The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Similar documents
MoDOT ACEC St. Louis Partnering Meeting. September 14, 2017

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

BOARD OF DIRECTORS MEETING MINUTES

Letting Schedule For Letting of

Appendix G: Freight Project List SFY

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

This page is intentionally left blank

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission

2018 District 1 Highway Construction Program

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Attachment #2 PPW133-07

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Arkansas State Highway and Transportation Department

Charlton/Oxford Route 20 Reconstruction Project

Update: July 20, 2012

Highway and Bridge Construction Schedule RSMo (3)

A & A Hauling, Inc. PO Box 838, Collinsville, IL phone: (618) fax: (618)

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

This first partnership performed work throughout Missouri, Illinois and Kentucky, building roads and performing other concrete construction projects.

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

HEARD COUNTY BOARD OF COMMISSIONERS MEETING MARCH 24, :30 P.M. The Heard County Board of Commissioners held a Commissioners Meeting on

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

The minutes from the February 24, 2014 Contracts and Purchasing Board meeting were unanimously approved, as written.

ROADWAY CROSS SECTIONS

Program vs. Award FY15 per District Through May 15, 2015 Bid Opening

Union Station Tunnel Overall DBE Goal Calculation

TABLE OF CONTENTS 1200 PLAN PREPARATION

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C.

Updated: April 7, 2016

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

Plan Preparation Checklist

King Mill Lambert DRI# 2035 Henry County, Georgia

C Missouri Extension Homemakers Association, Inc., Mural Documentation Project, linear feet

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER

1 st Judicial District Resources

Deep Creek Canyon US Highway 12

Drawbridge Operation Regulation; Oakland Inner Harbor, ACTION: Notice of deviation from drawbridge regulation.

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida

Straight Line Diagram. Lawrence 37. January 2010

Locate Request Information

STATE OF KANSAS DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL AID PROJECT 1 PAWNEE COUNTY US-56

TYPICAL SECTION OF IMPROVEMENT

2015 GDOT PowerPoint. Title Page

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

New Jersey Department of Transportation DATE : 05/21/09 PAGE : TABULATION OF BIDS

TEXAS SENATE MILES DESCRIPTION: WIDEN NB AND SB MAINLANES TO 3 LANES EACH DIRECTION TO: 0.25 MILES N. OF LOOP 20/FM 3464 IN

Exit 61 I-90 Interchange Modification Justification Study

RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST OIDO AREAWIDE COORDINATING AGENCY

APPENDIX IV-C. Glades County Critical Facilities Vulnerability Analysis

The Board of County Road Commissioners of the County of Kent met in the. The regular meeting was called to order by Commissioner Rambo, Chairman

Appendix B: Noise Study

UTILITY SERVICE/REPAIR PERMIT

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016

ANNOUNCEMENT BY BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM

County of Sonoma Agenda Item Summary Report

RECORD OF PROCEEDINGS MINUTES OF JACKSON TOWNSHIP BOARD OF TRUSTEES MEETING NOVEMBER 27, 2018

Re: Ruby Pipeline Project; Docket No. CP ; Response to Comments from Mr. Randy Largent, Landman for Newmont Mining Corporation

Planarization & Routing Guide

Survey Data and TOPO Checklist

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

%&g( %&g( ) Bridge Projects DRAFT

ICT LIBRARY UPDATE. Bi-monthly Nov. Dec Vol. 15 : No. 6. Contents

US Forest Service Standard Trail Plans and Specifications. Step By Step Guide

LCRA TRANSMISSION SERVICES CORPORATION

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

MARCH 7, The invocation was given by Reverend Leland Nelson from Calvary Baptist Church.

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

Increasing Pace of Utility Accommodations

MnDOT Contract Exhibit A - Scope of Services

MINUTES OF THE BOARD OF COUNTY ROAD COMMISSIONERS MONROE, MICHIGAN August 14, 2017

2012 MnDOT Greater Minnesota Construction Projects

REQUEST FOR PROPOSALS Rochester Downtown Alliance Rochester, Minnesota 2013 Transformer Cabinet Mural Project Budget of $500 per large transformer

Study Description. November 29, Overpass Road Alternatives Public Workshop

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

State Resource Guide Kentucky

Autodesk InfraWorks & Autodesk InfraWorks 360 Fundamentals Course Length: 3 days

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

July/August/September Traffic Adaptive Installation Preparation, July-September 2017

2007 Year Review File: c Date: December Slide Location

CITIZENS ADVISORY COMMITTEE OF THE HUNTSVILLE AREA METROPOLITAN PLANNING ORGANIZATION MINUTES. Regular Meeting - November 26, p.

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

LAND FOR SALE DEVELOPMENT OPPORTUNITY. St. Louis, Missouri JUNE 2017

AGENDA Board Meeting NEW JERSEY TURNPIKE AUTHORITY December 19, 2017

State Resource Guide Nebraska

Cabaniss Engineering Inc.

San Antonio Wrong Way Driver Initiative

Jackson County 2018 Traffic Summit

MAINTENANCE OF TRAFFIC &

[LLORW00000.L ER0000.LVRWH09H XL5017AP.WAOR Notice of Availability of the Record of Decision for the Proposed Vantage to

BAY MEADOWS SPECIFIC PLAN

Straight Line Diagram. Jefferson 33. January 2018

PREMIER BIG BOX SPACE FOR LEASE

Straight Line Diagram. Lawrence 37. January 2018

Transcription:

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins February 26, 2019 and ends March 5, 2019. The proposed March amendment is attached below. Comments may be submitted via telephone to MoDOT's customer service centers at 1-888 ASK MODOT (275-6636), email sent to TPM@modot.mo.gov, or letter addressed to Transportation Planning, Amendment Comments, PO Box 270, Jefferson City, MO 65102. The Missouri Highways and Transportation Commission, the Federal Highway Administration, and the Federal Transit Administration approved the current Statewide Transportation Improvement Program in July 2018. Amendments occur due to unforeseen circumstances, changing conditions, or new opportunities that require a more rapid response than can be provided by an annual update.

NW Holt IS 29 1I3296 Preventive maintenance on the shoulders from Rte. 59, east of Oregon, to 1.5 miles south of Rte. O near St. Joseph. Reason: To add project to improve shoulders. NE NE NE KC KC Lewis Lewis Jackson Jackson RT B RT C US 24 OR 49 2S3300 2S3291 2P3180 4S3287 4P2237 2019 RW 2019 RW Pavement resurfacing from Rte. 61 south through Canton and LaGrange to Rte. 61. Pavement preservation treatment from Rte. 6 in Ewing to Rte. B in LaGrange. Job Order Contracting for guardrail repair at various locations in the Northeast District. Bridge replacement over Delaware Avenue/Truman Library Drive 3.6 miles east of I-435 near Independence. Project involves bridge L0840. $1,322,000 city of Independence funds. Reason: To modify an existing project budget and funding source. Funding Source: Available STIP and city of Independence funds. Payment to city of Grandview to convert the frontage roads to 2-way traffic from 135th to Rte. 150 in Grandview. $4,524,242 Cost Share funds. Reason: To add project to improve pavement and split from 0P3004F, 0P3004G. (March Administrative Amendments) Funding Source: Cost Share funds. (0P3004F and 0P3004G) $376 $32 $1,187 $103 $401 $33 $265 $19 $157 $25 $4,524 -$5 MHTC Meeting 1 of 5 March 6, 2019

District County Route Job No. Change by Type Description of Location / Improvement / Funding KC Jackson MO 7 4S3392 Pavement resurfacing and guardrail replacement from Oak Haven Drive to the south intersection of Rte. 150. $1,572 $215 CD Callaway IS 70 5I3136 Replacement of median drainage culverts in Callaway County. $99,000 $99 District Operation funds. Reason: To add project to repair culverts. CD 5P3223 Job Order Contracting for guard cable and guardrail repair on various routes $250 in the southern portion of the Central District. CD 5P3274 Job Order Contracting for guard cable and guardrail repair on various routes $90 in the northern portion of the Central District. SL Franklin RT OO 6S3370 Pavement resurfacing, upgrade guardrail, and pipe replacement from Rte. -$2,268 100 to First Street in Pacific. Reason: To modify an existing project budget and scope. Funding Source: NA $7 $18 $6 -$151 SL Franklin RT ZZ 6S3420 Resurfacing, guardrail upgrades, and replace culvert pipes from Rte. C to Rte. Y. $1,440,000 District Operation funds. $1,483 $295 Reason: To add project to improve pavement and drainage. MHTC Meeting 2 of 5 March 6, 2019

SL Jefferson OR 55 6S3421 Resurfacing, guardrail upgrades, and ADA Transition Plan improvements from Elm to Imperial Main Street. $958,000 District Operation funds. Reason: To add project to improve pavement, guardrail, and ADA. $987 $241 SL Jefferson RT E 6S3090C 2022 CN Erosion control repairs at Joachim Creek near Plattin Street in DeSoto. $759 2019 RW Reason: To add project to improve drainage. $48 SL St. Charles IS 70 6I3195 Pavement resurfacing from west of Wentzville Parkway to Lake St. Louis -$4,337 Boulevard. Funding Source: NA SL St. Charles MO 94 6S3431 Bridge rehabilitation and substructure repair on Rte. 94 at Sehrt Creek, Rte. $609 Z at Little Dardenne Creek, Rte. K at Schote Creek, Rte. K at Dardenne Creek, and Rte. 370 at Cole Creek. Includes bridges A6476, A7372, A5064, A5065, A5116, and A5123. $591,000 District Operation funds. Reason: To add project to improve bridges. SL St. Louis IS 70 6I3338 Bridge rehabilitation to sixteen bridges from Branch Street to Springdale $1,843 Avenue. Project involves bridges A6108, A6110, A6111, A6131, A6132, A6153, A6154, A6167, A6168, A6172, A5879, A5859, A5895, A5878, A5860, and A5858. Reason: To modify existing project scope and budget. -$7 $56 $211 SL St. Louis RT D 6S3411 Pavement marking on Page Avenue (Rte. D) from I-270 to Broadway. $799,000 District Operations funds. $799 -$10 Reason: To add project to improve pavement markings. Funding Source: District Operating Budget. MHTC Meeting 3 of 5 March 6, 2019

SL St. Louis IS 70 6I3415 Bridge deck sealing and preventive maintenance on Stan Musial Veterans City Memorial Bridge. Project involves bridge A6500. $889,000 IDOT funds. Barton US 160 7P3356 *Contingent McDonald Newton St. Clair IS 49 IS 44 RT H 7P0601 7I3392 7S3241 8I3163 Reason: To add project to improve bridge. Funding Source: Available STIP and IDOT funds. Repair slides 0.3 mile east of Main Street in Mindenmines. $300,000 Abandoned Mine Lands funds from MoDNR. Reason: To modify an existing project budget and funding source. Funding Source: Abandoned Mine Land funds from MoDNR and available STIP funds. Construct new interstate roadway to complete I-49 from Pineville to the Arkansas State line (Bella Vista). $25,000,000 BUILD funds. Reason: To modify and accelerate an existing project budget and funding source. Funding Source: Available STIP funds and BUILD Program funds. Job Order Contracting for bridge repair at various locations in Newton, Jasper, Lawrence, Greene, and Webster Counties. Reason: To add project for bridge repairs. Pavement resurfacing from Rte. A to Rte. 82. Reason: To modify an existing project scope and budget. Job Order Contracting for bridge repair at various locations in the urban Southwest District. Reason: To add project for bridge repair. $1,780 $168 $285 $111 $24,746 $1,738 $408 $61 $629 $72 $194 $28 MHTC Meeting 4 of 5 March 6, 2019

Webster RT C 7S3146B Pavement resurfacing from Rte. 38 to Rte. 60. SE Cape Girardeau US 61 9P3460 Modify interchange configuration from Old Orchard Road to 0.2 mile south of Veteran's Memorial Drive. $310,500 city of Cape Girardeau funds and $256,200 city of Jackson funds. Reason: To modify an existing project budget and funding source. Funding Source: Cities of Cape Girardeau and Jackson funds and available STIP funds. $1,029 $111 $1,297 $89 Total: $39,164 $3,514 MHTC Meeting 5 of 5 March 6, 2019