, Need for an integrated programme to synchronise and consolidate results, SESAR JU will organise an adequate management structure. 18

Thank You 19