A Facility for Accelerator Physics and Test Beam Experiments

Similar documents
Preliminary Plan for a Hadron Production Facility at the SLAC A-Line and End Station A

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

3 General layout of the XFEL Facility

12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT. Upgrade Hall A

Chapter 9. Magnet System. 9.1 Magnets in the Arc and Straight Sections

Summer / Fall 2004 Downtime AEG Week 4 Summary

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009

BCS UPDATE. j. welch 2/9/17

CEBAF Overview June 4, 2010

Transverse Wakefields and Alignment of the LCLS-II Kicker and Septum Magnets

Experiment to Measure Ramped Electron Bunches at the UCLA Neptune Laboratory Using a Transverse Deflecting Cavity 1

Experience with Insertion Device Photon Beam Position Monitors at the APS

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

FACET. Andrei Seryi. FACET Project Manager

SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II*

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

Initial Beam Phasing of the SRF Cavities in LCLS-II

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors

The FERMI Elettra: radiation protection and safety issues

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

BEAM DIAGNOSTICS AT THE VUV-FEL FACILITY

SPEAR 3 - THE FIRST YEAR OF OPERATION*

Non-invasive Beam Profile Measurements using an Electron-Beam Scanner

Independent Measurement of Two Beams in an IP Feedback BPM (response to a question asked at LCWS05 )

12/08/2003 H. Schlarb, DESY, Hamburg

Grounding for EMC at the European XFEL

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs

New Tracking Gantry-Synchrotron Idea. G H Rees, ASTeC, RAL, U.K,

ANALYSIS OF 3RD OCTAVE BAND GROUND MOTIONS TRANSMISSION IN SYNCHROTRON RADIATION FACILITY SOLARIS Daniel Ziemianski, Marek Kozien

Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012

Circumference 187 m (bending radius = 8.66 m)

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER

Construction Status of SuperKEKB Vacuum System

Note on the LCLS Laser Heater Review Report

Beam Transfer to Targets

CHARACTERIZATION OF BUTTON AND STRIPLINE BEAM POSITION MONITORS AT FLASH. Summer Student Programme 2007 DESY- Hamburg.

THE CRYOGENIC SYSTEM OF TESLA

ILC Damping Rings: Engineering Model and Vacuum System Design

Shintake Monitor Nanometer Beam Size Measurement and Beam Tuning

Design of the magnets for the MAX IV project. Martin Johansson, Beam Dynamics meets Magnets-II workshop, Bad Zurzach, Dec.

LCLS-II SXR Undulator Line Photon Energy Scanning

LCLS project update. John Arthur. LCLS Photon Systems Manager

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group

COMMISSIONING STATUS AND FURTHER DEVELOPMENT OF THE NOVOSIBIRSK MULTITURN ERL*

FLASH 2. FEL seminar. Charge: 0.5 nc. Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg,

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

Installation of the Optical Replica Synthesizer (ORS) at FLASH

FLASH Operation at DESY From a Test Accelerator to a User Facility

Does the short pulse mode need energy recovery?

CLIC Compact Linear Collider

Focusing of Sub-Micron Beams for TeV-Scale e+e- Linear Colliders

CXI 1 micron Precision Instrument Stand

O. Napoly LC02, SLAC, Feb. 5, Higher Order Modes Measurements

Proton beam for UCN. UCN TAC-Meeting, May 12-13, 2005 Urs Rohrer, beam line physicist

Advanced Beam Instrumentation and Diagnostics for FELs

RF System LSD Work. William Merz

LCLS Injector Diagnostics. Henrik Loos. Diagnostics overview Transverse Beam Properties Longitudinal Beam Properties

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY

VEPP-2000 COLLIDER CONTROL SYSTEM*

Emilia Cruz. September 21, 2015

VUV-FEL User workshop, August 23-24, 2004

Feedback Requirements for SASE FELS. Henrik Loos, SLAC IPAC 2010, Kyoto, Japan

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

LCLS UNDULATOR COMMISSIONING, ALIGNMENT, AND PERFORMANCE *

LUSI Pulse Picker System

Experiences of the QSBPM System on MAX II

Radiological Safety Analysis Document for the CLAS12 Engineering and the first physics run of Run Group A

Re-commissioning the Recycler Storage Ring at Fermilab

X-Band Linear Collider Report*

New apparatus for precise synchronous phase shift measurements in storage rings 1

FLASH: Status and upgrade

Participant institutions: other INFN sections (Mi, RM1, RM2, Ba, Ca, Pi, Ts, Fe, Le, Fi, Na, LNS), ENEA-Frascat

Electron Beam Diagnosis Using K-edge Absorp8on of Laser-Compton Photons

Proposal of test setup

Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report

Accelerator Complex U70 of IHEP-Protvino: Status and Upgrade Plans

Coherent Synchrotron Radiation in the ANKA Storage Ring

F- 9 72) PROTECTION IN THE ~ L TEST AT SLAC

MAGNETIZED IRON MUON SffiELDS. R. H. March University of Wisconsin ABSTRACT

Message from the Americas

LHC TRANSVERSE FEEDBACK SYSTEM: FIRST RESULTS OF COMMISSIONING. V.M. Zhabitsky XXI Russian Particle Accelerator Conference

Physics Requirements for the CXI 0.1 micron Sample Chamber

Design of beam optics for FCC-ee

FAST RF KICKER DESIGN

(fb) Nevent/year for 50fb -1. s (GeV) ~ ~ qq q=t. ZZ cos <0.8 W + W tt 175GeV 500,00 5,000. Zh 120GeV. 230GeV. HA 400GeV 220GeV 410GeV

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

ERLP Status. Mike Dykes

CLARA: A new particle accelerator test facility for the UK

Roman Pots. Marco Oriunno SLAC, PPA. M.Oriunno, SLAC

ATF2 Project at KEK. T. Tauchi, KEK at Orsay 17 June, 2005

LCLS Bend Magnet Specification

LHC COMMISSIONING AT HIGHER ENERGY

THE ORION PHOTOINJECTOR: STATUS and RESULTS

The ILC Accelerator Complex

Short-Pulse X-ray at the Advanced Photon Source Overview

MEASUREMENT OF BEAM LOSSES USING OPTICAL FIBRES AT THE AUSTRALIAN SYNCHROTRON

arxiv: v1 [physics.acc-ph] 20 Jan 2010

Why Consider a Toroid Spectrometer Built Around Existing Hardware?

Transcription:

A Facility for Accelerator Physics and Test Beam Experiments Experimental Program Advisory Committee Roger Erickson for the SABER Design Team December 4, 2006

The Problem: FFTB is gone! The Final Focus Test Beam (FFTB) has been dismantled to make room for the LCLS. What can be done to replace its functions? SABER: South Arc Beam Experiment Region A proposed facility for experiments requiring compressed, focused beams of electrons or positrons. To be built in the Instrument Section in the SLC South Arc tunnel. Description: SABER White Paper (December 2005, revised August 2006) http://www.slac.stanford.edu/grp/rd/epac/loi/saber.pdf SABER Workshop (March 2006) presentations: http://www-conf.slac.stanford.edu/saber/present/default.htm SABER Optical Design, R. Erickson, K. Bane, P. Emma, and Y. Nosochkov, Proceedings of the EPAC06 (June 2006) https://www-internal.slac.stanford.edu/ad/adsaber/saber_files/wepch061.pdf

SLAC Overview with SABER SABER consists of three main components: 1. Experimental area with final focus and beam dump in SLC South Arc tunnel. 2. Linac Pulse Compressor upgrade to compress positron bunches. 3. Bypass Line to deliver e - or e + beams to SABER, bypassing the LCLS. LCLS injector is being installed at Sector 21, downstream of existing positron source.

SABER in SLC South Arc Tunnel

SW Adit Entrance Ramp View from the parking lot below MCC A trailer or small counting-house building could be installed adjacent to the ramp.

SW Adit Entrance to SABER South Arc tunnel at the bottom of the ramp. A concrete maze has been designed for this area.

Architectural Drawing of South Arc Area SABER MCC Linac SW Adit MCC 40 ft 3.73 Tunnel pitch angle

South Arc Tunnel People can work safely in the South Arc tunnel, independently of PEP-II or LCLS operations. Easy access through upgraded SW Adit entrance. Convenient space for user building in existing paved area beside SW Adit ramp. Radiation safety issues are easier than in FFTB (SABER is deep underground).

South Arc Tunnel Instrument Section, looking upstream.

South Arc Tunnel Looking downstream, approaching dump area.

Current Status of South Arc Magnets appear to be in good shape. Arc achromats 1 and 2 (BSY to SABER) have been electrically isolated from the rest of the South and North Arcs, and pass high-pot and resistance checks. A smaller power supply (30 V, 3000 A) has been identified for powering Achromats 1 and 2. Installation is expected to begin shortly. New dc cables have been installed for the arc circuit in the BSY area, replacing some that appeared to be radiation-damaged. Control system is functioning; arc magnet movers respond to control system commands. Some magnet power supplies in the BSY zone and non-interlocked corrector magnets in the S ARC zone have been powered up.

Current Status of South Arc - continued LCW flow has been maintained, except for a few devices in the BSY. To reduce power consumption for LCW pumps, flow restrictors have been fabricated to reduce pressure to the SLC arcs, but maintain full pressure for SABER systems. Vacuum system integrity is good in the arc achromats and SABER area. A section of the S. Arc beamline in the BSY had leaks that have been repaired; this section is being re-integrated with the BSY system this week.

Personnel Protection System Phase 1 Goal is to restore South Arc PPS to operating condition. Combine S Arc and SFF zones into one SABER zone. Status: Design complete. Maintenance in progress. Phase 2 Goal is to add a new controlled-access entrance portal at the SW Adit, and move the portal at the SE Adit to a new location in the tunnel closer to SABER. Status: PPS design work in progress. Rad Physics Dept studying entrance maze design.

PPS Phase 1 Status: Ready for certification January 2007.

PPS Phase 2 SABER Focal Point Emergency Off Buttons Utility Shaft

Plans for the Coming Year Phase 1 Restore South Arc through Instrument Section as it was in 1998. Upgrade to meet new safety standards. in progress. Install smaller power supply for arc magnets. design complete. Install temporary beam dump. done. Deliver first beam to temporary dump in early 2007. Phase 2 Reconfigure Instrument Section for SABER final focus. conceptual design complete. Install PPS entrance in SW Adit. detailed design in progress. Install shielded high-power beam dump. A suitable dump from a dismantled beam line has been located. Demonstrate focused and compressed electron beam.

Configuration for Initial Beam Tests Incoming Beam Temporary Beam Dump

Schematic Map Incoming Beam No changes to here Focal Point 12/4/06 Achro 3 EPAC Review

SABER Final Focus Magnets SABER quads (8) from SLC Final Focus Final focusing quad from FFTB Dump line quads from FFTB Dump line dipoles from FFTB

Experimental Area Current working design: Nominal beam position: 42 inches above the tunnel floor. 39 inches from south tunnel wall. Downward pitch 3.730 deg. Focal point is 2m downstream of face of last quadrupole. The focal point is approximately 100 feet from the next arc AG magnet (where the tunnel starts to curve to the south). This allows room for an imaging spectrometer system.

Ease of Access SW Adit entrance: Ramp is approximately 10 ft wide. Room enough for a 39 inch door (same as FFTB), followed by 4 ft wide PPS maze for personnel and equipment access. Two vertical cable penetrations carry cables to MCC for power supplies and instrumentation. One is near the upstream end of the IS and reaches the surface outside the west door of MCC. The other is near the proposed IP and reaches the surface outside the east door of MCC. A cable tray could be installed through the SW Adit (through the maze or above the shielding blocks) to a trailer or other building on the paved area near the SW Adit ramp.

Positron Compressor Chicane The existing Sector 10 compressor chicane has been used successfully for several years, but cannot be used with positrons (because electrons are required to make the positrons, and only one charge can pass through the present chicane). Chicane will be modified to be symmetric for electrons and positrons. Two new dipoles with wider poles are needed for the first and fourth positions.

Compressor Chicane Components Incoming beams e - e + New positron chicane Existing components with control system nomenclature

Proposed Symmetric Chicane e + e -

First Dipole of Compressor Chicane Chicane path Undeflected linac trajectory

Bypass Line A Bypass Line from Sector 20 will allow delivery of 30 GeV electrons to BSY without passing through last third of linac. SABER will then be independent of LCLS operations. Optics design is compatible with connection to the South Arc. Trajectory past Sector 30 and NIT/SIT breakout point passes through a congested area, but can be built with careful design. Cost could be reduced by using one of the PEP-II injection transport lines between Sectors 21-29 for this purpose.

Electron Transport Line for PEP-II e - Beam to PEP-II SABER Bypass Line geometry and components will look similar to PEP-II e- inject. system. e - Beam to PEP-II Linac Protection Collimator Bend Magnets Linac e + Return Line (only upstream of Sector 19) First Dipole of Compressor Chicane

PEP-II Transport Lines in Linac Tunnel e- e+

PEP-II Transport Lines e + to PEP-II e - to PEP-II Steering correctors BPM Quadrupole

Linac Tunnel with Transport Lines PEP-II e - PEP-II e + Linac Bypass Line Bypass quadrupoles are offset in z from PEP-II e+ system.

SABER Bypass Line Geometry

Bypass Trajectory Approaching South Arc Match at existing 51B2 dipole To LCLS To SABER Dipoles: red Quads: blue Sextupoles: green To PEP-II LER

Linac Tunnel Approaching BSY Bypass Line LINAC Bypass Line trajectory will pass over SIT Line through congested area. SIT Line to PEP-II

Bypass Trajectory in BSY near 51AGF Plan view of SLC arcs diverging downstream of 50B1. SLC South Arc Trajectory Linac Beam Bypass Line

Bypass Trajectory into 51B2 North Arc South Arc LCLS Beam Bypass Line New Dipole (52B2 from N. Arc)

B2 Dipoles in 51- and 52-lines South Arc Linac (LCLS) Trajectory 51B2 in S. Arc 52B2 in N. Arc To SABER

Optical Functions: Sector 20 to Focal Point 1 st Dogleg: Linac to Bypass 2 nd Dogleg: Match to Achro 1 Sector 20-5 Bypass Line Arc Achromats 1 & 2 Final Focus D (m) Prepared by Yuri Nosochkov.

Final Focus Optics and Dump Line β (m) D(m) Focal Point

Focal Point (No Bypass Line) β x = 1.5 cm, β y = 15 cm Red is Gaussian fit to tracking data. σ x = 6.9 μm σ y = 6.7 μm σ z = 18.8 μm

Focal Point with Bypass Line σ x = 5.5 μm σ y = 6.1 μm Final parameters are equivalent, whether the beam comes through the last third of the linac or is transported through the Bypass Line. σ z = 19.3 μm

Use of PEP-II Injection Transport Line The Bypass Line design runs parallel and close to the existing PEP-II transport lines, and could easily be modified to match a long section of the electron transport (NIT) line. Nearly 1 km of vacuum chamber, pumps, BPMs, steering correctors, cables, small power supplies, control system hardware, and mechanical supports can be used directly. The PEP-II electron injection transport line was designed for 12 GeV; needs 2.5 times stronger focusing for SABER. This could be achieved by adding quadrupoles with cross-sections identical to existing quads.

SABER Beam Parameters Energy: 28.5 GeV with PEP-II or LCLS with bypass line. Up to 30 GeV with full linac (but not with bypass line). Charge per pulse: 2 x 10 10 e - or e + /pulse with full compression. 3.5 x 10 10 e - or e + /pulse without compression. Pulse length: σ z < 30 μm with 4% momentum spread. σ z < 45 μm with 1.5% momentum spread. Spot size at IP: 10 μm nominal; σ x, y < 7 μm achieved in computer simulations. Momentum spread: 4% full width with full compression. < 0.5% full width without compression. Momentum dispersion at IP: η = 0. η = 0.

Future Opportunities Test Beam Single e+ or e- per pulse A beam of this kind could be produced by passing the primary beam through a foil in the BSY. Dipole B2 and magnets downstream would be set for a lower energy, dumping the primary beam on a collimator in the BSY. Reduce bunch length Studies suggest σ z could be further reduced by about 30% by lowering the damping ring energy from 1.19 GeV to 0.9 GeV. Other Ideas include moving the compressors further upstream and adding an RF photoinjector gun similar to the LCLS gun. These ideas merit further study.

SABER Safety Issues Radiation Beam energy and power are substantially less than SLC, which ran successfully from 1986 to 1998. The Sector 10 positron compressor chicane will be a mirror image of the electron compressor, and will incorporate the same safety features. Electrical Conventional electrical equipment is being inspected and upgraded for code compliance. Arc-flash hazard analysis has been done and new labels applied. Distribution panels and cable tray grounding have been upgraded. Some cables will be replaced. Non-ionizing Radiation No new RF sources involved with SABER. Some future experiments may involve lasers, but these will be reviewed when they are proposed. Seismic Hazard Existing South Arc tunnel will be used. No new civil construction, except for SW Adit PPS maze and additional cable penetrations. The walls of the SW Adit ramp were reinforced earlier this year.

Summary SLC experience proved that low-emittance beams of electrons or positrons could be transported through the arc systems and focused to small spots. FFTB experience proved that beam bunches could be compressed longitudinally to < 100 fsec. Computer simulations show that a final focus system can be built in the South Arc tunnel, and that low emittance, compressed bunches of electrons or positrons can be delivered to users. The electron bunch compressor chicane in the linac will be modified to compress positron bunches, opening up new areas of physics. A Bypass Line from Sector 20 to the BSY can be built to deliver beams to SABER, independently of LCLS. SABER will be constructed using equipment saved from the FFTB and SLC Final Focus, along with new hardware using well established designs.

Acknowledgements Special thanks to: Yuri Nosochkov, who has developed optical solutions for SABER. Karl Bane, who has been investigating wake field effects and demonstrated bunch compression in the South Arc. Lynn Bentson, who has done the preliminary engineering studies and cost estimates. Paul Emma, who did initial optics and tracking simulations for the FFTB and has helped in exploring other options. Patrick Krejcik, who revived our interest in the South Arc option and demonstrated its feasibility. Al Baker, Johannes Bauer, Martin Berndt, Patrick Bong, Dan Blankenship, Alex Chao, Scott DeBarger, Ted Fieguth, Carsten Hast, Rick Iverson, Nanyang Li, Paul Miller, Alyssa Prinz, Mike Saleski, H. Shin, Kristina Turner, Dieter Walz, Mark Woodley, and the CEP, Controls, PED, MFD, and Accelerator Operations staff members who have been helping revive the old hardware and offering help and ideas for SABER.