SECTION IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT

Similar documents
SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

1. ASME A Scheme for the Identification of Piping Systems.

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION MECHANICAL IDENTIFICATION

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION MECHANICAL IDENTIFICATION

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

Piping & Equipment Identification

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Industrial Pipe Marking

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

A. Product Data: For each electrical identification product indicated.

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION

SECTION COMMON WORK RESULTS FOR HVAC

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

SECTION IDENTIFICATION DEVICES

IDENTIFICATION DEPOT, INC. 206 East Second Street Washington, NC PHONE FAX

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

SECTION INTERIOR SIGNAGE

SECTION ELECTRICAL IDENTIFICATION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION SIGNAGE

Electrical Identification

The School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS

Page PRODUCT DESCRIPTION

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY

A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System.

Page PRODUCT DESCRIPTION

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION LOW PRESSURE DUCTWORK

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

SECTION BATHROOM ACCESSORIES

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

Page PRODUCT DESCRIPTION

MRI Safety. Stickers. MRI Safe - Do Not Remove From MRI Area - Warning Stickers. Available in Red or Green

SECTION IDENTIFYING DEVICES

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.

INSTALLATION MANUAL STORAGE

PRODUCT DATA CATALOG

A. Submit properly identified manufacturer's literature before starting work.

Disassembly Instructions for Recycling June 10, 2010

This specification describes the minimum requirements for piping systems for the following service:

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements.

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

APPENDIX A, UMC STANDARD 6-5 STANDARD FOR INSTALLATION OF FACTORY-MADE AIR DUCTS

Technical Development Program

SECTION IDENTIFYING DEVICES

SECTION CABLE TRAYS

*************************************************************************************************************

Guide Specification Section Interior Suspended Sliding Glass Doors


WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Construction Manual for High Altitude Test Chamber

Student Services & Classroom Addition

Industrial and Transportation Business DISTRIBUTOR PRODUCT LINE

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

*********************************************************************************************************

1. State that all workmanship must conform to all pertinent laws, ordinances and regulations of all bodies having jurisdiction.

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

SECTION ARCHITECTURAL WOOD CASEWORK

PROJECT LOCATION SECTION PREFINISHED STEEL DOOR FRAMES

This specification describes the minimum requirements for piping systems for the following service:

PRODUCT DATA CATALOG

Awning and Casement Window

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 08 - OPENINGS

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

Design for Manufacturability Guide

A. It is preferred that all submittals to be submitted electronically in PDF format.

NAVSEA STANDARD ITEM T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

The Saddle Rack. For Power And Communication Cables

Tufftec Lockers Specifications & Drawings SPECIFICATIONS & DRAWINGS

A-LOOK ver 1 A-LOOK TM. Installation Manual

EMAC 001 ACCESS PANEL

Two Panel Frameless Bypass Door

Tape No. Description Principal Uses

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR

Surface Developments. Sacramento City College Engineering Design Technology. Surface Developments 1

A. Submit manufacturer's technical data and installation for each type of sign required.

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

LINEAR DIFFUSERS AND BAR GRILLES

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

Transcription:

SECTION 23 05 53 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Plastic Nameplates 2. Tags 3. Plastic Pipe Markers 4. Ceiling Tags 5. Detectable Underground Tape 6. Stencils PART 2 - PRODUCTS 2.1 MANUFACTURERS A. General: Manufacturer's standard products of categories and types required for each application as referenced in other Division 23, HVAC Sections. Where more than a single type is specified for application, provide single selection for each product category. B. Plastic Nameplates: C. Tags: D. Plastic Pipe Markers: E. Ceiling Tags: 23 05 53 - Page 1

F. Detectable Underground Tape: G. Stencils: 2.2 PLASTIC NAMEPLATES A. Description: Engraving stock melamine plastic laminate in the size and thicknesses indicated, engraved with engraver's standard letter style of the sizes and wording indicated, black with white core (letter color), punched for mechanical fastening except where adhesive mounting is necessary because of substrate. Provide 1/8-inch thick material. 1. Letter Color: White. 2. Letter Height: 1/2-inch. 3. Background Color: Black. 4. Fasteners: Self-tapping stainless steel screws, except contact-type permanent adhesive where screws cannot or should not penetrate the substrate. 5. Access Panel Markers: Manufacturer's standard 1/16-inch thick engraved plastic laminate access panel markers, with abbreviations and numbers corresponding to concealed valve or devices/equipment. Include center hole to allow attachment. 2.3 TAGS A. Plastic Tags: Laminated three-layer plastic with engraved black letters on light contrasting background color. Tag size minimum 2-inch diameter. B. Metal Tags: Polished Brass with stamped letters; tag size minimum 2-inch diameter with smooth edges. C. Valve designations to be coordinated with existing valve identifications to ensure no repetitive designations are utilized. D. Chart/Schedules: Valve Schedule Frames. For each page of a valve schedule, provide glazed display frame with removable mounting as appropriate for wall construction upon which frame is to be mounted. Provide frames of finished hardwood or extruded aluminum, with SSB-grade sheet glass. E. Valve Tag Fasteners: Solid brass chain (wire link or beaded type), or solid brass S-hooks. 23 05 53 - Page 2

F. Warning Tags: Preprinted or partially preprinted, accident-prevention tags; of plasticized card stock with matte finish suitable for writing. 1. Size: Approximately 4 by 7-inches. 2. Fasteners: Brass grommet and wire. 3. Nomenclature: Large-size primary caption such as DANGER, CAUTION, or DO NOT OPERATE. 4. Color: Yellow background with black lettering. 2.4 PLASTIC PIPE MARKERS A. Color: Conform to ASME A13.1 and ANSI Z535.1. B. Plastic Pipe Markers (for external diameters of 6-inches and larger including insulation): Factory fabricated, flexible, semi- rigid plastic, preformed to fit around pipe or pipe covering; minimum information indicating flow direction arrow and identification of fluid being conveyed. C. Plastic Tape Pipe Markers (for external diameters less than 6-inches including insulation): Flexible, vinyl film tape with pressure sensitive adhesive backing and printed markings. Minimum information indicating flow direction arrow and identification of fluid being conveyed. D. Lettering: 1. 3/4-inch to 1-1/4-inch Outside Diameter of Insulation or Pipe: 8-inch long color field, 1/2-2. 1-1/2-inch to 2-inch Outside Diameter of Insulation or Pipe: 8-inch long color field, 3/4-3. 2-1/2-inch to 6-inch Outside Diameter of Insulation or Pipe: 12-inch long color field, 1-1/4-4. 8-inch to 10-inch Outside Diameter of Insulation or Pipe: 24-inch long color field, 2-1/2-5. Over 10-inch Outside Diameter of Insulation or Pipe: 32-inch long color field, 3-1/2-inch high letters. 2.5 CEILING TAGS A. Description: Steel with 3/4-inch diameter color coded head. B. Color code as follows: 1. Yellow - HVAC equipment. 2. Red - Fire dampers/smoke dampers. 3. Blue - Heating/cooling valves. 4. Ceiling tile labels, machine generated, adhesive backed tape labels with black letters, clear tape. 2.6 DETECTABLE UNDERGROUND TAPE A. Underground Plastic Pipe Markers: Bright colored continuously printed plastic ribbon tape with aluminum backing, minimum 6-inches wide by 4 mil thick, manufactured for direct burial service. Minimum information indicating flow direction arrow and identification of fluid being conveyed. 2.7 STENCILS A. Stencils: With clean cut symbols and letters of following size: 1. 3/4-inch to 1-1/4-inch Outside Diameter of Insulation or Pipe: 8-inch long color field, 1/2-23 05 53 - Page 3

2. 1-1/2-inch to 2-inch Outside Diameter of Insulation or Pipe: 8-inch long color field, 3/4-3. 2-1/2-inch to 6-inch Outside Diameter of Insulation or Pipe: 12-inch long color field, 1-1/4-4. 8-inch to 10-inch Outside Diameter of Insulation or Pipe: 24-inch long color field, 2-1/2-5. Over 10-inch Outside Diameter of Insulation or Pipe: 32-inch long color field, 3-1/2-inch high letters. 6. Equipment: 2-1/2-7. Direction Arrows: Show flow direction. B. Stencil Paint: As specified in Division 9, Finishes, semi-gloss enamel, colors conforming to ASME A13.1. PART 3 - EXECUTION 3.1 GENERAL - INSTALLATION A. Identify air handling units, pumps, heat transfer equipment, tanks, and water treatment devices with plastic nameplates riveted to equipment body. B. Identify ductwork with plastic ductmarkers. C. Identify piping, concealed or exposed, with stencilled painting. D. Coordinate names, abbreviations and other designations used in mechanical identification work with corresponding designations shown, specified or scheduled. Provide numbers, lettering and wording as indicated or, if not otherwise indicated, as recommended by manufacturers or as required for proper identification and operation/maintenance of mechanical systems and equipment. E. Multiple Systems: Where multiple systems of same generic name are shown and specified, provide identification which indicates individual system number as well as service (as examples: Chiller No. 3, Air Handling Unit No. 42, Standpipe F12, and the like). F. Degrease and clean surfaces to receive adhesive for identification materials. G. Coordination: Where identification is to be applied to surfaces which require insulation, painting or other covering or finish, including valve tags in finished mechanical spaces, install identification after completion of covering and painting. Install identification prior to installation of acoustical ceilings and similar removable concealment. H. Coordinate with the facility maintenance personnel to ensure consistency with the existing tagging system. I. Install all products in accordance with manufacturer's instructions. J. Manual Balancing Dampers: Provide 12-inch long orange marker ribbon to end of balancing damper handle. 3.2 PLASTIC NAMEPLATES A. Install plastic nameplates with corrosive-resistant mechanical fasteners. 23 05 53 - Page 4

B. Identify control panels and major control components outside panels with plastic nameplates riveted to equipment body. C. Identify thermostats with nameplates. 3.3 TAGS A. Use metal tags on piping 3/4-inch diameter and smaller. B. Tag balancing valves and major dampers with balanced GPM or CFM indicated after balancing is completed and accepted. C. Install tags with corrosion resistant chain. D. Small devices, such as in-line pumps, may be identified with tags. E. Identify valves in main and branch piping with metal tags. Indicate valve function and the normally open or closed positions on the valve tag. F. Identify air terminal units and radiator valves with numbered plastic tags. G. Tag automatic controls, instruments, and relays. Key to control schematic. H. Install valve schedule at each mechanical room. 3.4 PLASTIC PIPE MARKERS A. Install plastic pipe markers complete around pipe in accordance with manufacturer's instructions. B. Identify service, flow direction, and pressure. Install in clear view and align with axis of piping. Locate identification not to exceed 20-feet (reduced to 10-feet in congested areas and mechanical equipment rooms) on straight runs including risers and drops, adjacent to each valve and Tee, at each side of penetration of structure or enclosure, and at each obstruction. Locate near branches, valves, control devices, equipment connections, access doors, floor/wall penetrations. 3.5 CEILING TAGS A. Provide ceiling tags to locate valves, dampers, and equipment above accessible ceilings. Locate in corner of ceiling tee grid closest to equipment. 3.6 DETECTABLE UNDERGROUND TAPE A. For underground piping installations, Install underground plastic pipe markers with tracer wire 6- inches to 8-inches below finished grade, directly above buried pipe. 3.7 STENCILS A. Prepare surfaces for stencil painting. B. Follow manufacturer's instructions for paint used for stencils. END OF SECTION 23 05 53 - Page 5

23 05 53 - Page 6